Attachment E - Submittal Log
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| DE-SOL-0010889_0005.pdf | ||
| B_-_Specs_Amendment__004.pdf | ||
| DE-SOL-0010889_0004.pdf | ||
| Amend_4_Revised_Wage_Determination_Scaramento_County.pdf | ||
| Drawings_Rev_Amen_4_ELV_ODA_.pdf | ||
| Amend_4_Revised_Wage_Determination_Shasta_County.pdf | ||
| DE-SOL-0010889_0003.pdf | ||
| Site_Visit_Attendance_Roster.pdf | ||
| DE-SOL-0010889_0002.pdf | ||
| Drawings_Amendment_0001_elv02_oda03_project_dwgs_Final_2-9-17_(002).pdf | ||
| DE-SOL-0010889_0001.pdf | ||
| Specifications_Amendment_0001_ELV02_ODA03_SPEC-AMEND_001.pdf | ||
| Bid_Schedule_Amendment_0001ELV02_ODA03.pdf | ||
| Foreign_National_Data_Card.pdf | ||
| C_-_Drawings_elv02_oda03_project_dwgs_Final_2-9-17.pdf | ||
| B_-_Specs_ELV02_ODA03_COMPILED_Final_Feb_17_2017.pdf | ||
| DE-SOL-0010889.pdf | ||
| A_-_Bid_Schedule_-_Final.pdf | ||
| D2_-_Wage_Determination_Shasta_County.pdf | ||
| D1_-_Wage_Determination_Scaramento_County.pdf |
Show all 20
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Contract Title: Olinda/Elverta Shunt Reactors Award Date:
Contract No.: NTP:
Contractor: Completion Date:
Location Date Date Date Official In When Received Received Approved Approval
# Submittal Item Standards CSO DSW Required via E-mail via Mail via E-mail Sent
STANDARD 1
1 Construction Program 1.1.4.1. 3 (see project spec)
2 Survey Plan 1.1.5.2.(1) 3 Prior to survey work
3 Breakdown of Contract Prices 1.1.6.1. 3 1 NLT 30 days after NTP
4 Cable Location Plan w/Print of Locations 1.3.4.2 & 1.4.5.2 1 Prior to starting excavation
5 Acknowledgement When Stringing Over Energized Lines 1.3.5.3. 1 Prior to starting stringing
6 Safety and Health Program 1.4.1.5. 6 NLT 10 days prior to start of construction
7 Copies of Certifications, Test Records & Technical Data 1.4.1.10. 1 Prior to use
8 - Load Performance Tests 1.4.1.10.(1) 1 Prior to use
9 - Crane & Aerial Lift Equipment Annual Inspection Records 1.4.1.10.(2) 1 Prior to use
10 - Brake Performance Test 1.4.1.10.(3) 1 Prior to use
11 - Test Results of Protective Ground Leads 1.4.1.10.(4) 1 Prior to use
12 - Material Safety Data Sheets 1.4.1.10.(5) 1 Prior to use
13 - Manufacturer's Load Rating For Hoists and Grips 1.4.1.10.(6) 1 Prior to use
14 - Certification of Fabricated Lifting and Rigging Devices 1.4.1.10.(7) & 1.4.11 1 Prior to use
15 - Medical Examiner's Certificate 1.4.1.10.(8) & 1.4.3.3 1 Prior to use
16 - Data For Excavation Protective System 1.4.1.10.(9) & 1.4.5.5 1 Prior to use
17 Assurance of Competency in Equipment Operation 1.4.3.4. 1 Prior to use
18 Structure Erection Plan 1.4.8.1. 1 Prior to structure erection
19 Protective Ground Lead Test Results & Certification 1.4.14.3. 1 Prior to use
20 Clearance, Hot Line Order & Special Work Permit Requests 1.4.15.3. 1 NLT 10 working days prior to starting work
STANDARD 2
21 Earth Material Testing Laboratory 2.1.1.2.(1) & 2.7.1.2.(1) 1 20 days prior to compacting
22 Earth Material Compaction Test Reports 2.1.1.2.(2)& 2.7.1. 1 Immed. after test complete
23 Gravel Surfacing Material Gradation 2.1.1.4 1 Prior to placing
24 Gravel Surfacing Density & Compaction Test Results 2.1.1.4 1 NLT 7 days after test complete
25 Herbicide Applicator's References 2.1.1.5.(1) & 2.11.3.2. 1 2 NLT 30 calendar days prior to application
26 Herbicide Applicator's Certification/License 2.1.1.5.(2) 1 NLT 30 calendar days prior to application
27 Herbicide Application Plan 2.1.1.5.(3) 1 2 NLT 30 calendar days prior to application
Submitted To Copies
SUBMITTAL TRACKING SHEET
DE-SOL-001889
Attachment E
Location Date Date Date Official In When Received Received Approved Approval
# Submittal Item Standards CSO DSW Required via E-mail via Mail via E-mail Sent Submitted To
Copies
28 Herbicide Application Final Report 2.1.1.5.(4) 1 2 NLT 7 days after application
29 Batch Certification 2.1.1.7.(6) 1 NLT 20 days prior to paving
STANDARD 3
30 Concrete Testing Laboratory 3.1.1.2.(1) & 3.1.1.3. 1 NLT 20 days prior to concrete placement
31 Concrete Mix Design 3.1.1.2.(2) & 3.1.1.5. 1 NLT 10 days prior to use
32 Fly Ash For Concrete 3.1.1.2.(5) & 3.1.1.4. 1 NLT 20 days prior to use
33 Admixtures and Curing Compound 3.1.1.2.(6) & 3.1.1.4. 1 NLT 10 days prior to use
34 Batch Certificates 3.1.1.2.(7) 1 Provide at delivery
35 Test Reports 3.1.1.2.(8) 1 Immed. upon completing
36 Void Forming Material 3.1.1.2.(9) & 3.1.1.4. & 3.1.4.2. 2 Prior to use
37 Nonshrink Grout 3.1.1.2.(10) 1 Prior to use
STANDARD 4
38 Approval Drawings For Steel Structures & Steel Modifications 4.1.1.2. 2 T Prior to fabrication
39 Final Drawings For Steel Structures & Oil Storage Tanks 4.1.1.4. 1 & T 2 Prior to material shipment
40 Weld Procedures 4.1.1.5.(1) & 4.1.7.4. 1 Prior to fabrication
41 Partial Penetration Weld - Test & Evaluation Procedure 4.1.1.5.(2) & 4.1.7.4. 1 Prior to fabrication
STANDARD 9
42 Contractor On-site Test Personnel 9.1.2.2.(2) 1 Prior to working on-site
43 Electrical Test Reports & Documents 9.1.2.2.(3) 2 NLT 7 days after testing
44 Equipment Informational Drawings & Data Table 9-1 & 9.1.3.3. 3 NLT 60 days after NTP
45 Equipment Final Drawings Table 9-1 & 9.1.3.4.(1) 1 NLT 21 days prior to equip. installation
46 Equipment Parts Identification Lists & Bills of Materials Table 9-1 & 9.1.3.4.(2) 1 4 NLT 21 days prior to equip. installation
47 Manufacturer's Operation & Maintenance Instructions Table 9-1 & 9.1.3.4.(3) 1 4 NLT 21 days prior to equip. installation
48 Insulated Conductor Data Table 9-1 & 9.1.3.7. 2 NLT 60 days after NTP
49 Contractor's As-Built Equipment Drawings Table 9-1 & 9.1.3.10.(1) 1 1 NLT 60 days after equip. checkout
50 As-built Western Drawings Table 9-1 & 9.1.3.10.(2) 1 NLT 60 days after equip. checkout
51 Test Reports For Ground Tests 9.2.1.3. 3 NLT 15 days after completion of testing
STANDARD 13
52 Recycled Materials Quantity Report 13.1.1. & 13.6. 1 Prior to final invoice submission
53 Recovered Material & Biobased Products Report 13.1.2. & 13.7. 1 Prior to final invoice submission
54 Pesticide Use Plan 13.1.7. & 13.11.3. 1 NLT 14 days prior to use
55 Treated Wood Pole & Members Recycling Consumer Info. Receipt 13.1.8. & 13.12. 1 Prior to final invoice submission
Location Date Date Date Official In When Received Received Approved Approval
# Submittal Item Standards CSO DSW Required via E-mail via Mail via E-mail Sent Submitted To
Copies
56 Prevention of Air Pollution Permits 13.1.9. & 13.13 1 NLT 14 days prior to start of work
57 Oil & Oil-Filled Electrical Equipment Receipt 13.1.14. & 13.17.5. 1 Prior to final invoice submission
58 Cleanup Work Management Plan 13.1.16. & 13.18.2. 1 NLT 14 days prior to start of work
59 Post Cleanup Report 13.1.17. & 13.18.7. 1 Prior to final invoice submission
STANDARD 15
60 As-Built Drawings 15.2.6. 1 Prior to final invoice submission
*Submittal required if item is used in the performance of the contract.
"T"= Submit transmittal sheet only.
"NLT"= No Later Than "NTP"= Notice To Proceed "ASAP"= As Soon As Practicable
Sheet1
File details come from the government source that posted it. Updated .