Amendment_00001.pdf
PDF 96 KB Posted
- Attached to
- Mead Stage 15 Federal contract opportunity
- Solicitation number
- DE-SOL-0008469
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_2.pdf | ||
| Attch_C-_Amendment_3_Drawings.pdf | ||
| Amendment_3.pdf | ||
| Attch_A_-_Amendment_3_Bidding_Schedule_.pdf | ||
| Attch_B_-__Amendment_3_Specifications_.pdf | ||
| Amendment_2.pdf | ||
| 21e_Attch_C_Drawings_Table_of_Contents_Rev_7_8_15.pdf | ||
| 21c_Attch_B__Specifications_-_REV_7_9_15.pdf | ||
| Pre-Bid_Site_visit_attendees.pdf | ||
| 21d_Attch_A_-_Bidding_Schedule_Rev_7_8_15.pdf | ||
| 21e_Attch_C_Amendment_1_Drawings.pdf | ||
| 21f_Attch_D_-_Submittal_Log_Mead_15.pdf | ||
| 21h_Attch_F_-_Foreign_National_Data_Card.pdf | ||
| 21g_Attch_E_Wage_Determination_NV150022_1_23_2015.pdf | ||
| 21e__Attch_C_-_Drawings.pdf | ||
| 21d_Attch_A_-_Bidding_Schedule.pdf | ||
| 21c_Attch_B_-_Specifications.pdf | ||
| 21i_Attch_G_o442_21_(2).pdf | ||
| Solicitation_DE-SOL-0008469.pdf | ||
| Amendment_2.pdf |
Show all 20
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
DE-SOL-0008469
x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
PHOENIX AZ 85005-6457
DSW
PO BOX 6457
DESERT SOUTHWEST REGIONAL OFFICE
US DOE/WESTERN AREA POWER
WAPA (DSW)
MEAD STAGE 1507/09/2015000001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
06/16/2015
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
See continuation pages.
Note: The date and time specified for receipt of bids is hereby extended to July 21, 2015, 2:00 PM Local Time.
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Gregory K. Cagle
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
07/09/2015 Signature on File
Amendment 001
DE-SOL-0008469
The purpose of this Amendment is to post answer(s) to question(s), post the site-visit attendance sheet, and incorporate the below changes into the Project Specifications and Drawings:
A. Question(s) and answer(s) are provided as follows:
Q. Is the land that Mead Substation is located on Federal owned?
A. Yes.
B. Site visit attendance sheet is attached.
C. This Amendment shall effect the following changes:
1. Replace Attachment A Bidding Schedule with the attached revised Bidding Schedule.
Changes are identified with the vertical line in the right hand margin.
2. Replace Attachment B Specifications with the attached revised Specifications. Changes are identified with the vertical line in the right hand margin.
3. Replace Drawings Table of Contents with the attached Drawings Table of Contents.
4. Replace Drawing MED-2207-3 with the attached revised Drawing MED-2207-3A
5. The attached Drawings MED-2355B, MED-2372 and MED-2609 are hereby incorporated.
6. Provide two new bushing racks on new concrete foundations in accordance with Drawings
MED-2207-3A, MED-2372, and MED-2609. The new bushing racks will be located in the vicinity of the warehouse near the existing bushing racks and shall be connected to ground mat with 500 kcmil copper cable. This Bidding Schedule item shall include concrete foundations, structural steel, and all necessary material, labor, and equipment to complete the bushing racks and install spare bushings in the racks.
7. Provide all necessary material, equipment, and labor to weld transformer KU2B to plates embedded in the foundation (as shown on attached Drawing MED-2355B), ground the surge arresters on the 230-kV side of the transformer with new 500 kcmil copper cable and complete grounding connections to the transformer.
8. Provide Erection Engineering Services for a representative(s) of the Switch Manufacturer to supervise the assembly and adjustment of the Government-furnished disconnect switches. Costs for the Switch Manufacturer representative(s) shall be included in the Bidding Schedule items for installing Government-furnished disconnect switches.
Amendment 001
DE-SOL-0008469
9. The date and time specified for receipt of bids is hereby extended to July 21, 2015, 2:00 PM Local Time.
| downloadForm |
| Amendment 001 |
File details come from the government source that posted it. Updated .