Amendment_000003_spec_page_50.docx

DOCX document 16 KB Posted

Attached to
Longtin Substation, Stage 02 construction project Federal contract opportunity
Solicitation number
DE-SOL-0005448
Issued by
Department of Energy Western Area Power Administration

About this file

AMEND. 000003- SPEC PAGE 50

View the file

Other files for this federal contract opportunity

Other files attached to Longtin Substation, Stage 02 construction project, newest first.
File Type Posted
Amendment_00004_Spec_Page_12.docx DOCX document
SF-30_Amend._000004.pdf PDF
Amendment_00004_Spec_Page_47_.docx DOCX document
Amendment_000004_Spec_Pages_1-9_Table_of_Contents.pdf PDF
Amendment_00004_Spec_Page_23_.docx DOCX document
Amendment_00004_Spec_Page_14.docx DOCX document
Amendment_000004_spec_page_50.docx DOCX document
Amendment_00004_Spec_Page_22.docx DOCX document
Amendment_00004_Spec_Page_49.docx DOCX document
Amendment_00004_Spec_Page_18.docx DOCX document
Amendment_00003_Spec_Page_10_.docx DOCX document
ATTCH_E_-_WD_AZ27-_Building.pdf PDF
Amendment_00003_Spec_Page_12_.docx DOCX document
Amendment_000003_spec_page_104.docx DOCX document
Amendment_00003_Spec_Page_14.docx DOCX document
Amendment_00003_Spec_Page_47_.docx DOCX document
ATTCH_D_-_WD_AZ14-_Heavy.pdf PDF
Amendment_00003_Spec_Page_23_.docx DOCX document
LNG02_Amendment_000003_List_6-28-13_Drawing_List.pdf PDF
ATTCH_A-_Bid_Schedule-_Amendment_00003.pdf PDF
Amendment_00003_Spec_Page_18.docx DOCX document
Amendment_00003_Spec_Page_22_.docx DOCX document
Terms_and_Cond._Page_30-6.28.2013.pdf PDF
SF-30-_Amend._000003.pdf PDF
Drawings-Amendment_000002.pdf PDF
List_of_Drawings-Amendment_000002.pdf PDF
ATTCH_B-_SPECS_Amendment_000002.pdf PDF
ATTCH_A-_Bid_Schedule-_Amendment_000002.pdf PDF
Site_Visit_Attendees.pdf PDF
For_Information_Only_Davis_Transformer_Dwgs-Amend._000002.pdf PDF
SF30-Amend._000002.pdf PDF
SF30-Amend._000001.pdf PDF
ATTCH_E_-_WD_AZ27-_Building.pdf PDF
ATTCH_A-_Bid_Schedule-4.19.13.pdf PDF
ATTCH_D_-_WD_AZ14-_Heavy.pdf PDF
ATTCH_C-_DRAWINGS_5.7.2013.pdf PDF
ATTCH_B-_SPECS_5.7.13.pdf PDF
Solicitation.pdf PDF
Show all 38

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Amendment 000003

It is the responsibility of the Contractor to determine reel lengths, pulling lengths, and pulling locations for the entire project. Each reel length shall take into account the distance between the splice locations shown on drawing DAD-PAD 1 1005, amount needed to route down the structure from OPGW attachment to splice enclosure, amount coiled at splice enclosure, pulling length, and pulling location. The Contractor shall obtain the approval of the COR before relocating or adding optical splice enclosures. All pulling locations and pulling lengths shall be submitted to the COR at the same time the Construction program is submitted.

The OPGW shall contain 48 single-mode optical fibers and shall be equal to AFL Telecommunications Catalog Number CC-57/465.

The OPGW shall have the following characteristics:

Overall diameter not greater than 0.465-inches.

Rated breaking strength not less than 16,626 pounds.

Weight not greater than 0.314 pounds/feet.

Fault current rating not less than 43 (kA)2sec.

All optical fibers shall be equivalent to Corning type SMF-28E+ single-mode fiber (maximum attenuation at 1310 nm shall not be rated greater than 0.35 dB/km and maximum attenuation at 1550 nm shall not be rated greater than 0.2 dB/km).

Fiber optics testing is covered under the Bidding Schedule item “Furnish and install fiber optics”.

Design sag and tension of the new OPGW was based on the NESC Light Loading criteria, an example of which is shown below:

Maximum Initial Tension = 4,300 pounds.

Ruling Span = 1,346-feet.

Maximum Final Sag = 29.40-feet, at 30 degrees Fahrenheit, 9 psf wind, no ice.

Maximum Final Sag = 26.38-feet, at 60 degrees Fahrenheit, 0 psf wind, no ice.

Stringing shall strictly adhere to procedures recommended by the manufacturer. Ensure that the allowable bending radius of the fiber optic cable is not exceeded at any time.

The OPGW shall be routed down and attached to steel lattice towers at splice locations as shown on drawing 41 1027 using a standard clamp with angle attachment and standoff bolt as shown on drawing 41 1030. The OPGW shall be routed down and attached to the steel take-off structures at splice locations as shown on drawing 41 1028 using a standard clamps as shown on drawing 41 1030. The OPGW shall be routed down the structure and connected to the optical splice enclosure. Sixty-feet of OPGW shall be coiled in the external cable storage bracket before routing the OPGW to the splice enclosures.

Bidding Schedule item “Furnishing and installing optical splice enclosures” includes furnishing and installing the optical splice enclosures on the various types of steel lattice towers and steel take-off structures. Optical splice enclosures shall be located as shown on drawing DAD-PAD 1 1005 and the plan and profile drawings.

Splice locations shall be located at structures as shown on drawing DAD-PAD 1 1005 and the plan and profile drawings. The Contractor shall install splice enclosures and splice the OPGW at these locations.

File details come from the government source that posted it. Updated .