This Addendum No. 2 document, issued October 8, 2021, modifies the Request for Proposals for DOA 21-12 Airport General Engineering Consultant Services issued by the Palm Beach County Department of Airports and the Board of County Commissioners. The project seeks a single prime consultant firm certified under Florida's Consultant's Competitive Negotiations Act (CCNA) in Engineering to provide comprehensive general engineering consulting services across Palm Beach County's four airport facilities: Palm Beach International Airport (PBI), North Palm Beach County General Aviation Airport (F45), Palm Beach County Park Airport (LNA), and Palm Beach County Glades Airport (PHK). Services encompass horizontal and vertical infrastructure design, facilities inspection, environmental planning and compliance, construction management and engineering inspection, quality assurance, pavement management, IT/GIS services, and permitting across approximately eleven identified tasks. The pre-proposal conference was held virtually on October 7, 2021, with proposal submissions due October 28, 2021 at 3:00 p.m. (one original and six copies plus one electronic PDF copy). One firm will be selected for an initial two-year term with two optional one-year renewal periods at the County's discretion. Shortlisting of a minimum of three firms is scheduled for December 2021, with final selection and Board approval anticipated in February/March 2022.
This solicitation implements Palm Beach County's Equal Business Opportunity (EBO) Program, requiring mandatory 20% Small Business Enterprise (SBE) subcontracting participation and offering 15 evaluation points for Minority/Women Business Enterprise (M/WBE) dollar commitments. All funding is derived from local airport revenue sources with no ad valorem tax support. Subconsultants may operate under the prime consultant's $5,000,000 minimum liability insurance umbrella rather than maintaining individual policies. Addendum No. 2 clarifies that only the maximum workload percentages revised in Addendum No. 1 shall apply to consultant participation calculations, permits Standard Form 330 documents to satisfy both reference and resume requirements, and confirms that the PBI Turnage Boulevard Rehabilitation/Reconstruction project will not be included as a task due to its distinct funding source. The document was inadvertently referenced during the pre-proposal presentation but has been excluded from the contract scope. Additional clarifications address prime consultant certification requirements, insurance umbrella provisions, and the applicability of Florida Statute 725.08 indemnification language, which the County Legal Department will review prior to contract execution.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| DOA 21-12 Addendum 3.pdf | ||
| DOA 21-12 RFP Engineering Continuing Non-Federal.pdf | ||
| DOA 21-12 Notice of RFP.pdf | ||
| DOA 21-12 Addendum 1 w attach.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Addendum No. 2 – DOA 21-12 October 8, 2021 Page 1 of 3
BOARD OF COUNTY COMMISSIONERS
PALM BEACH COUNTY, FLORIDA
PALM BEACH COUNTY DEPARTMENT OF AIRPORTS
PROJECT NAME: DOA 21-12 AIRPORT GENERAL ENGINEERING CONSULTANT
SERVICES (Local EBO Program)
ADDENDUM NUMBER 2
Date of Issue: October 8, 2021
This addendum modifies or interprets the proposal documents by additions, deletions, clarifications, corrections, or other type of modifications. Addenda will become part of the Contract Documents.
Proposers, upon receiving addenda, shall insert same into the Proposal Documents.
It is required that this Addendum Number 2 be signed in the Acknowledgement of Receipt below, and attached to the Proposal and become part of the Proposal.
Acknowledgement of Receipt of Proposer
October 8, 2021 Page 2 of 3
ADDENDUM NO. 2
ISSUED October 8, 2021
This addendum includes the following:
Questions/Clarifications/Corrections
1. Consultant Questionnaire Workload percentage The maximum workload percentage reflected in the RFP (revised in Addendum No. 1) shall be used as the basis for the consultant participation in Attachments F, G and H. No other workload percentage shall be used unless issued as part of an addendum.
Questions:
1. Question: Should a MEP firm apply as a Prime on this or would you recommend we pursue this as a sub to an architect?
Response: The prime consultant for this RFP is to be CCNA certified in Engineering. It is incumbent on each firm to make the determination to submit as a prime or a subconsultant based on the selection criteria.
2. Question: In the RFP it states Five (5) verifiable references for work of a similar nature completed in the last ten (10) years. This can be accomplished in the Standard Form 330.
On the pre-proposal call today References was listed a separate section. Is it okay to just utilize the 330 for the references or does the DOA prefer separate section with only the 5 references?
Response: The 330 forms can be used to meet both the reference requirements and the resumes.
3. Question: The RFP state requirements of the insurance a minimum of $5,000,000 liability applies to Prime and Subconsultants. Can the Ssubconsultants fall under the umbrella of the prime's insurance or is the expectation that all subconsultants are also required to maintain $5,000,000 of liability insurance.
Response: Yes. The subconsultants can fall under the umbrella of the Prime’s insurance.
4. Question: Respectfully, we believe that the indemnity provision in Article 11 on Page 8 of Addendum Number 1 dated October 4, 2021 is not in compliance with FL Statute 725.08 which declares that an indemnity not written as required by the statute is void and unenforceable. Please consider rewording same to conform with the statute. Suggested language per FL Statutes 725.08: “The Consultant shall indemnify and hold harmless the agency, and its officers and employees, from liabilities, damages, losses, and costs, including, but not limited to, reasonable attorneys' fees, to the extent caused by the negligence, recklessness, or intentionally wrongful conduct of the design professional and other persons employed or utilized by the Consultant in the performance of the contract.
Response: The document provided is a draft document that will be reviewed by Palm Beach County Legal Department prior to execution with the selected firm. The language related to FL Statute 725, 08 is under review.
October 8, 2021 Page 3 of 3
5. Question: Section II Scope of Work, on page 2 of the base solicitation, itemizes 11 tasks contemplated by the Department under the DOA 21-12 agreement. However, during the pre-proposal meeting held on October 7th the same list appeared in the presentation with the addition of the PBI Turnage Boulevard Rehabilitation/Reconstruction project. Was this a typo in the presentation or will this project be included by addenda as a twelfth task to be considered?
Response: Due to the funding source for the PBI Turnage Boulevard project it will not be one of the tasks that may be assigned under this contract. It was inadvertently listed in the presentation.
Attachments to this Addendum:
• Pre-Proposal presentation and virtual attendance list
END OF ADDENDUM 2
Copyright [insert date set by system] by [CH2M HILL Entity] • Company Confidential
Request for Proposals Design Professionals
DOA 21-12
Airport General Engineering Consulting Services
(Local EBO Program)
October 7, 2021
Palm Beach County Department of Airports Planning & Development Division
Agenda
Introductions - DOA
Brief Overview of Services Desired
OEBO/SBE Participation
CCNA Certification Requirements
Contents of Submittal
Submittal Date
Selection Process
Questions
Palm Beach County Department of Airports
The Palm Beach County Department of Airports operates and maintains the following airports:
• Palm Beach International Airport (PBI)
• North Palm Beach County General Aviation Airport (F45)
• Palm Beach County Park Airport (LNA)
• Palm Beach County Glades Airport (PHK) Policy is established by the Board of County Commissioners
Operates as an enterprise fund, no ad valorem tax support
Operations are funded by user fees to airlines, businesses and passengers
All tasks under this contract will be funded with local revenue
Department of Airports
North Palm Beach County General Aviation Airport (F45)
Palm Beach County Glades Airport (PHK)
Palm Beach County Park Airport (LNA)
Palm Beach International Airport (PBI)
Location of Airports Within Our System
Key Palm Beach County Glades
North Palm Beach County GA
Palm Beach International
Park
Scope of Services Horizontal infrastructure design, such as general civil and airfield electrical design of runways, taxiways and aircraft parking aprons, as well as site development and roadway facility planning and design
Vertical facility design, such as architectural, mechanical, electrical, structural and landscaping design of airport-related and ancillary facilities
Facilities Inspection Stormwater and environmental planning, design, permitting and agency coordination Environmental Permit Compliance with the Environmental Protection Agency National
Pollutant Discharge Elimination System (NPDES);
Construction management, administration and coordination, as well as construction engineering and inspection (CEI) services Quality assessment and quality assurance reviews Pavement management system development and support Aviation/airport information technology (IT) and Geographic Information System (GIS) services Permitting Services – securing all permits and agency coordination necessary to support the development.
It is anticipated that one (1) firm will be selected for two (2) years, with an option of two (2), one-year renewal options at the sole discretion of the County.
Possible Tasks
General Consultant tasks may include, but are not limited to, the following:
Annual Facilities Inspection Report Campus Wide Signage & Wayfinding Improvements Terminal Elevator Replacement Parking Toll Plaza Canopy Replacement Security Camera Improvements Annual Airfield Pavement Repairs Environmental Compliance – Stormwater Pollution Prevention Plan (SWPPP) Landside Pavement Management System Development & Rehabilitation PBI Turnage Boulevard Rehabilitation/Reconstruction PBI Air Handler Replacement Phase 2 Airfield Drainage Infrastructure Assessment Construction Administration/Construction Management/Construction Engineering Inspection
Services
Note: There is no guarantee on the number of tasks that will be completed under this agreement.
EQUAL BUSINESS OPPORTUNITY (EBO) PROGRAM
Policy. It is the policy of the Board of County Commissioners of Palm Beach County, Florida, (the Board) that all segments of its business population, including, but not limited to, small, local, minority and women owned businesses, have an equitable opportunity to participate in the County’s procurement process, prime contract and subcontract opportunities. To that end, the Board adopted an Equal Business Opportunity Ordinance which is codified in Sections 2-80.20 through 2-80.30 (as may be amended) of the Palm Beach County Code, (EBO Ordinance) which sets forth the County’s requirements for the EBO program, and which is incorporated in this solicitation. A Proposer must comply with the requirements contained in this section for a Proposer to be deemed responsive to the solicitation requirements. The provisions of the EBO Ordinance are applicable to this solicitation, and shall have precedence over other provisions of this solicitation in the event of a conflict.
API Waiver Requests/Good Faith Efforts. If Proposer is unable to comply with the API requirements as set forth in this solicitation, such Proposer shall submit a request for a waiver or partial waiver at least (7) days prior to the proposal due date as stated in the solicitation. If a Proposer requests a waiver from an API from the Office of EBO at least 7 days prior to the proposal due date, then the proposal due date will be extended pending the outcome of a waiver request. Additionally, if the waiver is granted, the solicitation will be amended accordingly and the due date extended again. See Attachments B and C for Waiver Request Form and Good Faith Efforts form. Fillable pdfs of all EBO forms can be found on the OEBO website at http://discover.pbcgov.org/oebo/Pages/Compliance-Programs.aspx.
Affirmative Procurement Initiatives (APIs). The APIs approved for this solicitation, including any applicable include:
1. SBE Subcontracting: Mandatory 20% SBE
2. M/WBE Evaluation Preference – 15 points shall be awarded based on the level of
M/WBE dollar committed to on the prime respondents team.
Proposal Submission Documentation. In order to be deemed responsive to this solicitation, all Proposers are required to submit with their proposal the Consultant Questionnaire and the Subconsultant Questionnaires on all subconsultants intended to be used for performance of the contract, if awarded.
S/M/WBE Certification. Only those firms certified by Palm Beach County at the time of proposal opening shall be counted toward an S/M/WBE goal. Upon receipt of a complete application, IT TAKES UP TO NINETY (90) DAYS TO BECOME CERTIFIED AS AN S/M/WBE WITH PALM BEACH COUNTY. It is the responsibility of the Proposer to confirm the certification of any proposed S/M/WBE; therefore, it is recommended that Proposers visit the Office of EBO on-line Vendor Directory at http://discover.pbcgov.org/oebo/Pages/default.aspx to verify S/M/WBE certification
Post Proposal Waiver Request. After submission of a proposal, if Proposer, through no fault of its own, is unable to meet the S/M/WBE participation specified in its proposal, then Proposer must immediately seek substitute S/M/WBEs to fulfill the requirements and obtain the approval of the EBO Director. If, after reasonable Good Faith Efforts, the Proposer is unable to find an acceptable substitute S/M/WBE, a post-proposal submission waiver may be requested. The request shall document the reasons for the Proposer’s inability to meet the goal requirement.
See Section IV and Attachment A of the RFP for more information for SBE Plan requirements.
Consultant’s Competitive Negotiations Act (CCNA) Certification
Firms must be Consultant’s Competitive Negotiations Act (CCNA) certified prior to submission of qualifications, if required by Florida Statute
“Firm” means any individual, firm, partnership, corporation, association or other legal entity permitted by law to practice architecture, landscape architecture, engineering or land surveying and mapping in the State.
For information on CCNA certification contact:
Holly B. Knight, P.E.
Palm Beach County Engineering/Roadway Production Division
Telephone (561) 684 – 4150
Proposal Contents – Section VI (D)
Section #1 – Letter of Interest/Program Approach/Executive Summary Section #2 – Proposal Certification Form (per Attachment D) Section #3 – A team organizational chart clearly indicating each subconsultant, their role in the work, and key personnel of the consultant (and subconsultants, if applicable) assigned to the work. Provide a resume for each of the key personnel also identifying work/projects of a similar nature in which the staff member has been involved and their role
Section #4 – Provide current Standard Form 330 Part I and Part II for each member of the team.
Section #5 – Five (5) Verifiable references for work of a similar nature completed in the last ten (10) years
Section #6 - Conflict of Interest Disclosure Form for each member of the team (Attachment E)
Section #7 Completed Consultant Questionnaire (Attachment F) Section #8 Completed Subconsultant Questionnaire for each subconsultant
(Attachment G).
Section #9 Completed Summary of Questionnaires (Attachment H) Section #10 Copies of S/M/WBE certificates for firms that are certified as S/M/WBEs Section #11 Other information that may be appropriate
Submittal Date
Submittals are due at the Department of Airports on or before:
3:00 P.M., Local Time, on Thursday, October 28, 2021
Submit one (1) original and six (6) copies for a total of seven (7) along with (1) electronic copy in Portable Document Format (PDF) on a flash drive.
Direct all questions and comments, in writing, to:
Javier A. Gamboa
Airport Planner Department of Airports jgamboa@pbia.org
(561) 656-5989
Last day for questions/clarifications is Thursday, October 21, 2021 at 3:00 P.M.
Selection Process/Criteria
Each proposal will be evaluated based on the criteria contained in CW-O-048 and summarized below:
Ability, knowledge of design criteria and past performance of firm and the designated project team to satisfy the technical requirements of the project, including the following areas of consideration:
Professional qualifications of proposed project team to perform the work Demonstrated knowledge of design criteria for similar projects Demonstrated past performance of the firms and project team in completing similar projects
Selection Process/Criteria (continued)
Approach to the project, understanding of the project and quality of presentation, including meeting time/budget requirements, including the following areas of consideration:
Demonstrated understanding of the project and County’s goals and objectives Demonstrated innovation in project approach Demonstrated ideas for cost-effectiveness Quality and clarity of proposal and/or presentation Demonstrated ability to meet time and budget constraints
Volume of previous work awarded by the County
State Certified MBE
Location of firm’s offices
EBO Program Evaluation
Selection Process/Preliminary Timeline
Following submittal on October 28, 2021, packages will be reviewed by members of the Shortlist Committee
Shortlist Committee will convene in December to “shortlist” a minimum of three (3) of the most qualified firms
Shortlisted firms will receive notification that they have been selected for an interview, consisting of a presentation followed by Q & A
The CCNA A/E Selection Committee will convene in Feb/Mar to hear presentations/Q&A and to make final ranking/selection
Most qualified firms will be chosen and submitted to Board of County Commissioners for final approval
All information related to this Request, as well as all forms to be included in the submittal, can be found on Palm Beach County’s Self Service Vendor website at:
https://pbcvssp.co.palm-beach.fl.us/webapp/vssp/AltSelfService
NOTE: All amendments and/or addenda to this Request for Letters of Interest/Statements of Qualifications will also be posted on this website. It is incumbent upon the interested individuals or firms to ensure they have all of the current information by visiting this website prior to the submittal date.
Important Information
Thank You!
DOA 21-12
Airport General Engineering Consultant Services (Local EBO Program)
Pre-Proposal Meeting Oct 7, 2021 at 10:00am Attendance
2021.10.07 DOA 21-12 Pre-Proposal Attendance List10/7/2021 1 of 3
Note: This was a virtual meeting. Not all the information on attendees was provided unless a meeting invite was requested.
Company Name/Point of Contact Email Address Phone Number Requested Invite Invited to WebEx Invited on Accepted Invite Attended
PBCDOA Cindy Portnoy cportnoy@pbia.org 561-471-7411 - Yes
- X
PBCDOA Gary Sypek gsypek@pbia.org 561-471-7474 - Yes
- X
PBCDOA George Santos gsantos@pbia.org 561-681-5121 - Yes
- Yes X
PBCDOA Javier Gamboa jgamboa@pbia.org 561-656-5989 - Yes
- Yes
PBC OEBO Allen Gray AGray@pbcgov.org 561-616-6842 - Yes
- Yes
AVCON Meghann Kriss mkriss@avconinc.com 407-599-1122 9/20/2021 Yes
9/21/2021 at 7:22 a.m.
AVCON Sandeep Singh ssingh@avconinc.com
- Invited by Others -
Invited by Others Yes
AVCON Mark Waller mwaller@avconinc.com
- Invited by Others -
Invited by Others Yes Yes
HDR Cody Parham cody.parham@hdrinc.com 561-209-6641 9/20/2021 Yes
9/21/2021 at 7:22 a.m. Yes Yes
Masse Consulting Services Fenson Masse fmasse@masseconsultingfirm.com 561-577-3482 9/20/2021 Yes
9/21/2021 at 7:23 a.m. Yes Yes
Keith Kristen Lawlor klawlor@keithteam.com 954-788-3400 9/20/2021 Yes
9/21/2021 at 7:23 a.m.
Keith Alex Lazowick alazowick@keithteam.com
- Invited by Others -
Invited by Others Yes
JLRD Kevin Gomez kgomez@jlrdinc.com 561-689-2303 9/21/2021
EXP Marcos Souza marcos.souza@exp.com 954-999-8292 9/21/2021 Yes
9/22/2021 at 8:06 a.m. Yes
EXP Arturo Martinez arturo.martinez@exp.com
- Invited by Others -
Invited by Others Yes Yes
EXP Giovanni Cortes giovanni.cortes@exp.com
- Invited by Others -
Invited by Others Yes
EXP David Castaneda david.castaneda@exp.com
- Invited by Others -
Invited by Others Yes
EXP Adam Koziol adam.koziol@exp.com
- Invited by Others -
Invited by Others
EXP Kyle Henry kyle.henry@exp.com
- Invited by Others -
Invited by Others
EXP Jose Cano Diaz jose.cano@exp.com
- Invited by Others -
Invited by Others
EXP Gino Valderrama gino.valderrama@exp.com
- Invited by Others -
Invited by Others Yes
EXP Bri Gagliardi bri.gagliardi@exp.com
- Invited by Others -
Invited by Others
KKCS World Raymond Saavedra raymond.saavedra@kkcsworld.com 305-537-0027 9/23/2021 Yes
9/27/2021 at 10:35 a.m.
AID Alicia Vanderpool avanderpool@aidinc.us 813-374-2200 9/24/2021 Yes
9/27/2021 at 10:35 a.m.
AID Inc Mohsen Mohammadi mohsen@aidinc.us - Invited by Others - Invited by Others Yes Yes mailto:cportnoy@pbia.org mailto:gsypek@pbia.org mailto:gsantos@pbia.org mailto:jgamboa@pbia.org mailto:mkriss@avconinc.com mailto:ssingh@avconinc.com mailto:mwaller@avconinc.com mailto:cody.parham@hdrinc.com mailto:fmasse@masseconsultingfirm.com mailto:klawlor@keithteam.com mailto:alazowick@keithteam.com mailto:kgomez@jlrdinc.com mailto:marcos.souza@exp.com mailto:arturo.martinez@exp.com mailto:giovanni.cortes@exp.com mailto:david.castaneda@exp.com mailto:adam.koziol@exp.com mailto:kyle.henry@exp.com mailto:jose.cano@exp.com mailto:gino.valderrama@exp.com mailto:bri.gagliardi@exp.com mailto:raymond.saavedra@kkcsworld.com mailto:avanderpool@aidinc.us mailto:mohsen@aidinc.us
Pre-Proposal Meeting Oct 7, 2021 at 10:00am Attendance
2021.10.07 DOA 21-12 Pre-Proposal Attendance List10/7/2021 2 of 3
Note: This was a virtual meeting. Not all the information on attendees was provided unless a meeting invite was requested.
Company Name/Point of Contact Email Address Phone Number Requested Invite Invited to WebEx Invited on Accepted Invite Attended
AID Inc Sabina Mohammadi sabina@aidinc.us - - Yes 9/28/2021 at 3PM Yes
Aero Systems Engineering Rob Brethauer rob.brethauer@aerosys.net 770-423-4200 9/24/2021 Yes
9/27/2021 at 10:35 a.m. Yes Yes
Earthology Environmental Consulting Raj Kamthe raj.kamthe@earthology.info 561-315-1085 9/27/2021 Yes
9/28/2021 at 3PM Yes
Kimley-Horn Wendy Ettorre wendy.etorre@kimley-horn.com 407-789-2208 9/27/2021 Yes
9/28/2021 at 3PM
Swanson Rink Kisa Hanlon khanlon@swansonrink.com 303-839-2968 9/27/2021 Yes
9/28/2021 at 3PM Yes
ACAI Associates Melvern Atencio matencio@aecmworld.com 954-484-4000 9/17/2021 Yes
9/28/2021 at 3PM Yes
Kimley-Horn Tom O'Donnell tom.odonnell@kimley-horn.com 9/28/2021 Yes
9/28/2021 at 3PM Yes Yes
Smith Engineering Consultants Larry Smith larry@smithengineeringconsultants.com 561-818-3600 9/28/2021 Yes
9/28/2021 at 3PM Yes
Jacobs Ryan Forney ryan.forney@jacobs.com 561-882-5009 9/28/2021 Yes
9/28/2021 at 3PM Yes Yes
FICE Design June Adams jadams@ficedesign.com 561-702-5355 9/30/2021 Yes 9/30/2021 at 1:36PM Yes
ADCI John Thompson jthompson@adci-corp.com 410-465-9600 9/30/2021 Yes
10/4/2021 at 7:05AM Yes
Greywood Consulting Lorna Anderson lorna.anderson@greywood.us 678-612-2446 9/30/2021 Yes
10/4/2021 at 7:05AM Yes
HBC Engineering Michael O'Krepky mokrepky@hbcengineeringco.com 561-899-4438 10/1/2021 Yes
10/4/2021 at 7:05AM
Craig Smith Associates Dimitrios Scarlatos dscarlatos@craigasmith.com 561-400-2811 10/1/2021 Yes
10/4/2021 at 7:05AM Yes
Keshavarz Associates Amir Keshavarz amir@keshavarz.com 561-236-7592 10/4/2021 Yes
10/4/2021 at 3:25PM Yes
Apple Designs Kalyn Huffman kalyn@apple-designs.com 301-434-4500 10/4/2021 Yes
10/4/2021 at 3:25PM Yes
Michael Baker John Neff john.neff@mbakerintl.com 561-812-6403 10/6/2021 Yes
10/7/2021 at 6:55AM Yes
AECOM Mark Minnery mark.minnery@aecom.com 305-804-6689 10/7/2021 Yes
10/7/2021 at 9:29 a.m. Yes
Rodriguez and Quiroga Architects Mirtha Albeirus malbeirus@rodriguezquiroga.com 305-448-7417 10/7/2021 Yes
10/7/2021 at 9:53AM Yes
Andrew Kacer Yes
Anthony Gregory Yes
AERO Chris Britton Yes
Clint Martin Yes
Shannon McKenzie Yes
Ted Leshiniski Yes mailto:sabina@aidinc.us mailto:rob.brethauer@aerosys.net mailto:raj.kamthe@earthology.info mailto:wendy.etorre@kimley-horn.com mailto:khanlon@swansonrink.com mailto:matencio@aecmworld.com mailto:tom.odonnell@kimley-horn.com mailto:larry@smithengineeringconsultants.com mailto:ryan.forney@jacobs.com mailto:jadams@ficedesign.com mailto:jthompson@adci-corp.com mailto:lorna.anderson@greywood.us mailto:mokrepky@hbcengineeringco.com mailto:dscarlatos@craigasmith.com mailto:amir@keshavarz.com mailto:kalyn@apple-designs.com mailto:john.neff@mbakerintl.com mailto:mark.minnery@aecom.com mailto:malbeirus@rodriguezquiroga.com
Pre-Proposal Meeting Oct 7, 2021 at 10:00am Attendance
2021.10.07 DOA 21-12 Pre-Proposal Attendance List10/7/2021 3 of 3
Note: This was a virtual meeting. Not all the information on attendees was provided unless a meeting invite was requested.
Company Name/Point of Contact Email Address Phone Number Requested Invite Invited to WebEx Invited on Accepted Invite Attended
Vanessa Bermudez Yes
Steve Yes
SS Yes
| DOA_21-12 Pre Proposal Conference_2021.10.07 Presentation.pdf |
| ��������������� �� Request for Proposals �Design Professionals�DOA 21-12�Airport General Engineering Consulting Services �(Local EBO Program)����October 7, 2021 |
| Agenda |
| Palm Beach County �Department of Airports |
| Palm Beach County �Department of Airports |
| Location of Airports Within Our System |
| Scope of Services |
| Possible Tasks |
| �EQUAL BUSINESS OPPORTUNITY (EBO) PROGRAM |
| �EQUAL BUSINESS OPPORTUNITY (EBO) PROGRAM |
| �EQUAL BUSINESS OPPORTUNITY (EBO) PROGRAM |
| Consultant’s Competitive Negotiations Act (CCNA) Certification |
| Proposal Contents – Section VI (D) |
| Submittal Date |
| Selection Process/Criteria |
| Selection Process/Criteria (continued) |
| Selection Process/Preliminary Timeline |
| Important Information |
| Thank You! |
| 2021.10.07 DOA 21-12 Pre-Proposal Attendance List.pdf |
| Sheet1 |
File details come from the government source that posted it. Updated .