Appendix V Dix Park Utility Infrastructure Master Plan_red.pdf

PDF 5 MB Posted

Attached to
Request for Qualifications - Dix Park Design-Build Services for Building Stabilization and Demolition State and local contract opportunity
Solicitation number
274-DixParkDesign-BuildServices
Issued by
Wake County, Teachey Town, North Carolina

About this file

This is a Utility Infrastructure Master Plan Phase 1 report prepared by Dewberry Engineers Inc. for the City of Raleigh Parks, Recreation, and Cultural Resources Department regarding the Dorothea Dix Campus transition. The report provides comprehensive recommendations for decommissioning existing central steam and chilled water plants, stabilizing approximately 20 buildings totaling nearly 500,000 square feet for future adaptive reuse, and demolishing approximately 17 buildings totaling approximately 400,000 square feet. Key deliverables include detailed decommissioning procedures for steam and chilled water distribution systems serving 44 and 20 buildings respectively, building-specific scope of work documentation, stabilization protocols to prevent deterioration and mold growth during extended periods before redevelopment, and utility infrastructure planning. The report establishes a September 1, 2026 deadline for completing all building decommissioning to prepare for the following winter season and recommends completing all stabilization work within one year of decommissioning. Coordination is required with the North Carolina Department of Health and Human Services, which currently operates the campus and plans full vacation by October 31, 2025, and with the Raleigh Fire Marshal and insurance companies regarding sprinkler system abandonment procedures.

The report identifies estimated annual operational costs of $6,575,000 for the existing steam and chilled water plants, with decommissioning expected to generate substantial savings. Recommendations include executing decommissioning and stabilization work under a single construction contract to facilitate faster completion and reduce overall costs. Additionally, the report addresses future utility corridor infrastructure, estimating $10 million to $12 million in construction costs for new water, reclaimed water, and sanitary sewer systems based on 2024-2025 bid pricing. Site lighting modifications are estimated at approximately $350,000 to $690,000 depending on the methodology selected. The City of Raleigh will utilize an internally determined contract vehicle for this work, and Dewberry's recommendations assume approval from the Raleigh Fire Marshal and insurance companies for the proposed decommissioning and abandonment procedures.

View the file

Other files for this state and local contract opportunity

Other files attached to Request for Qualifications - Dix Park Design-Build Services for Building Stabilization and Demolition, newest first.
File Type Posted
Dix Design Build PreConf PPT.pdf PDF
Exhibit E City Sales Tax Reporting Program.pdf PDF
Exhibit F Design Builders Insurance Requirements.pdf PDF
DixParkDBServicesRFQ.pdf PDF
Appendix IV Standard Form of Agreement Between Owner and Design-Builder.pdf PDF
Exhibit D.pdf PDF
Exhibit C DBIA 535 General Conditions.pdf PDF
Dix_Park_RFQ_QA_Addendum.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEI PROJECT NO: 50188448

DIX PARK

UTILITY INFRASTRUCTURE

MASTER PLAN – PHASE 1

Building Decommissioning, Stabilization, and Demolition Report

Final Report

DECEMBER 05, 2025

SUBMITTED BY

Dewberry Engineers Inc.

2610 Wycliff Road, Suite 410

Raleigh, NC 27607

919.881.9939

SUBMITTED TO

City of Raleigh

Parks, Recreation, and Cultural Resources Dept

222 W. Hargett Street, Sixth Floor

Raleigh, NC 27601

ORIGINAL

D I X P A R K U I M P – P H A S E 1 1

Table of Contents

1. INTRODUCTION 2

2. DECOMMISSIONING 3

3. STABILIZATION 8

4. DEMOLITION 9

5. BUILDINGS WITH STANDALONE SYSTEMS 9

6. ROLES AND RESPONSIBILITIES 9

7. UTILITY CORRIDOR 10

8. SITE LIGHTING 11

9. APPENDICES 12

Appendix A – Building Information Table 12 Appendix B – Building Decommissioning Map 13 Appendix C – Building Demolition & Stabilization Map 14 Appendix D – Building Decommissioning Scope 15 Appendix E – Roles and Responsibilities Matrix 16 Appendix F – Utility Corridor Map 17 Appendix G – Site Lighting Maps 18

Abbreviations

City The City of Raleigh CHW Chilled Water CRAC Computer Room Air Conditioning Dewberry Dewberry Engineers Inc.

DHHS North Carolina Department of Health and Human Services Dix Park Staff The City of Raleigh’s Recreation and Cultural Resources

Department DX Direct Expansion Engineering Services The City of Raleigh Engineering Services Department UIMP Utility Infrastructure Master Plan

D I X P A R K U I M P – P H A S E 1 2

1. INTRODUCTION

In preparation of the City of Raleigh (City) assuming full operational responsibilities of the Dorothea Dix Campus, Dewberry Engineers Inc. (Dewberry) has been providing utility infrastructure master plan (UIMP) services to the City of Raleigh’s Park, Recreation and Cultural Resources Department staff (Dix Park Staff) in association with the implementation of the parkwide Dix Park Master Plan.

As part of these services, the City tasked Dewberry with meeting with the City and its stakeholders to provide a decommissioning plan for the existing central steam plant and chilled water (CHW) plant.

Senior staff from the City of Raleigh’s Engineering Services Department (Engineering Services), a primary stakeholder in the implementation of the Dix Master Plan, provided continuous technical support to Dix Park Staff throughout this task.

The City is anticipated to take full responsibility for the operation of the campus at the end of October 2025. As part of this task, Dewberry reviewed Dix Park Staff’s list and schedule for buildings to be demolished, stabilized for reuse, and occupied when the North Carolina Department of Health and Human Services (DHHS) vacates the campus.

Dewberry has reviewed the following documents, reports, and assessments to gain a full understanding of the campus chilled water and steam distribution systems:

• Dorothea Dix Campus Facilities Study – Dewberry - 2015

• Dorothea Dix Park Utility Review – MVVA & Dewberry - 2023

• Building Demolition, Stabilization for Reuse, and Occupancy Plan – Dix Park Staff - 2025

• Dorothea Dix Steam Plant Operations Cost Models Memo - Engineering Services - 2025

Dewberry’s recommendations for decommissioning, stabilizing, and demolition assume that the City of Raleigh Fire Marshal (fire marshal) and relevant insurance companies do not take exception to draining and abandoning any existing fire sprinkler lines until the buildings are demolished or renovated. Per Dewberry’s understanding, Dix Park Staff has received approval from the fire marshal and insurance companies. The goal of these recommendations is to shut down the central steam and chilled water plants as quickly as possible. This will provide the most cost savings for the City based on operational costs provided in the “Dorothea Dix Steam Plant Operations Cost Models Memo” provided by Engineering Services.

Per conversations with Dix Park Staff, Dewberry recommends performing the decommissioning and stabilization scope of work under a single construction project. This will help facilitate a faster construction schedule, decommission the steam system, prepare buildings for stabilization within a year, and reduce the cost of operating the steam plant. The contract vehicle associated with this work will be determined internally by the City.

Appendix A includes a table summarizing general information, associated utilities, and the intended decommissioning, stabilization, and demolition for each building at Dix Park. Decommissioning, stabilization for reuse, and demolition recommendations are detailed in the following sections and appendices.

D I X P A R K U I M P – P H A S E 1 3

2. DECOMMISSIONING

Dix Park is currently served by two chiller plants and a central steam plant. There is a 900 ton chiller plant located in McBryde North that consists of three (3) 300 ton chillers and a 1,000 ton chiller plant located in a standalone building off Palmer Drive that consists of two 500 ton chillers. The two chiller plants are interconnected and distribute chilled water to 20 buildings on campus. The steam plant consists of four boilers of the following nominal sizes: 1500 hp, 800 hp, 500 hp, and 250hp. These four boilers distribute 125 psig steam to 44 buildings on campus. Per review of prior year’s plant operation costs provided by DHHS and the Steam Plant Operations Cost Models Memo provided by Engineering Services, it is estimated that the cost to operate and maintain these plants is $6,575,000 per year.

Based on conversations with Dix Park Staff and Engineering Services, one of the first priorities is to decommission the existing steam and chilled water plants. However, deactivation of the steam plant can lead to freezing conditions inside the buildings during winter months currently heated by steam and potentially lead to pipe ruptures. Deactivation of the chilled water plant creates a situation where buildings are not air conditioned and lead to an environment that allows for mold growth during summer months.

Therefore, before the steam and chilled water plants can be deactivated and decommissioned, the buildings served by these plants must first be prepared for an unconditioned environment.

Furthermore, none of the buildings served by steam and chilled water are planned for immediate occupation. Therefore, the chilled water plant can be shut down by DHHS before they vacate the site.

However, DHHS has recently requested the chilled water plants remain online until all IT equipment and spaces have been vacated. DHHS plans to have all IT equipment removed by no later than December 31st, 2025.

Additional information is required from DHHS detailing the buildings that will require chilled water to support IT services and the required duration. It is Dewberry’s understanding that Dix Park Staff and DHHS are currently discussing this requirement. Cooling may be required on campus until December 31st and would require the chilled water plant to operate. At a minimum, the Harvey building (main IT building) will need cooling after DHHS vacates the campus.

The Harvey building is currently served by three (3) means of cooling for redundancy. The chilled water plant provides the main source of cooling. Separate DX CRAC and window air conditioning units are used as redundant cooling sources when the CHW plant is not operational.

DHHS stated that the redundant DX cooling system serving the Harvey building was in good operating condition. DHHS will verify if this source of cooling can be used and relied on to serve the IT space in the Harvey building. Assuming this is the only IT space that would require cooling after DHHS vacates the campus, the chiller plants could be shut down before DHHS vacates Dix Park.

No other specific preparations are required prior to the deactivation of the chilled water plants, however, buildings served by the chiller plants will need to have all possible sources for mold growth removed in a timely manner, as described in the stabilization section of this report.

Prior to turning off the steam plant, all buildings that utilize steam for heating, regardless of if they are planned for reuse or demolition, must be made ready to withstand freezing temperatures. In general, this means cutting and capping all utility piping at least five (5) feet outside the building and draining interior piping to prevent pipe ruptures. In addition to being cut and capped at least five (5) feet outside the building, sanitary sewer piping should be disconnected and capped at the associated sanitary sewer manhole or sewer main as well. Roof drain leaders shall remain in service to convey stormwater. In order reduce fire risk, it is recommended that building electrical service be disconnected at the utility transformer. Prior to performing work in the building, testing should be performed on all potentially hazardous materials that will be disturbed. Dependent on test results, abatement and removal of hazardous materials may be required to perform the scope of work in the building.

D I X P A R K U I M P – P H A S E 1 4

All buildings shall be decommissioned no later than September 1st, 2026 to prepare for next year’s winter season. Buildings scheduled to be stabilized for reuse should be prioritized and completed first followed by buildings scheduled for demolition. The list of these buildings is outlined in Appendix A.

Dix Park Staff confirmed with the Raleigh Fire Department that abandonment of the buildings is acceptable provided the following criteria are met: electrical service is removed from buildings, buildings are not be utilized for storage, security measures are implemented to prevent unauthorized access or storage, and stairwell hose stations remain operational in buildings taller than 30 feet.

Appendix B outlines all buildings that require decommissioning preparation. Appendix D outlines the decommissioning scope of work required in each building. It is recommended that one contractor take responsibility for the entire decommissioning scope of work to facilitate coordination between building decommissioning and plant deactivation.

Engineering Services will need to operate the steam plant until the building decommissioning work is complete. The timeline associated with this work will be determined by how quickly the decommissioning scope of work can be completed once a contractor is under contract. Buildings may be decommissioned one at a time or multiple at the same time; however, per the Dorothea Dix Park Utility Review, approximately 50,000 square feet of building space will need to remain operational until the smallest boiler is deactivated. Deactivation of the final boiler and buildings being decommissioned will need to be coordinated during construction.

In the event Engineering Services staff can no longer operate the steam plant or if the steam plant fails, the following steps will need to be taken to properly shut down the steam plant and minimize risk to each building connected to the steam system.

• Engineering Services shall valve off and drain the chilled water, domestic water, fire sprinkler, steam, and steam condensate lines entering each building at the main shut off valve where the service enters the building. This work shall take place before the plant is de-energized, if possible.

• In buildings that convert steam to heating hot water, heating hot water pumps shall be de-energized and the heating hot water piping shall be drained.

• Install heat trace upstream of the main building domestic water shut off valve where piping is uninsulated. Heat trace shall also be installed on long runs of pressurized piping that remain due to the location of the main building shut off valve.

• Supplemental heat shall be provided to buildings that are currently occupied or will remain occupied by DHHS.

• Power shall remain on to all buildings.

• Engineering Services will need to coordinate with Raleigh Fire to determine the requirements to occupy buildings that will have their fire sprinkler systems valved off and drained. Fire alarm systems will be required to function for buildings that will remain occupied by DHHS. A fire watch and caution signage may also be required.

• Engineering Services will need to purchase additional domestic water shut off valves common to domestic water pipe sizes serving each building to facilitate a quick repair if domestic water main shut off valves fail.

• Engineering services staff will need to walk all buildings weekly to monitor domestic water leaks and note changes in building conditions.

• If possible, the plant shall be shut down when temperatures are expected to be above freezing as the estimated time to complete the heating hot water scope noted above is approximately two weeks. This will reduce the risk of heating hot water pipes freezing once the steam system is de-energized.

D I X P A R K U I M P – P H A S E 1 5

Engineering Services will need to remove the remaining fuel oil from the storage tanks adjacent to the steam plant. The fuel stored in these tanks serves the dual fuel boilers when gas service to the steam plant is curtailed by Enbridge during high demand. Per conversations with Engineering Services, several options to remove fuel oil have been considered. The options below are currently being discussed by Engineering Services to determine the best path forward.

• Hire a company to remove the fuel oil from the tanks.

• Allow the boilers to use the estimated 3-to-4-day supply of fuel oil from the tanks before the steam plant is shut down.

• Work with the City’s Vehicle Fleet Services to remove and repurpose the fuel oil.

Refer to Appendix B for a map of all buildings planned for decommissioning.

Photo: Steam Plant Building

D I X P A R K U I M P – P H A S E 1 6

Photo: fire tube steam boiler (800 hp) inside of Steam Plant Building

Photo: water tube steam boiler (1500 hp) inside of Steam Plant Building

D I X P A R K U I M P – P H A S E 1 7

Photo: Chiller Plant Building

Photo: water cooled chiller inside Chiller Plant Building

Photo: Chiller Plant

Photo: water cooled chiller inside Chiller Plant

D I X P A R K U I M P – P H A S E 1 8

3. STABILIZATION

Once the scope of work described in the decommissioning section of this report has been completed, the next phase is for buildings to remain to be stabilized for reuse.

Building stabilization for reuse means that buildings will be put in a condition that will allow for minimal deterioration or mold growth during the time period between stabilization and redevelopment of the buildings by others. This time period could potentially last up to ten (10) years. This involves demolishing building interiors including, but not limited to, drywall, building insulation, piping/ductwork/equipment insulation, carpet, ceiling tiles, etc. Roof drain leaders are to remain in service to convey stormwater.

Additionally, roofs are to be inspected for leaks and patched as required. All rooftop equipment and roof penetration seals are to remain. Hazardous materials testing is to be performed in each building.

Dependent on test results, abatement and removal of hazardous materials may be required to stabilize buildings for reuse.

Stabilizing all buildings scheduled for reuse and providing a new utility corridor may make each building more appealing as they are brought to market.

Dewberry recommends that all the buildings scheduled for stabilization for reuse be completed within a year of decommissioning. This will minimize building decay and prepare the buildings for future renovations. Several small buildings not connected to the steam and chilled water systems will need to be stabilized as well. Recommendations for these buildings are included in section 6.

After correspondence with the City of Raleigh’s Building Permitting Department, it was determined permitting will require site plans showing buildings to be stabilized for reuse and this corresponding narrative explaining the scope of work for stabilization. The design-build team will ultimately decide what documentation is needed to price and execute the stabilization scope of work. However, the City can require the minimum documentation it wants to see to negotiate pricing and work.

Refer to Appendix C for a map of all buildings planned for demolition and stabilization for reuse.

D I X P A R K U I M P – P H A S E 1 9

4. DEMOLITION

Dix Park Staff is currently developing and issuing packages for building demolition throughout Dix Park.

Building demolitions may continue to proceed on their own timeline as determined by Dix Park Staff.

Building demolitions can occur concurrently with building stabilizations. However, Dewberry recommends that decommissioning of the boiler plant and building stabilizations take priority over building demolitions.

If buildings are demolished before the boiler plant has been decommissioned, utilities should be dealt with as follows:

• Disconnect electrical service entrance conductors associated with each building at utility transformer. If all secondary conductors at the utility transformer are disconnected, coordinate with utility to de-energize the transformer.

• Disconnect and cap steam and chilled water piping 5 feet outside the building entrance.

• Disconnect and cap natural gas piping 5 feet outside the building entrance and coordinate with gas utility provider to remove the associated meter.

• Disconnect and cap waste piping 5 feet outside the building entrance.

• Disconnect and cap domestic water and fire protection piping 5 feet outside the building entrance.

• Disconnect and cap roof leaders 5 feet outside the building entrance and at the associated storm structure.

Refer to Appendix C for a map of all buildings planned for demolition and stabilization.

5. BUILDINGS WITH STANDALONE SYSTEMS

Several buildings are currently on standalone heating and cooling systems. Dewberry recommends these buildings continue to operate with adjusted cooling setpoints set to 80 degrees F. and heating set points set to 50 degrees F. These buildings could also be stabilized for reuse as noted above if desired by Dix Park Staff and Engineering Services. However, they are not required to be decommissioned to facilitate deactivation of the chilled water plants and central steam plant.

6. ROLES AND RESPONSIBILITIES

Dewberry has provided a matrix defining the roles and responsibilities for stakeholders moving forward.

This matrix is intended to assign tasks as the project continues to move forward. This matrix can be found in Appendix E.

D I X P A R K U I M P – P H A S E 1 10

7. UTILITY CORRIDOR

As part of the UIMP, much of the existing infrastructure throughout Dix Park will be replaced as they have reached the end of their useful service life and are in poor condition. Dewberry is currently reviewing and outlining future options for the utility corridor that will serve Dix Park.

Dewberry is coordinating with Raleigh Water for future domestic water and reclaimed water connection points with the Pullen to Bain Water Main and Reclaimed Water Main project. This project is scheduled to be completed in 2028. Dewberry has identified potential connection points to the Pullen to Bain Water Main and Reclaimed Water Main, which are shown in Appendix F.

Further conversations are needed to determine if the utility corridor will traverse through the park footprint or have two separate loop systems to cross the existing railroad. If two separate loop systems are to be used, additional connections to the water main system on Lake Wheeler Road and Western Boulevard may be required. However, the sizes of the future water mains and reclaimed water mains along the west side of the campus could be smaller in diameter due to the lower water demand on this side of the park.

Discussions have also been held with Raleigh Water for future sanitary sewer tie-in locations. Per conversations with Raleigh Water, the preferred tie-in location is to the Big Branch sewer interceptor which runs parallel to Western Boulevard. There are existing capacity issues with the sewer interceptor along Lake Wheeler Drive. However, these capacity issues may be resolved in the future as Raleigh Water has planned sewer improvements to take place during the Lake Wheeler Drive project.

The utility corridor will also contain high voltage power, natural gas, fiber, and communication duct banks.

Further coordination will be needed with these utility providers to determine logistical tie-in points, correct sizing, and potential costs.

At the time of this report, Dewberry is only able to provide a high level cost of the west utilities (water, sewer, and reclaimed water). This cost also represents having one corridor traverse through Dix Park.

Wet Utilities (approximate lengths):

• 5,200 LF of 16-inch water main – includes tie-ins, valves, fittings etc.

• 5,200 LF of 8-inch reclaimed water main – includes tie-ins, valves, fittings etc.

• 5,200 LF of 12-inch gravity sanitary sewer and manholes

Construction Cost:

• $10M – $12M

Costs were taken from bid openings in 2024 and 2025 and are integrated in for this opinion of probable cost.

D I X P A R K U I M P – P H A S E 1 11

8. SITE LIGHTING

Dewberry completed a review of the existing site lighting at Dix Park. It was found that a portion of fixtures were tagged and powered by the utility under a lease agreement, and that some of these were not functional. The remaining 137 fixtures not powered by the utility are currently being powered from a nearby building and some of these were also found to be not functional. A site plan with site lighting status annotated can be found in Appendix G. The fixtures powered from building will not receive power once the decommissioning work is complete. To maintain continuity of site lighting, these fixtures must be recircuited or replaced with solar powered fixtures.

Currently two options exist for recircuiting lighting impacted by decommissioning work. Light fixtures and poles can be removed and replaced with Solar light fixtures and poles powered by a photovoltaic panel and battery. The basis of design can be found in Appendix G. Another option is to provide a NEMA 3R panelboard connected to the secondary of a nearby transformer to refeed light poles. Dewberry recommends a combination of the two options to provide power to site lighting.

It was found that nine (9) fixture locations are prime candidates for replacement with solar light fixtures and poles. This is based on their remote location and lack of shading. One hundred twenty-eight (128) fixture locations could be wired to the secondary of a nearby transformer via new exterior panelboard(s).

A site plan detailing these recommendations can be found in Appendix G.

Recommendations for powering fixtures are based on the existing poles and locations only. Photometric calculations have not been done to verify layout is optimized or that the current site lighting levels meet IES recommendations.

Additionally, several utility-leased fixtures were found to not be functioning properly. Dewberry recommends contacting the utility regarding these fixtures.

Recommendations made above are based on economic factors. Realizing this is not the only factor in decision making, Dewberry looked at the costs of a traditional wired system vs maximizing the solar option. There are 71 fixtures not currently powered by the utility that are not suitable for solar lighting due to shading concerns. The remaining 66 fixture locations needing to be modified are good candidates for replacement with solar. The approximate cost of replacing these 66 fixtures with solar lights is $690k. The approximate cost to re-feed these same fixtures is $350k. The costs were determined by the solar vendor pricing, recent bid pricing, and RSMeans.

D I X P A R K U I M P – P H A S E 1 12

9. APPENDICES

Appendix A – Building Information Table

Bldg # Building Name SQFT Demolish or

Stabilize Decommission Steam

Chilled

Water Generator

Natural

Gas

Water &

Sewer

Fire

Suppression

3 Flower Cottage 1,697 No* No No No No No Yes No

12 Gate Keeper's Cottage 1,336 No* No No No No No Yes No

13 Doctor's House 2,260 No* No No No No No Yes No

14 Superintendent's House 3,694 No* No No No No Yes Yes No

21 1003 Richardson 891 Demolish No No No No Yes Yes No

28 1003 Stancil 1,346 Stabilize No No No No Yes Yes No

29 1005 Stancil 1346 Stabilize No No No No Yes Yes No

30 1009 Stancil 1,346 Stabilize No No No No Yes Yes No

36 Royster 23,380 Stabilize Yes Yes Yes No Yes Yes No

37 All Faiths Chapel 11852 No* No No No No No Yes No

38 Paint Warehouse 2,460 Demolish No No No No Yes Yes No

39 Paint Shop 2,044 Demolish No No No No Yes Yes No

40 1101 Warehouse 22,780 No* No No No No No Yes No

41 Lineberger 31,770 Stabilize Yes Yes Yes Yes Yes Yes No

42 Wright 13,600 Demolish Yes Yes No Yes Yes Yes Yes

43 Hargrove 30,568 Demolish Yes Yes Yes No No Yes No

44 McBryde North B 43,380 Stabilize Yes Yes Yes Yes No Yes Yes

45 McBryde North Male 61,576 Stabilize Yes Yes Yes Yes No Yes Yes

46 McBryde East 97,500 Demolish Yes Yes Yes Yes No Yes No

47 McBryde West E Spruill Annex 35,510 Stabilize Yes Yes Yes No No Yes Yes

48 McBryde West D 21,610 Demolish Yes Yes Yes No No Yes No

49 McBryde West C 24,634 Stabilize Yes Yes No No No Yes No

50 McBryde South A 78,016 Stabilize Yes Yes Yes Yes Yes Yes No

51A Old Dobbin 3,800 Stabilize Yes No Yes No No Yes No

51B New Dobbin 20,782 Demolish Yes Yes Yes No No Yes No

52 McBryde West A 24,366 Stabilize Yes Yes Yes No No Yes No

53 McBryde South B 21,372 Stabilize Yes Yes Yes No Yes Yes No

54 McBryde West B Kitchen 31,413 Demolish Yes Yes Yes Yes No Yes Yes

55 Cold Storage 6,638 Demolish No No No No No Yes No

56 HVAC/Electric Shop (Old Laundry) 7,848 Stabilize Yes Yes No No No Yes No

57 McBryde South C Erwin 15,348 Demolish Yes Yes Yes No No Yes Yes

58 Spruill 46,464 Demolish Yes Yes Yes Yes Yes Yes No

59 Garage & Plumbing Shop (Old Boiler) 8,904 Stabilize Yes Yes No No No Yes No

60 Carpenter Shop 7,052 Stabilize Yes Yes No No No Yes No

61 Engineering 2,772 Demolish No No No No No Yes No

62 Edgerton 28,431 Demolish Yes Yes No Yes No Yes No

63A Haywood Gymnasium 44,119 Stabilize Yes Yes No Yes No Yes No

63B Haywood Gymnasium 44,119 Demolish Yes Yes No Yes No Yes No

64 Hoey 23,783 Demolish Yes Yes No Yes No Yes No

65 804 Ruggles 8,340 Demolish Yes Yes No No No Yes Yes

66 800 Ruggles 10,080 Demolish No No No Yes No Yes Yes

67 Power Plant 14,670 Stabilize Yes Yes No Yes Yes Yes No

68 Wood Chip Storage 5,422 Stabilize No No No No No No Yes

69 Salt Storage 1,341 Demolish No No No No No No No

70 Graham 7,525 Demolish Yes Yes Yes No Yes Yes No

71 Taylor 16,470 Demolish Yes Yes Yes No Yes Yes No

72 Anderson 43,704 Demolish Yes Yes Yes Yes Yes Yes Yes

73 Buffaloe House 2,586 No* No No No No No Yes No

75 Chiller Plant 3,061 Demolish Yes No Yes No No Yes No

76 Harvey 19,068 Stabilize Yes Yes Yes Yes No Yes No

77 Brown 16,811 No* Yes Yes No Yes Yes Yes No

78 Clark 19,004 Demolish Yes Yes No No Yes Yes Yes

79 Broughton 15,222 Demolish Yes Yes No Yes Yes Yes No

82 Williams Wooden Gazebo 117 Demolish No No No No No No No

83 Williams Metal Gazebo 181 Demolish No No No No No No No

84 Gazebo at Umstead/Hunt 262 Demolish No No No No No No No

* Building has been previously renovated or shall remain as is.

APPENDIX A - BUILDING INFORMATION TABLE

D I X P A R K U I M P – P H A S E 1

D I X P A R K U I M P – P H A S E 1 13

Appendix B – Building Decommissioning Map

NORTHSCALE: 1" = 240'-0"

DECOMMISSIONING MAP

0'

1 inch = 240 feet

120' 240' 480'

M-01

APPENDIX B

BUILDING

DECOMMISSIONING

MAP

TJH

JJP

JAC

EXISTING BUILDING NAMES

LEGEND

= EXISTING BUILDING OCCUPIED BY THE CITY OF RALEIGH TO REMAIN

= EXISTING BUILDING OWNED BY NCSU

= EXISTING BUILDING SERVED BY STANDALONE SYSTEMS. RESET

HEATING AND COOLING SETPOINTS AND DISCONNECT AND DRAIN WATER

= EXISTING BUILDING TO BE DECOMMISSIONED

= EXISTING BUILDING TO BE OCCUPIED BY THE CITY OF RALEIGH IN THE

INTERIM BUT ULTIMATELY DEMOLISHED

C

B

A

SHEET NO.

SEAL

SCALE

D

E

APPROVED BY

CHECKED BY

REVISIONS

TITLE

DRAWN BY

DATE

PROJECT NO.

2610 WYCLIFF ROAD

SUITE 410

RALEIGH, NC 27607

PHONE: 919.881.9939

FAX: 919.881.9923

NC LICENSE No.: F-0929

Dewberry Engineers Inc.

NO. DATE BY DESCRIPTION

D O

R O

TH

EA

D

IX

U

TI

LI

TY

IN

FR

AS

TR

U C

TU

R

E M

AS

TE

R P

LA

N

PH

AS

E

C

IT

Y

O F

R

AL

EI

G

H

PA

R

KS

, R

EC

R

EA

TI

O

N

W H

AR

G

ET

T

ST

R

EE

T

R

AL

EI

G

H , N

O R

TH

C

AR

O

LI

N

A

C

U

LT

U R

AL

R

ES

O

U R

C

ES

NOVEMBER 7, 2025

50188448

1. SCOTT

2. ASHBY

3. FLOWER COTTAGE

4. ADAMS

5. KIRBY

6. WILLIAMS

7. 918 TATE

8. 916 TATE

9. 912 TATE

10. 908 TATE

11. 906 TATE

12. GATE KEEPERS COTTAGE

13. DOCTORS HOUSE

14. SUPERINTENDENTS HOUSE

15. 920 RICHARDSON

16. 918 RICHARDSON

17. 916 RICHARDSON

18. 912 RICHARDSON

19. 908 RICHARDSON

20. 906 RICHARDSON

21. 1003 RICHARDSON

22. 1005 RICHARDSON

23. 1007 RICHARDSON

24. 1009 RICHARDSON

25. RICHARDSON GREENHOUSE STORAGE

26. 1003 TATE

27. 1005 TATE

28. 1003 STANCIL

29. 1005 STANCIL

30. 1009 STANCIL

31. 1008 RICHARDSON

32. 1010 RICHARDSON

33. 1010 RICHARDSON PUMP BUILDING

34. 1012 RICHARDSON

35. 1014 RICHARDSON

36. ROYSTER

37. ALL FAITHS CHAPEL

38. PAINT WAREHOUSE

39. PAINT SHOP

40. 1101 WAREHOUSE

41. LINEBERGER

42. WRIGHT

43. HARGROVE

44. McBRYDE NORTH B

45. McBRYDE NORTH MALE

46. McBRYDE EAST

47. McBRYDE WEST E SPRUILL ANNEX

48. McBRYDE WEST D

49. McBRYDE WEST C

50. McBRYDE SOUTH A

51A.OLD DOBBIN

51B.NEW DOBBIN

52. McBRYDE WEST A

53. McBRYDE SOUTH B

54. McBRDYE WEST B KITCHEN

55. COLD STORAGE

56. HVAC/ELECTRIC SHOP (OLD LAUNDRY)

57. McBRYDE SOUTH C ERWIN

58. SPRUILL

59. GARAGE AND PLUMBING SHOP (OLD BOILER)

60. CARPENTER SHOP

61. ENGINEERING

62. EDGERTON

63. HAYWOOD GYMNASIUM

64. HOEY

65. 804 RUGGLES

66. 800 RUGGLES

67. POWER PLANT

68. WOOD CHIP STORAGE

69. SALT STORAGE

70. GRAHAM

71. TAYLOR

72. ANDERSON

73. BUFFALOE HOUSE

74. BENNER HOUSE

75. CHILLER PLANT

76. HARVEY

77. BROWN

78. CLARK

79. BROUGHTON

80. GREENWAY GAZEBO

81. SCOTT GAZEBO

82. WILLIAMS WOODEN GAZEBO

83. WILLIAMS METAL GAZEBO

84. GAZEBO AT UMSTEAD AND HUNT

85. BASEBALL SHELTER

86. CHERRY BUILDING

87. SPRING HILL HOUSE

88. COUNCIL BUILDING

D

IX

P

AR

K

DECEMBER 5, 2025

APPENDIX B

APPENDIX B

BUILDING

DECOMMISSIONING

MAP

APPENDIX B

APPENDIX BAPPENDIX B

D I X P A R K U I M P – P H A S E 1 14

Appendix C – Building Demolition & Stabilization Map

NORTHSCALE: 1" = 240'-0"

DEMOLITION & STABILIZATION MAP

0'

1 inch = 240 feet

120' 240' 480'

M-02

BUILDING

DEMOLITION &

STABILIZATION

MAP

TJH

JJP

JAC

EXISTING BUILDING NAMES

LEGEND

= EXISTING BUILDING OCCUPIED BY THE CITY OF RALEIGH TO REMAIN

= EXISTING BUILDING OWNED BY NCSU TO REMAIN

= EXISTING BUILDING TO BE STABILIZED

= EXISTING BUILDING TO BE DEMOLISHED

= EXISTING BUILDING TO BE OCCUPIED BY THE CITY OF RALEIGH IN

THE INTERIM BUT ULTIMATELY DEMOLISHED

C

B

A

SHEET NO.

SEAL

SCALE

D

E

APPROVED BY

CHECKED BY

REVISIONS

TITLE

DRAWN BY

DATE

PROJECT NO.

2610 WYCLIFF ROAD

SUITE 410

RALEIGH, NC 27607

PHONE: 919.881.9939

FAX: 919.881.9923

NC LICENSE No.: F-0929

Dewberry Engineers Inc.

NO. DATE BY DESCRIPTION

D O

R O

TH

EA

D

IX

U

TI

LI

TY

IN

FR

AS

TR

U C

TU

R

E M

AS

TE

R P

LA

N

PH

AS

E

C

IT

Y

O F

R

AL

EI

G

H

PA

R

KS

, R

EC

R

EA

TI

O

N

W H

AR

G

ET

T

ST

R

EE

T

R

AL

EI

G

H , N

O R

TH

C

AR

O

LI

N

A

C

U

LT

U R

AL

R

ES

O

U R

C

ES

NOVEMBER 7, 2025

50188448

1. SCOTT

2. ASHBY

3. FLOWER COTTAGE

4. ADAMS

5. KIRBY

6. WILLIAMS

7. 918 TATE

8. 916 TATE

9. 912 TATE

10. 908 TATE

11. 906 TATE

12. GATE KEEPERS COTTAGE

13. DOCTORS HOUSE

14. SUPERINTENDENTS HOUSE

15. 920 RICHARDSON

16. 918 RICHARDSON

17. 916 RICHARDSON

18. 912 RICHARDSON

19. 908 RICHARDSON

20. 906 RICHARDSON

21. 1003 RICHARDSON

22. 1005 RICHARDSON

23. 1007 RICHARDSON

24. 1009 RICHARDSON

25. RICHARDSON GREENHOUSE STORAGE

26. 1003 TATE

27. 1005 TATE

28. 1003 STANCIL

29. 1005 STANCIL

30. 1009 STANCIL

31. 1008 RICHARDSON

32. 1010 RICHARDSON

33. 1010 RICHARDSON PUMP BUILDING

34. 1012 RICHARDSON

35. 1014 RICHARDSON

36. ROYSTER

37. ALL FAITHS CHAPEL

38. PAINT WAREHOUSE

39. PAINT SHOP

40. 1101 WAREHOUSE

41. LINEBERGER

42. WRIGHT

43. HARGROVE

44. McBRYDE NORTH B

45. McBRYDE NORTH MALE

46. McBRYDE EAST

47. McBRYDE WEST E SPRUILL ANNEX

48. McBRYDE WEST D

49. McBRYDE WEST C

50. McBRYDE SOUTH A

51A.OLD DOBBIN

51B.NEW DOBBIN

52. McBRYDE WEST A

53. McBRYDE SOUTH B

54. McBRDYE WEST B KITCHEN

55. COLD STORAGE

56. HVAC/ELECTRIC SHOP (OLD LAUNDRY)

57. McBRYDE SOUTH C ERWIN

58. SPRUILL

59. GARAGE AND PLUMBING SHOP (OLD BOILER)

60. CARPENTER SHOP

61. ENGINEERING

62. EDGERTON

63. HAYWOOD GYMNASIUM

64. HOEY

65. 804 RUGGLES

66. 800 RUGGLES

67. POWER PLANT

68. WOOD CHIP STORAGE

69. SALT STORAGE

70. GRAHAM

71. TAYLOR

72. ANDERSON

73. BUFFALOE HOUSE

74. BENNER HOUSE

75. CHILLER PLANT

76. HARVEY

77. BROWN

78. CLARK

79. BROUGHTON

80. GREENWAY GAZEBO

81. SCOTT GAZEBO

82. WILLIAMS WOODEN GAZEBO

83. WILLIAMS METAL GAZEBO

84. GAZEBO AT UMSTEAD AND HUNT

85. BASEBALL SHELTER

86. CHERRY BUILDING

87. SPRING HILL HOUSE

88. COUNCIL BUILDING

O R

O

TH

EA

D

D

IX

P

AR

K

NOVEMBER 7, 2025DECEMBER 5, 2025

APPENDIX C

File details come from the government source that posted it. Updated .