5.0 TECHNICAL DATA DELIVERABLES
All CDRL’s that are sent to the COR for approval shall use CR-1022-ACQ-FM-11000-000002, CDRL transmittal form as a cover page. Contractor shall use UFGS 01 33 00 for instruction on how to submit submittals
CDRL DID Number DID Title Applicable
SOW
Paragraph
Deliverable Schedule
A001 DI-MGMT-
81596A
Contractor’s Personnel Roster
6.14 Post Award
Kickoff (PAK)
A002 DI-SAFT-81841 Operating, Support, Health, & Safety (OSH&S) Hazard Analysis Report
4.4.1 Within 10 days
after the PAK
A003 DI-MISC-
80508B
Accident Prevention Plan 4.4.3 Within 10 days after the PAK
A004 DI-MISC-
80508B
Quality Control Plan 4.3.1 Post Award Kickoff
A005 DI-MISC-
80508B
Waste Management Plan 4.5 Prior to Final Inspection
A006 DI-MISC-
80508B
Schedule 4.3.1, 4.1 Post Award Kickoff
A007 DI-MISC-
80508B
Warranty Management Plan 4.8 10 days prior to pre-warranty conference
A008 DI-MISC-
80508B
Hazardous Material Clean-Up 4.5 As Required
A009 DI-MISC-
80508B
Severe Hazard Exposure 4.5, 4.6.10, 4.6.11
As Required
A010 DI-SAFT-82188 Accident/Incident Report 4.4.4, 6.7 As Required
A011 DI-SAFT-82188 Damage Reporting 4.4.3, 6.9 As Required
A012 DI-MISC-
80508B
Approved Build Drawings 4.0 Post Award Kickoff
Attachment 03
A013 DI-MISC-
81489B
As-Built Drawings 4.7 5 days prior to
BOD
A014 DI-MISC-
80508B
Asbestos Containing Building Material Report
4.6.1 As Required
A015 DI-MISC-
80508B
Production Report 4.1 Weekly
A016 ER 415-1-10 Submittal Register 4.1, 4.1.a Post Award Kickoff