DJU1600000477RFQ.pdf

PDF 4 MB Posted

Attached to
B3291 – SHAR 15032 – Room 158 Modify Space
Solicitation number
SICG016-22
Issued by

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Page 1 of 73ORDER NUMBER:

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30

1. REQUISITION NUMBER PAGE 1 OF

2. CONTRACT NO. 3. AWARD/EFFECTIVE

DATE

4. ORDER NUMBER 5. SOLICITATION NUMBER 6. SOLICITATION ISSUE

DATE

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME b. TELEPHONE NUMBER (No collect calls)

8. OFFER DUE DATE/

LOCAL TIME

9. ISSUED BY

13b. RATING

14. METHOD OF SOLICITATION

CODE

15. DELIVER TO 16. ADMINISTERED BY CODE

18a. PAYMENT WILL BE MADE BY CODE17a. CONTRACTOR/

OFFEROR

CODE

FACILITY

CODE

CODE

TELEPHONE NO.

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN

OFFER

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK

BELOW IS CHECKED

RFQ IFB RFP

SEE ADDENDUM

19.

ITEM NO.

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

(Use Reverse and/or Attach Additional Sheets as Necessary)

25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Govt. Use Only)

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED

29. AWARD OF CONTRACT: REF. OFFER

DATED . . YOUR OFFER ON SOLICITATION

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

30a. SIGNATURE OF OFFEROR/CONTRACTOR

30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE SIGNED

31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

31b. NAME OF CONTRACTING OFFICER (Type or print) 31c. DATE SIGNED

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA - FAR (48 CFR) 53.212

10. THIS ACQUISITION IS UNRESTRICTED OR

NAICS:

SIZE STANDARD:

13a. THIS CONTRACT IS A

RATED ORDER UNDER

DPAS (15 CFR 700)

SET ASIDE: % FOR:

11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

12. DISCOUNT TERMS

ARE ARE NOT ATTACHED

ARE ARE NOT ATTACHED

27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA

Coll. No.

8 (A)

EDWOSB

WOMEN-OWNED SMALL BUSINESS

(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

HUBZONE SMALL

BUSINESS

SMALL BUSINESS

Page 2 of 73ORDER NUMBER:

Page 3 of 73ORDER NUMBER:

Page 4 of 73ORDER NUMBER:

SECTION B

SUPPLIES OR SERVICES AND PRICES/COSTS

Item No. SUPPLIES OR SERVICE Quantity U/M UNIT PRICE AMOUNT IN US$ Delivery Date

Page 5 of 73ORDER NUMBER:

Page 6 of 73ORDER NUMBER:

Page 7 of 73ORDER NUMBER:

Page 8 of 73ORDER NUMBER:

Page 9 of 73ORDER NUMBER:

Page 10 of 73ORDER NUMBER:

Page 11 of 73ORDER NUMBER:

Page 12 of 73ORDER NUMBER:

Page 13 of 73ORDER NUMBER:

Page 14 of 73ORDER NUMBER:

Page 15 of 73ORDER NUMBER:

Page 16 of 73ORDER NUMBER:

Page 17 of 73ORDER NUMBER:

Page 18 of 73ORDER NUMBER:

Page 19 of 73ORDER NUMBER:

Page 20 of 73ORDER NUMBER:

Page 21 of 73ORDER NUMBER:

Page 22 of 73ORDER NUMBER:

Page 23 of 73ORDER NUMBER:

Page 24 of 73ORDER NUMBER:

Page 25 of 73ORDER NUMBER:

Page 26 of 73ORDER NUMBER:

Page 27 of 73ORDER NUMBER:

Page 28 of 73ORDER NUMBER:

Page 29 of 73ORDER NUMBER:

Page 30 of 73ORDER NUMBER:

Page 31 of 73ORDER NUMBER:

Page 32 of 73ORDER NUMBER:

Page 33 of 73ORDER NUMBER:

Page 34 of 73ORDER NUMBER:

Page 35 of 73ORDER NUMBER:

Page 36 of 73ORDER NUMBER:

Page 37 of 73ORDER NUMBER:

Page 38 of 73ORDER NUMBER:

Page 39 of 73ORDER NUMBER:

Page 40 of 73ORDER NUMBER:

Page 41 of 73ORDER NUMBER:

Page 42 of 73ORDER NUMBER:

Page 43 of 73ORDER NUMBER:

Page 44 of 73ORDER NUMBER:

Page 45 of 73ORDER NUMBER:

Page 46 of 73ORDER NUMBER:

Page 47 of 73ORDER NUMBER:

Page 48 of 73ORDER NUMBER:

Page 49 of 73ORDER NUMBER:

Page 50 of 73ORDER NUMBER:

Page 51 of 73ORDER NUMBER:

Page 52 of 73ORDER NUMBER:

Page 53 of 73ORDER NUMBER:

Page 54 of 73ORDER NUMBER:

Page 55 of 73ORDER NUMBER:

Page 56 of 73ORDER NUMBER:

Page 57 of 73ORDER NUMBER:

Page 58 of 73ORDER NUMBER:

Page 59 of 73ORDER NUMBER:

Page 60 of 73ORDER NUMBER:

Page 61 of 73ORDER NUMBER:

Page 62 of 73ORDER NUMBER:

Page 63 of 73ORDER NUMBER:

Page 64 of 73ORDER NUMBER:

Page 65 of 73ORDER NUMBER:

Page 66 of 73ORDER NUMBER:

Page 67 of 73ORDER NUMBER:

Page 68 of 73ORDER NUMBER:

Page 69 of 73ORDER NUMBER:

Page 70 of 73ORDER NUMBER:

Page 71 of 73ORDER NUMBER:

Page 72 of 73ORDER NUMBER:

Page 73 of 73ORDER NUMBER:

Page of

ORDER NUMBER:

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30

1. REQUISITION NUMBER

PAGE 1 OF

2. CONTRACT NO.

3. AWARD/EFFECTIVE

DATE

4. ORDER NUMBER

5. SOLICITATION NUMBER

6. SOLICITATION ISSUE

DATE

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

b. TELEPHONE NUMBER (No collect calls)

8. OFFER DUE DATE/

LOCAL TIME

9. ISSUED BY

13b. RATING

14. METHOD OF SOLICITATION

CODE

15. DELIVER TO

16. ADMINISTERED BY

CODE

18a. PAYMENT WILL BE MADE BY

CODE

17a. CONTRACTOR/

OFFEROR

CODE

FACILITY

CODE

CODE

TELEPHONE NO.

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN

OFFER

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK

BELOW IS CHECKED

RFQ

IFB

RFP

SEE ADDENDUM

19.

ITEM NO.

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

(Use Reverse and/or Attach Additional Sheets as Necessary)

25. ACCOUNTING AND APPROPRIATION DATA

26. TOTAL AWARD AMOUNT (For Govt. Use Only)

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED

29. AWARD OF CONTRACT: REF. OFFER

DATED . . YOUR OFFER ON SOLICITATION

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

30a. SIGNATURE OF OFFEROR/CONTRACTOR 30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE SIGNED 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER) 31b. NAME OF CONTRACTING OFFICER (Type or print) 31c. DATE SIGNED

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA - FAR (48 CFR) 53.212

10. THIS ACQUISITION IS

UNRESTRICTED OR

NAICS:

SIZE STANDARD:

13a. THIS CONTRACT IS A

RATED ORDER UNDER

DPAS (15 CFR 700)

SET ASIDE:

% FOR:

11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

12. DISCOUNT TERMS

ARE

ARE NOT ATTACHED

ARE

ARE NOT ATTACHED

27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA 27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA \\iaimain\apps1\Pam_Ward\Logos\Pointer.jpg Right Arrow Pointing to Call the Contact Point for this Solicitation/Contract/Order 8 (A)

EDWOSB

SMALL BUSINESS

WOMEN-OWNED SMALL BUSINESS

(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

SMALL BUSINESS

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

HUBZONE SMALL

BUSINESS

SMALL BUSINESS

SMALL BUSINESS

Page of Printing C:\FORMFLOW\FORMS\SF\S1449_3.FRP BarbMWilliams

SECTION B

SUPPLIES OR SERVICES AND PRICES/COSTS

Item No. SUPPLIES OR SERVICE Quantity U/M UNIT PRICE AMOUNT IN US$ Delivery Date

LV_TITLE: Request for Quotation
CurrentSheet:
SheetCount:
20. SCHEDULE OF SUPPLIES/ SERVICES: 1600000477
20. SCHEDULE OF SUPPLIES/ SERVICES: 1600000477
20. SCHEDULE OF SUPPLIES/ SERVICES: 1600000477
20. SCHEDULE OF SUPPLIES/ SERVICES: 1600000477
20. SCHEDULE OF SUPPLIES/ SERVICES: 1600000477
20. SCHEDULE OF SUPPLIES/ SERVICES: 1600000477
20. SCHEDULE OF SUPPLIES/ SERVICES: 1600000477
20. SCHEDULE OF SUPPLIES/ SERVICES: 1600000477
20. SCHEDULE OF SUPPLIES/ SERVICES: 1600000477
20. SCHEDULE OF SUPPLIES/ SERVICES: 1600000477
20. SCHEDULE OF SUPPLIES/ SERVICES: 1600000477
1. REQUISITION NUMBER:
PAGE 1 OF:
2. CONTRACT NUMBER:
4. ORDER NUMBER:
5. SOLICITATION NUMBER: SICG016-22
31b. NAME OF CONTRACTING OFFICER (Type or print): Jason Morgan
31b. NAME OF CONTRACTING OFFICER (Type or print): Jason Morgan
7. FOR SOLICITATION INFORMATION CALL: b. TELEPHONE NUMBER (No collect calls):
15. DELIVER TO CODE: COCO
15. DELIVER TO CODE: COCO
% For : 100
12. DISCOUNT TERMS:
13b. RATING:
15. DELIVER TO:
17a. CONTRACTOR/ OFFEROR CODE: 321000101
17a. CONTRACTOR/ OFFEROR CODE: 321000101
17a. CONTRACTOR/ OFFEROR CODE: 321000101
17a. CONTRACTOR/ OFFEROR: Misc

400 First Street NW Washington DC 20534

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER:
18a. PAYMENT WILL BE MADE BY:
19. ITEM NUMBER. Line 1 of 8.:
20. SCHEDULE OF SUPPLIES/ SERVICES: See Section B
21. QUANTITY:
22. UNIT:
23. UNIT PRICE:
19. ITEM NUMBER. Line 2 of 8.:
20. SCHEDULE OF SUPPLIES/ SERVICES:
21. QUANTITY:
22. UNIT:
23. UNIT PRICE:
19. ITEM NUMBER. Line 3 of 8.:
21. QUANTITY:
22. UNIT:
23. UNIT PRICE:
19. ITEM NUMBER. Line 4 of 8.:
20. SCHEDULE OF SUPPLIES/ SERVICES: SICG016-22
20. SCHEDULE OF SUPPLIES/ SERVICES: SICG016-22
21. QUANTITY:
22. UNIT:
23. UNIT PRICE:
19. ITEM NUMBER. Line 5 of 8.:
20. SCHEDULE OF SUPPLIES/ SERVICES:
21. QUANTITY:
22. UNIT:
23. UNIT PRICE:
19. ITEM NUMBER. Line 6 of 8.:
21. QUANTITY:
22. UNIT:
23. UNIT PRICE:
19. ITEM NUMBER. Line 7 of 8.:
20. SCHEDULE OF SUPPLIES/ SERVICES:
20. SCHEDULE OF SUPPLIES/ SERVICES:
21. QUANTITY:
22. UNIT:
23. UNIT PRICE:
19. ITEM NUMBER. Line 8 of 8.:
20. SCHEDULE OF SUPPLIES/ SERVICES:
21. QUANTITY:
22. UNIT:
23. UNIT PRICE:
25. ACCOUNTING AND APPROPRIATION DATA:
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED. INITIALS :

29. AWARD OF CONTRACT: REFERENCE OFFER:
DATE. YOUR OFFER ON SOLICITATION

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS.:

30b. NAME OF SIGNER (Type or print):
30b. TITLE OF SIGNER (Type or print):
10. THIS ACQUISITION IS UNRESTRICTED: 0
10. THIS ACQUISITION IS SET ASIDE:: 1
11. DELIVERY FOR FOB DESTINATION UNLESS BLOCK IS MARKED SEE SCHEDULE: X
13a. THIS CONTRACT IS A RATED ORDER UNDER DPAS (15 CFR 700): 0
14. METHOD OF SOLICITATION RFQ: 1
10. THIS ACQUISITION IS NAICS:: 236220
14. METHOD OF SOLICITATION IFB:
14. METHOD OF SOLICITATION RFP: 0
18a. PAYMENT WILL BE MADE BY CODE:
17a. CONTRACTOR/ OFFEROR TELEPHONE NUMBER:
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA: 0
29. AWARD OF CONTRACT :
27a. ARE ATTACHED: 0
29. AWARD OF CONTRACT DATE Enter 2 digit month, 2 digit day and 4 digit year.:
30c. DATE SIGNED. Enter 2 digit month, 2 digit day and 4 digit year.:
6. SOLICITATION ISSUE DATE. Enter 2 digit month, 2 digit day and 4 digit year.: 2022-08-05
8. OFFER DUE DATE Enter 2 digit month, 2 digit day and 4 digit year.: 2022-09-19
8. OFFER LOCAL TIME: 2:00 PM
9. ISSUED BY: UNICOR, FPI CENTRAL OFFICE

400 1ST ST NW

WASHINGTON DC 20534-0004

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK IS CHECKED SEE ADDENDUM:
26. TOTAL AWARD AMOUNT (FOR GOVT. USE ONLY): 0.00
26. TOTAL AWARD AMOUNT (FOR GOVT. USE ONLY): 0.00
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN

OFFER :

31A. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER) :
10. THIS ACQUISITION IS SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESS: 0
10. THIS ACQUISITION IS HUBZONE SMALL BUSINESS: 0
27a. ARE ATTACHED:
6. SOLICITATION ISSUE DATE. Enter 2 digit month, 2 digit day and 4 digit year.: 2022-08-15
10. THIS ACQUISITION IS SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESS: 0
10. THIS ACQUISITION IS HUBZONE SMALL BUSINESS: 1
10. THIS ACQUISITION IS HUBZONE SMALL BUSINESS: 0
10. THIS ACQUISITION IS HUBZONE SMALL BUSINESS: 0
23. UNIT PRICE:
23. UNIT PRICE:
23. UNIT PRICE:
23. UNIT PRICE:
23. UNIT PRICE:
23. UNIT PRICE:
23. UNIT PRICE:
23. UNIT PRICE:
27a. ARE ATTACHED: 0
10. THIS ACQUISITION IS NAICS:: 39.5 M Ann Rece
LV_TERMS_OF_DELIV: Terms:
INCO1:
INCO2:
LV_TARGET_VALUE_CHAR:
TDLINE: B3291 SHAR 15032 ROOM 158 MODIFY SPACE
TDLINE: Section A:
TDLINE: Optional Form 308 or SF33
TDLINE: Section B:
TDLINE: Supplies or Services/Pricing or Cost
TDLINE: 1. The following information pertains to the SF1442, Solicitation,
TDLINE: Offer, and Award:
TDLINE: OMB Clearance Number 1103-0018
TDLINE: Block 8: Emailed, Hand carried or Overnight Express to:
TDLINE: UNICOR, FPI
TDLINE: ATTN: Jason Morgan, UNICOR Contracting Officer
TDLINE: 3301 Leestown RD<(>,<)>
TDLINE: Lexington, KY 40511
TDLINE: 1-800-827-3168 ext 3002
TDLINE: Block 17: LUMP SUM (ENTER THE AMOUNT IN SECTION B.
TDLINE: Block 24, and 27, See Section H.
TDLINE: GENERAL INTENTION: It is the intent of this request for quote to result
TDLINE: in a Firm Fixed Price, Construction Purchase Order for a project within
TDLINE: building 3291 located at NSA Crane for (JXQQ). The project consists of
TDLINE: converting an office space into a laboratory, as outlined in the
TDLINE: attached Statement of Work. The solicitation is 100% set aside for
TDLINE: Small Business. The North American Industrial Classification System
TDLINE: (NAICS) Code applicable to this project is 236220, commercial and
TDLINE: institutional buildings and related structure construction.
TDLINE: Contract Line Item: Offerors shall enter unit price and amount for
TDLINE: contract line item.
TDLINE: QUESTIONS WILL ONLY be accepted in writing and WILL NOT BE ACCEPTED
TDLINE: AFTER Monday, August 22, 2022, at 10:00 AM EST. Responses to questions
TDLINE: and site visit sign in sheet will be posted via www.sam.gov.
TDLINE: NO PHONE CALLS PLEASE.
TDLINE: Proposal due date is Monday, September 19, 2022, at 2:00 PM EST. Late
TDLINE: offers will not be accepted.
TDLINE: QUESTIONS PERTAINING TO THIS SOLICITATION WILL ONLY BE ADDRESSED IN
TDLINE: WRITING VIA EMAIL TO:Jason.morgan2@usdoj.gov
TDLINE: THE NAICS CODE FOR THIS PROJECT IS: 236220 COMMERCIAL AND INSTITUTIONAL
TDLINE: BUILDING CONSTRUCTION
TDLINE: SITE VISIT IS MANDATORY.
TDLINE: Mandatory Site visit has been scheduled for Thursday, August 18, 2022 at
TDLINE: 9:00 AM EST. Participants will meet at the Naval Surface Warfare Center
TDLINE: Crane Division, Bldg. 3291-SHAR 15032-Room 158,(main entrance on the
TDLINE: south west side of the complex) 300 Highway 361 Crane, IN 47522. The
TDLINE: Contractor shall inspect the site where services are to be performed.
TDLINE: This site review shall satisfy the Contractor's need to identify all
TDLINE: general and local conditions that may affect the cost of the contract.
TDLINE: Failure to inspect the site will not constitute grounds for claims
TDLINE: after contract award. UP to two (2) people per company may attend.
TDLINE: Mandatory attendance is required for award. Company Name, Name of
TDLINE: attendees, and phone number for attendees must be submitted to
TDLINE: Jason.morgan2@usdoj.gov by 10:00 AM, Wednesday, August 17, 2022.
TDLINE: NOTE: If you have clearance to access the base - you are still required
TDLINE: to submit your names for the site visit by the deadline of 10:00 AM,
TDLINE: Wednesday, August 17, 2022-in order to attend the site visit.
TDLINE: Physical access to the Government’s facility at Naval Support Activity
TDLINE: (NSA), Crane shall be through the use of the Defense Biometric
TDLINE: Identification System (DBIDS) and associated data processing/information
TDLINE: services for purposes of protecting U.S./Coalition/allied
TDLINE: government/national security areas of responsibility and information.
TDLINE: The contractor shall obtain employee personal identity verification
TDLINE: credentialing (badge) by submitting to the NSA Crane Visitor Center, 103
TDLINE: Furlong St, Crane, IN 47522, form SECNAV 5512/1 (APR 2014), for each
TDLINE: contractor employee. Upon Base Registrar authorization of form 5512/1
TDLINE: the contractor shall submit form NSA Crane 5512/47 DBIDS Badge
TDLINE: Application Record to the NSWC Crane Security Division (812)-854-1213.
TDLINE: The Contractor shall retrieve badges of employed personnel upon
TDLINE: separation. A background check will be conducted as part of the process
TDLINE: and two forms of identification are required. A visitor's pass will be
TDLINE: provided if the background
TDLINE: check is cleared. Please allow a significant time (1-2 hours) for the
TDLINE: entire process.
TDLINE: PROJECT MUST BE COMPLETED WITHIN 180 DAYS OF AWARD.
TDLINE: THE FOLLOWING INFORMATION IS REQUIRED TO BE COMPLETED BY THE OFFEROR:
TDLINE: VENDOR'S Unique Entity Identifer:_______________________________
TDLINE: VENDOR'S POINT OF CONTACT: _____________________________________
TDLINE: VENDOR'S TELEPHONE & FAX NUMBER: ______________________________
TDLINE: VENDOR'S EMAIL ADDRESS: ________________________________________
TDLINE: VENDOR'S BUSINESS SIZE (i.e.SMALL,LARGE,ETC.): ________________
TDLINE: By submission of an offer, the offeror acknowledges the requirement that
TDLINE: a prospective awardee shall be registered in the SAM database (System
TDLINE: Award Management) prior to award, during performance and through final
TDLINE: payment of any contract resulting from this solicitation.
TDLINE: _________________
TDLINE: B3291 SHAR 15032 ROOM 158 MODIFY SPACE
TDLINE: B3291 – SHAR 15032 – Room 158
TDLINE: 1.0,,SCOPE
TDLINE: The scope of this project will be performed at Building 3291 at NSA
TDLINE: Crane for JXQQ. The office space in Room 158 needs to be modified to
TDLINE: transition to new lab space. The new lab space must be constructed to
TDLINE: meet the secret level classification.
TDLINE: 2.0 APPLICABLE DOCUMENTS
TDLINE: The following documents of the revision or issue in effect at the date
TDLINE: of award, form a part of this SOW for reference. In the event of
TDLINE: conflict between the documents referenced herein and the contents of
TDLINE: this SOW, the contents of this SOW shall prevail. Reference ATTACHMENT
TDLINE: 01 for Applicable Documents.
TDLINE: 3.0 PERFORMANCE REQUIREMENTS
TDLINE: The performance requirements of this project include: Installation of 3
TDLINE: electrical bus ducts, installation of a transformer, concrete pad for
TDLINE: transformer, new double entry door for large equipment access, a low
TDLINE: pressure dry air space with N2 ports and exhaust hood, and man bars over
TDLINE: ducts and penetrations in 2 places above drop ceiling. Contractor must
TDLINE: provide Build Drawings for approval. (CDRL A012) See section 4.1 for
TDLINE: additional requirements.
TDLINE: 3.1 REQUIREMENTS
TDLINE: The location of this project is at building 3291 at NSA Crane, IN. The
TDLINE: work will be performed in room 158 on the bottom floor of building 3291.
TDLINE: A),,Electrical – Three new overhead, below the existing drop ceiling,
TDLINE: copper bus ducts shall be installed including arrangements of 200A
TDLINE: 115VAC 3 phase delta, 200A 208/115 VAC 3 phase, and 200A 440 VAC 3
TDLINE: phase. The bus ducts shall be mounted in the center of the room not to
TDLINE: block HVAC diffusers, existing sprinkler heads, and/or current lights.
TDLINE: The new bus duct should be modular in 10’ sections. Each bus duct
TDLINE: section has configuration requirements. See Figure 1. 440V 3 phase
TDLINE: power source is located in Rm156 panel F. A new 75KVA 480V-PRI/115V-SEC
TDLINE: 3-phase delta 80 degree transformer shall be installed on a contractor
TDLINE: installed concrete pad outside the building adjacent to RM158. Obtain
TDLINE: power from pump/electrical RM155 to provide the 208V/115V 3 phase power
TDLINE: for the bus duct in Rm 158. The transformer feed shall come from an
TDLINE: existing 480/277V source within Rm 155. Contractor to provide all
TDLINE: materials and equipment to create a functioning system. Existing light
TDLINE: switch, shall be relocated inside RM 158 adjacent to existing 3’ door on
TDLINE: the wall that shares the office location to be approved by the COR.
TDLINE: The N2 Exhaust hood requires a dedicated power source.
TDLINE: B),,Door installation – A 6’ x 7’ door opening shall be cut into the
TDLINE: existing wall where the existing window to the hall is located for
TDLINE: access to move equipment in and out of room 158. Opening prep to include
TDLINE: installation of a header and blocking as appropriate. The new door shall
TDLINE: have a knock down metal jamb with 2 steel doors and no windows. Door
TDLINE: hardware to include steel hinges, keyed lever door handle, captured
TDLINE: stainless steel interlocking leaf door hinges, door sweeps, ADA low
TDLINE: profile threshold, weather stripping, and astragal. New door and jamb
TDLINE: shall be painted to match single entry door to the room. Both doors
TDLINE: shall swing in to RM 158. Security devices for the new door shall be
TDLINE: installed by others. Existing outswing doors need new tamper proof
TDLINE: non-removable hinges. New Hinges are required to be a captured stainless
TDLINE: steel interlocking leaf configuration.
TDLINE: C) ,,N2 requirements - Room 158 shall be provided with a low pressure,
TDLINE: dry air space with N2 ports (~2-5 PSIG). The contractor shall provide a
TDLINE: new N2 exhaust hood for dry air system capable of preventing the N2 from
TDLINE: entering the lab space. Exhaust ductwork shall exit the building through
TDLINE: an exterior wall and be fitted with a cap that prevents animal and
TDLINE: insects from entering the building. Exhaust duct shall be insulated
TDLINE: above the drop ceiling and anywhere it passes through a non-conditioned
TDLINE: space.
TDLINE: D) ,,Data and Communications – All data drops and connections will be
TDLINE: performed outside of this contract.
TDLINE: E) ,,Security – Contractor shall install security grilles within exiting
TDLINE: ductwork at 2 penetrations above drop ceiling for security measures.
TDLINE: Utility openings such as ducts and vents must be smaller than
TDLINE: man-passable (96 square inches). Man-passable openings (openings larger
TDLINE: than 96 sq. inches and over 6 inches in its smallest dimension) are
TDLINE: hardened per Military Handbook 1013/1A (ref. DoD Manual 5200.01 volume 3
TDLINE: enclosure 3 Appendix section 1b(5)).
TDLINE: ,,
TDLINE: F),,Furniture – Contractor shall supply a 15’ x 4’ laminated rectangular
TDLINE: conference table with 12 rolling adjustable office chairs.
TDLINE: G),,Wall Finishes – All wall modification, repair, patching, and
TDLINE: painting shall match existing wall in construction methods, finish, and
TDLINE: color. Contractor is responsible for color matching.
TDLINE: H),,Signage – Exit sign updates to include exit and no exit signs for
TDLINE: all doors in RM158. Arc flash study / labeling required for all
TDLINE: energized equipment as required by NFPA70e and EM385 1-1 Section 11.B.
TDLINE: I),,Concrete - Transformer pad located on the outside of building 3291.
TDLINE: Area for pad will need to have top soil removed, excavated to a depth
TDLINE: that allows for 4” of compacted #53 aggregate, formed pad must be
TDLINE: minimum of 24” larger than the transformer on all sides, all edges must
TDLINE: have a 45 degree bevel, top of transformer pad must be 3” above finished
TDLINE: grade, minimum 6 Inch thickness 4000psi reinforced concrete. Reinforced
TDLINE: with tied #4 bar maximum 8” centers in both directions held to the
TDLINE: center of the placement with rebar chairs. Concrete shall receive a
TDLINE: broom finish to edge of formwork. Include all applicable grounding and
TDLINE: locate transformer per National Electric Code. Repair disturbed areas
TDLINE: and establish grass.
TDLINE: J) ,,The Contractor shall clean the worksite at the end of each work day
TDLINE: or more frequent as needed. The Contractor shall dispose of any scrap
TDLINE: material and clean any spills that may occur.
TDLINE: The following requirements listed, but not limited to, are not
TDLINE: applicable to this project:
TDLINE: A),,Network and phone cable disconnection, relocation, and reconnection
TDLINE: will be executed outside of this contract.
TDLINE: Additional Notes:
TDLINE: A),,Contractor shall provide a weekly status report on Monday’s
TDLINE: for the week prior (CDRL A015).
TDLINE: B) Contractor shall provide a schedule at PAK meeting and
TDLINE: provide updated schedule if any deviation over five (5) days of the
TDLINE: approved schedule (CDRL A006).
TDLINE: C),,All cubicles in room 158 will be disconnected and removed
TDLINE: from the area prior to the contractor starting work.
TDLINE: D),,Material laydown area is available at one of building 3291’s
TDLINE: lots if needed.
TDLINE: E),,Contractor will need to sign in each day upon arrival in the
TDLINE: lobby of building 3291 and be escorted to RM 158 each time access is
TDLINE: needed.
TDLINE: F),,Existing sanitary facilities will be available for use by
TDLINE: contractor personnel.
TDLINE: 3.1.a Submittal Requirements
TDLINE: A.,,Contractor is responsible for providing a Submittal Register
TDLINE: utilizing form ER 415-1-10 (A016) for all anticipated submittal items.
TDLINE: B.,,Submittals are to be provided to the GVT for review and acceptance
TDLINE: by the COR prior to procurement of material.
TDLINE: C.,,The QCM shall follow processes set forth in the Quality Control plan
TDLINE: and Spec 01 45 00.10 20 to ensure the products being submitted are
TDLINE: contract compliant.
TDLINE: D.,,Submittals shall include the following where applicable:
TDLINE: a.,,Shop Drawings
TDLINE: b.,,Product Data
TDLINE: c.,,Samples
TDLINE: d.,,Design Data
TDLINE: e.,,Test Reports
TDLINE: f.,,Manufacturers Instructions
TDLINE: g.,,Manufacturers Field Reports
TDLINE: h.,,Operation and Maintenance Data
TDLINE: E.,,Anticipated material submittal items listed but not limited to:
TDLINE: a.,,Transformer
TDLINE: b.,,Disconnects
TDLINE: c.,,Conduit
TDLINE: d.,,Conductors
TDLINE: e.,,Bus Duct
TDLINE: f.,,Breakers
TDLINE: g.,,Wall framing
TDLINE: h.,,Double door including frames
TDLINE: i.,,Door hardware
TDLINE: j.,,Door hinges
TDLINE: k.,,Security bars
TDLINE: l.,,N2 Piping
TDLINE: m.,,N2 Valves
TDLINE: n.,,Ductwork
TDLINE: o.,,Insulation
TDLINE: p.,,Exhaust Hood System
TDLINE: q.,,Signs
TDLINE: r.,,Conference Table
TDLINE: s.,,Office chairs
TDLINE: t.,,Concrete mix
TDLINE: u.,,Concrete reinforcement
TDLINE: v.,,Grass seed
TDLINE: w.,,Aggregate - stone fill
TDLINE: x.,,Paint
TDLINE: y.,,Arc Flash Labels
TDLINE: 3.2 Installation Access
TDLINE: Physical access to the Government’s facility at Naval Support Activity
TDLINE: (NSA), Crane shall be through the use of the Defense Biometric
TDLINE: Identification System (DBIDS) and associated data processing/information
TDLINE: services for purposes of protecting U.S./Coalition/allied
TDLINE: government/national security areas of responsibility and information.
TDLINE: The contractor shall obtain employee personal identity verification
TDLINE: credentialing (badge) by submitting to the NSA Crane Visitor Center,
TDLINE: form SECNAV 5512/1 (APR 2014), for each contractor employee. Upon Base
TDLINE: Registrar authorization of form 5512/1 the contractor shall submit form
TDLINE: NSA Crane 5512/47 DBIDS Badge Application Record to the NSWC Crane
TDLINE: Security Division. The Contractor shall retrieve badges of employed
TDLINE: personnel upon separation.
TDLINE: Each employee shall affix their badge on their person above the waste at
TDLINE: all times while on the Activity. Badges may only be removed for safety
TDLINE: reasons and must be reaffixed when work is completed.
TDLINE: DBIDS information can be found at the following website:
TDLINE: http://dbids.dmdc.mil/
TDLINE: For Contract employees or subcontractors requiring infrequent access to
TDLINE: the Activity, one day temporary passes MAY be authorized. Requests for
TDLINE: temporary passes shall be submitted, including the completed SECNAV
TDLINE: 5512/1 form, to the COR at least 5 working days prior to the requested
TDLINE: base access day. Employees shall also be prepared to provide a completed
TDLINE: SECNAV 5512/1 form to the authorizing individual the day of their visit.
TDLINE: Temporary passes MAY be authorized up to and including a 28 day
TDLINE: duration. A base pass request DOES NOT guarantee base access. Approved
TDLINE: base access will be communicated to the Contractor by the NSWC
TDLINE: Construction Manager, or their designee. Be advised that the DBIDS
TDLINE: process and temporary pass process both involve a background check.
TDLINE: Persons with a Felony conviction in the last 10 years will not be issued
TDLINE: badges or passes.
TDLINE: Individuals supporting these efforts shall comply with the latest
TDLINE: security regulations applicable to the government facility/installation.
TDLINE: a.,,Depending on the facility/installation regulations, contractor
TDLINE: personnel shall present a proper form of identification(s) and vehicle
TDLINE: proof of insurance or vehicle rental agreement.
TDLINE: b.,,All contractor persons engaged in work while on government property
TDLINE: shall be subject to inspection of their vehicles at any time by the
TDLINE: government, and shall report any known or suspected security violations
TDLINE: to the local host Security Department.
TDLINE: Failure to obtain entry approval will not affect the contract price or
TDLINE: the time of completion.
TDLINE: 3.3 Program Management
TDLINE: The Contractor shall comply with the manufacturer’s recommendations in
TDLINE: installation of all materials and equipment. The Contractor shall be
TDLINE: responsible for field verification of actual conditions prior to
TDLINE: commencement of work. The Contractor shall be responsible for quality
TDLINE: control of all work that is performed via this task order. The
TDLINE: Contractor is responsible for compliance with the U.S. Army Corps of
TDLINE: Engineers Safety and Health Requirements Manual, EM 385-1-1, and shall
TDLINE: maintain a safe working environment at all times during the performance
TDLINE: of this task order. Although this document is intended to identify all
TDLINE: significant features of work to be accomplished in the performance of
TDLINE: this task order, it should not be considered absolutely inclusive of all
TDLINE: minor tasks required for completion of the major work described herein.
TDLINE: 3.3.1 Design and Construction Quality Control Plan
TDLINE: The Contractor shall establish and maintain a Quality Control program
TDLINE: that is administered by a Design and Construction Quality Control
TDLINE: organization, using Quality Control (Design and Construction) Plans,
TDLINE: (CDRL A004) Commissioning Plans and Reports, meetings, a Coordination
TDLINE: and Mutual Understanding Meeting, three phases of control, submittal
TDLINE: review and approval, testing, completion inspections, and QC
TDLINE: certifications, Inspections in accordance with Section 01 45 00.10 20
TDLINE: QUALITY CONTROL FOR MINOR CONSTRUCTION and documentation necessary to
TDLINE: provide design, materials, equipment, workmanship, fabrication,
TDLINE: construction and operations which comply with the requirements of this
TDLINE: Contract. The QC program must cover on-site and off-site work. (CDRL
TDLINE: A006) No construction work or testing may be performed unless the
TDLINE: Contractor’s QC Manager is on the work site.
TDLINE: 3.3.2 Inspection Benchmarks
TDLINE: A) Periodic quality / safety checks at Government determined frequency.
TDLINE: B) Prior to transformer pad placement
TDLINE: C) Electrical Energize Inspection
TDLINE: D) Pre-Final
TDLINE: The Government and QC Manager will perform this inspection to verify
TDLINE: that the facility is complete and ready to be occupied. A Government
TDLINE: "Pre-Final Punch List" will be documented by the QC Manager as a result
TDLINE: of this inspection. The QC Manager will ensure that all items on this
TDLINE: list are corrected prior to notifying the Government that a "Final"
TDLINE: inspection with the Client can be scheduled. Any items noted on the
TDLINE: "Pre-Final" inspection must be corrected in a timely manner and be
TDLINE: accomplished before the contract completion date for the work or any
TDLINE: particular increment thereof, if the project is divided into increments
TDLINE: by separate completion dates.
TDLINE: E) Final (At completion)
TDLINE: Notify the COR at least 5 working days prior to the date a final
TDLINE: acceptance inspection can be held. State within the notice that all
TDLINE: items previously identified on the pre-final punch list will be
TDLINE: corrected and acceptable, along with any other unfinished Contract work,
TDLINE: by the date of the final acceptance inspection. The Contractor must be
TDLINE: represented by the QC Manager, the Project Superintendent, and others
TDLINE: deemed necessary. Attendees for the Government may include the PCO, COR,
TDLINE: Construction Management personnel, and personnel representing the
TDLINE: Client.
TDLINE: 3.4 Safety and Health
TDLINE: 3.4.1 Activity Hazard Analysis (AHA)
TDLINE: Before beginning each activity, task, or Definable Feature of Work
TDLINE: (DFOW) involving a type of work presenting hazards not experienced in
TDLINE: previous project operations, or where a new work crew or subcontractor
TDLINE: is to perform the work, the Contractor(s) performing that work activity
TDLINE: must prepare an AHA. Format the AHA in accordance with EM 385-1-1,
TDLINE: Section 1 or as directed by the COR. Submit the AHA for review within 10
TDLINE: working days after the PAK meeting. (CDRL A002) The Government reserves
TDLINE: the right to require the Contractor to revise and resubmit the AHA if it
TDLINE: fails to effectively identify the work sequences, specific anticipated
TDLINE: hazards, site conditions, equipment, materials, personnel and the
TDLINE: control measures to be implemented.
TDLINE: 3.4.2 Accident Prevention Plan
TDLINE: Contractor shall provide a site-specific Accident Prevention Plan (APP),
TDLINE: including Activity Hazard Analyses (AHA), in accordance with EM 385-1-1
TDLINE: Appendix A, paragraph 3.k for the construction team to follow during
TDLINE: design, each DFOW, site visits, testing, and investigations. Update the
TDLINE: APP if there are changes in the personnel, or the tasks to be performed.
TDLINE: Submit the APP for review and acceptance by the Government within 10
TDLINE: days after the PAK meeting. (CDRL A003) Plan must be accepted by the COR
TDLINE: before work can begin. SSHO may also be designated the role of the QCM
TDLINE: and Superintendent if individual meets all applicable criteria.
TDLINE: 3.4.3 Accident/Incident Reporting
TDLINE: The Contractor shall maintain an accurate record of and shall report all
TDLINE: accidents to the COR within 10 minutes after incident occurs. (CDRL
TDLINE: A010)
TDLINE: For Navy Projects, complete a near miss report (CDRL A010). Near miss
TDLINE: reports are considered positive and proactive Contractor safety
TDLINE: management actions.
TDLINE: The Contractor shall maintain an accurate record of and shall report to
TDLINE: the COR within 10 minutes, all damages to Government Owned Equipment and
TDLINE: Facilities as prescribed by OPNAVINST 5102.1. (CDRL A011)
TDLINE: 3.5 Waste Management Plan
TDLINE: The Contractor shall submit a waste management plan within 10 days after
TDLINE: the PAK meeting. In accordance with UFGS 01 74 19 Construction and
TDLINE: Demolition Waste Management. The plan must demonstrate how the project
TDLINE: waste diversion goal is met and plan must include the following: (CDRL
TDLINE: A005)
TDLINE: ·,,Ensure Hazardous Waste is labeled, handled and stored in accordance
TDLINE: with the Safety Data Sheets (SDS) and regulations.
TDLINE: ·,,The Contractor shall contact the COR to set up a temporary hazardous
TDLINE: waste storage area. This storage area shall not exceed 60 days.
TDLINE: ·,,The Contractor shall immediately (within 10 minutes) notify the Fire
TDLINE: department, and COR of any hazardous material spillage.
TDLINE: ·,,The Contractor shall be responsible for clean-up efforts in
TDLINE: accordance with 40 CFR 300 and shall provide verbal and written
TDLINE: notifications to the COR (CDRL A008) as required by 40 CFR 355.
TDLINE: ·,,Any unforeseen hazardous material is found or suspected to be
TDLINE: hazardous material, the contractor shall notify the COR. (CDRL A009)
TDLINE: Stop work and wait for the government for instructions.
TDLINE: ·,,The Contractor shall maintain records to document the quantity of
TDLINE: waste generated. The contractor shall make the records available to the
TDLINE: COR during construction, and a copy of the records must be delivered to
TDLINE: the COR upon completion of the construction. (CDRL A005)
TDLINE: 3.6 Environmental
TDLINE: 3.6.1 The Contractor shall not use any Asbestos Containing Material
TDLINE: (ACM) at any time during the construction. The Contractor shall verify
TDLINE: that all materials, including those supplied by third parties, are
TDLINE: asbestos free.
TDLINE: ·,,A written certification letter shall be provided by the Contractor to
TDLINE: the Contract Officer certifying that the finished work is asbestos free.
TDLINE: A signed letter-head stating,” to the best of my knowledge, no Asbestos
TDLINE: Containing Building Material (ACBM) was used as a building material in
TDLINE: the building” may suffice, per 40 CFR part 763.99 (a)(7). (CDRL A014)
TDLINE: ·,,The Contractor shall submit SDS for any suspect materials to the
TDLINE: Contract Officer
TDLINE: 3.6.2 Provide protection of areas and spaces not to be painted. Prior to
TDLINE: surface preparation and coating applications, remove, mask, or otherwise
TDLINE: protect such items not to be coated that are in contact with surfaces to
TDLINE: be coated. Following completion of painting, reinstall removed items by
TDLINE: workmen skilled in the trades. Restore surfaces contaminated by coating
TDLINE: materials, to original condition and repair damaged items.
TDLINE: 3.6.3 Comply, at minimum, with manufacturer recommendations for space
TDLINE: ventilation during and after paint application. Isolate area of
TDLINE: application from rest of building when applying high-emission paints or
TDLINE: coatings.
TDLINE: 3.6.4 Do not apply coating when air or substrate conditions are:
TDLINE: ·,,Less than 3 degrees C 5 degrees F above dew point;
TDLINE: ·,,Below 10 degrees C 50 degrees F or over 35 degrees C 95 degrees F,
TDLINE: unless specifically pre-approved by the Contracting Officer and the
TDLINE: product manufacturer.
TDLINE: 3.6.5 Do not use materials having a lead content over 0.6 percent by
TDLINE: weight of nonvolatile content.
TDLINE: 3.6.6 All coatings containers used to apply the contents therein to a
TDLINE: surface directly from the container by pouring, siphoning, brushing,
TDLINE: rolling, padding, ragging, or other means shall be closed when not in
TDLINE: use.
TDLINE: 3.6.7 Containers of any Volatile Organic Compound (VOC) containing
TDLINE: materials used for thinning and cleanup shall be closed when not in use.
TDLINE: 3.6.8 Compliance with the VOC content limits shall not exceed the
TDLINE: following limits: flat coatings (0.835 lb VOC/gal), non-flat coatings
TDLINE: (1.25 lb VOC/gal), non-flat-high-gloss coatings (2.09 lb VOC /gal) and
TDLINE: floor coatings (2.09 lb VOC/gal), as per coating category identified in
TDLINE: 326 IAC 8-14-3. The Contractor shall provide chemical products Safety
TDLINE: Data Sheets (SDS) to show compliance with VOC content limit.
TDLINE: 3.6.9 Do not, under any circumstances, violate the manufacturer’s
TDLINE: application recommendations.
TDLINE: 3.6.10 All technicians conducting work on Heating, Ventilation,
TDLINE: Air-Conditioning, & Refrigeration (HVAC<(>&<)>R) systems that could
TDLINE: result in a release of refrigerant must be certified as a Section 608
TDLINE: Technician. Copies of technician certifications must be provided to the
TDLINE: Contracting officer at least 14 days prior to working on equipment
TDLINE: containing refrigerant. (CDRL A009) Products containing Ozone Depleting
TDLINE: Substance (ODS) and non-exempt substitute refrigerants in a sealed,
TDLINE: self-contained system shall be disposed of in accordance with 40 CFR 82.
TDLINE: The full refrigerant charge, in pounds, of the installed HVAC<(>&<)>R
TDLINE: systems must be provided to the RTA. This full charge value must also be
TDLINE: permanently marked at the system.
TDLINE: 3.6.11 For HVAC equipment being demolished, submit to the COR a record
TDLINE: of the technician name, date of refrigerant recovery, the full
TDLINE: refrigerant charge, the system location, make, model, and serial number,
TDLINE: type and amount of refrigerant recovered, to where and whom the material
TDLINE: was transferred, date of transfer, and if refrigerant will be reclaimed
TDLINE: or destroyed. (CDRL A009) Recovered Class I ODS and Hydro
TDLINE: chlorofluorocarbon (HCFC-22) is property of the government and must be
TDLINE: returned to the Navy’s ODS reserve. The Contractor must notify the RTA
TDLINE: to arrange for delivery of the refrigerant to Crane’s repository at
TDLINE: B2748.
TDLINE: 3.7 Closeout Submittals
TDLINE: As-built drawings are developed and maintained by the Contractor and
TDLINE: depict actual conditions, including deviations from the Contract
TDLINE: Documents. These deviations and additions may result from coordination
TDLINE: required by, but not limited to: contract modifications; official
TDLINE: responses to Contractor submitted Requests for Information; direction
TDLINE: from the COR; designs which are the responsibility of the Contractor,
TDLINE: and differing site conditions. Maintain the as-built throughout
TDLINE: construction as red-lined hard copies on site. These files serve as the
TDLINE: basis for the creation of the record drawings. Other closeout submittals
TDLINE: may include, but not limited to, warranty documentation, operation &
TDLINE: maintenance manuals, manifests, testing results, equipment training
TDLINE: report, as applicable. All applicable documents shall be submitted to
TDLINE: the RTA and COR before project is complete and final payment is issued.
TDLINE: ·,,The record drawings are the final compilation of actual conditions
TDLINE: reflected in the as-built drawings.
TDLINE: ·,,Provide and maintain two black line print copies of the PDF contract
TDLINE: drawings for As-Built Drawings in accordance with FC 1-300-09N. At a
TDLINE: minimum of 5 working days prior to Beneficial Occupancy Date (BOD),
TDLINE: certify both sets of as-built drawings as correct, sign, and submit the
TDLINE: As-Built Drawings for COR approval. (CRDL A013)
TDLINE: 3.8 Warranty Management Plan
TDLINE: Develop a warranty management plan which contains information relevant
TDLINE: to FAR 52.246-21. At least 10 working days before the planned
TDLINE: pre-warranty conference, submit one set of the warranty management plan.
TDLINE: Include within the warranty management plan all required actions and
TDLINE: documents to assure that the Government receives all warranties to which
TDLINE: it is entitled. The plan must be in narrative form and contain
TDLINE: sufficient detail to render it suitable for use by future maintenance
TDLINE: and repair personnel, whether tradesmen, or of engineering background,
TDLINE: not necessarily familiar with this contract. The term "status" as
TDLINE: indicated below must include due date and whether item has been
TDLINE: submitted or was accomplished. The construction warranty period will
TDLINE: begin on the date of project acceptance and continue for the full
TDLINE: product warranty period. A joint 4 month and 9 month warranty
TDLINE: inspection will be conducted, measured from time of acceptance, by the
TDLINE: Contractor, COR, and the Customer Representative. (CDRL A007)
TDLINE: 4.0 TECHNICAL DATA DELIVERABLES
TDLINE: All CDRL’s that are sent to the COR for approval shall use
TDLINE: CR-1022-ACQ-FM-11000-000002, CDRL transmittal form as a cover page.
TDLINE: Contractor shall use UFGS 01 33 00 for instruction on how to submit
TDLINE: submittals. Reference ATTACHMENT 02
TDLINE: 5.0 SPECIAL CONDITIONS
TDLINE: 5.1 Contracting Officer’s Representative (COR)
TDLINE: The COR is the point of contact for non-substantiated communications of
TDLINE: a technical nature. Only the Contracting Officer has the authority to
TDLINE: change the requirements of this order(s).
TDLINE: 5.2 Requiring Technical Activity (RTA)
TDLINE: The RTA contacts are Functional Managers, Task Managers, and project
TDLINE: leads. RTAs do not have the authority to direct Contractor personnel or
TDLINE: change the requirements of this order(s) or change the requirements of
TDLINE: any TO(s). RTA’s shall be copied on each CDRL deliverable identified.
TDLINE: 5.3 Safety and Health
TDLINE: The requirements of this order may require Contractor personnel to come
TDLINE: in contact or be exposed to hazardous conditions. The Contractor shall
TDLINE: abide by all applicable federal, local, and state occupational safety
TDLINE: and health requirements. The Government will provide Standard Operating
TDLINE: Procedures (SOP) when applicable. The Contractor must have on record a
TDLINE: corporate safety plan and shall provide a copy to the COR when
TDLINE: instructed. The Contractor shall ensure all employees have appropriate
TDLINE: Personal Protection Equipment (PPE). The Contractor shall ensure
TDLINE: employees have all required training and certifications related to
TDLINE: Occupational Safety and Health Administration (OSHA) requirements.
TDLINE: Any Contractor employee exhibiting unsafe behavior may be removed from
TDLINE: the NSWC Crane site. Such removal shall not relieve the Contractor from
TDLINE: meeting its contractual obligations and shall not be considered an
TDLINE: excusable delay as defined in FAR 52.249-14.
TDLINE: 5.4 Hazardous Materials
TDLINE: The Contractor will provide a responsible party for the handling of the
TDLINE: hazardous materials and the respective SDS. This responsibility includes
TDLINE: proper training in the handling and disposal of the hazardous materials.
TDLINE: 5.5 Control of Contractor Personnel
TDLINE: Contractor personnel shall physically access government facilities and
TDLINE: installations for purposes of site visitation, meeting attendance,
TDLINE: supervisory and work performance within government spaces (either
TDLINE: temporary or permanent). Individuals supporting these efforts shall
TDLINE: comply with the latest security regulations applicable to the government
TDLINE: facility/installation.
TDLINE: a) Depending on the facility/installation regulations, Contractor
TDLINE: personnel shall present a proper form of identification(s) and vehicle
TDLINE: proof of insurance or vehicle rental agreement.
TDLINE: b) All Contractor persons engaged in work while on government property
TDLINE: shall be subject to inspection of their vehicles at any time by the
TDLINE: government, and shall report any known or suspected security violations
TDLINE: to the local host Security Department.
TDLINE: c) All persons engaged in work while on Government property shall be
TDLINE: subject to search of their persons (no bodily search) and vehicles at
TDLINE: any time by the Government, and shall report any known or suspected
TDLINE: security violations to the NSWC Crane Security Department.
TDLINE: d) Assignment, transfer, and reassignment of Contractor personnel shall
TDLINE: be at the discretion of
TDLINE: the Contractor. However, when the Government directs, the Contractor
TDLINE: shall remove from contract performance any person who endangers life,
TDLINE: property, or national security through improper conduct.
TDLINE: e) All Contractor personnel engaged in work while on Government property
TDLINE: shall be subject to the Standards of Conduct contained in SECNAVINST
TDLINE: 5370.2J (Standards of Conduct and Government Ethics).
TDLINE: f) Prior to conducting work under this contract, the Contractor shall
TDLINE: provide a list of employees that will be working on site. The employee
TDLINE: list shall contain full names, security clearance levels, social
TDLINE: security numbers, job titles, and official birth certificates. This list
TDLINE: shall be updated within forty-eight hours after changes occur.
TDLINE: g) Any photography on base is not permitted without prior approval and
TDLINE: photography permit request submitted to the COR. Permit request must be
TDLINE: approved and signed by the COR prior to any photos being taken. All
TDLINE: photos taken, after approval, must be analyzed and approved prior to
TDLINE: release.
TDLINE: h) Restricted Areas - visitor control and surveillance of personnel in a
TDLINE: restricted area requires security consciousness and is the
TDLINE: responsibility of all personnel working in the area.
TDLINE: 5.7 Accident Reporting
TDLINE: The Contractor shall maintain an accurate record of and shall report all
TDLINE: accidents to the COR within 10 minutes after an incident occurs. (CDRL
TDLINE: A010)
TDLINE: 5.8 Smoking Regulations
TDLINE: Smoking on NSWC Crane, Crane, IN premises shall be in approved areas
TDLINE: only in accordance with NSACRANEINST 5100.13A (NSA Crane Smoking and
TDLINE: Tobacco Use). Smoking in vehicles is prohibited.
TDLINE: 5.9 Damage Reporting
TDLINE: The Contractor shall maintain an accurate record of and shall report to
TDLINE: the COR (within 10 minutes) all damages to Government Owned Equipment
TDLINE: and Facilities as prescribed by OPNAVINST 5102.1. (CDRL A011)
TDLINE: 5.10 Investigations
TDLINE: Contractor employees shall cooperate with Government investigative
TDLINE: agencies conducting criminal or administrative investigations.
TDLINE: 5.11 Government Observations
TDLINE: Government personnel, such as Inspector General or higher headquarters
TDLINE: staff, are authorized to observe Contractor operations. Efforts will be
TDLINE: made to minimize the degree of disturbance on Contractor performance.
TDLINE: 5.12 Hours of Operation
TDLINE: NSWC Crane core duty hours for on-site Contractor personnel and the
TDLINE: Contractor’s liaison facility personnel assigned to this effort are 0900
TDLINE: to 1430 hours, Monday through Friday, during regular Government
TDLINE: workdays.
TDLINE: Government personnel are afforded a flextime schedule that allows a
TDLINE: starting time between the hours of 0600 and 0900, with a quitting time
TDLINE: between the hours of 1430 and 1800 depending on the applicable work
TDLINE: schedule. Contractors are required to work during Government work hours
TDLINE: in accordance with company timekeeping policies. Exceptions may be
TDLINE: approved by the COR if requested by the Contractor.
TDLINE: 5.12.1 Closed Days
TDLINE: All closed days will be designated by the Commander, NSA Crane. Closed

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .