DIVISONAL COST BREAKOUT SHEET.docx
DOCX document 14 KB Posted
- Attached to
- Z1LC-- 640A0-22-903 Repair Steamlines
- Solicitation number
- 36C26123R0014
About this file
This document contains a divisional cost breakout sheet template for the federal contract opportunity Solicitation Number 36C26123R0014 to repair steamlines for the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 21. The cost breakout sheet template requires contractors to provide a complete divisional cost breakdown for the project, including costs for general requirements, other applicable divisions, subtotals, bonds and insurance, overhead, and total proposed project amount. No pricing or response deadline information is included in the template or opportunity description.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C26123R0014 Amendment 0002.docx | DOCX document | |
| SIte Walk Log Steam Lines.pdf | ||
| 36C26123R0014 0001.docx | DOCX document | |
| 36C26123R0014_1.docx | DOCX document | |
| S02 - RFI FORM.docx | DOCX document | |
| 640.000000.000.MPD-UTILITY EXHIBIT.201323.pdf | ||
| CONTRACTOR CERTIFICATION REGARDING SAFETY AND ENVIRONMENTAL.docx | DOCX document | |
| Previous RFI.docx | DOCX document | |
| mpd steam vault pics.pdf | ||
| VHA Supplemental Contract Requirements for Combatting COVID-19 02.docx | DOCX document | |
| P07 Wage Determination CA20220018 12.16.2022.pdf | ||
| Attachement A - mpd_utility_steam excerpt.pdf | ||
| SPEC 2023.01.30.pdf | ||
| VHA Supplemental Contract Requirements for Combatting COVID-19.docx | DOCX document |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DIVISIONAL COST BREAK-OUT
CLIN 0001
36C26123R0018 - Replace Steam Tunnels Menlo Park Provide complete Divisional Cost Break-Out for complete project. If necessary, add additional lines for each Division applicable to this project.
| REF |
| DESCRIPTION |
| TOTAL |
010000
DIVISION 1 - GENERAL REQUIREMENTS
000000
| DIVISION XX |
| $ |
OTHER
| OTHER |
| $ |
| OTHER |
| OTHER |
| $ |
SUB TOTAL:
BONDS & INSURANCE
OVERHEAD
PROFIT
TOTAL PROJECT PROPOSAL AMOUNT: