21c_Attch_B__Specifications_-_REV_7_9_15.pdf
PDF 486 KB Posted
- Attached to
- Mead Stage 15 Federal contract opportunity
- Solicitation number
- DE-SOL-0008469
About this file
Amendment 1 Specifications
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_2.pdf | ||
| Amendment_3.pdf | ||
| Attch_A_-_Amendment_3_Bidding_Schedule_.pdf | ||
| Attch_B_-__Amendment_3_Specifications_.pdf | ||
| Attch_C-_Amendment_3_Drawings.pdf | ||
| Amendment_2.pdf | ||
| 21e_Attch_C_Drawings_Table_of_Contents_Rev_7_8_15.pdf | ||
| Pre-Bid_Site_visit_attendees.pdf | ||
| 21d_Attch_A_-_Bidding_Schedule_Rev_7_8_15.pdf | ||
| Amendment_00001.pdf | ||
| 21e_Attch_C_Amendment_1_Drawings.pdf | ||
| 21f_Attch_D_-_Submittal_Log_Mead_15.pdf | ||
| 21e__Attch_C_-_Drawings.pdf | ||
| 21d_Attch_A_-_Bidding_Schedule.pdf | ||
| 21c_Attch_B_-_Specifications.pdf | ||
| 21i_Attch_G_o442_21_(2).pdf | ||
| Solicitation_DE-SOL-0008469.pdf | ||
| 21h_Attch_F_-_Foreign_National_Data_Card.pdf | ||
| 21g_Attch_E_Wage_Determination_NV150022_1_23_2015.pdf | ||
| Amendment_2.pdf |
Show all 20
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MEA
DESC
AD SU
STA
SE
RIPTIO
NE
UBST
AGE
ECTION
ON/SPE
VADA
TATI
N C
CIFICA
A
ON
S
ATIONS
Spec. N
No. 849
SECTION C
DESCRIPTION/SPECIFICATIONS
MEAD SUBSTATION STAGE 15
DIVISION 1 – GENERAL REQUIREMENTS
A. CONTRACT REQUIREMENT
B. DECSRIPTION OF WORK
1. THE WORK IS SEPARATED INTO PART A, PART B, AND PART C
2. THE PRINICIPLE COMPONENTS OF WORK INCLUDE
C. DESCRIPTION OF BIDDING SCHEDULE ITEM
D. COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK
1. COMMENCEMENT AND COMPLETION
2. SUBMITTAL APPROVAL TIME
3. COMMENCEMENT OF CONTROL WORK
4. OUTAGE RESTRICTIONS
5. CONSTRUCTION SCHEDULE RESTRICTIONS
6. PROTECTIVE GROUND LEADS
7. TYPICAL FOUNDATIONS FOR GOVERNMENT-FURNISHED ELECTRICAL EQUIPMENT
8. TYPICAL FOUNDATIONS FOR CONTRACTOR-FURNISHED ELECTRICAL EQUIPMENT
E. CONSTRUCTION SCHEDULE
1. SUBMITTAL TIME
2. FORMAT AND DETAIL
F. MATERIAL
1. POINTS-OF-DELIVERY
G. RIGHTS-OF-WAY
1. GENERAL
H. GEOLOGIC INVESTIGATIONS
I. ELECTRIC POWER FOR CONSTRUCTION PURPOSES
J. WATER FOR CONSTRUCTION PURPOSES
K. EXPLOSIVES AND BLASTING
L. SUBMITTALS
1. GENERAL
2. APPROVAL TIME
3. TRANSMITTAL
DIVISION 2 – SITEWORK
A. DESCRIPTION OF BIDDING SCHEDULE ITEMS
DIVISION 3 – CONCRETE
A. GENERAL
1. MATERIAL
2. CURING
B. DESCRIPTION OF BIDDING SCHEDULE ITEMS
DIVISION 4 – SUBSTATION METALWORK
A. DESCRIPTION OF BIDDING SCHEDULE ITEMS
DIVISION 9 – SUBSTATION – ELECTRICAL
A. GENERAL
B. DESCRIPTION OF BIDDING SCHEDULE ITEMS
DIVISION 13 – ENVIRONMENTAL QUALITY PROTECTION
A. GENERAL
B. SPECIAL CONDITIONS
1. PREVENTION OF AIR POLLUTION
2. CONSERVATION OF NATURAL RESOURCES
MEAD SUBSTATION, STAGE 15
DIVISION 1 – GENERAL REQUIREMENTS
A. CONTRACT REQUIREMENT:
Construct and complete Mead Substation, Stage 15, in accordance with the Construction Contract (Standard Form 1442); the Contract Clauses; Western’s Construction Standards, including Standard 1 – General Requirements (September 2013), Standard 2 – Sitework (September 2013), Standard 3 – Concrete (September 2013), Standard 4 – Substation Metalwork and Transmission Line Lattice Structures (September 2013), Standard 9 – Substation – Electrical (September 2013), Standard 12 – Painting (September 2013), Standard 13 – Environmental Quality Protection (September 2013), Standard 15 – Drawings (September 2013); the Standard Drawings; and these Project Specifications and Drawings.
If a conflict occurs between the Project Specifications and the Construction Standards, the Project Specifications shall govern. The Project Specifications and the Drawings are used to take exceptions or provide additions to the Construction Standards. Some paragraphs in the Construction Standards will not apply to this job.
Western’s Construction Standards, Standard Drawings, and Electrical Equipment Standards are available at http://www.wapa.gov/business/buys.htm.
Western’s Project Specifications and Construction Standards are explained in Standard 1 – General Requirements, Section 1.1.1, “Standards and Project Specifications”.
B. DECSRIPTION OF WORK:
1. THE WORK IS SEPARATED INTO PART A, PART B, AND PART C:
a. Part A Description: Mobilization and preparatory work.
b. Part B Description: Work listed under Part B of the Bidding Schedule includes installation of a complete new 230-kV bay for the existing 345/230/24-kV transformer KU2B (new and not energized). The transformer KU2B will be installed to operate in parallel with the existing transformer KU2A, which must remain energized, except for an outage window in February-March when the 345-kV interconnection work (switches, breaker, and bus work), installation of the 24-kV tertiary switches, and demolition of the 345-kV interrupter switch (345-kV series capacitor bypass) may be completed.
c. Part C Description: Work listed under Part C of the Bidding Schedule includes replacement of twenty-one (21) deteriorating concrete pedestals for 230-kV CT’s and CCVT’s in the Arden, Davis, KU2A (Peacock), Eldorado No. 1, and Eldorado No. 2 line bays. Includes complete removal of the existing foundations, compacted backfilling of the excavation, installation of new foundations, erection of GFE stands, and replacement/testing of the original transformers.
2. THE PRINICIPLE COMPONENTS OF WORK INCLUDE:
a. Installation of Government-furnished equipment (GFE): 345-kV and 230-kV power circuit breakers, 345-kV, 230-kV, and 24-kV disconnecting switches, 230-kV coupling capacitor voltage transformers, 230-kV current transformers, steel structures, station post insulators, and duplex switchboard sections.
b. Provide all connections to a 345/230-kV, 600 MVA power transformer.
c. Provide 27.6-kV voltage transformers, power resistors, outdoor station service assembly, and safety switches.
d. Provide bus system, grounding system, conduit system, insulated conductors and cables, terminal boxes, and substation signs.
e. Provide foundations and anchor bolts for substation structures, electrical equipment, and material.
f. Removal and installation of a motor-operator, 230-kV coupling capacitor voltage transformers, 230-kV current transformers, and terminal boxes.
g. Remove and dispose of concrete pedestals, electrical equipment, steel structures, post insulators, aluminum tubing, aluminum conductor, and insulated cables.
h. Perform sitework and finish grading.
i. Perform electrical testing.
Paragraphs “Description of Bidding Schedule Items” in Divisions – 1, 2, 3, 4, and 9 describe the work to be performed.
The work is located near Boulder City, Nevada in Clark County, as shown on Drawing
MED 0015.
C. DESCRIPTION OF BIDDING SCHEDULE ITEM:
1. Part A Bidding Schedule item “Mobilization and preparatory work” includes the following:
a. Perform mobilization and preparatory work in accordance with Section H of the contract clauses.
b. Prepare and submit a Construction Schedule and Safety and Health Program.
c. Provide jobsite office trailer and the items listed below. Prior to any jobsite work, the
Contractor shall provide the office trailer for the exclusive use of Western.
(1) Relocation: If the Contractor changes the location of his office during the term of the contract, then the Contractor shall also move the mobile office trailer provided for Western, simultaneously with the transportation of his own unit.
(a) Installation: Install anchors and tie-downs for the trailer complying with local, State and Federal regulations. The office trailer shall be grounded. Entry points to the trailer shall be provided with stairways complying with Occupational Safety and Health Administration (OSHA) (29 C.F.R.
§ 1926.1052).
(b) Office Space Requirements:
1) Size and Arrangement: At least 250-square-feet (minimum) consisting of two (2) separate rooms (one (1) office and one (1) larger workroom).
2) Heating and Cooling: Heating and cooling unit sized to provide adequate heating and cooling.
3) Lighting and Electrical: Adequate lighting and 110 V electrical outlets.
4) Utilities: Make all arrangements and pay all costs for providing utilities, including potable drinking water, electrical power, and heating and cooling energy.
5) Toilet Facilities: Toilet facilities shall be provided in the immediate vicinity of the office and shall be maintained.
(2) Emergency Equipment: Provide and maintain the following emergency equipment:
(a) First Aid Kit by Affirmed Medical, Inc., Model No. 3503, or equal. Mount to the wall inside the workroom.
(b) Dry chemical fire extinguishers, Classified 4-A:60-B:C; one (1) to be located inside each entrance to the trailer.
(3) Window Coverings: Provide adjustable mini-blinds.
(4) Office Furniture: Provide good quality, fully-functional, office furniture as follows:
QUANTITY DESCRIPTION
5 Folding Office Chairs
1 Office desk (30-inches by 60-inches minimum)
2 Office tables (30-inches by 60-inches minimum)
1 Five-drawer file-cabinet
1 Bookcase (30-inches by 13-inches by 48-inches)
12 “Plan Hold” binders No. 1CB-24 (including one (1) plan rack)
D. COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK:
1. COMMENCEMENT AND COMPLETION: Refer to SF 1442, Block 11, and FAR Clause 52.211-10, Commencement, Prosecution, and Completion of Work.
2. SUBMITTAL APPROVAL TIME: Except as otherwise provided for specific submittals, Western will require 30-calendar-days for review of drawings or data submitted for approval.
3. COMMENCEMENT OF CONTROL WORK: Do not perform any control board or outdoor equipment wiring until receipt of Government-furnished wiring diagrams. Western will furnish outdoor wiring and schematic diagrams no sooner than 20-calendar-days after the delivery of the control board. Include these restrictions in the Construction Schedule.
4. OUTAGE RESTRICTIONS: In addition to the restrictions listed in Construction Standard 1, the following outage restrictions shall apply:
a. Outage requests shall be in writing from the Contractor to the COR and shall be received no later than 60-calendar-days prior to the requested outage start date.
b. Outages on the 345-kV Mead-Peacock Transmission Line can only occur from February
22, 2016 to April 1, 2016.
c. Outages on 345/230/24-kV transformer KU2A can only occur from February 22, 2016 to May 13, 2016.
d. Outages for CT and/or CCVT foundation/support replacement work (Arden, Davis, Eldorado No. 1, and Eldorado No. 2 line bays) shall be allowed as follows:
i. An outage on the Mead-Arden (NVE) 230-kV Transmission Line will be allowed between November 9, 2015 and December 4, 2015.
ii. An outage on the Mead-Davis 230-kV Transmission Line will be allowed between December 7, 2015 and January 8, 2016.
iii. An outage on the Mead-Eldorado #1 (SCE) 230-kV Transmission Line will be allowed between January 11, 2016 and February 5, 2016.
iv. An outage on the Mead-Eldorado #2 (SCE) 230-kV Transmission Line will be allowed between February 8, 2016 and March 11, 2016.
e. A two-day outage on 500/230/34.5-kV transformer KT1A will be allowed on November 4 and 5, 2015. This outage is needed so that the Contractor can safely perform (large/deep) auger excavation work for constructing foundations for the new 230-kV bus-tie structure (located in 230-kV bay for new transformer KU2B). The 230-kV bay for new transformer KU2B is in close proximity, immediately adjacent and north of the 230-kV bay for 500/230/34.5-kV transformer KT1A.
f. A two-day outage on 500/230/34.5-kV transformer KT1A will be allowed on December 7 and 8, 2015. This outage is needed so that the Contractor can safely erect steel for the new bus-tie structure (located in 230-kV bay for new transformer KU2B). The 230-kV bay for new transformer KU2B is in close proximity, immediately adjacent and north of the 230-kV bay for 500/230/34.5-kV transformer KT1A.
g. A two-day outage on the Equestrian #2 230-kV Transmission Line will be allowed on
December 9 and 10, 2015. This outage is needed so that the Contractor can safely erect the new T.O.S. on the west side of KU2B.
h. A 26-calendar-day outage on the Mead Substation, North-East 230-kV Bus will be allowed between January 11, 2016 and February 5, 2016. Work to be performed during this outage shall include, but is not limited to: stringing of strain-bus and OGW between transformer KU2B area and newly constructed 230-kV bay for KU2B; connect new switch WW24A to North-East 230-kV Bus; connect new 230-kV breaker CT’s into bus differential relay circuit; etc.
i. A seven-calendar-day outage on the Mead Substation, North-West 230-kV Bus will be allowed between February 8, 2016 and February 14, 2016. Work to be performed during this outage shall include, but is not limited to: connect new switch WW25A to North-West 230-kV Bus; connect new 230-kV breaker CT’s into bus differential relay circuit; etc.
j. A 40-calendar-day outage on the Mead-Peacock 345-KV Transmission Line will be allowed between February 22, 2016 and April 1, 2016. Work to be performed during this outage shall include, but is not limited to: final testing and commissioning of new transformer KU2B (energize Mead-Peacock and KU2B on April 1, 2016 – KU2A stays out-of-service until May 13, 2016). Also, beginning February 22, 2016, the Contractor can remove/replace CT and CCVT foundation/supports for VW18A and QW18A, replace breaker 2192, etc., in the 345-kV area immediately east of KU2A, relocate the motor-operator from Switch # 2199 to Switch # 2191, remove existing 345-kV By-Pass Switch # 2599 (out in the Series Capacitor Yard), etc.
5. CONSTRUCTION SCHEDULE RESTRICTIONS: The following Construction Schedule restrictions shall apply.
a. New transformer KU2B shall be test energized from the 230-kV side no later than
February 15, 2016 (one week prior to de-energizing the Mead-Peacock 345-kV Transmission Line).
6. PROTECTIVE GROUND LEADS: When protective ground leads are required, the protective ground leads shall be sized as defined below, and shall meet the requirements of Standard 1 – General Requirements, Section 1.4., “Safety and Health”, and the following:
a. Two (2) 4/0 AWG copper cables per phase shall be used in the 525-kV, 230-kV, 24-kV, and 13.8-kV areas. One (1) 4/0 AWG copper cable per phase shall be used in the 345-kV, 287-kV, and 34.5-kV areas.
b. Testing and Certification of Protective Ground Leads: Each protective ground lead shall have a permanent identification tag with unique identification number, certified wire size, and test date. Each protective ground lead shall be tested complete with connectors, in accordance with ASTM F 2249. Protective ground leads shall be retested and recertified annually. A protective ground lead without an identification tag to relate it to the annual certification of that protective ground lead shall not be used. No protective ground lead shall be longer than 36-feet, unless approved by the COR. Test results shall be submitted to the COR for approval prior to use of the grounds. When using the DC test method, the Contractor shall submit testing information in the format shown below in the Personal Protective Grounds Test Report. When using the AC test method, the Contractor shall submit testing information in accordance with the test set manufacturers recommendations.
CABLE
ID
CABLE
SIZE
CABLE
CONDITION
CABLE LENGTH ASTM
RESISTANCE
(mΩ)
MEASURED
RESISTANCE
(mΩ)
PASS/
FAIL FEET INCHES
Tester’s Signature ________________________________________________
Test Temperature ______
Test Date _______
7. TYPICAL FOUNDATIONS FOR GOVERNMENT-FURNISHED ELECTRICAL EQUIPMENT:
Typical foundations are shown in drawings. Western will design these foundations after receipt of the seismic report and informational drawings and data, including the seismic report from the equipment manufacturer. Western will forward the revised construction drawings for these foundations no later than 45-days prior to the NLT delivery date listed in the “Material” section.
If the NLT delivery date is adjusted by Western, forwarding of revised foundation construction drawings will be automatically adjusted in a like manner.
8. TYPICAL FOUNDATIONS FOR CONTRACTOR-FURNISHED ELECTRICAL EQUIPMENT:
Typical foundations are shown on drawings. Regarding foundations noted as “design not firm”:
Western will design these foundations after receipt and final approval of seismic qualification documents and informational drawings and data from the Contractor. Western will forward revised drawings for these foundations within 30-days after approval.
E. CONSTRUCTION SCHEDULE:
1. SUBMITTAL TIME: Refer to FAR Clause 52.236.15, Schedules for Construction Contracts.
2. FORMAT AND DETAIL: Dates for each item of Government-furnished material shall be included in the submitted Construction Schedule. Construction Schedule shall be provided in the Microsoft Project 2007 format, PDF and shall clearly show a critical patch base line. Do not schedule dates earlier than the estimated delivery dates shown in the “Material” paragraph.
F. MATERIAL: Furnish all material for completing the work, except material furnished by Western, as listed below:
ITEM
ESTIMATED
WEIGHT
(LBS)
ESTIMATED
DELIVERY
DATE
ESTIMATED
COST
1. Two (2) 3-phase, power circuit breaker, 345-kV, 4,000 amp
18,200 EA
NST 6-1-15
NLT 6-25-15
$226,000 EA
2. Two (2) 3-phase, power circuit breaker, 230-kV, 3,000 amp
15,000 EA
NST 10-1-15
NLT 11-10-15
$266,000 EA
3. One (1) 3-phase, 345-kV, 2,000 amp motor-operated disconnecting switch with support
18,000
NST 12-1-15
NLT 1-7-16
$110,000
4. Four (4) 3-phase, 230-kV, 3,000 amp motor-operated disconnecting switch with support
8,000 EA
NST 12-1-15
NLT 1-7-16
$30,000 EA
5. Two (2) 3-phase, 24-kV, 4,000 amp disconnecting switch with support
2,000 EA
NST 12-1-15
NLT 1-7-16
$20,000
6. Three (3) single-phase coupling capacitor voltage transformer, 230-kV with support
1,000 EA
NST 10-1-15
NLT 12-1-15
$10,000 EA
7. Three (3) single-phase current transformer, 230-kV
1,200 EA
On-site at Mead Substation (in warehouse)
$20,000 EA
8. Three (3) single-phase current transformer, 230-kV with support
1,418 EA
(Transformer)
1,050 EA
(Supports)
On-site at Mead Substation; Supports located at Glen Canyon Substation
$20,000 EA
9. Steel:
a. Part B
b. Part C
164,724
10,200
NST 9-15-15
NLT 10-15-15
NST 9-15-15
NLT 10-15-15
$289,765
$16,422
10. Fifty-seven (57) 345-kV post insulator
480 EA
NST 9-1-15
NLT 10-1-15
$1,300 EA
11. Eight (8) 230-kV post insulator, underhung
600 EA
NST 9-1-15
NLT 10-1-15
$1,450 EA
ITEM
ESTIMATED
WEIGHT
(LBS)
ESTIMATED
DELIVERY
DATE
ESTIMATED
COST
12. Twenty-seven (27) 230-kV post insulator, upright
600 EA
NST 9-1-15
NLT 10-1-15
$1,300 EA
13. Fifteen (15) 24-kV post insulator
60 EA
NST 9-1-15
NLT 10-1-15
$150 EA
14. One (1) duplex switchboard section
700 EA
NST 10-5-15
NLT 11-3-15
$75,000 EA
NST – No sooner than.
NLT – No later than.
1. POINTS-OF-DELIVERY: Material furnished by Western (except as noted) will be delivered to the Mead Substation. The Contractor shall load, transport, and unload the material to the jobsite. The Contractor shall inspect the equipment and report any damages to the COR within 10-calendar days after receipt. Glen Canyon Substation is located near Page, Arizona, as shown on Drawing GC 0015.
G. RIGHTS-OF-WAY:
1. GENERAL: Contact Western for the substation line right-of-way dimensions and physical restrictions. Orient construction methods and equipment to utilize Government-furnished rights-of-way, or obtain temporary access, or any required permits, without additional cost to Western. Any additional temporary access acquired by the Contractor shall have prior COR approval, since several areas of the transmission line have travel restricted areas. During the contract period, Western reserves the right to use Contractor-obtained access or any additional Environmental clearance during the performance period to complete the construction contract.
H. GEOLOGIC INVESTIGATIONS:
Geologic logs of subsurface explorations included in the “Drawings” Division constitute the information and records of geologic investigations for the work. Locations of subsurface investigations are shown on the Drawings.
Samples and cores of recovered material were not retained. Bidders shall obtain their own samples and perform tests on the material to evaluate properties, which they believe to be significant.
Western does not guarantee that the geologic information and records show the conditions that will be encountered in performing the work, but only that the geologic information and records show conditions encountered at the particular point and time the information and records were obtained.
The geologic information may not indicate variations, such as those caused by seasonal fluctuations in rainfall and other factors, which may affect the water level. The Contractor shall determine the nature of material to be excavated, the difficulties of making and maintaining required excavations, and doing other work affected by geology and ground water elevations at the worksite.
I. ELECTRIC POWER FOR CONSTRUCTION PURPOSES:
The Contractor shall furnish electric power for construction purposes. Limited single-phase or three-phase power is available from receptacles or panelboards located throughout the substation at approximately 120, 240, or 480 volts nominal. Co-ordinate with the COR for establishing electric power service.
J. WATER FOR CONSTRUCTION PURPOSES:
The Contractor shall furnish water for construction purposes. Make arrangements for obtaining the water, and provide for conveying the water to the points of use.
K. EXPLOSIVES AND BLASTING:
Explosives shall not be used.
L. SUBMITTALS:
1. GENERAL: Submittals must be provided in accordance with the Construction Standards and Project Specifications. The Contractor shall furnish submittals electronically (i.e. e-mail), unless otherwise specified by the COR. Submittals shall be sent to DSW-G5600-CS@wapa.gov in standard PDF or electronic CAD “*.dwg” (AutoCAD 2010) formats. All submittals shall include Western’s Specification No., project title, Transmittal/Submittal No., and corresponding Item No.
Refer to the Submittal Log for the list of required submittals. This list may not be all-inclusive, and it remains the Contractor’s responsibility to ensure conformance to the individual Specifications for possible additional submittal requirements. The submittal cover sheet in Microsoft Word or PDF format shall be included.
In addition to the submittals required in the attached tables, the Contractor shall submit the following information electronically to DSW-G5600-CS@wapa.gov:
a. Payrolls.
b. Sub-Contractor List/Forms.
c. Citizenship Forms.
d. Erosion Control Plan.
e. Environmental Submittals.
A submittal is required if the item is used in the performance of the contract.
2. APPROVAL TIME: Approval time for submittals shall be in accordance with the
“Commencement, Prosecution, and Completion of Work” paragraph.
3. TRANSMITTAL: The Contractor shall forward specified non-electronic submittals to one (1) of the following addresses:
Western Area Power Administration Western Area Power Administration
ATTN: G5600 ATTN: G5600
P.O. Box 6457 615 43rd Avenue
Phoenix, AZ 85005-5313 Phoenix, AZ 85009
DIVISION 2 – SITEWORK
A. DESCRIPTION OF BIDDING SCHEDULE ITEMS:
1. Parts B and C Bidding Schedule item “Miscellaneous sitework” includes the following:
a. Replace all disturbed gravel surfacing with new gravel surfacing and protecting existing gravel surfacing.
b. Disposal of excess waste material from excavation, not necessary or suitable for construction, as determined by COR.
c. Provide a soil-applied herbicide where gravel surfacing is placed.
2. Parts B and C Bidding Schedule item “Demolition” includes the following:
a. Remove and dispose of the concrete structures and concrete foundations, as shown on Drawings: MED 2001h(EI), MED 2002i(EI), MED 2003o(EI), MED 2005-3e(EI), MED 2007-1d(EI), MED 2009h, MED 2011g, MED 2119b, MED 2013, MED 2016, MED 2036b(EI), and MED 2010h.
b. Backfill the areas where foundations were removed with compacted structural backfill, and replace the existing gravel surface over those areas where foundations were removed.
c. Removal and disposal of existing buried utilities as shown on the drawings. Co-ordinate with the COR, Division 13, and Standard 13 regarding the disposal of material to include, but not limited to, buried conduit, pipe, groundwire, and cable.
3. Part B Bidding Schedule item “Bushing racks with concrete foundations” includes providing two bushing racks complete with concrete foundations, as shown on Drawings MED 2207-3a, MED 2372, and MED 2609, near the warehouse and existing bushing racks, with exact locations to be determined in the field by the COR.
a. Provide two concrete foundations complete with gravel fill, steel reinforcement, and anchor bolts. Connect bushing racks to ground mat with 500 kcmil copper.
b. Provide two galvanized structural steel bushing racks completely assembled on associated concrete foundations.
c. Transport spare bushings for transformer KU2B and power circuit breakers installed under this contract from temporary storage, and mount bushings in new bushing racks. Provide appropriately-sized stainless steel bolts, nuts, and washers to secure the bushings to the racks for long-term storage. Arrangement of bushings in racks will be determined in the field by the COR.
4. Parts B and C Bidding Schedule items do not contain separate items for the following.
Include these items in applicable Bidding Schedule items.
a. Excavations for foundations, structures, and trenches.
b. Place and compact earth material and backfill.
c. Grading for structure sites and line clearance.
d. Comply with Environmental Standards.
e. Provide engineering and gravel fills under concrete foundations, as shown on the drawings.
f. Expansion anchors and adhesive anchors.
g. Casing excavation, if required.
h. Dispose of Excavated and Demolition Material: Material from excavations and demolition not suitable or required for earthwork shall be removed from Government property and disposed of in an approved landfill. The Contractor shall make arrangements required for disposal of waste material in an approved landfill.
DIVISION 3 – CONCRETE
A. GENERAL:
1. MATERIAL:
a. Cement: Type II cement conforming to ASTM C 150 for Part B Bidding Schedule items.
b. Cement: Type III cement conforming to ASTM C 150 for Part C Bidding Schedule items.
c. Compressive Strength: 4000 psi at 28-days for Part B Bidding Schedule items.
d. Compressive Strength: 4000 psi at 3-days for Part C Bidding Schedule items.
e. Water-Cement Ratio: Net water-cement ratio, exclusive of water absorbed by the aggregates, shall not exceed .45 by weight.
f. Type A and D water-reducing and retarding admixtures may be used if approved by the
COR.
g. Fly-Ash: Shall be used in accordance with Standard 3.
The Contractor shall perform tests for potential reactivity for the sand and coarse aggregate to be used in this project. If the tests determine the aggregate(s) to be unsuitable as a concrete aggregate, a suitable source shall be obtained by the Contractor.
2. CURING: Exposed, formed surfaces of all concrete shall be cured with a water, resin-base curing compound without fugitive dye, or by covering with polyethylene film.
B. DESCRIPTION OF BIDDING SCHEDULE ITEMS:
1. Part B Bidding Schedule item “Concrete foundations” item includes the use of concrete with Type II cement for the following:
a. Earthwork, formwork, reinforcement, material used in concrete, void forming material, drilling and grouting anchor bars, anchor bolts, curing, finishing, joints, and other related work and material needed to complete the concrete construction.
b. Concrete foundations for steel structures.
c. Concrete foundations for electrical equipment.
d. Unwatering foundation excavations, if required.
e. Casing auger excavations, if required.
f. Trial augering, if required.
g. Measurement for quantities for concrete foundations will be made on the basis of concrete quantities shown on Drawing MED 2207-3. Regardless of the concrete quantities actually placed, payment will be based on the quantities of concrete shown on the drawing.
2. Part B Bidding Schedule item “Bridge over existing cable trench” includes providing a bridge over the existing cable trench. This bid item includes providing all materials including: all bridge steel, steel grating, steel bolts, anchor bolts, two (2) 4-by-4 timbers, two (2) 15VC3 foundations, two (2) concrete ramps, compacted backfill, gravel, and gravel surfacing.
3. Part C Bidding Schedule item “Concrete foundations” includes the use high-early strength concrete with Type III cement for the following:
a. Earthwork, formwork, reinforcement, material used in concrete, void forming material, drilling and grouting anchor bars, anchor bolts, curing, finishing, joints, and other related work and material needed to complete the concrete construction.
b. Concrete foundations for steel structures.
c. Concrete foundations for electrical equipment.
d. Unwatering foundation excavations, if required.
e. Casing auger excavations, if required.
f. Trial augering, if required.
g. Measurement for quantities for concrete foundations will be made on the basis of concrete quantities shown on Drawing MED 2207-3. Regardless of the concrete quantities actually placed, payment will be based on the quantities of concrete shown on the drawing.
DIVISION 4 – SUBSTATION METALWORK
A. DESCRIPTION OF BIDDING SCHEDULE ITEMS:
1. The Part B Bidding Schedule item “Steel structures, welded (galvanized) (Government-furnished” includes installing the following:
a. Three (3) – 85-feet Ground Masts Type I, foundation (15GM1, 15GM2, and 15GM3).
b. One (1) – 230-kV Bus Tie Structure Type I, foundation (15BT1).
c. One (1) – 230-kV Take-Off-Structures Type IV, foundation (15TOS4).
d. Two (2) – 25-kV Transformer Supports Type I, foundation (15XS1 and 15XS2).
e. One (1) – 25-kV Bus Tee Pole Type I, foundation (15BTP1).
f. Two (2) – 25-kV Horizontal Insulator Bus Poles Type I, foundation (15HIBP1).
g. Four (4) – 230-kV Bus Poles Type XXII, foundation (15BP22).
h. Two (2) – 230-kV Bus Poles Type XXIII, foundation (15BP23).
i. Nine (9) – 345-kV Bus Poles Type XXIV, foundation (15BP24).
j. Five (5) – 345-kV Bus Poles Type XXV, foundation (15BP25).
k. Five (5) – 345-kV Bus Poles Type XXVI, foundation (15BP26).
l. Six (6) – 230-kV Bus Frames Type XXIV, foundation (15BF24).
m. Three (3) – 345-kV Bus Frames Type XXV, foundation (15BF25).
n. Eight (8) – 345-kV Bus Frames Type XXVI, foundation (15BF26).
o. Ten (10) – Single Switch Operating Platforms Type I.
p. Five (5) – Equipment Cabinet Platforms Type V.
The steel manufacturer will deliver the steel to the site. The Contractor shall unload steel from the trucks, and Contractor personnel shall inspect the steel for possible damage during shipment or transportation, and report any issues to Western’s COR. Regardless of the steel quantities installed, payment shall be based upon the lump sum amount in the Bidding Schedule.
2. The Part C Bidding Schedule item “Steel structures, welded (galvanized) (Government-furnished)” includes installing the following:
a. Six (6) – Equipment Supports Type I, foundation mark (15CT3 and 15CT4).
b. Three (3) – Equipment Supports Type II, foundation mark (15CT2).
c. Nine (9) – Equipment Supports Type III, foundation mark (15CC1, 15CC2, and 15CC3).
d. Three (3) – Equipment Supports Type IV, foundation mark (15CT1).
The steel manufacturer will deliver the steel to the site. The Contractor shall unload the steel from trucks, and Contractor personnel shall inspect the steel for possible damage during shipment or transportation, and report any issues to Western’s COR. Regardless of the steel quantities installed, payment shall be based upon the lump sum amount in the bidding schedule.
DIVISION 9 – SUBSTATION – ELECTRICAL
A. GENERAL: Electrical equipment and material shall be as specified in Western’s “WAPA ES”
Standard Equipment Specifications, as shown on project drawings, and in accordance with NEMA, ANSI, IEEE, ICEA, ASTM, NEC, NESC, UL, and Federal specifications and standards as applicable.
Applicable requirements shall be met under the following service conditions:
Ambient Temperatures:
Maximum ........................................................................................... +55C Maximum 24-Hour Average .............................................................. +45C Minimum ............................................................................................. -10C
Elevation:
Above Mean Sea Level .............................................................. 2,050-Feet
*ASCE-7 Wind Load:
Minimum Basic Wind Speed .......................................................... 90 MPH Importance Factor ................................................................................ 1.15
*IEEE Seismic Qualification ......................................................... Moderate
*Wind and seismic loads are non-simultaneous.
1. For all Government-furnished Bidding Schedule items, the Contractor shall:
a. Unless otherwise indicated, unload and inspect Government-furnished items.
b. Install associated support structures when furnished.
c. Install Government-furnished items as shown on the drawings.
2. For all Contractor-furnished Bidding Schedule items, the Contractor shall:
a. Provide (furnish and install) Bidding Schedule items, equipment, and material not furnished by the Government.
3. Unless otherwise specified, associated support structures provided for each item of electrical equipment rated above 7-kV shall be 102-inches-in-height and hot-dip-galvanized, if made of steel. Instrument transformers that are seismically qualified shall be 96-inches-in-height. If tubular steel supports are furnished, they shall be galvanized internally and externally.
4. Installation and painting of electrical equipment and material shall be provided in accordance with Standards 9 and 12 respectively.
B. DESCRIPTION OF BIDDING SCHEDULE ITEMS:
1. Part B Bidding Schedule item “Connections to 345/230-24-kV, 600 MVA, three-phase power transformer” includes furnishing all equipment and material, and performing all work required to complete grounding connections, weld transformer base to plates embedded in foundation, connect the power transformer to the switchyard bus system, and make all control and power cable connections necessary to place the power transformer in service. A minimum of 14-linear-inches of 5/16-inch fillet weld are required at each embedded plate (ten locations) to anchor the transformer in accordance with seismic requirements. Details are shown on Drawing MED 2355b.
Lightning arresters for the 230-kV side of the transformer shall be grounded with new 500 kcmil copper cable arranged in a loop from one ground connection up the side of the transformer, through the arresters, and down the side of the transformer to a second ground connection.
The transformer will be set on its pad, assembled, and filled with oil by others prior to this project. Testing of the transformer shall be performed in accordance with Standard 9.1.2, Acceptance Tests – Method B (See “Electrical testing”).
DESIGNATION KU2B
Voltage Rating (kV) 345/230-24
BIL Rating (kV) 1175/900
MVA Rating (MVA) 450/600
Total Weight (including oil, LBS) 746,300
Manufacturer Hyundai
2. Part B Bidding Schedule items “Power circuit breaker, 345-kV, 4,000 amps (Government-furnished)” and “Power circuit breaker, 230-kV, 3,000 amps (Government-furnished)” includes furnishing all equipment and material not furnished by Western, and installing the Government-furnished power circuit breakers:
DESIGNATION JU21A, JU22A JW24A, JW25A
Manufacturer Mitsubishi ABB
Type Dead tank, SF6 gas Dead tank, SF6 gas
Nominal Voltage Rating (kV)
345 230
Maximum Voltage Rating (kV)
362 245
Continuous Current (Amps)
4,000 3,000
Estimated Weight of 3-pole Breaker (LBS)
18,200 15,000
The equipment supplier will unload the power circuit breakers from the truck, and the Contractor personnel shall inspect the power circuit breakers for possible damage during shipment or transportation, and report any damage to Western’s COR.
a. One (1) set of spare parts furnished with each voltage class of power circuit breaker will include, but not be limited to the following:
(1) Two (2) trip coils and two (2) close coils.
3. Part B Bidding Schedule items “Disconnecting switch, 345-kV, 2,000 amps, motor-operated with support structure (Government-furnished)”, “Disconnecting switch, 230-kV, 3,000 amps, motor-operated with support structure (Government-furnished)” and “Disconnecting switch, 24-kV, 4,000 amps, with support structure (Government-furnished)” includes furnishing all equipment and material not furnished by Western, obtaining erecting engineering services from the disconnect switch manufacturer (Southern States, LLC), and installing the Government-furnished switches and support structures in accordance with the manufacturer’s instructions.
DESIGNATION WU22A
WW24A, WW25A,
YW24A, YW25A
WY89A, WY95A
Type
3-pole, single-throw, outdoor, motor group operated, vertical break, rotating insulator
3-pole, single-throw, outdoor, motor group operated, vertical break, rotating insulator
3-pole, single-throw, outdoor, manually group operated, vertical break, rotating insulator
System Nominal Voltage Rating (kV)
345 230 24
Rated Maximum Voltage (kV)
362 245 27
Basic Impulse Insulation Level (kV)
1300 900 150
Continuous Current Rating (Amps)
2,000 3,000 4,000
Momentary Current Rating (kA)
100 120 120
Grounding Blades No No No
Phase Spacing 16’-0” 11’-0” 4’-0”
Mounting Position Horizontal Horizontal Horizontal
Support structure Yes Yes Yes
Control Circuit Voltage
125 DC 125 DC N/A
Key interlock No No Yes
The equipment supplier will unload the disconnecting switches, and Contractor personnel shall inspect the disconnecting switches for possible damage during shipment or transportation, and report any damage to the COR. The Contractor shall obtain the services of field service representative(s) from Southern States, LLC to supervise the assembly and adjustment of the disconnect switches. After installation is complete, the field service representative(s) shall provide report(s) certifying that the disconnect switches are properly assembled, adjusted, and ready for normal service. Contact information for Southern States, LLC:
Southern States, LLC 30 Georgia Avenue Hampton, GA 30228 Telephone: 770-946-4562 www.southernstatesllc.com
a. One (1) set of spare parts furnished with each voltage class of disconnecting switch will include, but not be limited to, the following:
(1) Insulators.
(2) One (1) complete set of each type of moving and stationary high voltage contacts.
(3) One (1) worm gear operator.
(4) One (1) motor.
4. Part B Bidding Schedule item “Coupling capacitor voltage transformer, 230-kV, single-phase (Government-furnished)” includes furnishing all equipment and material not furnished by Western, and installing the Government-furnished coupling capacitor voltage transformers and support structures:
DESIGNATION (SINGLE-PHASE)
VW24B1, VW24B2,
VW24B3
Nominal System Voltage (kV) 230
Maximum System Voltage (kV) 245
Basic Impulse Insulation Level (BIL) 1050
Performance Reference Voltage (kV) 138
Primary to Secondary Ratios 1200/2000:1
ANSI Accuracy Class 0.3% M, W, X, Y, Z
Metering
Output Rating (minimum VA) 200
Mounting Base
The equipment supplier will unload the coupling capacitor voltage transformers, and Contractor personnel shall inspect the coupling capacitor voltage transformers for possible damage during shipment or transportation, and report any damage to Western’s COR.
5. Part B Bidding Schedule item “Current transformer, 230-kV, single-phase (Government-furnished)” includes furnishing all equipment and material not furnished by Western, and installing the Government-furnished current transformers and support structures:
DESIGNATION (SINGLE-PHASE) QW24A1, QW24A2, QW24A3
Nominal System Voltage (kV) 230
Maximum System Voltage (kV) 245
Basic Impulse Level (kV) 1050
Rated Primary and Secondary Currents (Amps)
2000:5
ANSI Accuracy Class 0.15% for all burdens
Accuracy Range 4A to 4000A primary Continuous Thermal Current Rating Factor at 30°C Ambient Temperature
2.0
Type Oil-Filled
The Contractor shall load and haul the current transformers and support structures from Glen Canyon Substation and off-load the current transformers and support structures at Mead Substation, as directed by the COR. Contractor personnel shall inspect the current transformers and support structures for possible damage during transportation, and report any damage to the COR.
6. Part B Bidding Schedule item “Voltage transformer, 27.6-kV, 3-kVA, single-phase” includes providing distribution transformers in accordance with WAPA ES 2.1 Equipment Standard:
DESIGNATION (SINGLE-PHASE)
VY89A1, VY89A2, VY89A3,
VY95A1, VY95A2, VY95A3
Type 3 single-phase, 60 Hz, outdoor
Primary Voltage Rating 27,600/27600Y
Secondary Voltage Ratings 115 V & 115 V Dual secondary
Capacity minimum 3,000 VA per phase
Ratio 240:1 & 240:1
BIL (kV) 150
The voltage transformers, in combination with a resistor, are used for ground fault detection.
7. Part B Bidding Schedule item “Resistor, 208-V single-phase” includes providing resistors in accordance with WAPA ES 9.3 Equipment Standard:
DESIGNATION RY89A, RY95A
Type Single-phase, 60 Hz, outdoor, furnished in a weatherproof enclosure suitable for bracket mounting
Voltage Rating (V) 208
Resistance (ohms) 12
Current rating (Continuous Amps) 18
Enclosure
Weatherproof with a conduit entrance on the side as indicated on Drawing MED 1141.
One (1) grounding pad and clamp-type terminal for 500 kcmil bare copper cable shall be furnished with enclosure.
The resistors, in combination with voltage transformers, are used for ground fault detection.
8. Part B Bidding Schedule item “Outdoor station service assembly” includes providing outdoor station service assembly designated DWF, as shown on Drawing MED 1653.
The station service assembly DWF shall consist of one (1) 480-240/120 V, 75-KVA dry-type transformer (designated T11), and one (1) 240 V panelboard (designated DWF). The station service assembly shall be connected to a single-phase, 480 V source from unit substation DWA (Drawing MED 1630).
a. Dry-Type Transformer: The transformer shall be designed and manufactured in accordance with ANSI C57, and have the ratings and features in Table 1. The transformer shall receive the routine tests required by paragraph 8.3 of ANSI C57.12.01, except that the no-load loss and exciting current tests will not be required. Transformer shall be painted with the manufacturer’s standard painting system, color ANSI 70 gray.
RATINGS AND FEATURES FOR DRY-TYPE TRANSFORMER TABLE 1
DESIGNATION T11
Type Distribution, single-phase, 60 Hz outdoor, self-cooled, dry-type, deadfront
Voltage Rating (V) 480 to 240/120
High-voltage taps ±2 1/2%, ±5%
Impedance range 3 – 5.75%
Capacity (kVA) 75
Number of high-voltage bushings (enclosed) 2
High-voltage bushings BIL (kV) 10
Number of low-voltage bushings (enclosed) 3
Low-voltage connection (V) 240/120
b. Station Service Assembly: The station service assembly shall be furnished in accordance with the following sections of WAPA ES 2.3 Equipment Standard:
(1) 2.3.1 – General.
(2) 2.3.3 – Switchgear Assembly Features.
(3) 2.3.4 – AC Distribution Panelboards.
(4) 2.3.11 – Drawings and Data.
The station service assembly shall be rated to operate under the service conditions specified in paragraph “A. General”.
The station service assembly shall be installed in the location shown on Drawing
MED 1064.
9. Part B Bidding Schedule item “Grounding system” includes providing material and services required to complete the substation grounding system. Paint any exposed copper ground cable with flat gray colored paint. Unless otherwise specified on the drawings, splices, crosses, tees, and other fittings used on grounding system may be 360 degree radial swaged type (DMC Power or equal). Informational drawings and data are not required for this item.
10. Part B Bidding Schedule item “Bus system” includes providing material and services required to complete the outdoor strain buses, jumper buses, rigid buses, and overhead groundwire installations. The 345-kV, 230-kV, and 24-kV post insulators will be furnished by Western. Unless otherwise specified on the drawings, splices, elbows, pad type terminal connectors, and other fittings used on rigid or cable may be 360-degree radial swaged type (DMC Power or equal). Furnish corona shields for all 345-kV and 230-kV pad to pad connections.
11. Part B Bidding Schedule item “Conduit system” includes providing material and services required to complete the substation conduit system, including embedded and exposed conduit.
Conduit entering the cable trench with a 90-degree-bend is allowed to be Schedule 40 PVC, as shown on Drawing 31 1006. All other 90-degree-bends shall be rigid metal. A detectable warning tape shall be installed directly above each conduit run and located 12-inches below finished grade. All conduits shall have sealing compound installed at both ends. Informational drawings and data are not required for this item.
12. Part C Bidding Schedule items “Remove and reinstall coupling capacitor voltage transformer, 230-kV, single-phase” and “Remove and reinstall current transformer, 230-kV, single-phase” includes removing and reinstalling the following instrument transformers and associated jumpers and terminal boxes:
a. Nine (9) coupling capacitor voltage transformers designated VW18A1, VW18A2, VW18A3, VW42B1, VW42B2, VW42B3, VW72A1, VW72A2, and VW72A3; and nine (9) current transformers designated QW18A1, QW18A2, QW18A3, QW72A1, QW72A2, QW72A3, QW74A1, QW74A2, and QW74A3.
b. Terminal boxes designated EW18A, EW18B, EW42B, EW72A, EW72C, and EW74B.
c. The existing jumpers shall be disconnected from the instrument transformers and the instrument transformers and terminal boxes shall be removed from their concrete pedestals and stored in the temporary storage facility (refer to the “Existing outdoor electrical equipment and material” paragraph). Control cables installed from the cable trenches to the terminal boxes shall be pulled back and coiled for reinstallation.
d. The instrument transformers and terminal boxes shall be transported from the temporary storage facility and installed on their new support structures. The terminal boxes shall be reinstalled at a height that allows the existing control cables from the trench to be reused.
Existing jumpers and control cables shall be reconnected to the instrument transformers.
e. New conduits and grounding associated with the reinstallation of the instrument transformers shall be included in these Bidding Schedule items, and installed in accordance with the drawings.
13. Part C Bidding Schedule item “Current transformer, 230-kV, single-phase (Government-furnished)” includes removing existing current transformers and associated jumpers and terminal box, installing new Government-furnished current transformers, and reinstalling the jumpers and terminal box:
DESIGNATION (SINGLE-PHASE) QW16A1, QW16A2, QW16A3
Nominal System Voltage (kV) 230
Maximum System Voltage (kV) 245
Basic Impulse Level (kV) 1050
Rated Primary and Secondary Currents (Amps)
2000:5
ANSI Accuracy Class 0.15% for all burdens
Accuracy Range 4A to 4000A primary Continuous Thermal Current Rating Factor at 30°C Ambient Temperature
2.0
Type Oil-Filled
a. The existing jumpers shall be disconnected from the current transformers, and the current transformers and Terminal Box EW16B shall be removed from their concrete pedestals and stored in the temporary storage facility (refer to the “Existing outdoor electrical equipment and material” paragraph). Control cables installed from the cable trench to the terminal box shall be pulled back and coiled for reinstallation.
b. The new current transformers shall be transported from the Mead Substation warehouse, and Terminal Box EW16B shall be transported from the temporary storage facility and installed on their new support structures. The terminal box shall be reinstalled at a height that allows the existing control cables from the trench to be reused. Existing jumpers and control cables shall be reconnected to the current transformers.
c. New conduits and grounding associated with the installation of the current transformers shall be included in this Bidding Schedule item, and installed in accordance with the drawings.
14. Part B Bidding Schedule item “Associated electrical equipment and material” includes providing equipment, material, and services required to complete the following substation installations, as shown on the drawings:
a. Insulated Conductors: Includes all insulated conductors and cables except 3/c No. 2, 5/c and 12/c No. 10 AWG control cable use when 5/c and 9/c No. 10 control cable is listed in the Bidding Schedule on a unit price basis, which are covered under separate Bidding Schedule items. The Contractor shall terminate both ends of all cables.
b. Terminal Boxes: Terminal boxes’ internal components shown on Drawings 31 1085 and
31 1086 are typical and the Contractor shall provide internal components for Type A and Type F terminal box configuration. Actual internal arrangements will be determined by the
COR.
c. Gas Cart Receptacles with Safety Switches: The safety switches shall be of the outdoor type, single-throw, fusible, single-phase, 3-wire, 240 V, 60-A. The enclosure for the safety switches shall be NEMA Type 4. The receptacles shall be single-phase, 3-wire 250 V, 50-A, grounding, NEMA 6-50R, complete with weatherproof enclosure, outlet body, and matching plug.
d. Oil Processing Safety Switches: The safety switches shall be of the outdoor type, single-throw, fusible, 3-phase, 3-wire, 600 V, 600-A with the phases marked to identify phases A, B, and C. The enclosure for the safety switches shall be NEMA Type 4.
e. Phase Identification Signs (31 1000):
(1) One (1) on each phase at both ends of main and transfer buses, at each high voltage circuit terminating structure, and on each phase of an instrument transformer or single-phase transformer:
(a) Phase A – 10 required.
(b) Phase B – 10 required.
(c) Phase C – 10 required.
f. Equipment Identification Signs (31 1000) – Lettering on the signs shall be as follows:
(1) XFMR KU2B
MED 2483
DISC SW WW24A 230KV
(2) XFMR KU2B
MED 2482
PCB JW24A 230KV
(3) XFMR KU2B
MED 2481
DISC SW YW24A 230KV
(4) XFMR KU2B
MED 2585
DISC SW YW25A 230KV
(5) XFMR KU2B
MED 2586
PCB JW25A 230KV
(6) XFMR KU2B
MED 2587
DISC SW WW25A 230KV
(7) XFMR KU2A
MED 2192
PCB JU21A 345KV
(8) XFMR KU2B
MED 2292
PCB JU22A 345KV
(9) XFMR KU2B
MED 2291
DISC SW WU22A 345KV
(10) XFMR KU2A
MED 8935
DISC SW WY89A 24KV
(11) XFMR KU2B
MED 9535
DISC SW WY95A 24KV
(12) INSTRUMENT TRANSFORMER
CCVT VW24B1 230KV
(13) INSTRUMENT TRANSFORMER
CCVT VW24B2 230KV
(14) INSTRUMENT TRANSFORMER
CCVT VW24B3 230KV
(15) CURRENT TRANSFORMER
CT QW24A1 230KV
(16) CURRENT TRANSFORMER
CT QW24A2 230KV
(17) CURRENT TRANSFORMER
CT QW24A3 230KV
(18) TERMINAL BOX EW24B
SECONDARY FUSE
BLOCKS FOR VW24B
(19) TERMINAL BOX EW24C
FOR QW24A
(20) TRANSFORMER
KU2B
(21) RESISTOR
RY89A
(22) RESISTOR
RY95A
(23) VOLTAGE TRANSFORMER
VT VY89A1 27.6KV
(24) VOLTAGE TRANSFORMER
VT VY89A2 27.6KV
(25) VOLTAGE TRANSFORMER
VT VY89A3 27.6KV
(26) VOLTAGE TRANSFORMER
VT VY95A1 27.6KV
(27) VOLTAGE TRANSFORMER
VT VY95A2 27.6KV
(28) VOLTAGE TRANSFORMER
VT VY95A3 27.6KV
(29) TERMINAL BOX EY89A
BLOCKS FOR VY89A
(30) TERMINAL BOX EY95A
BLOCKS FOR VY95A
(31) DWF
(32) T11
15. Parts B and Part C Bidding Schedule item “Existing outdoor electrical equipment and material” includes constructing a temporary storage facility…