(x)
DE-SOL-0005448
x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
PHOENIX AZ 85005-6457
DSW
PO BOX 6457
DESERT SOUTHWEST REGIONAL OFFICE
US DOEWESTERN AREA POWER
WAPA DSW
PHOENIX AZ 85005-6457
DSW
PO BOX 6457
DESERT SOUTHWEST REGIONAL OFFICE
US DOEWESTERN AREA POWER
WAPA DSW
06/21/2013000002
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
05/16/2013
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
LONGTIN SUBSTATION, STAGE 02, SOLICITATION DE-SOL-0005448
The purpose of this amendment is to update the bid schedule, clarify/change the specifications and drawings, provide the site visit attendance sheet, provide clarifications/responses to vendor questions and extend the bid opening date.
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Susan M. Ethridge
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
06/21/2013
Longtin Substation, Stage 02
Solicitation DE-SOL-0005448
Amendment 000002
A. Project Bid Schedule
Remove and replace the bid schedule in its entirety with the attached revised bid schedule. The changes are as follows:
1. Revise CLIN 0036 Quantity from 39,500 to “25,000”
2. Revise CLIN 0037 Quantity from 39,500 to “25,000”
3. Revise CLIN 0038 Quantity from 34,500 to “20,500”
4. Revise CLIN 0037 Quantity from 34,500 to “20,500”
5. Revise CLIN 0041 to say “Control panels (3) for SWTC (Government-furnished)”
6. Insert CLIN 0046 “Furnish and install substation fiber optics…….LS”
7. Revise Bid Schedule CLIN heading “Furnishing and installing optical overhead ground wire assemblies, complete with suspension clamp or bolted dead end, suitable for 0.465-inch diameter, 24 fiber optical overhead ground wire, as follows:” to “Furnishing and installing optical overhead ground wire assemblies, complete with suspension clamp or bolted dead end, suitable for 0.465-inch diameter, 48 fiber optical overhead ground wire, as follows:”
8. Revise CLIN 0053 to say “Furnishing and installing one 0.645-inch diameter, 48 fiber optical overhead ground wire”
9. Revise CLIN 0055 to say “Furnishing and installing spiral-type vibration dampers for 0.465-inch, 48 fiber optical overhead ground wire”
B. Project Specifications
Remove and replace the project specification in its entirety with attached revised project specification.
Changes are noted by a right side bar.
C. Project Drawings
1. Remove and replace the following drawings (also remove and replace the drawing list in its entirety with the updated drawing list attached as part of this amendment to reflect the drawings below):
LNG 1113 – Rev B
LNG 1115 – Rev B
LNG 1116 – Rev B
LNG 1119 – Rev B
LNG 1712 – Rev B
LNG 1713 – Rev B
LNG 2000 – Rev C
LNG 2300 – Rev D
LNG 2301 – Rev D
LNG 2302 – Rev A
LNG 2305 – Rev A
LNG 2307 – Rev A
LNG 2602 – Rev A
LNG 2603 – Rev A
LNG 2612 – Rev A
LNG 2613 – Rev A
LNG T600 – Rev A
LNG 4000-1 – Rev B
LNG 4000-2 – Rev B
LNG 4000-3 – Rev A
LNG 6000 – Rev A
LNG 6001
DAD-PAD 1 – 1004
DAD-PAD 1 – 1005 – Rev A
DAD-PAD 1 – 4010 – Rev D
DAD-PAD 1 – 4011 – Rev E
DAD-PAD 1 – 4013 – Rev E
DAD-PAD 1 – 4014 – Rev F
43-29S -2200
43-29S -2201
PAD – GNE – 2009 – Rev A
The following drawings are to be added as information only, and are included as an attachment to this amendment:
MCR002-01
MCR002-02
D. The Site Visit attendance sheet is attached.
E. The following clarifications shall apply to this solicitation:
1) Vendor Question: Please confirm the 100% small business includes subs as well.
Clarification/Response: Please refer to clause 52.219-8 – Utilization of Small Business
Concerns, which states “It is the policy of the United States that small business concerns, veteran-owned small business concerns, service-disabled veteran-owned small business concerns, HUBZone small business concerns, small disadvantaged business concerns, and women-owned small business concerns shall have the maximum practicable opportunity to participate in performing contracts let by any Federal agency… The Contractor hereby agrees to carry out this policy in the awarding of subcontracts to the fullest extent consistent with efficient contract performance.”
2) Vendor Question: Looking through the specs and drawings I have noticed a discrepancy.
Drawing # LNG 2150 States: “Block security wall removed from stage 01 work and moved to stage 02 work. There is not a bid schedule item for the Block Security Wall, it is not included in the stage 02 work on the Foundation Designation drawing LNG 2000 nor have found anything in the specs. Please Advise.
Clarification/Response: The block security wall was not in Stage 01 or Stage 02 work. It was not procured by Western Area Power Administration.
3) Vendor Question: Do subcontractors have to meet the small business requirements? There are concrete subcontractors that would like to bid the piers but do not meet the small business criteria.
veteran-owned small business concerns, service-disabled veteran-owned small business concerns, HUBZone small business concerns, small disadvantaged business concerns, and women-owned small business concerns shall have the maximum practicable opportunity to participate in performing contracts let by any Federal agency… The Contractor hereby agrees
4) Vendor Question: Our steel suppliers are saying there is not enough information to quote the lattice structures. The drawings provided (if these are to be used for estimating purposes) are not legible. Can we get better copies of #43-29S 2200, 2201 structure drawings.
Clarification/Response: See attached drawings #43-29S 2200 and 2201 (included as part of this amendment).
5) Vendor Question: The entire site is fairly rough and has allot of large rocks at the surface.
Should we assume our bid should include dressing up the site including haul off of all the rocks at the surface or is the grading contractor not complete?
Clarification/Response: The top 6 inches of the gravel surfacing must meet the gradation requirements listed in Western Standard 2 section 2.11.1 (the Western standards website location is referenced in the Solicitation Specifications, Division 1 paragraph A).
6) Vendor Question: The service building pad appears to have been built up at its location in the corner of the substation, however it does not appear compacted. Has this area been tested for compaction and approved or should we include preparing the subgrade for the building in our proposal?
Clarification/Response: The entire substation site has been completely compacted under a previous contract.
7) Vendor Question: (Retracted name of company)’s steel foundation system is an alternative solution to concrete foundations. We have been working with companies such as (retracted names of companies) on substation projects and would like to know if the Western Area Power
Administration would consider issuing using our system on the Longtin Substation project. If so, could an amendment be issued that would include a bid alternate for the concrete foundations?
Clarification/Response: No, Foundations must meet Western Standard 3.1.8 (the Western standards website location is referenced in the Solicitation Specifications, Division 1 paragraph
A).
8) Vendor Question: We have reviewed the drawings and spec. but are unable to determine the material type for the 6" gravel service or the structural fill. Can you please direct us to the spec.
information for both of these items.
Clarification/Response: Refer to Western Standard section 2.11.1. The Western standards website location is referenced in the Solicitation Specifications, Division 1 paragraph A.
9) Vendor Question: Will WAPA be furnishing the foundations bolts our should we include them in our proposal?
Clarification/Response: Refer to Division 4, Section B.4.B. of the Specifications.
10) Vendor Question: Do we need to be signed up as an interested vendor if we are just looking to supply the structural steel for the Longtin project, or do we just independently contact the general contractors bidding on this project?
Clarification/Response: There is no existing bidders list, however, at the bottom of the solicitation (link: https://www.fbo.gov/notices/a2391955463f1b0536dd6d0f2468147c), there's an option/link that says "Add Me To Interested Vendors". You may be able to see other interested vendors on that list as well. The requirements of this contract are listed in the solicitation. The prime contractor is responsible for procurement of the material with the exception of the material noted as Government-Furnished.
11) Vendor Question: Is the general contractor responsible for procurement of the material?
Clarification/Response: The requirements of this contract are listed in the solicitation. The prime contractor is responsible for procurement of the material with the exception of the material noted as Government-Furnished.
12) Vendor Question: Does being a certified small business help us as a sub, or the GC?
https://www.fbo.gov/notices/a2391955463f1b0536dd6d0f2468147c veteran-owned small business concerns, service- disabled veteran-owned small business concerns, HUBZone small business concerns, small disadvantaged business concerns, and women-owned small business concerns shall have the maximum practicable opportunity to participate in performing contracts let by any Federal agency… The Contractor hereby agrees
13) Vendor Question: In the package of drawings, #s 163 to 171 for the lattice towers are not legible. Is there another way we can get these?
Clarification/Response: Refer to clarification/response to Question # 4 above.
14) Vendor Question: Has there or will there be a site visit? The FBO site doesn't indicate an planned date nor an attendee list.
Clarification/Response: The site visit was already held. The details regarding the site visit is listed in the solicitation, under the provision DOE-L-1010 Site Visit. A second site visit will not be held. Contractors can still visit the substation site, but will not have access inside the substation walls.
15) Vendor Question: Will the government be issuing any Q&A responses for all contractors to use?
Clarification/Response: Yes, clarifications/responses are being addressed through this
Amendment 000002.
16) Vendor Question: Scope Question, Stage 2: Stage two drawing provided in the Longtin package include Power XMFR LT-T201 and LT-T202, but only T202 is presented in the project bidding schedule and spec documents. Will drawings be revised to clarify Stage 2 scope inclusion?
Clarification/Response: T-201 is the new transformer that is ALREADY located on site.
17) Vendor Question: Can we get any drawings on the transformer that is being relocated?
Clarification/Response: Reference attached drawings MCR002-01 and MCR002-02 (included as part of this amendment).
18) Vendor Question: Does anyone have a recent oil sample on the transformer that is being relocated?
Clarification/Response: Western does not have a current oil sample. The contractor is responsible to test prior, to meet EPA and ADOT requirements before relocating.
19) Vendor Question: With installing the supplied oil pumps and fans for the Westinghouse
Transformer is there a drawing made up showing the new wiring so I can estimate the time & material needed for this?
as part of this amendment).
20) Vendor Question: Section 13.17 ask for PCB test on the oil prior to draining. Does WAPA have current samples showing the Westinghouse Transformer to be PCB free as this does matter for the proposal?
Clarification/Response: Western does not have a current oil sample. The contractor is responsible to test prior to meet EPA and ADOT requirements before relocating.
21) Vendor Question: Scope show contractor only testing for the Transformers and Ctrl/Power
Cables. Is there any other testing required? Instr XFMRs/Circuit Breakers/Relays/Etc or is this done by others?
Clarification/Response: Refer to Division 9, Section B 27 of the specifications, and Western
Standard 9 paragraph 9.1.2 Method B. The Western standards website location is referenced in the Solicitation Specifications, Division 1 paragraph A.
22) Vendor Question: The scope of work for the 50mva transformer, bid item 0013, requires detail dwgs of the transformer showing configuration and dimensions for shipping purposes. Please advise.
as part of this amendment), regarding the transformer configuration and dimensions.
23) Vendor Question: Is the electrical testing for bid item 0046 to duplicate the tests already being performed under bid item 0013 or are we to only test the 50mva tfmr under 0013 once?
Clarification/Response: Refer to Western Standard 9, paragraph 9.1.2, Acceptance tests –
Method B. The Western standards website location is referenced in the Solicitation
Specifications, Division 1 paragraph A.
24) Vendor Question: I would like to know if the rigid tubular Al bus is Welded or Compression?
Or is the bidding Schedule item "Bus Systems" reference to (DMC or Equal) just for the wire bus and Jumpers?
Clarification/Response: Refer to Western Standard 9, paragraph 9.3.1.4 and the project drawings. The Western standards website location is referenced in the Solicitation
Specifications, Division 1 paragraph A.
25) Vendor Question: I would like to know an approximate value of the 50 mva transformer that’s being relocated to Longtin Substation from Davis Substation?
Clarification/Response: The approximate value of the 50 mva transformer is $750,000.00.
F. Extend Bid Opening/Due Date
1. Standard Form 1442- change block 13, paragraph A, bid due date to July 9, 2013. The time remains unchanged.
2. Section L, Page 41, Clause WES-L-1005 Mailed or Handcarried Bid/Proposal, c., change
Due Date to July 9, 2013. The time remains unchanged.
N O T H I N G F O L L O W S