This Statement of Work (SOW) specifies requirements for the rental and delivery of a diesel-powered portable generator, load bank, and isolation transformer to provide backup power to a submarine at a naval shipyard facility. The contractor must supply a trailer-mounted diesel generator with a Tier 4 engine capable of delivering a minimum of 1,000 kW (1,250 kVA) standby power with a maximum capacity of 1,250 kW (1,562.5 kVA), running continuously for at least 12 hours on a single fuel tank. The generator output shall be variable between 450–480 VAC at 60 Hz, with either ungrounded power (floating neutral) or grounded power when paired with an isolation transformer. A completely self-contained, freestanding load bank with a minimum capacity of 1,875 kVA at 0.8 power factor (2,134 kVA at 480 VAC) must be provided to perform load testing and initial verification of the generator. The isolation transformer must achieve at least 1 megohm to ground on the diesel side and 5 megohms on the secondary side, with a minimum rating of 1,062.5 kVA. Physical dimensions are constrained, with the diesel generator width not to exceed 8 feet, and compact footprints advantageous for all equipment. The machinery must be newly manufactured or completely refurbished within 10 years, NEMA 3R construction suitable for seaside environments, NRTL-approved, and include a lifting diagram for four-point crane lifts.
The contractor is responsible for performing a comprehensive load test immediately upon delivery at 30% load for 30 minutes, 50% load for 30 minutes, and 100% load for 60 minutes, submitting test reports and equipment documentation including technical manuals, operating instructions, and emergency repair contacts. All periodic and annual maintenance must be performed per manufacturer specifications with all filters refreshed before rental commencement to enable six months of operation before semi-annual maintenance. The contractor must respond to repair notifications within 24 hours with a technician and complete repairs or replacement within 48–72 hours. For Portsmouth Naval Shipyard (PNS), the diesel must meet EPA non-road engine standards in 40 CFR Part 1039; for Portsmouth Naval Shipyard Detachment Seal Beach (PNSDETSD), compliance with California regulations 17 CCR 93116 is required with valid CARB Portable Equipment Registration Program (PERP) registration. Delivery and return must occur on normal business days by U.S. citizens with appropriate identification, and personnel must meet facility security requirements including access to controlled industrial areas.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BACK UP DIESEL, ISOLATION TRANSFORMER AND LOAD BANK OFF YARD
Spec #: 2025 Rev (A) Page 1 of 9
STATEMENT OF WORK
1. SCOPE
1.1. To provide a trailer mounted Diesel-Powered Portable Generator with a built-in fuel tank. The built-in fuel tank shall have its own containment (i.e. UL 142 Double Wall Tank Assembly).
1.2. To provide a load bank that is completely self-contained and freestanding which includes all resistive and reactive load elements per the requirements listed below.
Also, to provide services to perform a load test of the 1000kW/1,250kVA (or larger, up to a maximum of 1,250KW/1,562.5KVA) Diesel Generator per paragraph 4.1 of this Statement of Work.
1.3. To provide an isolation transformer that ungrounds the power from the grounded generator.
2. REFERENCES
2.1. Issues of Publications - The following documents of the issue date in effect on the date of request for proposal form a part of this specification to the extent applicable, or as specified herein. Within the specification, they shall be referred to by their basic designation only.
2.1.1. Government
2.1.1.1. County of San Diego Air Pollution Control District Rule 69.4.1
2.1.1.2. 40 CFR Part 1039
2.1.1.3. California Code of Regulations 17 CCR 93116
2.1.1.4. 17 CCR 93116.3(b)
2.1.1.5. 40 CFR Part 86
2.1.2. Nongovernment
2.1.2.1. N/A
2.2. Order of precedence - In the event of conflict between the text of this specification and that of the references cited above, the text of this specification shall take precedence. Nothing in this specification, however, shall supersede applicable laws or regulations unless a specific exemption has been obtained.
3. REQUIREMENTS
3.1. Load Bank
3.1.1. The capacity of the load bank shall be a minimum as follows (@ 450 VAC, however; the load box shall accept voltages between 450 – 480 VAC).
3.1.1.1. 1875 kVA, 0.8 power factor (2134 KVA, if 480 VAC rated)
3.1.1.2. 1500 kW, Resistive (1707 KW, if 480 VAC rated)
3.1.1.3. 1125 kVAR, Inductive (1280 KVAR, if 480 VAC rated)
Rev (A) Page 2 of 9
3.1.2. The voltage and wiring of the load bank shall be as follows:
3.1.2.1. 450VAC, 3-Phase, 3-Wire
3.1.3. The load bank shall have a digital load controller. The minimum step resolution shall be no greater than:
10 kW / 7.5 kVAR @ 450VAC
11.3KW/8.5 KVAR @ 480VAC
3.1.4. The load bank shall be freestanding, semi-portable, and have a self-contained load module. The load bank shall include crane lifting eyes, forklift channels, a heavy skid base, and a lifting sketch shall be provided. Load bank shall perform initial testing of rented diesel generator.
3.2. Diesel
3.2.1. The Diesel generator with a Tier 4 engine shall be capable of running, without being refueled, for a minimum of twelve (12) hours in duration at a minimum of 1000 kW (1,250 kVA) and maximum of 1,250KW/1,562.5KVA STANDBY power. It shall be capable of being refueled while in operation.
3.2.2. Vendor shall provide all manuals and specification sheet at proposal period for technical review.
3.2.3. For pricing purposes, the generator should be assumed to be secured unless of a loss of power, or the threat of a loss of power or being tested.
3.2.4. When operating at full speed, noise levels shall not be over 85 dB[A] at three feet from the unit.
3.2.5. The trailer for the diesel shall be in operational readiness condition and be capable of being moved by tractor or mule. If the diesel generator is equipped with an auxiliary fuel tank (i.e. UL 142 Double Wall Tank Assembly), the tank shall fit entirely within the CONEX box.
3.2.6. The diesel generator shall be capable of being lifted by crane (i.e. a four-point lift).
A Lifting & Handling diagram/sketch that is applicable to the situation shall be provided.
3.2.7. Output shall be ungrounded (commonly referred to as ‘floating the ground’ or ‘isolating the neutral’) three-phase power (when an isolation transformer is used, the diesel shall be grounded and the isolation transformer will be ungrounded on the secondary side). Output voltage shall be variable between 450 and 480 VAC at 60 Hz, while maintaining the rated power levels. The maximum STANDBY amperage for a 1000KW generator will be approximately 1,568A (@ 460V, 1000 kW and a 0.8PF).
Rev (A) Page 3 of 9
Therefore, the generator’s breaker shall be set to trip on long-time delay at between approximately 1,568A (higher for larger generators, but not to exceed 1,600A). Also, the instantaneous trips shall be HIGH to allow for in-rush currents.
3.2.7.1. The Diesel Generator SHALL have at least one 120 VAC, 15 Amps, single-phase power receptacle available for string lighting when the diesel generator is (or, is not) running or have internal lights sufficient to illuminate the controls when the diesel generator is (and is not) running.
Diesel generator frame SHALL be grounded.
3.2.7.2. The 120 VAC power shall be grounded. Grounded power must be isolated from the 480 VAC ungrounded power.
3.2.7.3. Diesel Generator Power Limiter State parameter (if applicable) SHALL be set to “STANDBY.”
3.2.7.4. Vendor shall provide OQE Objective Quality Evidence that a 100 percent load test has been performed within the last 30 days of arrival. If data cannot be provided vendor shall perform load test on site after arrival.
3.3. Isolation Transformer
3.3.1. Because the diesels in San Diego have not been able to provide a ground reading in excess of 5 megohms recently; provide an additional isolation transformer where the diesel’s side of the transformer shall achieve 1 megohm to ground (prior to connection to the grounded diesel), and 5 megs to ground on the side toward the ship (also prior to connection). The isolation transformer shall be large enough to transmit the entire power of the generator from the primary side to the secondary side over the 450 to 480VAC voltage range. As a minimum, the transformer needs to be at least 1,062.5 KVA and at least as big as the KVA of the diesel (whichever is bigger). Small physical size is an advantage.
3.4. Connections
3.4.1. Lugged connections are acceptable as well as compression fittings (lugged connections are preferred).
3.4.2. When lugs are used, the unit must accept Thomas and Betts 600 Two Hole Green 94 lugs. When lugs are not used, the unit must accept SHOF-500 fine-stranded cables in compression fittings.
3.5. Footprint
3.5.1. Load Bank – A load bank with small physical dimensions is an advantage.
Rev (A) Page 4 of 9
3.5.2. Diesel - The diesel generator package shall be deployed pier-side (or dockside) to provide backup power to a submarine. The platform that the diesel generator will be placed on is space limited. Diesel generator packages with small physical dimensions are an advantage. If the diesel comes in two (2) parts (diesel with external fuel tank), the dimensions of both parts are required. The overall width shall not be greater than eight (8) feet. The diesel generator shall be delivered with a quantity of diesel fuel sufficient to run for at least twelve (12) hours in duration at a load of 1000 kW (1250 kVA).
3.6. Construction
3.6.1. Load Bank - Shall be Type 3R weatherproof suitable for all-weather transport and use.
3.6.2. Diesel –
3.6.2.1. Units shall be a single integrated framed structure manufactured as a complete entity to include all devices, accessories, and fittings necessary to perform the function for which it was designed.
3.6.2.2. Construction shall be NEMA 3R (or greater) with self-contained temperature control system that is appropriate for a seaside environment.
3.6.2.3. Machines shall meet State and Federal requirements for its type such as the National Electrical Code (NEC) for electrical devices / components.
3.6.2.4. Machines shall be newly manufactured / completely refurbished and factory tested within ten (10) years.
3.6.2.5. Machines shall be Nationally Recognized Testing Laboratory (NRTL) approved.
3.6.2.6. The diesel generator shall be equipped with a self-contained cooling/ (and if applicable) heating system.
3.6.2.7. The diesel generator shall have the ability to charge its own batteries while its engine is running; or while utility power is available, the batteries shall be trickle charged.
4. RESPONSIBILITIES
4.1. Contractor Services (PNS and PNSDETSD)
4.1.1. The Contractor shall be responsible for and shall perform a load test of the 1000kW/ 1250kVA (or larger) diesel generator at (300KW/225kVAR/375KVA (or larger)) load for thirty (30) minutes, (500KW/375kVAR/625KVA) (or larger)) for thirty (30) minutes and 100% (1250KW/750KVAR/1250KVA) (or larger)) for sixty (60) minutes.
Rev (A) Page 5 of 9
The Contractor shall submit a test/inspection report for the load tests performed.
(CDRL A001, B001, C001)
4.1.2. Except for daily surveillance checks (i.e. liquid levels and refueling), the Contractor shall be responsible for and shall perform all periodic maintenance as recommended by the engine and control equipment manufacturers (e.g. oil changes, replace / clean filters, lubrication, coolant refills, liquid top-offs, etc.) for the duration of the lease.
4.1.3. All monthly, semi-annual and annual scheduled maintenance as recommended by the engine and control equipment manufacturers SHALL be refreshed before the rental begins (e.g. oil filters, fuel filters and air filters) so that the generator set can be operated for up to six (6) months before performing semi-annual maintenance and more than eleven (11) months without having to perform annual scheduled maintenance. Notwithstanding the frequencies recommended by the engine and control equipment manufacturers, the annual maintenance shall be conducted at least once each calendar year during the lease period, and shall include, but is not limited to the following:
4.1.3.1. Changing the oil and filter or testing the oil in accordance with the requirements of 40 CFR Part 63, Section 63.6625(i) or 63.6625(j).
4.1.3.2. Inspect and clean air filters, replacing air filters as necessary;
4.1.3.3. Inspect all hoses and belts, replacing hoses as necessary; and
4.1.3.4. Inspect spark plugs, if equipped, replacing spark plugs as necessary.
4.1.4. Coordinate all maintenance with the executing point of contact (POC). Maintenance shall be performed at shutdown periods that are convenient for the government.
4.1.5. The equipment (diesel) will be operating around-the-clock under a rigorous deployment performance schedule. Within twenty-four (24) hours (one-day) of initial notification of the need for repair, the Contractor shall have a knowledgeable and equipped technician on the jobsite fully prepared to repair the rental equipment. The defective unit(s) shall be repaired within forty-eight (48) hours (two days) of initial notification or, if the original defective unit(s) cannot be made operational, replaced within seventy-two (72) hours (three days) of initial notification. If the equipment failure is not the fault of the Government, the Contractor shall bear all costs associated with its repair and/or replacement.
4.2. Contractor Services (PNSDETSD)
4.2.1. Contractor will provide engines that have valid District of California Air Resources Board (CARB) Portable Equipment Registration Program (PERP) registration.
Rev (A) Page 6 of 9
4.2.2. Contractor provided engines shall have an original manufacturer label containing the following information: make, model, family number (if any), and serial number.
4.2.3. The Contractor shall ensure diesel-fired engines contain CARB diesel fuel, if unit is delivered with residual diesel fuel.
4.2.4. The Contractor shall ensure a non-resettable engine hour meter is installed on each engine throughout the lease period. The Contractor shall replace a defective engine hour meter immediately and make notifications of the replacement in accordance with County of San Diego Air Pollution Control District Rule 69.4.1.
4.2.5. The Contractor shall provide the following records upon request within three (3) business days:
4.2.5.1. Records of periodic inspections, including the date the inspection was performed; (CDRL A004, B004, C004)
4.2.5.2. Records of annual engine maintenance, including the date the maintenance was performed and the nature of the maintenance. (CDRL A004, B004, C004)
4.2.6. Contractor to provide updated PERP registration, as available, if original PERP registration expires while the engine remains under contract." (CDRL A005, B005, C005)
4.3. Maintenance
4.3.1. The Contractor shall be responsible for and shall perform all maintenance (e.g.
hardware, connections, magnetic contactors etc.) for the duration of the lease. The Contractor shall coordinate maintenance with Shipyard POC.
4.4. Repairs
4.4.1. Within twenty-four (24) hours (one-day) of initial notification of the need for repair, the Contractor shall have a knowledgeable and equipped technician on the job-site fully prepared to repair the rental equipment. The defective unit(s) shall be repaired within forty-eight (48) hours (two days) of initial notification or, if the original defective unit(s) cannot be made operational, the defective unit(s) shall be replaced within seventy-two (72) hours (three days) of initial notification.
4.4.2. If the equipment failure is not the fault of the Government, the Contractor shall bear all costs associated with its repair and/or replacement.
5. NOTES
5.1. Training
5.1.1. N/A
Rev (A) Page 7 of 9
5.2. Operator / Maintenance Manuals - Documentation will be located within a waterproof case affixed to each machine. Minimally, the documentation shall consist of:
5.2.1.1. Technical Instructions (TIs) such as an Operations & Maintenance Manual, Controls Manual, and/or Electrical Manual with Schematics. (CDRL A002, B002, C002)
5.2.1.2. Equipment Data Sheet (EDS). (CDRL A002, B002, C002)
5.2.1.3. Operating Instructions, if not in the Technical Instructions. (CDRL A002, B002, C002)
5.2.1.4. Points of contact with telephone numbers for requesting emergency repair regardless of the time or type of day. (CDRL A003, B003, C003)
5.3. General
5.3.1. No deviations without Tech Code authorization.
6. GOVERNMENT FURNISHED MATERIAL
6.1. N/A
7. DELIVERY / RETURN
7.1. Delivery - The machinery shall be in a fully assembled, ready-to-use, and in a first class-operating condition. The machinery with its support equipment shall be delivered to the site on or prior to the request date. It is incumbent and shall be the responsibility of the Contractor to either confirm or coordinate the date and time of delivery prior to each shipment via the Point-of-Contact (POC) as designated on the Contract and/or the Contracting Officer's Representative (COR).
7.1.1. Upon delivery, the vendor shall instruct designated shipyard personnel on how to properly run the equipment to include its operation, control, daily checks, and service contacts.
7.1.2. Delivery and return shipping shall be on a normal weekday (i.e. neither a Saturday, nor a holiday, nor a Sunday). Delivery and return shipping to/from the Controlled Industrial Area (CIA) must be performed by a US Citizen who has a copy of their birth certificate and two forms of ID (e.g. Social Security No./card, State ID/Drivers License, US Passport). Upon delivery, the diesel will go through a testing period to verify its capabilities.
7.1.3. Delivery/Diesel
7.1.3.1. Upon delivery, the vendor shall prove that the 450-480 VAC power is grounded (when an isolation transformer is provided), and ungrounded when an isolation transformer is not provided.
Rev (A) Page 8 of 9
7.1.3.2. Upon delivery, the vendor shall instruct designated shipyard personnel on how to properly run the equipment to include its operation, control, daily checks, and service contacts.
7.1.3.3. Upon acceptance, vendor will be notified and a technician be made available within 24 hours to ensure the diesel generator can sustain a load of 1000 kW / 1,250 kVA applied for the duration of one (1) full hour. A unit that cannot sustain the load shall be rejected.
7.2. Security - To be allowed onto a government Shipyard, personnel must be US citizens and in possession of appropriate personal identification. Proof of US citizenship may be necessary and can be required for access to the drydock. Allowable documentation of US citizenship is an official government issued Certificate of Birth or Naturalization (w/ raised seal & not a photocopy) or a US passport. Vehicular access requires a non-expired personal REAL ID Driver’s License and appropriate vehicle identification or registration. The transport vehicle must have the company’s name / logo prominently displayed. To gain access to the drydock environs, personnel must be escorted and possess / wear their own personal safety gear.
7.3. Final Acceptance - Upon satisfactory completion of inspection and test of the equipment, the authorized Government Representative (Portsmouth Naval Shipyard, Code 990 Equipment Manager) will sign and forward the acceptance document(s) to Code 420 for completion. Unloading of equipment from Vendor’s transport does not signify acceptance.
7.4. Return - The Government will dismantle the equipment and provide a temporary storage location convenient for Contractor pick-up. The Government will notify the Contractor as well as the Contracting Office as to when the rental Item has been released and is available for pick-up. The last day of the rental period shall be the next normal workday after the Contractor has been so notified. The Contractor shall be responsible for shipping.
8. ENVIRONMENT
8.1. (FOR PNS) The diesel generator shall meet all Federal, State and Local regulations with regard to the emission standards of the Environmental Protection Agency (EPA). The diesel generator must meet the EPA non-road engine standards listed in 40 CFR Part 1039.
8.2. (FOR PNSDETSD) The diesel fired engine shall comply with all applicable provisions of the Airborne Toxic Control Measure for Diesel Particulate Matter from Portable Engines Rated at 50 Horsepower and greater as listed in California Code of Regulations
17 CCR 93116.
8.2.1. PNSDETSD Approved Models. The diesel-fired engine shall demonstrate compliance with the diesel particulate matter standards of 17 CCR 93116.3(b) for each engine satisfying one of the following requirements:
Rev (A) Page 9 of 9
8.2.1.1. The engine must meet Tier 4 interim or Tier 4 final non-road engine standards.
8.2.1.2. If a Tier 4 engine cannot be provided, the vendor must submit documentation that this engine standard is not available.
8.2.1.3. If the Tier 4 engine is not available the next highest tier engine can be contracted, with specific documentation provided by the vendor, and must meet the following standards:
8.2.1.3.1. The engine shall be certified to the on-road emission standards pursuant to 40 CFR Part 86, or the equivalent category in Title 13, California Code of Regulations; or
8.2.1.3.2. Engines rated between 50 hp and 750 hp shall be flexibility engines manufactured to meet Tier 3 or Tier 4 interim emissions standards; or
8.2.1.3.3. Engines rated over 750 hp shall be flexibility engines manufactured to meet Tier 2 or Tier 4 interim emission standards; or
8.2.1.3.4. Tier 1, Tier 2, or Tier 3 engines shall have been operated in the state of California prior to 1/1/2017, along with supporting documentation.
8.2.1.4. All documentation necessary to demonstrate compliance shall be maintained with the engine. If the engine has a valid District or CARB PERP registration, the documentation concerning this registration shall be required to accompany the unit upon delivery, and remain with the equipment throughout the lease period.
9. ATTACHMENTS
9.1. N/A