DNR - Kickapoo Boat Dock QUESTIONS AND ANSWERS .docx

DOCX document 19 KB Posted

Attached to
DNR Kickapoo - Install Docks at Clear Pond Boat Ramps
Solicitation number
23-422DNR-REALT-B-35015
Issued by
St. Clair County, Illinois

About this file

This document contains a series of questions and answers regarding the installation of boat docks at Kickapoo State Park in Illinois. The Illinois Department of Natural Resources (IDNR) is the agency overseeing this project, titled "Install Boat Docks" with the project number 23-422DNR-REALT-B-35015. The key details include: vendors can install one 24-foot dock instead of two 12-foot docks, the water depth at the end of the dock is 5-6 feet, and the existing concrete abutment size is 66 inches wide by 9 inches deep. The agency also confirmed that installing a gangway on top of the abutment with a transition plate to the concrete walk is acceptable as long as it meets ADA slope requirements, and vertical pickets are not required on the approach ramp or gangway.

The document does not provide information about pricing terms, set asides, incumbents, funding requirements and sources, or contract term and renewal options.

View the file

Other files

File Type Posted
Attachment 1 - Location Map Site Sketch and Photos.pdf PDF
Pictures~9.docx DOCX document
Scope of Work - Small 1.docx DOCX document
2Standard Terms and ConditionsV 23.2~2.pdf PDF
2SMALL CONSTRUCTION BID FORM~22.docx DOCX document
Attachment 2 - 351500-Floating Boat Docks.pdf PDF
2Standard Illinois Certifications-v.23.1~1.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ILLINOIS DEPARTMENT OF NATURAL RESOURCES

VENDOR QUESTIONS

Date: March 7, 2023

23-422DNR-REALT-B-35015

LOCATION: Kickapoo State Park

PROJECT TITLE: Install Boat Docks

Vendor Question 1:

Instead of having two (2) 12' long docks installed end to end, could we do one (1) 24' long dock?

IDNR Answer 1:

Yes Vendor Question 2:

Do you have an approx. depth of the water at the farthest sawed-off post?

IDNR Answer 2:

3’-4’ Vendor Question 3:

Does this lake fluctuate much? Or does it stay within a couple of feet of same elevation?

IDNR Answer 3:

This pond does not fluctuate of any note.

Vendor Question 4:

What is the size of the existing concrete abutment? Is it 7'x7' ?

IDNR Answer 4:

The actual size of the concrete abutment is W: 66” x D: 9” Vendor Question 5:

Would setting the gangway on top of the abutment (to allow sliding horizontal movement with the vatical movement with the dock) and installing a transition plate from gangway to concrete walk be acceptable as long as it an meet the ada slope?

IDNR Answer 5:

Yes.

Vendor Question 6:

Do you know the approx. depth the water would be at the proposed end of the dock?

IDNR Answer 6:

5 Ft. – 6 Ft.

Vendor Question 7:

Is vertical pickets required on the ramp?

IDNR Answer 7:

If referring to the boat ramp the answer is no, however, if referring to the approach ramp / gangway vertical pickets are not required.

Additional information pertaining to ramps and gangways can be found in the link below.

https://www.access-board.gov/aba/