DE-SOL-0010889_0005.pdf
PDF 119 KB Posted
- Attached to
- Olinda & Elverta Substation Shunt Reactor Project Federal contract opportunity
- Solicitation number
- DE-SOL-0010889
About this file
Amendment 0005
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Drawings_Rev_Amen_4_ELV_ODA_.pdf | ||
| Amend_4_Revised_Wage_Determination_Shasta_County.pdf | ||
| B_-_Specs_Amendment__004.pdf | ||
| DE-SOL-0010889_0004.pdf | ||
| Amend_4_Revised_Wage_Determination_Scaramento_County.pdf | ||
| DE-SOL-0010889_0003.pdf | ||
| Site_Visit_Attendance_Roster.pdf | ||
| DE-SOL-0010889_0002.pdf | ||
| Drawings_Amendment_0001_elv02_oda03_project_dwgs_Final_2-9-17_(002).pdf | ||
| DE-SOL-0010889_0001.pdf | ||
| Specifications_Amendment_0001_ELV02_ODA03_SPEC-AMEND_001.pdf | ||
| Bid_Schedule_Amendment_0001ELV02_ODA03.pdf | ||
| DE-SOL-0010889.pdf | ||
| Foreign_National_Data_Card.pdf | ||
| C_-_Drawings_elv02_oda03_project_dwgs_Final_2-9-17.pdf | ||
| B_-_Specs_ELV02_ODA03_COMPILED_Final_Feb_17_2017.pdf | ||
| A_-_Bid_Schedule_-_Final.pdf | ||
| D2_-_Wage_Determination_Shasta_County.pdf | ||
| D1_-_Wage_Determination_Scaramento_County.pdf | ||
| E_-_Submittal_Log.pdf |
Show all 20
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
DE-SOL-0010889
x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
PHOENIX AZ 85005-6457
DSW
PO BOX 6457
DESERT SOUTHWEST REGIONAL OFFICE
US DOE/WESTERN AREA POWER
WAPA (DSW)
04/13/2017000005
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
03/03/2017
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Eric W. Jordan
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
04/13/2017
Amendment 0005
DE-SOL-0010889
The purpose of this Amendment is to post additional Contractors questions and answers.
A. Contractors questions and answers are provided as follows:
Question 1: The specifications sent out in addendum #4 say the contractor is responsible for dressing and oil fill of the reactors, we would like to make sure that is not the case?
Answer 1: Yes, the construction contractor is not responsible to fill the reactor.
Question 2: Will a revised price sheet be sent out for the changes in qty' of concrete?
Answer 2: No, the net change in concrete is reduced 10 CYS.
Question 3: The description of work includes the installation of government furnished “Vertical Switchboards” – please provide full details on these switchboards and associated field testing needed.
Answer 3: Part A and Part B Bidding Schedule items “Electrical testing” includes providing electrical testing in accordance with Standard 9, paragraph 9.1.2, Acceptance Tests – Method B, except for the following which will be performed by WAPA personnel:
a. Control, Metering and Relaying Equipment Tests.
b. Testing of Protective Relays.
c. Operational Tests.
d. Energization Tests.
Question 4: The Electrical Testing scope refers to Standard 9 paragraph 9.1.2 Acceptance Tests – Method B. This specification details a few tests to be performed on Power Circuit Breakers, but the specification requires additionally that the manufacturer’s recommended test be performed. Please provide the manufacturer’s recommended tests.
Answer 4: Manufacturer's test requirements are not available at this time.
Question 5: Standard 9 paragraph 9.1.2 Acceptance Tests – Method B details tests to be performed on current transformers, please provide the quantity and type of current transformers in the shunt reactors and circuit breakers.
Answer 5: The type and quantity of current transformers on both the shunt reactors and circuit breakers is unknown at this time.
Amendment 0005
DE-SOL-0010889
Question 6: In Standard 9 paragraph 9.1.2 Acceptance Tests – Method B, there is no mention of any testing needed for shunt reactors, motor operated switches, surge arresters, substation bus/insulators, or substation grounding. These seem to be major apparatus in need of testing, please provide desired field tests for this equipment.
Answer 6:
a. Shunt reactor tests are similar to the transformer tests described in Standard 9 paragraph 9.1.2 Acceptance Tests – Method B and shall be bid accordingly.
b. The contractor shall adjust motor operated switches per the manufacturer's instructions. Prior to piercing the operating linkage, operation of the switches will be witnessed by Western. Upon Western's acceptance, the operating linkage shall be pierced.
c. Surge arrestors will be tested by Western.
d. There is no requirement to test substation bus, insulators, or grounding.
Question 7: If Shunt reactors are to be tested please provide information on the accessories contained in the shunt reactors, such as the temperature/pressure sensing systems, other protective devices, alarms, fans, pumps, controls, etc, if these accessories must also be tested. A full set of shop drawings for each shunt reactor would be very helpful.
Answer 7: Shop drawings and particulars of accessories are not available at this time.
B. Date and time for bid opening remains unchanged, bid opening is April 19, 2017 at 2:00 PM local time.