DID_80969.pdf

PDF 157 KB Posted

Attached to
Remanufacture of F108 Fuel Gear Motor
Solicitation number
FA812225R0024
Issued by

About this file

This is a Data Item Description (DID) for a Production Surge Plan, identified with the number DI-MGMT-80969. The document provides a standardized format and preparation instructions for contractors to demonstrate their capability to rapidly accelerate and sustain production utilizing existing facilities and equipment during a peace-time acquisition environment, without a declaration of war or mobilization.

The Production Surge Plan must include specific details such as the maximum sustainable production rate, building schedules, lists of subcontracted and non-subcontracted items/components, potential production bottlenecks, and critical logistics considerations. Contractors are required to detail the impact of surging production on other government contracts, identify additional skilled labor requirements, list strategic or critical materials needed, and outline production equipment that could increase production rate or reduce lead times by at least 10 percent. The document is marked for unlimited distribution and supersedes a previous version (DI-P-1634A).

View the file

Other files

File Type Posted
TRNSPDATA_REPORT.pdf PDF
DID_81535B.pdf PDF
DID_10184.pdf PDF
CDRL1_REPORT_.pdf PDF
PKGRQMT_REPORT.pdf PDF
DID_80809B.pdf PDF
DID_80503.pdf PDF
GFP_FD20302400395_FA812225R0024_.pdf PDF
DID_81534B.pdf PDF
DID_80441D.pdf PDF
SOW_24JUN2025_Rev3_09052025.pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .