Project_Drawings.pdf
PDF 3 MB Posted
- Solicitation number
- DE-SOL-0008113
About this file
Project Drawings
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_003_Final.pdf | ||
| Amendment_002_Final.pdf | ||
| Amendment_001_Final.pdf | ||
| Contract_Clauses_and_Bid_Schedule.pdf | ||
| Project_Specificaitons.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WHITE SUBSTATION
345-KV BREAKER REPLACEMENT
SOUTH DAKOTA
SECTION C
DESCRIPTION/SPECIFICATIONS
Solicitation No. DE-SOL-0008211 Spec. No. 15WC111814-672
DIVISON 15 – DRAWINGS
A. GENERAL:
CONSTRUCTION STANDARD DRAWINGS: A complete set of standard drawings are available at http://www.wapa.gov/business/buys.htm. Construction drawings are the specification drawings and any additional drawings required for use in construction. The construction drawings will be issued after contract award and may include amendment changes and other details, which make the drawings suitable to use for construction purposes.
PROJECT DRAW INGS: Project drawings included herein are reduced reproductions and are not to scale. Some project drawings show details of fabrication and other information not a part of the work. Disregard information and details, which are not applicable.
STANDARD DRAW INGS: W here details shown on standard drawings included herein differ from project drawings or text, the details of project drawings or text shall govern.
INFORMATIONAL DRAW INGS: Some project drawings have the words “FOR INFORMATION ONLY” appearing above the title block. These drawings show some information, which may be required for bidding purposes. These drawings do not show items to be furnished or work to be performed.
EXISTING INSTALLATION DRAW INGS: Some project drawings have the words “EXISTING INSTALLATION” appearing above the title block. These drawings show the existing installations prior to modifications and may show some new work to be performed.
REFERENCE DRAW INGS: Reference drawings referred to on project drawings and not included herein, are not necessary for bidding purposes.
CONTRACTOR'S RESPONSIBILITY: Check all drawings and advise Western of any errors or omissions.
B. LIST OF DRAWINGS:
1. WHT 0023, Rev. A - White Substation Location and Vicinity Map
2. WHT 0001, Rev. D - White Substation Switching Diagram
3. WHT 1000, Rev. H - White Substation General Arrangement Plan (Existing Installation)
4. WHT 1010, Rev. D - White Substation 345KV Bays U3 and U5 (Existing Installation)
5. WHT 1110, Rev. F - White Substation 345KV Area Section A-A (Existing Installation)
6. WHT 1500, Rev. G - White Substation Key Grounding Plan (Existing Installation)
7. WHT 1510, Rev. D - White Substation 345KV Bays U3 and U5 Grounding Plan (Existing Installation)
8. WHT 1710, Rev. A - White Substation 345KV Bays U3 and U5 Conduit and Buried Cable Plan
(Existing Installation)
9. WHT 1711, Rev. A - White Substation 345KV Bays U4 and U6 Conduit and Buried Cable Plan
(For Information Only)
10. WHT 2000, Rev. G - White Substation Grading and Plot Plan
11. WHT 2001, Rev. C - White Substation Grading and Drainage Facilities (For Information Only)
12. WHT 2003, Rev. J - White Substation Foundation General Plan (Existing Installation)
13. WHT 2003, Rev. J - White Substation Foundation General Plan
14. WHT 2004, Rev. G - White Substation Foundation Plan 345KV Area
15. WHT 2008-2, Rev. D - White Substation Foundation/Structural Data and Drawing Index (Sheet 2 of 2)
16. WHT 2303, Rev. C - White Substation Foundation Outline and Reinforcement
17. WHT 2550, Rev. A - White Substation Anchor Bolts
18. WHT T0001, - White Substation Culvert Layout http://www.wapa.gov/business/buys.htm
EXISTING INSTALLATION
INDICATES EXISTING GROUNDS AND CONCRETE
FOUNDATIONS TO BE REMOVED
FOR INFORMATION ONLY
alford Rectangle alford Text Box
REMOVE 3 EXISTING FOUNDATIONS
DESIGNATED "CB1"
PLACE CONCRETE FOUNDATION 3CB3
Message from the Administrator
At Western, we show our commitment to safety every day through the actions we take, the training we offer and the work conditions we provide. We expect the same commitment to safety from each of our contractors who provide products or services to Western.
right decisions to ensure that the work environment is as safe as possible.
Our safety program is based on four points:
� Safety procedures or common sense must be applied by each Federal and not be set aside to meet a project schedule or for personal convenience.
� Employees and contractors must believe that they have the right and the responsibility to identify and take action to reduce, if not eliminate, haz
� Managers and supervisors must lead by example and execute their responsibility to ensure each job is accomplished in a safe and healthy way.
� Safety is a personal responsibility. Each individual make a task.
By integrating these principles into every task we take, together we can ensure Western is a safe place to work.
Message from the Administrator t Western, we show our commitment to safety every day through the actions we take, the training we offer and the work conditions we provide. We expect the same commitment to safety from each of our contractors who provide products or services to Western. In performing work for Western, all contractors must make the right decisions to ensure that the work environment is as safe as possible.
Our safety program is based on four points:
Safety procedures or common sense must be applied by each Federal and not be set aside to meet a project schedule or for personal convenience.
Employees and contractors must believe that they have the right and the responsibility to identify and take action to reduce, if not eliminate, hazardous work environments and hazardous work practices.
Managers and supervisors must lead by example and execute their responsibility to ensure each job is accomplished in a safe and healthy way.
Safety is a personal responsibility. Each individual makes the decision on what action to take to accomplish
By integrating these principles into every task we take, together we can ensure Western is a safe place to t Western, we show our commitment to safety every day through the actions we take, the training we offer and the work conditions we provide. We expect the same commitment to safety from each of our contractors
In performing work for Western, all contractors must make the right decisions to ensure that the work environment is as safe as possible.
Safety procedures or common sense must be applied by each Federal and contract employee. Safety should not be set aside to meet a project schedule or for personal convenience.
Employees and contractors must believe that they have the right and the responsibility to identify and take ardous work environments and hazardous work practices.
Managers and supervisors must lead by example and execute their responsibility to ensure each job is s the decision on what action to take to accomplish
By integrating these principles into every task we take, together we can ensure Western is a safe place to
Mark A. Gabriel
Administrator
| White 345kV Breaker Replacement Drawings Index.pdf |
| DIVISON 15 – DRAWINGS |
| A. GENERAL: |
| B. LIST OF DRAWINGS: |
| White 345kV Breaker Replacement Drawings Index.pdf |
| DIVISON 15 – DRAWINGS |
| A. GENERAL: |
| B. LIST OF DRAWINGS: |