DixParkDBServicesRFQ.pdf

PDF 445 KB Posted

Attached to
Request for Qualifications - Dix Park Design-Build Services for Building Stabilization and Demolition State and local contract opportunity
Solicitation number
274-DixParkDesign-BuildServices
Issued by
Wake County, Teachey Town, North Carolina

About this file

Summary

This is a Request for Qualifications (RFQ) issued by the City of Raleigh Parks Department for professional design-build services related to the Dix Park Buildings Abatement, Demolition and Stabilization Project. The project encompasses architectural and engineering services, labor, materials, equipment, project management, and construction management for evaluating, abating, and stabilizing approximately 20 buildings totaling nearly 500,000 square feet to prevent deterioration and mold growth during a stabilization period extending up to ten years, as well as abating and demolishing approximately 17 buildings totaling 400,000 square feet. The City will select one or more qualified firms to perform these services. The RFQ was issued on Friday, January 5, 2026, with a deadline for written questions on Friday, January 23, 2026, at 2:00 PM EST. A pre-submittal conference is scheduled for Thursday, January 15, 2026, at 2:00 PM at Dix Park Chapel, with attendance encouraged but not mandatory. Proposals are due by Friday, February 13, 2026, at 5:00 PM EST. The evaluation meeting is anticipated for Friday, February 20, 2026, with interviews potentially scheduled for the week of March 9, 2026. The contract will specify a completion date by which all services must be finished.

Pricing is not a determining factor in firm selection, as this solicitation is issued under North Carolina General Statutes Chapter 143 Article 3D (the Mini-Brooks Act). Proposers must submit hourly rate schedules in a separate sealed envelope and are responsible for all expenses incurred in proposal development and any interviews or presentations. The project includes multiple service components including civil/site, architectural, environmental/abatement, cost estimating, structural, fire, survey, and mechanical, electrical, and plumbing disciplines. The Dix Park property, purchased by the City in July 2015 from the State of North Carolina, comprises 308 acres with 85 buildings totaling approximately 1.2 million square feet, most of which were leased to the Department of Health and Human Services until October 31, 2025. The scope includes building stabilization for reuse, demolition and hazardous materials abatement, utilities identification and management, permitting, coordination, and public safety considerations, with the park remaining open and accessible to the public throughout construction. Most utility decommissioning work outlined in the Utility Infrastructure Master Plan has already been completed by the City.

View the file

Other files for this state and local contract opportunity

Other files attached to Request for Qualifications - Dix Park Design-Build Services for Building Stabilization and Demolition, newest first.
File Type Posted
Dix Design Build PreConf PPT.pdf PDF
Exhibit E City Sales Tax Reporting Program.pdf PDF
Exhibit F Design Builders Insurance Requirements.pdf PDF
Appendix IV Standard Form of Agreement Between Owner and Design-Builder.pdf PDF
Exhibit D.pdf PDF
Exhibit C DBIA 535 General Conditions.pdf PDF
Appendix V Dix Park Utility Infrastructure Master Plan_red.pdf PDF
Dix_Park_RFQ_QA_Addendum.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Request for Qualifications # 274-DixParkDesign-BuildServices

Title: Dix Park Design-Build Services for Building

Stabilization and Demolition

Issue Date: Friday, January 5, 2026

Due Date: Friday, February 13, 2026, not later than 5:00PM EST

*LATE PROPOSALS WILL NOT BE ACCEPTED*

Issuing Department: Raleigh Parks

Direct all inquiries concerning this RFQ to:

Eric Regensburger Senior Planner Email: eric.regensburger@raleighnc.gov

Table of Contents

1. Introduction

1.1. Purpose

1.2. Background

1.3. RFQ Timeline

1.4. Pre-Submittal Conference

1.5. Questions

1.6. Submittal Requirements and Contact Information

1.7. Business Engagement and Opportunities

1.8. Rights to Submitted Material

1.9. Communications

1.10. Lobbying

1.11. Conflicts of Interest

1.12. Proposer Expenses

1.13. Proposer Acceptance

2. Qualifications Package

2.1. Request for Qualifications Required Document Format

2.2. Hourly Rates

2.3. Qualifications Package Documents

3. Proposal Evaluation

3.1. Evaluation Criteria

3.2. Final Selection

3.3. Notice to Proposers Regarding RFQ Terms & Conditions

3.4. Contract Term…………………………………………………………..11

4. Scope of Services

Appendix I – Hourly Rate Schedule

Appendix II – Proposer Questionnaire

Appendix III – Reference Questionnaire (Instructions)

Appendix III – Reference Questionnaire Form

Appendix IV – Sample Agreement.......................................................... attachment

Appendix V – Utility Infrastructure Master Plan ................................. attachment

1 INTRODUCTION

1.1 Purpose

The City of Raleigh is seeking one or more qualified firm(s) with which to contract for the following services:

Professional Design-Build Services for the Dix Park Buildings Abatement, Demolition and Stabilization Project (the Project) including, but not limited to, the architectural and engineering services necessary to describe, design and permit the work, the labor, materials and equipment necessary to construct or implement the work, the project management and construction management services necessary to manage the work, and other related services.

The Project generally involves evaluating, abating and stabilizing 20 buildings with an estimated combined total area of nearly 500,000 square feet (SF) such that the buildings do not deteriorate or experience significant mold growth during the period between stabilization to the point when the City and or partners begin renovating the buildings for adaptive reuse. The Project also includes abating and demolishing approximately 17 buildings with an estimated combined area of 400,000SF and determining a strategy to address the utility systems that remain.

A detailed scope of services is provided in Section 4 of this document.

All information related to this solicitation, including any addenda, will be posted to the North Carolina electronic Vendor Portal (eVP) at https://evp.nc.gov/.

All questions related to this solicitation must be submitted in writing (via email) to the following individual – questions submitted via telephone will not be answered:

Contact Name Email Address

Eric Regensburger Eric.regensburger@raleighnc.gov

1.2 Background

The City of Raleigh, the Capital City of North Carolina, remains one of the fastest growing areas in the country. A great economy, top educational institutions, and exceptional health care facilities are some of the characteristics that attract people to the triangle area. The mild climate, diverse work force and proximity to Research Triangle Park combine to make Raleigh a great place to live.

Raleigh is a 21st Century City of Innovation focusing on environmental, cultural, and economic sustainability. The City conserves and protects our environmental resources through best practice and cutting-edge conservation and stewardship, land use, infrastructure and building technologies. The City welcomes growth and diversity through policies and programs that will protect and enhance Raleigh’s existing neighborhoods, natural amenities, history, and cultural and human resources for future generations. The City leads to improve quality of life for neighborhoods and standard of living for all citizens. The City works with universities, colleges, citizens, and local partners to promote new technology, create new job opportunities, and encourage local businesses and entrepreneurs. The City enlists and prepares 21st Century https://evp.nc.gov/ staff with the skill sets to carry out the duties of the City through transparent civic engagement and by providing the very best customer service to our citizens.

In July 2015, the City of Raleigh purchased the Dix property from the State of North Carolina.

The purchase of the 308-acre site included 85 buildings, which totaled approximately 1.2 million square feet of building space. As part of the purchase agreement, the City leased back most buildings to the State of North Carolina’s Department of Health and Human Services (DHHS). DHHS occupied most of the buildings in Dix Park until October 31, 2025, at which time DHHS vacated its operation on the campus. With the take-over of the buildings and infrastructure systems, the City is advancing the recommendations of the Dix Park Master Plan by decommissioning utilities, abating hazardous materials, demolishing buildings and other facilities not identified for adaptive reuse, and stabilizing buildings selected for adaptive reuse.

1.3 RFQ Timeline

Provided below is a list of the anticipated schedule of events related to this solicitation. The City of Raleigh reserves the right to modify and/or adjust the following schedule to meet the needs of the project. All times shown are Eastern Time (ET):

RFQ Process Date and time

RFQ Date Friday, January 5, 2026

Pre-Submittal Conference (if required)

Thursday, January 15, 2026, 2pm Dix Park Chapel, 1030 Richardson Drive

Deadline for written questions Friday, January 23, 2026, 2pm

City Response to Questions (anticipated)

Tuesday, January 27, 2026, 5pm

Submittal Due Date and Time Friday, February 13, 2026, 5pm

Evaluation Meeting (anticipated)

Friday, February 20, 2026

Interviews (if required)

Anticipated week of March 9, 2026

1.4 Pre-Submittal Conference

If the City of Raleigh elects to conduct a Pre-Submittal Conference or Site Visit, attendance by prospective proposers is strongly encouraged but is not mandatory. Prospective Proposers are encouraged to submit written questions in advance.

1.5 Questions

Requests for clarification and questions to this RFQ must be received by the City not later than the date shown above in Section 1.3 RFQ Timeline, for the submittal of written inquires. The firm’s failure to request clarification and submit questions by the date in the RFQ Timeline above shall be considered to constitute the firm’s acceptance of all City’s terms and conditions and requirements.

The City shall issue addenda reflecting questions and answers to this RFQ, if any, and shall be posted to North Carolina electronic Vendor Portal (eVP). No information, instruction or advice provided orally or informally by any City personnel, whether made in response to a question or otherwise in connection with this RFQ, shall be considered authoritative or binding.

Respondents shall be entitled to rely only on written material contained in an Addendum to this

RFQ.

It is important that all Respondents submitting to this RFQ periodically check eVP for any Addenda. It is the Respondents responsibility to ensure that all addenda have been reviewed and, if required signed and returned.

All questions related to this solicitation must be submitted in writing (via email) to the following individual – questions submitted via telephone will not be answered:

Contact Name Email Address

Eric Regensburger Eric.regensburger@raleighnc.gov

1.6 Submittal Requirements and Contact Information

Submittals must follow the format as defined in Section 2 Qualifications Package. Proposers must submit one (1) electronic version of the signed proposal via email to Eric Regensburger Eric.regensburger@raleighnc.gov by the proposal date provided in Section 1.3.

The electronic version of the Proposal must be submitted as a viewable and printable Adobe Portable Document File (PDF). Proposals must be received by the City on or before the RFQ date and time provided in Section 1.3 RFQ Timeline. Proposals received after the RFQ deadline above will not be considered and will be returned unopened to the return address provided.

Proposers must respond to the entire Request for Qualifications (RFQ). Any incomplete submittal may be eliminated from competition at the discretion of the City of Raleigh.

The City reserves the right to reject any or all submittals for any reason and to waive any informality it deems in its best interest.

Submittals that arrive after the due date and time will not be accepted or considered for any reason whatsoever. If the Firm elects to mail in its response, the Firm must allow sufficient time to ensure the City’s proper receipt of the package by the time specified in Section 1.3 RFQ Timeline. Regardless of the delivery method, it is the responsibility of the Firm to ensure that https://evp.nc.gov/ https://evp.nc.gov/ mailto:Eric.regensburger@raleighnc.gov their response arrives at the designated location specified in this Section 1.6 by the due date and time specified in Section 1.3 RFQ Timeline.

1.7 Business Engagement and Opportunities

The City of Raleigh maintains processes to conduct business with all business enterprises, including small, emerging, growing, under-capitalized, and under-resourced firms or organizations.

1.8 Rights to Submitted Material

All qualification packages and supporting materials, as well as correspondences relating to this RFQ, shall become the property of the City. The content of all submittals will be held confidential until the selection of the firm is made. Qualifications will be reviewed by the Evaluation Team, as well as other City staff and members of the general public who submit public record requests. Any proprietary data must be clearly marked. In submitting qualifications, each submitting firm/company agrees that the City may reveal any trade secret materials contained in such submittal to all City staff and City officials involved in the selection process and to any outside consultant or other third party who serves on the Evaluation Team or who is hired by the City to assist in the selection process. Qualification submittals marked entirely as “confidential”, “proprietary”, or “trade secret” will be considered non-responsive and will be removed from the evaluation process.

1.9 Communications

All communications of any nature regarding this RFQ with any City staff, elected City officials, evaluation committee members are strictly forbidden from the time the solicitation is publicly posted until award. Questions must be submitted in writing to the individual designated in Section 1.1 Purpose, prior to the deadline provided in Section 1.3 RFQ Timeline. Violation of this provision may result in the firm’s proposal being removed from consideration.

1.10 Lobbying

By responding to this solicitation, the firm certifies that is has not and will not pay any person or firm to influence or attempt to influence an officer or employee of the City or the State of North Carolina, or any elected official in connection with obtaining a contract as a result of this

RFQ.

1.11 Conflicts of Interest

City of Raleigh contracts are controlled by three conflict of interest provisions.

(1) First, federal procurement standards provided in 2 CFR 200.318 (c)(1) state:

No employee, officer, or agent may participate in the selection, award, or administration of a contract supported by a Federal award if he or she has a real or apparent conflict of interest. Such a conflict of interest would arise when the employee, officer, or agent, any member of his or her immediate family, his or her partner, or an organization which employs or is about to employ any of the parties indicated herein, has a financial or other interest in or a tangible personal benefit from a firm considered for a contract. The officers, employees, and agents of the non-Federal entity may neither solicit nor accept gratuities, favors, or anything of monetary value from contractors or parties to subcontracts.

(2) Similarly, the North Carolina General Statutes provides a criminal statute for conflicts of interest in public contracting, N.C.G.S. § 14-234(a) states:

(1) No public officer or employee who is involved in making or administering a contract on behalf of a public agency may derive a direct benefit from the contract except as provided in this section, or as otherwise allowed by law.

(2) A public officer or employee who will derive a direct benefit from a contract with the public agency he or she serves, but who is not involved in making or administering the contract, shall not attempt to influence any other person who is involved in making or administering the contract.

(3) No public officer or employee may solicit or receive any gift, favor, reward, service, or promise of reward, including a promise of future employment, in exchange for recommending, influencing, or attempting to influence the award of a contract by the public agency he or she serves.

(3) City of Raleigh Charter Section 3.9 regulates private transactions between the City and its officials and employees, the charter states:

No member of the City Council, official, or employee of the City of Raleigh shall be financially interested, or have any personal beneficial interest, either directly or indirectly, as agent, representative, or otherwise, in the purchase of, or contract for, or in furnishing any materials, equipment or supplies to the City of Raleigh, nor shall any official or employee of the City of Raleigh accept or receive, or agree to accept or receive, directly or indirectly, from any person, firm or corporation to whom any contract may be awarded or from whom any materials, equipment or supplies may be purchased by the City of Raleigh, by rebate, gift, or otherwise, any money or anything of value whatsoever, or any promise, obligation or contract for future reward or compensation, for recommending or procuring the uses of any such materials, equipment or supplies by the City of Raleigh; no member of the City Council, official or employee of the City of Raleigh shall for his own personal benefit operate, directly or indirectly, any concession in any building or on any lands of the City of Raleigh, nor shall any official or employee of the City of Raleigh bid for or be awarded any contract granting concessionary rights of any nature or kind from the City of Raleigh; it shall be unlawful for any member of the City Council, official or employee of the City of Raleigh to bid for or to purchase or to contract to purchase from the City of Raleigh any real estate, equipment, materials, or supplies of any nature or kind whatsoever, either directly or indirectly, at either public or private sale, either singly, or through or jointly with any other person.

1.12 Proposer Expenses

The City of Raleigh will not be responsible for any expenses incurred by any Firm in the development of a response to this Request for Qualifications or any other activities associated with this procurement including but not limited to any onsite (or otherwise) interviews and/or presentations, and/or supplemental information provided, submitted, or given to City of Raleigh and/or its representatives. Further, the City of Raleigh shall reserve the right to cancel the work described herein prior to issuance and acceptance of any contractual agreement/purchase order by the recommended Firm even if the awarding authority for each entity has formally accepted a recommendation.

1.13 Proposer Acceptance

Submission of any proposal indicates a Proposer’s acceptance of the conditions contained in this RFQ. The City of Raleigh has the sole discretion and reserves the right to cancel this RFQ, and to reject any and all submittals, to waive any and all informalities and/or irregularities, if it is deemed to be in the City’s best interests to do so.

The City of Raleigh reserves the right to accept or reject any or all of the items in any proposal, and to award the contract in whole or in part and/or negotiate any or all items with individual firms if it is deemed in the City’s best interest. Moreover, the City reserves the right to make no selection if the submittals are deemed to be outside the fiscal constraint or not in the best interest of the City.

2 QUALIFICATIONS PACKAGE

Submittal responses must follow the format outlined below. The City may reject as non-responsive at its sole discretion any submittal that does not provide complete and/or adequate responses or departs in any substantial way from the required format.

2.1 Request for Qualifications Required Document Format

Responses should be divided using tabs to separate each section, listed sequentially as follows:

Tab 1: Cover Letter

Provide an introduction letter summarizing the unique qualifications of your firm to meet the needs of this project. This letter should be presented on the firm’s official letterhead and signed by an authorized representative who has the authority to enter into a contract with the City on behalf of the firm. Include the name, address, telephone and email address of the individual who serves as the point of contact for this solicitation.

Tab 2: Corporate Background and Experience

Include background information on the firm and provide detailed information regarding the firm’s experience with similar projects. Provide a list of all similar contracts performed in the past five (5) years, accompanied by at least three (3) references (contact persons, firm, telephone number and email address).

Include the total amount invoiced for each listed project, the length of the project, and list of personnel involved in the project who are also proposed for the subject project named in this solicitation. Failure to provide a list of all similar contracts in the specified period may result in the rejection of the firm’s proposal. The evaluation team reserves the right to contact any or all listed references, and to contact other public entities regarding past performance on similar projects.

Tab 3: Financial Information Review and provide one of the following three (3) financial statement options:

1. Recent audited or reviewed financial statements prepared by an independent certified public accountant (CPA) that shall include, at a minimum, a balance sheet, income statement (i.e., profit/loss statement) and cash flow statement and, if the audited or reviewed financial statements were prepared more than six (6) months prior to the issuance of this RFQ, the Proposer shall submit its most recent internal financial statements (balance sheet, income statement and cash flow statement or budget with entries reflecting revenues and expenditures from the date of the audited or reviewed financial statements to the end of the most recent financial reporting period (i.e., the quarter or month preceding the issuance date of this RFQ)).

OR

2. Recent compiled financial statements prepared by an independent CPA that shall include, at a minimum, a balance sheet, income statement (i.e., profit/loss statement) and cash flow statement and, if the compiled financial statements were prepared more than three (3) months prior to the issuance of this RFQ, the Proposer shall submit its most recent internal financial statements (balance sheet, income statement and cash flow statement or budget with entries reflecting revenues and expenditures to date), and other evidence of financial stability such as most recently filed income tax return, evidence of a line of credit/loans/other type of financing with statement of amount in use/outstanding balance (e.g., a complete copy commitment letter, loan agreement, billing statement reflecting the line of credit or statement from lender acknowledging the commitment to fund the Proposer’s stated financing), personal guaranty with copies of personal income tax filing and statement of net worth or such other evidence that is accurate, reliable and trustworthy regarding the Proposer’s financial stability.

OR

3. Include a certified, signed statement from a licensed CPA regularly engaged in the review of the firm’s financial information verifying the financial viability of the firm.

All financial information, statements and/or documents provided in response to this solicitation shall be kept confidential provided that EACH PAGE is marked as follows:

“CONFIDENTIAL – DO NOT DISCLOSE EXCEPT FOR THE EXPRESS PURPOSE OF

PROPOSAL EVALUATION.“

“Recent” shall be defined as financial statements that were prepared within the 12 months preceding the issuance date of this RFQ.

Consolidated financial statements of the Proposer’s parent or related corporation/business entity will not be considered, unless: (1) the Proposer’s actual financial performance for the designated period is separately identified in and/or attached to the consolidated statements; (2) the parent or related corporation/business entity provides the State with a document wherein the parent or related corporation/business entity will be financially responsible for the Proposer’s performance of the contract and the consolidated statement demonstrates the parent or related corporation’s/business entity’s financial ability to perform the contract, financial stability and/or such other financial considerations identified in the evaluation criteria;

and/or (3) Proposer provides its own internally prepared financial statements and such other evidence of its own financial stability identified above.

The firm’s failure to provide any of the above-referenced financial statements may result in the proposal being removed from consideration. Proposers are also encouraged to explain any negative financial information, and to provide documentation supporting those explanations and demonstrating the financial strength of the firm.

Tab 4: Project Understanding, Approach and Schedule Provide a comprehensive narrative, outline, and/or graph demonstrating the firm's understanding and approach to accomplishing the tasks outlined in the Scope of Work section of this RFQ. A description of each task and deliverable and the schedule for accomplishing each shall be included.

Tab 5: Team Firm, Experience and Certifications/Qualifications

This section must include the proposed staffing, deployment and firm of personnel to be assigned to this project. The Proposer shall provide information as to the qualifications and experience of all executive, managerial, legal, and professional personnel to be assigned to this project, including resumes citing experience with similar projects and the responsibilities to be assigned to each person. A project-specific firm chart which clearly illustrates the roles, responsibilities, and the reporting relationships of each team member should be included.

2.2 Hourly Rates

This solicitation is being issued in accordance with NC G.S. Chapter 143 Article 3D (Procurement of Architectural, Engineering, and Surveying Services), otherwise known as the Mini-Brooks Act, and therefore price cannot and will not be a determining factor in the selection of the successful service provider. One copy of the Hourly Rate Schedule (see Appendix I) for all proposed project personnel should be enclosed in a separate, sealed envelope.

2.3 Qualifications Package Documents

This RFQ is comprised of the base RFQ document, any attachments, and any addenda released before Contract award. All attachments and addenda released for this RFQ in advance of any Contract award are incorporated herein by reference.

3 SUBMITTAL EVALUATION

3.1 Evaluation Criteria

This is not a bid. There will not be a public opening. The submittals received in response to this RFQ will be evaluated and ranked, by the evaluation committee in accordance with the process and evaluation criteria contained below. Submittals will be evaluated in light of the material and substantiating evidence presented in the response, and not on the basis of what is inferred.

After thoroughly reading and reviewing this RFQ, each evaluation committee member shall conduct his or her independent evaluation of the submittals received and grade the responses on their merit in accordance with the evaluation criteria set forth in the following table:

Criteria (a)

Weight (b)

Score (0-3)

(a) x (b) Weighted

Score https://www.ncleg.gov/EnactedLegislation/Statutes/HTML/ByArticle/Chapter_143/Article_3D.html

Corporate Background and Experience 15

Familiarity with Site and Conditions 25

Project Understanding and Approach 15

Previous Experience with Design-Build Contracts

Team Firm, Experience, and Qualifications 20

Final Score

Score Points 0 - Missing or Does Not Meet Expectation 2 - Meets Expectation 1 - Partially Meets Expectation 3 - Exceeds Expectation

3.2 Final Selection

Qualifications will be reviewed after opening and will be ranked in order of choice, at which point contract negotiations will begin with the most qualified firm. If negotiations are unsuccessful, the City will then pursue negotiations with the next most qualified firm. The City shall not be bound or in any way obligated until both parties have signed a contract. The City also reserves the right to delay the award of a contract or to not award a contract.

3.3 Notice to Submitting Firms Regarding RFQ Terms and Conditions It shall be the submitting firm’s responsibility to read the RFQ Instructions, the City’s contract terms and conditions provided in Appendix IV, all relevant exhibits and attachments, and any other components made a part of this RFQ and comply with all requirements and specifications provided herein. Submitters are responsible for obtaining and complying with all Addenda and other changes that may be issued in connection with this RFQ.

3.4 Contract Term

The contract issued by the City to the selected firm will state and define a completion date by which the services are to be finished and completed.

4 SCOPE OF SERVICES

Awarded firm shall provide services, all as set forth in this RFQ and more particularly described in this Section 4, Appendix IV: Standard Form of Agreement Between Owner and Design-Builder and in the Dix Park Utility Infrastructure Master Plan, Phase 1 Report provided in Appendix V.

All proposers should review Appendix IV and V to this RFQ to become more familiar with the Project.

The Design-Builder’s services for the Project will be engaged in a two-phase process, one phase being pre-construction and the other being construction. The Design-Builder shall perform the Phase 1 Services of design, pricing, and other services for the Project. Design documents shall include all drawings and specifications needed to permit and perform the work, including but not limited to the following disciplines:

• Civil/Site

• Architectural

• Environmental/Abatement

• Cost Estimating

• Structural

• Fire

• Survey

• Mechanical, Electrical and Plumbing

• Site management, safety, logistics, phasing and other construction related matters.

Design-Builder’s Phase 2 Services shall consist of the completion of design services, including permitting, for the Project; the procurement of all materials and/or equipment for the Project;

the performance of all construction, demolition, and/or abatement services for the Project; the start-up, testing, and commissioning of the Project, if applicable; and the provision of warranty services.

Building Stabilization for Reuse Building stabilization for reuse consists of placing each building in a condition that minimizes deterioration, water intrusion, and mold growth during the period between stabilization and future redevelopment by others. This stabilization period may extend for up to ten (10) years.

Stabilization work includes the abatement and demolition of interior building components, including but not limited to drywall, insulation, piping, ductwork and equipment insulation, carpeting, and ceiling systems. Roof drain leaders shall remain operational to convey stormwater. Roofs shall be inspected for leaks and repaired or patched as necessary to maintain weather-tight conditions.

Hazardous materials testing shall be conducted in each building. Based on the results of testing, abatement and removal of identified hazardous materials may be required to achieve stabilization suitable for reuse.

Building Demolition and Hazardous Materials Abatement Building demolition work includes the identification, abatement, removal, handling, and lawful disposal of hazardous materials in preparation for demolition of existing buildings and associated site improvements. All demolition and abatement activities shall be performed in accordance with applicable federal, state, and local laws, regulations, and codes.

Utilities Identification and Management The identification, coordination, and management of all utilities is critical to the successful execution of this work. The selected firm shall identify all existing utilities serving or crossing the campus, including but not limited to electrical, gas, water, sewer, storm drainage, telecommunications, and fire protection systems. The scope includes coordination with utility providers and the city to disconnect, cap, abandon, reroute, or remove the utility systems as required.

Permitting, Coordination, and Public Safety The selected firm shall obtain all required permits, provide all required notifications, and coordinate with regulatory agencies having jurisdiction. All work shall be properly sequenced to support the overall project schedule while maintaining continuous site safety, environmental protection, and public safety. This requirement is of paramount importance, as the park will remain open and accessible to the public throughout the duration of the work.

Updates to Appendix V There are a few important updates to the work described in Appendix V.

• Most of the work outlined in Section 2: Decommissioning is already complete. The City will provide an update on work completed at the pre-proposal conference.

• The design of the utility corridor (Section 7) is outside the scope of this request but is happening concurrently and will require coordination.

• Solutions for ongoing site lighting will need to be considered as part of this scope of services.

APPENDIX I

HOURLY RATE SCHEDULE

Awarded firm shall perform the services to be performed as set forth in this RFQ and more particularly described in Section 4 Scope of Services utilizing the following hourly rate schedule below.

As stated above in section 2.2 Hourly Rates, provide the Hourly Rate Schedule in a separate, sealed envelope.

Position Title Hourly Rate

Firm Name: ____________________________________________________________

Authorized Signature: _________________________________Date_______________

Signed by: _____________________________________________________________

[Type or Print Name]

Title of Signer: __________________________________________________________

APPENDIX II

PROPOSER QUESTIONNAIRE

The following questions must be answered, and data given must be clear and comprehensive. If necessary, questions may be answered on separate sheets. The Proposer may submit any additional information desired.

Company Name: d/b/a (if applicable)

Street / PO Box:

City: State: Zip:

Phone: Fax: E-Mail:

Website (if applicable):

Sole Proprietor Partnership Corporation Other

Number of years in business under company’s present name:

Fed Tax ID #: DUNS #

Are you registered with the North Carolina Secretary of State to conduct business (if required)? (Check One) YES: NO: Not Applicable:

Are you properly licensed/certified by the Federal and/or State of North Carolina to perform the specified work?

YES: NO: Not Applicable: ATTACH COPY OF ALL APPLICABLE LICENSING/CERTIFICATION DOCUMENTS

Are/will you be properly insured to perform the work? YES: NO:

Contact for this Contract: Title:

Phone: Fax: E-Mail:

Have you ever defaulted or failed on a contract? (If yes, attach details) YES: NO:

List at least three (3) references for which you have provided these services (same scope/size) in the past three years - preferably government agencies. Do not include City of Raleigh as a reference to meet the requirement of listing at least (3) references.

PROPOSERS ARE RESPONSIBLE FOR SENDING REFERENCE QUESTIONNAIRE (APPENDIX III) TO THEIR

REFERENCES.

1. Company:

Contact Person: Title:

Phone: Fax: E-Mail:

Describe Scope of Work:

2. Company:

Contact Person: Title:

Phone: Fax: E-Mail:

Describe Scope of Work:

3. Company:

Contact Person: Title:

Phone: Fax: E-Mail:

Describe Scope of Work:

4. Company:

Contact Person: Title:

Phone: Fax: E-Mail:

Describe Scope of Work:

5. Company:

Contact Person: Title:

Phone: Fax: E-Mail:

Describe Scope of Work:

The undersigned swears to the truth and accuracy of all statements and answers contained herein:

Authorized Signature: Date:

APPENDIX III

REFERENCE QUESTIONNAIRE

(Instructions)

# 274-Dix Park Design-Build Services for Buildings

The City of Raleigh, as a part of the RFQ, requires proposing companies to submit a minimum of three (3) business references as required within this document. The purpose of the references is to document the experience of the proposer relevant to the scope of services and assist in the evaluation process.

• The Proposer is required to send the reference form (the following two pages) to each business reference listed on Proposer Questionnaire.

• The business reference, in turn, is requested to submit the Reference Form directly to the City of Raleigh Point of Contact identified on the Reference Questionnaire form for inclusion in the evaluation process.

• The form and information provided will become a part of the submitted proposal. The business reference may be contacted for validation of the response.

• It is the Proposer’s responsibility to verify their references have been received by the

City of Raleigh Point of Contact by the date indicated on the reference form.

APPENDIX III

REFERENCE QUESTIONNAIRE FORM

# 274-Dix Park Design-Build Services for Buildings

(Name of Business Requesting Reference)

This form is being submitted to your company for completion as a business reference for the company listed above.

This form is to be returned to the City of Raleigh, Eric Regensburger via email to eric.regensburger@raleighnc.gov no later than 5 p.m. ET, Friday, February 13, 2026 and MUST NOT be returned to the company requesting the reference.

For questions or concerns regarding this form, please contact the City of Raleigh, Point of Contact above.

Company Providing Reference

Contact Name and Title/Position

Contact Telephone Number

Contact Email Address

Questions:

1. In what capacity have you worked with this company in the past? If the company was under a contract, please acknowledge and explain briefly whether or not the contract was successful.

Comments:

2. How would you rate this company’s knowledge and expertise?

3= Excellent 2= Satisfactory 1= Unsatisfactory 0= Unacceptable

3. How would you rate the company’s flexibility relative to changes in the scope and timelines?

4. What is your level of satisfaction with hard-copy materials, e.g. reports, logs, etc. produced by the company?

mailto:eric.regensburger@raleighnc.gov

5. How would you rate the dynamics/interaction between the company and your staff?

6. Who were the company’s principle representatives involved in providing your service and how would you rate them individually? Would you comment on the skills, knowledge, behaviors or other factors on which you based the rating?

(3= Excellent; 2= Satisfactory; 1= Unsatisfactory; 0= Unacceptable)

Name: Rating:

7. With which aspect(s) of this company’s services are you most satisfied?

8. With which aspect(s) of this company’s services are you least satisfied?

9. Would you recommend this company’s services to your organization again?

APPENDIX IV

Standard Form of Agreement Between Owner and Design-Builder (see attachment)

APPENDIX V

Utility Infrastructure Master Plan

(see attachment)

1 INTRODUCTION
1.1 Purpose
The Project generally involves evaluating, abating and stabilizing 20 buildings with an estimated combined total area of nearly 500,000 square feet (SF) such that the buildings do not deteriorate or experience significant mold growth during the period...
1.2 Background
1.3 RFQ Timeline
1.4 Pre-Submittal Conference
1.5 Questions
Requests for clarification and questions to this RFQ must be received by the City not later than the date shown above in Section 1.3 RFQ Timeline, for the submittal of written inquires. The firm’s failure to request clarification and submit questions...
The City shall issue addenda reflecting questions and answers to this RFQ, if any, and shall be posted to North Carolina electronic Vendor Portal (eVP). No information, instruction or advice provided orally or informally by any City personnel, whether...
1.6 Submittal Requirements and Contact Information
1.7 Business Engagement and Opportunities
1.8 Rights to Submitted Material
All qualification packages and supporting materials, as well as correspondences relating to this RFQ, shall become the property of the City. The content of all submittals will be held confidential until the selection of the firm is made. Qualificatio...
1.9 Communications
All communications of any nature regarding this RFQ with any City staff, elected City officials, evaluation committee members are strictly forbidden from the time the solicitation is publicly posted until award. Questions must be submitted in writin...
1.10 Lobbying
By responding to this solicitation, the firm certifies that is has not and will not pay any person or firm to influence or attempt to influence an officer or employee of the City or the State of North Carolina, or any elected official in connection wi...
1.11 Conflicts of Interest
1.12 Proposer Expenses
1.13 Proposer Acceptance
2 QUALIFICATIONS PACKAGE
2.1 Request for Qualifications Required Document Format
2.2 Hourly Rates
2.3 Qualifications Package Documents
3 SUBMITTAL EVALUATION
3.1 Evaluation Criteria
3.2 Final Selection
3.3 Notice to Submitting Firms Regarding RFQ Terms and Conditions
3.4 Contract Term

4 SCOPE OF SERVICES