36C26123R0014 Amendment 0002.docx

DOCX document 15 KB Posted

Attached to
Z1LC-- 640A0-22-903 Repair Steamlines
Solicitation number
36C26123R0014
Issued by

About this file

This document contains answers to questions regarding federal contract number 36C26123R0014 for repair of steamlines at Department of Veterans Affairs facilities. The contract involves repair and insulation of underground steam pipes between vaults. While the entire pipe run will be insulated, it will not be fully encased in concrete. Specialty quality control personnel may perform additional duties provided they have sufficient time to fulfill quality control responsibilities, as determined by complexity of work. The related opportunity is for steamline repairs at VA facilities under solicitation number 36C26123R0014, issued by VISN 21 of the VA for project 640A0-22-903.

View the file

Other files

File Type Posted
SIte Walk Log Steam Lines.pdf PDF
36C26123R0014 0001.docx DOCX document
DIVISONAL COST BREAKOUT SHEET.docx DOCX document
36C26123R0014_1.docx DOCX document
S02 - RFI FORM.docx DOCX document
640.000000.000.MPD-UTILITY EXHIBIT.201323.pdf PDF
CONTRACTOR CERTIFICATION REGARDING SAFETY AND ENVIRONMENTAL.docx DOCX document
Previous RFI.docx DOCX document
mpd steam vault pics.pdf PDF
VHA Supplemental Contract Requirements for Combatting COVID-19 02.docx DOCX document
P07 Wage Determination CA20220018 12.16.2022.pdf PDF
Attachement A - mpd_utility_steam excerpt.pdf PDF
SPEC 2023.01.30.pdf PDF
VHA Supplemental Contract Requirements for Combatting COVID-19.docx DOCX document
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

36C26123R0014 Amendment 0002 Question 6- Can you confirm if the entire pipe run between vaults is incapsulated in concrete?

Answer 6 - The entire pipe run is not incapsulated in concrete. The pipe run between the vaults shall be insulated pipe in accordance with our requirements.

Question 7. Can you confirm if the entire pipe run between vaults is wrapped with insulation?

Answer 7 - The entire pipe run shall be insulated per our underground steam line specifications.

Question 8 - Section 01 45 00, under para 3.4.C (CQC Personnel) it states, “These individuals have no other duties other than quality control. Depending on the complexity and with approval from the COR, can perform other duties but need to be allowed sufficient time to perform the specialized personnel’s assigned quality controls duties as described in the CQC Plan.” Please confirm that specialty CQC Personnel (i.e. Civil CQC) can perform other duties in addition to quality control.

Answer 8 - Please note that it states it depends on the complexity, we take no exception to individuals filling multiple roles in this instance, so long as the project remains on track and safe.