Dix Design Build PreConf PPT.pdf

PDF 4 MB Posted

Attached to
Request for Qualifications - Dix Park Design-Build Services for Building Stabilization and Demolition State and local contract opportunity
Solicitation number
274-DixParkDesign-BuildServices
Issued by
Wake County, Teachey Town, North Carolina

About this file

This is a pre-conference presentation for a Request for Qualifications (RFQ) issued by the City of Raleigh Parks, Recreation and Cultural Resources Department for design-build services related to the Dix Park Buildings Abatement, Demolition and Stabilization Project. The project encompasses professional design-build services including architectural and engineering work, project management, construction management, and related technical disciplines for evaluating, abating, and stabilizing approximately 20 buildings totaling nearly 500,000 square feet to prevent deterioration and mold growth during a seven-to-ten-year stabilization period, as well as abating and demolishing approximately 17 buildings spanning 400,000 square feet and determining utility system strategies. The pre-submittal conference is scheduled for January 15, 2026, at 2:00 PM at Dix Park Chapel; written questions are due by January 23, 2026, at 2:00 PM; proposals are due by February 13, 2026, at 5:00 PM; the evaluation meeting is anticipated for February 20, 2026; and interviews, if required, are scheduled for the week of March 9, 2026. The scope of services includes two primary phases: Phase 1 (Design) involving design documents, specifications, and pricing for permitting and performance of work, and Phase 2 (Construction) encompassing permitting, procurement, and execution of construction, demolition, and abatement services. The City acquired the 308-acre Dix Park property in July 2015 and leased it to the Department of Health and Human Services until October 31, 2025.

Pricing is not a determining factor in firm selection as the procurement is issued under North Carolina General Statutes Chapter 143 Article 3D (Mini-Brooks Act), with hourly rate schedules to be submitted in a separate sealed envelope. The project includes a participation goal of fifteen percent for minority and women-owned business enterprises (MWBE). The Design-Builder must provide a Performance Bond covering 100 percent of the Contract Price and comply with specified insurance requirements. Estimated construction costs for new utility systems range from $10 million to $12 million, with site lighting modifications estimated between $350,000 and $690,000. Most utility decommissioning work has already been completed or is in progress by the City, including offline central steam and chiller plants. The project requires coordination with various stakeholders and maintains public accessibility throughout construction. Proposers are responsible for all proposal development expenses and must demonstrate comprehensive capabilities across multiple technical disciplines and the ability to work within the constraints of this adaptive reuse project.

View the file

Other files for this state and local contract opportunity

Other files attached to Request for Qualifications - Dix Park Design-Build Services for Building Stabilization and Demolition, newest first.
File Type Posted
DixParkDBServicesRFQ.pdf PDF
Appendix IV Standard Form of Agreement Between Owner and Design-Builder.pdf PDF
Exhibit D.pdf PDF
Exhibit C DBIA 535 General Conditions.pdf PDF
Exhibit E City Sales Tax Reporting Program.pdf PDF
Exhibit F Design Builders Insurance Requirements.pdf PDF
Appendix V Dix Park Utility Infrastructure Master Plan_red.pdf PDF
Dix_Park_RFQ_QA_Addendum.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Dix Park Design-Build Services for Building

Stabilization and Demolition

Parks, Recreation and Cultural Resources

1.15.2026

Welcome!

• Welcome and Introductions

• RFQ Overview

• Building Tour (Optional)

Agenda

• Dix Park

• Kate Pearce, Executive Director

• Eric Regensburger, Senior Planner (Project Manager)

• Dean Perry, Director of Design and Planning

• Ellis Cayton, P&R Consultant

• Engineering Services

• Shelton Williams, Asst. Department Director

• James Walters, Manager Facilities Operations

• Tommy Mangum, Maintenance and Operations Supervisor

Introductions – City Team

• July 2015 - City purchased Dix property from State of North Carolina

• July 2015 to October 31, 2025 – City leased buildings back to Department of Health and Human Services

(DHHS)

• October 31, 2025 - DHHS departed campus

Project Background

• Today - City advancing Dix Park Master Plan via Building Stabilization and Demolition Project

Project Background

• Abate and stabilize ~20 buildings with combined total area of nearly 500,000 square feet (SF)

• Abate and demolish ~17 buildings totaling 400,000 estimated SF

• Determining strategy to address utility systems that remain

Project Description

• Stabilization

• Minimize deterioration or mold growth to extend building life by 7-to-10-years

• Ready buildings for adaptive reuse

Project Goals

• Demolition

• Remove buildings per Master

Plan and Building & Site Analysis

• Utilities

• Disconnect campus utility system and devise strategy for abandon-in-place/removal

• Coordination with stakeholders to reduce parkwide interruptions

Project Goals

Stabilize

Demo In Progress/ Complete

• Design (Phase 1)

• Designing, pricing, and other services

• Design documents to include all drawings and specifications needed to permit and perform the work

Design-Build Scope of Services

• Construction (Phase 2)

• Permitting

• Procure materials and equipment

• Perform construction, demolition, abatement, and other needed services

Design-Build Scope of Services

• Decommissioning work described in Appendix V, Section 2 already completed or in progress

• Central Steam Plant Offline

• Central Chiller Offline

• Cut, cap, drain work pending

RFQ Updates and Clarifications

• Utility Corridor

• Design outside this project’s scope but will require coordination

• Future construction may be considered as part of this work

• Site lighting strategy will be a part of this scope of Work

RFQ Updates and Clarifications

• Resources

• Appendix IV: Standard Form of Agreement Between Owner and Design-Builder

• Appendix V: Dix Park Utility Infrastructure Master Plan, Phase 1 Report

Design-Builder Scope of Services

Written Questions Due Friday, January 23, 2026, 2pm

City Response to Questions * Tuesday, January 27, 2026, 5pm

Submittal Due Date and Time Friday, February 13, 2026, 5pm

Evaluation Meeting * Friday, February 20, 2026

Interviews (if required) Week of March 9, 2026*

* - anticipated

RFQ Timeline Going Forward

Questions?

Slide Number 1
Slide Number 2
Agenda
Introductions – City Team
Project Background
Project Background
Project Description
Project Goals
Project Goals
Slide Number 10
Slide Number 11
Slide Number 12
Design-Build Scope of Services
Design-Build Scope of Services
RFQ Updates and Clarifications�
RFQ Updates and Clarifications �
Design-Builder Scope of Services
RFQ Timeline Going Forward
Slide Number 19