21._Attachment_C_-_Wage_Determination.pdf

PDF 283 KB Posted

Attached to
Sterling Breaker Replacement Federal contract opportunity
Solicitation number
DE-SOL-0008721
Issued by
Department of Energy Western Area Power Administration

About this file

21. Attachment C - Wage Determination

View the file

Other files for this federal contract opportunity

Other files attached to Sterling Breaker Replacement, newest first.
File Type Posted
21._Attachment_A_-_Sterling_Transformer_Replacement_Specifications.pdf PDF
21._IFB_Letter-signed.pdf PDF
21._Attachment_E_-_Foreign_National_Data_Card.pdf PDF
21._Attachment_F_-_Bid _Performance _Payment_Bond.pdf PDF
21._Attachment_B_-_Sterling_Transformaer_Replacement_Drawings.pdf PDF
21._DE-SOL-0008721.pdf PDF
21._Attachment_D_-_DPO.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5 June 2015

Attachment C

Wage Determinations Sterling Breaker Replacement

CO150013

DE-SOL-0008721

http://www.wdol.gov/wdol/scafiles/davisbacon/CO13.dvb?v=2[8/10/2015 12:26:07 PM]

General Decision Number: CO150013 06/05/2015 CO13

Superseded General Decision Number: CO20140013

State: Colorado

Construction Type: Heavy

Counties: Alamosa, Archuleta, Baca, Bent, Chaffee, Cheyenne, Clear Creek, Conejos, Costilla, Crowley, Custer, Delta, Dolores, Eagle, Elbert, Fremont, Garfield, Gilpin, Grand, Gunnison, Hinsdale, Huerfano, Jackson, Kiowa, Kit Carson, La Plata, Lake, Las Animas, Lincoln, Logan, Mineral, Moffat, Montezuma, Montrose, Morgan, Otero, Ouray, Park, Phillips, Pitkin, Prowers, Rio Blanco, Rio Grande, Routt, Saguache, San Juan, San Miguel, Sedgwick, Summit, Teller, Washington and Yuma Counties in Colorado.

HEAVY CONSTRUCTION PROJECTS

Note: Executive Order (EO) 13658 establishes an hourly minimum wage of $10.10 for 2015 that applies to all contracts subject to the Davis-Bacon Act for which the solicitation is issued on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.10 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract. The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/02/2015 1 03/27/2015 2 06/05/2015

ELEC0012-002 09/01/2014

ALAMOSA, ARCHULETA, BACA, BENT, CHAFFEE, CONEJOS, COSTILLA,

CROWLEY, CUSTER, FREMONT, HUERFANO, KIOWA, LAS ANIMAS, MINERAL,

OTERO, PROWERS, RIO GRANDE AND SAGUACHE COUNTIES

Rates Fringes

Electricians:

Electrical contract over $1,000,000..................$ 27.30 10.80+3% Electrical contract under $1,000,000..................$ 24.75 11.84

ELEC0068-011 06/01/2014

CLEAR CREEK, EAGLE, GILPIN, GRAND, JACKSON, LAKE, LOGAN,

MORGAN, PHILLIPS, SEDGWICK, SUMMIT, WASHINGTON AND YUMA COUNTIES

Rates Fringes

ELECTRICIAN......................$ 32.65 12.70

ELEC0111-002 09/01/2014

Rates Fringes

Line Construction:

Cable Splicer...............$ 28.65 13.75%+4.75 Equipment Operator- Underground.................$ 25.05 9.20 Groundmen...................$ 18.20 9.12 Line Equipment Operator.....$ 28.47 11.30 Lineman and Welder..........$ 40.81 15.14

* ELEC0113-004 06/01/2015

CHEYENNE, ELBERT, KIT CARSON, LINCOLN, PARK AND TELLER COUNTIES

Rates Fringes

ELECTRICIAN......................$ 30.00 14.95

ELEC0969-003 12/01/2014

DOLORES, GARFIELD, GUNNISON, HINSDALE, LA PLATA, MOFFAT,

MONTEZUMA, RIO BLANCO, AND ROUTT COUNTIES

Rates Fringes

ELECTRICIAN......................$ 24.00 7.32

ELEC0969-006 12/01/2014

OURAY, PITKIN, SAN JUAN AND SAN MIGUEL COUNTIES

Rates Fringes

ELECTRICIAN......................$ 30.00 8.40

ELEC0969-010 12/01/2014

DELTA AND MONTROSE COUNTIES

Rates Fringes

ELECTRICIAN......................$ 24.00 7.32

ENGI0009-004 10/23/2013

Rates Fringes

Power equipment operators:

Mechanic....................$ 24.88 9.15 Motor Grader: Blade-finish..$ 25.04 9.15 Motor Grader: Blade-rough...$ 24.73 9.15 Roller: self-propelled, all types over 5 tons.......$ 24.73 9.15 Roller: self-propelled, rubber tires under 5 tons...$ 24.37 9.15 Trackhoe....................$ 24.88 9.15

PLUM0003-003 07/01/2014

CLEAR CREEK, GILPIN, GRAND, JACKSON, LAKE, LOGAN, MORGAN,

PHILLIPS, SEDGWICK, SUMMIT, WASHINGTON, AND YUMA. PARTS OF

ELBERT, EAGLE, KIT CARSON, LINCOLN, AND PARK COUNTIES

Rates Fringes

PLUMBER..........................$ 35.18 12.34

PLUM0058-010 07/01/2013

ALAMOSA, BACA, BENT, CHAFFEE, CHEYENNE, CONEJOS, COSTILLA,

CROWLEY, CUSTER, ELBERT (Southern portion including towns of Elbert, Matherson and Simla), FREMONT, HUERFANO, KIOWA, KIT CARSON (Including towns of Dfalgler, Siebert, Vona, Stratton and Bethune), LAS ANIMAS, LINCOLN (Including towns of Geona and Arriba in the southern portion of the county), MINERAL, OTERO, PARK (Including towns of Fauplay, Hartsel and Lake George), PROWERS, PUEBLO, RIO GRANDE, AND SAGUACHE COUNTIES

Rates Fringes

PLUMBER..........................$ 32.55 13.65

PLUM0058-012 07/01/2013

TELLER COUNTY

Rates Fringes

PLUMBER/PIPEFITTER

Plumbers Include HVAC Work

Pipefitters Exclude HVAC

Work........................$ 28.55 13.15

PLUM0145-004 08/01/2013

ARCHULETA, DELTA, DOLORES, EAGLE (Eagle County is divided from where Pitkin and Lake Counties join on the north, and in a straight line to and including the town of Edwards and northerly to the south east corner of Routt County), GARFIELD, GUNNISON, HINSDALE, LA PLATA, MOFFAT, MONTEZUMA, MONTROSE, OURAY, PITKIN, RIO BLANCO, ROUTT, SAN JUAN AND SAN MIGUEL

COUNTIES

Rates Fringes

PLUMBER..........................$ 24.58 10.97

SUCO2001-005 12/20/2001

Rates Fringes

Carpenters:

Form Building and Setting...$ 16.16 .82 All Other Work..............$ 15.72

Cement Mason/Concrete Finisher...$ 14.76 2.28

Laborer, common..................$ 11.11 3.80

PIPEFITTER.......................$ 18.13 1.84

Power equipment operators:

Backhoe.....................$ 15.93 3.58 Bobcat/Skid Loader..........$ 20.22 4.41 Bulldozer...................$ 15.08 4.44 Excavator...................$ 15.39 Front End Loader............$ 15.86 3.59

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION