36C26123R0014 0001.docx
DOCX document 95 KB Posted
- Attached to
- Z1LC-- 640A0-22-903 Repair Steamlines
- Solicitation number
- 36C26123R0014
About this file
This document is an amendment to a solicitation responding to questions from potential offerors. The solicitation is for repair of steam lines at VA medical facilities in Reno, Nevada, issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 21. Temporary heating systems are not required as the work involves replacement of failed steam utilities only. All existing pipe insulation is to be treated as asbestos containing material for proposal purposes. The amendment provides clarification that replacement of concrete utility vaults is not included in the scope, unless unforeseen conditions are discovered and approved by the contracting officer. No changes are made to other terms and conditions of the solicitation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C26123R0014 Amendment 0002.docx | DOCX document | |
| SIte Walk Log Steam Lines.pdf | ||
| DIVISONAL COST BREAKOUT SHEET.docx | DOCX document | |
| 36C26123R0014_1.docx | DOCX document | |
| S02 - RFI FORM.docx | DOCX document | |
| 640.000000.000.MPD-UTILITY EXHIBIT.201323.pdf | ||
| CONTRACTOR CERTIFICATION REGARDING SAFETY AND ENVIRONMENTAL.docx | DOCX document | |
| Previous RFI.docx | DOCX document | |
| mpd steam vault pics.pdf | ||
| VHA Supplemental Contract Requirements for Combatting COVID-19 02.docx | DOCX document | |
| P07 Wage Determination CA20220018 12.16.2022.pdf | ||
| Attachement A - mpd_utility_steam excerpt.pdf | ||
| SPEC 2023.01.30.pdf | ||
| VHA Supplemental Contract Requirements for Combatting COVID-19.docx | DOCX document |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
36C26123R0014 Amendment 0001 RFI Questions and Response
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
640-23-1-5281-0005
640A0-22-903 36C261 Department of Veterans Affairs VA Sierra Pacific Network (VISN 21) VA Sierra Nevada Health Care System 975 Kirman Avenue Reno NV 89502-2597
36C261 Department of Veterans Affairs VA Sierra Pacific Network (VISN 21) VA Sierra Nevada Health Care System 975 Kirman Avenue Reno NV 89502-2597 To all Offerors/Bidders
36C26123R0014 03-14-2023
X
640-23-1-5281-0005
The purpose of this amendment is to post responses to request for information (RFI).
All other terms and conditions shall remain unchanged.
1. Is Temporary Domestic/Heating HW required by Contractor as defined in this section? (There appear to be notations in the document indicating questions/clarifications raised by the VA specifier, and this was unclear at the site visit.)
Answer 1 – No Temporary Heating Required
2. If so, please provide a prelim diagram/P&ID of the proposed temp system for both the Domestic and Heating systems for buildings 311, 331 and 347 with (at minimum) Boiler/HW Heater sizing requirements, building/system loads, and related Iso/shut off and POC/tie in locations. Please also provide Electrical POC’s for temp control panel tie ins for .
Answer 2 – Not Required 3.What is the bid basis for energy (propane/gas/elect/etc) that Contractors should carry in their proposal for the temp heating system, if required? (i.e., allowance for (“x” qty) gallons of propane, etc.).
Answer 3 – Not Required
4. Please confirm per the site visit that no work or repair to the existing concrete utility vault(s) are included with this RFP. (Excavate, expose, remove/replace cover for steam line work only). Confirmed, replacement of failed steam utilities.
Answer 4 - If unforeseen conditions/issues with vaults is identified a determination by the COR/CO will be made for request to quote or alternate repair means if necessary.
5. Please confirm for bid purposes that ALL existing pipe insulation is assumed to be ACM.
Answer 5 – Confirmed for the purposes of providing a proposal.