Project_Drawings.pdf

PDF 3 MB Posted

Attached to
White Substation 345kV Circuit Breaker Replacement, South Dakota
Solicitation number
DE-SOL-0008113
Issued by

About this file

Project Drawings

View the file

Other files

File Type Posted
Amendment_003_Final.pdf PDF
Amendment_002_Final.pdf PDF
Amendment_001_Final.pdf PDF
Contract_Clauses_and_Bid_Schedule.pdf PDF
Project_Specificaitons.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WHITE SUBSTATION

345-KV BREAKER REPLACEMENT

SOUTH DAKOTA

SECTION C

DESCRIPTION/SPECIFICATIONS

Solicitation No. DE-SOL-0008211 Spec. No. 15WC111814-672

DIVISON 15 – DRAWINGS

A. GENERAL:

CONSTRUCTION STANDARD DRAWINGS: A complete set of standard drawings are available at http://www.wapa.gov/business/buys.htm. Construction drawings are the specification drawings and any additional drawings required for use in construction. The construction drawings will be issued after contract award and may include amendment changes and other details, which make the drawings suitable to use for construction purposes.

PROJECT DRAW INGS: Project drawings included herein are reduced reproductions and are not to scale. Some project drawings show details of fabrication and other information not a part of the work. Disregard information and details, which are not applicable.

STANDARD DRAW INGS: W here details shown on standard drawings included herein differ from project drawings or text, the details of project drawings or text shall govern.

INFORMATIONAL DRAW INGS: Some project drawings have the words “FOR INFORMATION ONLY” appearing above the title block. These drawings show some information, which may be required for bidding purposes. These drawings do not show items to be furnished or work to be performed.

EXISTING INSTALLATION DRAW INGS: Some project drawings have the words “EXISTING INSTALLATION” appearing above the title block. These drawings show the existing installations prior to modifications and may show some new work to be performed.

REFERENCE DRAW INGS: Reference drawings referred to on project drawings and not included herein, are not necessary for bidding purposes.

CONTRACTOR'S RESPONSIBILITY: Check all drawings and advise Western of any errors or omissions.

B. LIST OF DRAWINGS:

1. WHT 0023, Rev. A - White Substation Location and Vicinity Map

2. WHT 0001, Rev. D - White Substation Switching Diagram

3. WHT 1000, Rev. H - White Substation General Arrangement Plan (Existing Installation)

4. WHT 1010, Rev. D - White Substation 345KV Bays U3 and U5 (Existing Installation)

5. WHT 1110, Rev. F - White Substation 345KV Area Section A-A (Existing Installation)

6. WHT 1500, Rev. G - White Substation Key Grounding Plan (Existing Installation)

7. WHT 1510, Rev. D - White Substation 345KV Bays U3 and U5 Grounding Plan (Existing Installation)

8. WHT 1710, Rev. A - White Substation 345KV Bays U3 and U5 Conduit and Buried Cable Plan

(Existing Installation)

9. WHT 1711, Rev. A - White Substation 345KV Bays U4 and U6 Conduit and Buried Cable Plan

(For Information Only)

10. WHT 2000, Rev. G - White Substation Grading and Plot Plan

11. WHT 2001, Rev. C - White Substation Grading and Drainage Facilities (For Information Only)

12. WHT 2003, Rev. J - White Substation Foundation General Plan (Existing Installation)

13. WHT 2003, Rev. J - White Substation Foundation General Plan

14. WHT 2004, Rev. G - White Substation Foundation Plan 345KV Area

15. WHT 2008-2, Rev. D - White Substation Foundation/Structural Data and Drawing Index (Sheet 2 of 2)

16. WHT 2303, Rev. C - White Substation Foundation Outline and Reinforcement

17. WHT 2550, Rev. A - White Substation Anchor Bolts

18. WHT T0001, - White Substation Culvert Layout http://www.wapa.gov/business/buys.htm

EXISTING INSTALLATION

INDICATES EXISTING GROUNDS AND CONCRETE

FOUNDATIONS TO BE REMOVED

FOR INFORMATION ONLY

alford Rectangle alford Text Box

REMOVE 3 EXISTING FOUNDATIONS

DESIGNATED "CB1"

PLACE CONCRETE FOUNDATION 3CB3

Message from the Administrator

At Western, we show our commitment to safety every day through the actions we take, the training we offer and the work conditions we provide. We expect the same commitment to safety from each of our contractors who provide products or services to Western.

right decisions to ensure that the work environment is as safe as possible.

Our safety program is based on four points:

� Safety procedures or common sense must be applied by each Federal and not be set aside to meet a project schedule or for personal convenience.

� Employees and contractors must believe that they have the right and the responsibility to identify and take action to reduce, if not eliminate, haz

� Managers and supervisors must lead by example and execute their responsibility to ensure each job is accomplished in a safe and healthy way.

� Safety is a personal responsibility. Each individual make a task.

By integrating these principles into every task we take, together we can ensure Western is a safe place to work.

Message from the Administrator t Western, we show our commitment to safety every day through the actions we take, the training we offer and the work conditions we provide. We expect the same commitment to safety from each of our contractors who provide products or services to Western. In performing work for Western, all contractors must make the right decisions to ensure that the work environment is as safe as possible.

Our safety program is based on four points:

Safety procedures or common sense must be applied by each Federal and not be set aside to meet a project schedule or for personal convenience.

Employees and contractors must believe that they have the right and the responsibility to identify and take action to reduce, if not eliminate, hazardous work environments and hazardous work practices.

Managers and supervisors must lead by example and execute their responsibility to ensure each job is accomplished in a safe and healthy way.

Safety is a personal responsibility. Each individual makes the decision on what action to take to accomplish

By integrating these principles into every task we take, together we can ensure Western is a safe place to t Western, we show our commitment to safety every day through the actions we take, the training we offer and the work conditions we provide. We expect the same commitment to safety from each of our contractors

In performing work for Western, all contractors must make the right decisions to ensure that the work environment is as safe as possible.

Safety procedures or common sense must be applied by each Federal and contract employee. Safety should not be set aside to meet a project schedule or for personal convenience.

Employees and contractors must believe that they have the right and the responsibility to identify and take ardous work environments and hazardous work practices.

Managers and supervisors must lead by example and execute their responsibility to ensure each job is s the decision on what action to take to accomplish

By integrating these principles into every task we take, together we can ensure Western is a safe place to

Mark A. Gabriel

Administrator

White 345kV Breaker Replacement Drawings Index.pdf
DIVISON 15 – DRAWINGS
A. GENERAL:
B. LIST OF DRAWINGS:
White 345kV Breaker Replacement Drawings Index.pdf
DIVISON 15 – DRAWINGS
A. GENERAL:
B. LIST OF DRAWINGS: