ATTCH_C-_DRAWINGS_5.7.2013.pdf

PDF 21 MB Posted

Attached to
Longtin Substation, Stage 02 construction project Federal contract opportunity
Solicitation number
DE-SOL-0005448
Issued by
Department of Energy Western Area Power Administration

About this file

Attachment C - Drawings

View the file

Other files for this federal contract opportunity

Other files attached to Longtin Substation, Stage 02 construction project, newest first.
File Type Posted
Amendment_00004_Spec_Page_12.docx DOCX document
SF-30_Amend._000004.pdf PDF
Amendment_00004_Spec_Page_47_.docx DOCX document
Amendment_000004_Spec_Pages_1-9_Table_of_Contents.pdf PDF
Amendment_00004_Spec_Page_23_.docx DOCX document
Amendment_00004_Spec_Page_14.docx DOCX document
Amendment_000004_spec_page_50.docx DOCX document
Amendment_00004_Spec_Page_22.docx DOCX document
Amendment_00004_Spec_Page_49.docx DOCX document
Amendment_00004_Spec_Page_18.docx DOCX document
Amendment_00003_Spec_Page_10_.docx DOCX document
ATTCH_E_-_WD_AZ27-_Building.pdf PDF
Amendment_00003_Spec_Page_12_.docx DOCX document
Amendment_000003_spec_page_104.docx DOCX document
Amendment_00003_Spec_Page_14.docx DOCX document
Amendment_00003_Spec_Page_47_.docx DOCX document
ATTCH_D_-_WD_AZ14-_Heavy.pdf PDF
Amendment_00003_Spec_Page_23_.docx DOCX document
LNG02_Amendment_000003_List_6-28-13_Drawing_List.pdf PDF
ATTCH_A-_Bid_Schedule-_Amendment_00003.pdf PDF
Amendment_000003_spec_page_50.docx DOCX document
Amendment_00003_Spec_Page_18.docx DOCX document
Amendment_00003_Spec_Page_22_.docx DOCX document
Terms_and_Cond._Page_30-6.28.2013.pdf PDF
SF-30-_Amend._000003.pdf PDF
Drawings-Amendment_000002.pdf PDF
List_of_Drawings-Amendment_000002.pdf PDF
ATTCH_B-_SPECS_Amendment_000002.pdf PDF
ATTCH_A-_Bid_Schedule-_Amendment_000002.pdf PDF
Site_Visit_Attendees.pdf PDF
For_Information_Only_Davis_Transformer_Dwgs-Amend._000002.pdf PDF
SF30-Amend._000002.pdf PDF
SF30-Amend._000001.pdf PDF
ATTCH_E_-_WD_AZ27-_Building.pdf PDF
ATTCH_A-_Bid_Schedule-4.19.13.pdf PDF
ATTCH_D_-_WD_AZ14-_Heavy.pdf PDF
ATTCH_B-_SPECS_5.7.13.pdf PDF
Solicitation.pdf PDF
Show all 38

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION C

DESCRIPTION/SPECIFICATIONS

PROJECT DRAWINGS

LONGTIN SUBSTATION

STAGE 02

ARIZONA

Spec. No. 13WA00000-781

A. GENERAL:

CONSTRUCTION STANDARD DRAWINGS: A complete set of standard drawings are available at http://www.wapa.gov/business/buys.htm. Construction drawings are the specification drawings and any additional drawings required for use in construction. The construction drawings will be issued after contract award and may include amendment changes and other details, which make the drawings suitable to use for construction purposes.

PROJECT DRAWINGS: Project drawings included herein are reduced reproductions and are not to scale.

Some project drawings show details of fabrication and other information not a part of the work. Disregard information and details, which are not applicable.

STANDARD DRAWINGS: Where details shown on standard drawings included herein differ from project drawings or text, the details of project drawings or text shall govern.

INFORMATIONAL DRAWINGS: Some project drawings have the words “FOR INFORMATION ONLY” appearing above the title block. These drawings show some information, which may be required for bidding purposes. These drawings do not show items to be furnished or work to be performed.

EXISTING INSTALLATION DRAWINGS: Some project drawings have the words “Existing Installation” appearing above the title block. These drawings show the existing installations prior to modifications and may show some new work to be performed.

REFERENCE DRAWINGS: Reference drawings referred to on project drawings and not included herein, are not necessary for bidding purposes.

CONTRACTOR'S RESPONSIBILITY: Check all drawings and advise Western of any errors or omissions.

B. LIST OF DRAWINGS:

LOCATION MAPS:

1. LNG 0015 – Location and Vicinity Map

2. DAD 0015 Rev. C – Location and Vicinity Map

3. TOP 0015 Rev. A – Location and Vicinity Map

TOPOGRAPHY:

4. LNG 0016 – Topography

ELECTRICAL:

5. LNG 0001 Rev. A – Switching Diagram

6. LNG 1000 Rev. A – Arrangement Plan

7. LNG 1010 Rev. A – 230kV Bays W1, W2, W4, W5, W7 and W8 Area Plan

8. LNG 1011 Rev. A – 230kV Bays W3, W6 and W9 Area Plan

9. LNG 1012 Rev. A – Transformer LT-T201 230kV and 69kV Area Plan

10. LNG 1013 Rev. A – Transformer LT-T202 230kV and 69kV Area Plan

11. LNG 1100 Rev. A – Equipment & Material Index

12. LNG 1110 Rev. A – 230kV Area Section A-A

13. LNG 1111 – 230kV Area Section B-B

14. LNG 1112 Rev. A – 230kV Area Sections C-C and D-D

15. LNG 1113 Rev. A – Transformer LT-T201 230kV and 69kV Area Section E-E

16. LNG 1114 Rev. A – Transformer LT-T202 230kV and 69kV Area Section F-F

17. LNG 1115 Rev. A – 69kV Area Section G-G

18. LNG 1116 Rev. A – 69kV Area Sections H-H and I-I

19. LNG 1117 Rev. A – 230kV Area Sections J-J, K-K, L-L, M-M, N-N, O-O, P-P, Q-Q, Details A, B and C

20. LNG 1118 Rev. A – 69kV Area Sections R-R, R1-R1, S-S and T-T

21. LNG 1119 Rev. A – Transformer LT-T202 Sections U-U, V-V and W-W

22. LNG 1500 – Grounding Plan

23. LNG 1510 Rev. A – 230kV Bays W1, W2, W4, W5, W7 and W8 Area Grounding Plan

24. LNG 1511 Rev. A – 230kV Bays W3, W6 and W9 Area Grounding Plan

25. LNG 1512 Rev. A – Transformer LT-T201 230kV and 69kV Area Grounding Plan

26. LNG 1513 Rev. A – Transformer LT-T202 230kV and 69kV Area Grounding Plan

27. LNG 1600 – Station Service Panels DZA and DZA1 Wiring Diagram

28. LNG 1610 – Station Service Panel DZA1 240/120 Volt Power and Lighting Wiring Diagram

29. LNG 1710 Rev. A – 230kV Bays W1, W2, W4, W5, W7 and W8 Area Conduit Plan

30. LNG 1711 Rev. A – 230kV Bays W3, W6 and W9 Area Conduit Plan

31. LNG 1712 Rev. A – Transformer LT-T201 230kV and 69kV Area Conduit Plan

32. LNG 1713 Rev. A – Transformer LT-T202 230kV and 69kV Area Conduit Plan

33. LNG 1720 – Fiber Optic Cable Mounting Details http://www.wapa.gov/business/buys.htm

CIVIL & SITE DRAWINGS:

34. LNG 2050-1 Rev. B FIO – Site Plan Sheet 1 of 2 (For Information Only)

35. LNG 2050-2 Rev. B FIO – Site Plan Sheet 2 of 2 (For Information Only)

36. LNG 2051-1 Rev. B FIO – Grading Plan Sheet 1 of 4 (For Information Only)

37. LNG 2051-2 Rev. B FIO – Grading Plan Sheet 2 of 4 (For Information Only)

38. LNG 2051-3 FIO – Profile Sta. 1+00 to 6+00 Sheet 3 of 4 (For Information Only)

39. LNG 2051-4 Rev. A FIO – Profile Sta. 6+00 to 15+00 Sheet 4 of 4 (For Information Only)

40. LNG 2052 Rev C FIO – Masonry Screen Wall Plan (For Information Only)

41. LNG 2053 Rev. C FIO – Masonry Screen Wall Details (For Information Only)

42. LNG 2054 Rev. D FIO – Typical Sections & Details (For Information Only)

43. LNG 2055 FIO – Security Gate Details (For Information Only)

FOUNDATION AND STRUCTURAL DRAWING INDEX:

44. LNG 2000 EI – Foundation/Structural Data and Drawing Index (Existing Installation)

45. LNG 2000 Rev. A – Foundation/Structural Data and Drawing Index

CONCRETE:

46. LNG 2150 Rev. A EI – General Foundation Plan (Existing Installation)

47. LNG 2150 Rev. C – General Foundation Plan

48. LNG 2200 – 230kV Bays 5A 7D Foundation Plan

49. LNG 2201 – 230kV Bays 5E 7G Foundation Plan

50. LNG 2202 EI – 69kV Bays 1A 4F Foundation Plan (Existing Installation)

51. LNG 2202 Rev. B – 69kV Bays 1A 4D Foundation Plan

52. LNG 2203 EI – 69kV Bays 1G 4K Foundation Plan (Existing Installation)

53. LNG 2203 Rev. B – 69kV Bays 1E 4G Foundation Plan

54. LNG 2300 Rev. B EI – Foundations Outline and Reinforcement (Existing Installation)

55. LNG 2300 Rev. C – Foundations Outline and Reinforcement

56. LNG 2301 Rev. B EI – Foundations Outline and Reinforcement (Existing Installation)

57. LNG 2301 Rev. C – Foundations Outline and Reinforcement

58. LNG 2302 – Foundations Outline and Reinforcement

59. LNG 2303 – Foundations Outline and Reinforcement

60. LNG 2304 – Foundations Outline and Reinforcement

61. LNG 2305 – Foundations Outline and Reinforcement

62. LNG 2306 Rev. A – Foundations Outline and Reinforcement

63. LNG 2307 – Foundations Outline and Reinforcement

64. LNG 2308 – Foundations Outline and Reinforcement

65. LNG 2309 – Foundations Outline and Reinforcement

66. LNG 2310 – Foundations Outline and Reinforcement

CABLE TRENCH:

67. LNG 2500 – Cable Trench Plans, Sections and Details

STEEL STRUCTURES:

68. LNG 2550 – Anchor Bolts

69. LNG 2600 – 230kV Take-Off Structure Type I Elevation

70. LNG 2601 – 230kV Take-Off Structure Type I Assemblies and Connections

71. LNG 2602 – 69kV Take-Off Structure Type II Elevation

72. LNG 2603 – 69kV Take-Off Structure Type II Assemblies and Connections

73. LNG 2604 – 230kV Bus Tower Type I Elevation

74. LNG 2605 – 230kV Bus Tower Type I Assemblies and Connections

75. LNG 2606 – 230kV Bus Tower Type II Elevation

76. LNG 2607 – 230kV Bus Tower Type II Assemblies and Connections

77. LNG 2608 – 65 Ft Ground Mast Type I

78. LNG 2609 – Bus Frames Steel Design and Details

79. LNG 2610 – Bus Tee Poles Steel Design and Details

80. LNG 2611 Rev. A – Bus Poles Steel Design and Details

81. LNG 2612 – 25kV Switch & Bus Support Type I Steel Design and Details

82. LNG 2613 – 27.6kV Transformer Support Type I Steel Design and Details

83. LNG 2614 – Spare Bushing Rack Steel Design and Details

84. LNG 2615 – Surge Arrester Pole Steel Design and Details

85. LNG 2616 – Fuse Disconnect Switch Support Steel Design and Details

86. LNG 2925 – Equipment Cabinet Platforms Steel Design and Details

87. LNG 2926 – Switch Operating Platforms Steel Design and Details

STRINGING REQUIREMENTS:

88. LNG 2900 – Stringing Requirements

SERVICE BUILDING:

89. LNG 3000 – Architectural Floor Plan

90. LNG 3001 – Architectural Overhead Cable Tray Plans

91. LNG 3002 – Architectural Reflected Ceiling Plan

92. LNG 3003 – Architectural Exterior Elevations

93. LNG 3004 – Architectural Exterior Elevations

94. LNG 3005 – Architectural Overall Building Section

95. LNG 3006 – Architectural Roof Overhang Detail

96. LNG 3007 – Architectural Sections and Details

97. LNG 3008 – Architectural Overall Building Section

98. LNG 3009 – Architectural Sections and Details

99. LNG 3010 – Architectural Sections and Details

100. LNG 3011 – Architectural Sections and Details

101. LNG 3012 – Architectural Door Details

102. LNG 3200 – General Structural Notes Abbreviations & Reference Drawings

103. LNG 3201 – Structural Foundation Plan

104. LNG 3202 – Structural Roof Framing Plan

105. LNG 3203 – Structural Steel Stud Framing Plan

106. LNG 3204 – Structural Tube Steel Plan

107. LNG 3205 – Structural Building Section S-S

108. LNG 3206 – Structural Building Section W-W

109. LNG 3207 – Structural Steel Joist Elevation & Loads

110. LNG 3208 – Structural Steel Joist Bearing Details

111. LNG 3209 – Structural Exterior Flatwork Details

112. LNG 3210 – Structural Foundation/Cable Entry Details

113. LNG 3211 – Structural Cable Entry Details (Sheet 1 of 2)

114. LNG 3212 – Structural Cable Entry Details (Sheet 2 of 2)

115. LNG 3213 – Structural Sections & Details

116. LNG 3214 – Structural Sections & Details

117. LNG 3215 – Structural Sections & Details

118. LNG 3216 – Structural Sections & Details

119. LNG 3217 – Structural Sections & Details

120. LNG 3218 – Structural Sections & Details

121. LNG 3219 – Structural Sections & Details

122. LNG 3220– Structural Sections & Details

123. LNG 3221– Structural Sections & Details

124. LNG 3300 – Mechanical HVAC Floor Plan

125. LNG 3301 – Mechanical HVAC Upper Plan

126. LNG 3302 – Mechanical Control Room Schedules

127. LNG 3303 – Mechanical Battery Room Diagrams & Schedules

128. LNG 3304 – Mechanical Building Section

129. LNG 3305 – Mechanical Details & Sections

130. LNG 3400 – Electrical Power Plan

131. LNG 3401 – Electrical Mechanical Power Plan

132. LNG 3402 – Electrical Lighting Plan

133. LNG 3403 – Electrical Egress Marking Plan

134. LNG 3404 – Electrical Luminaire & Equipment Schedule

135. LNG 3405 – Electrical Panelboards DHB, DHC

CONTROLS:

136. LNG T600 – Control Cable List

137. LNG 4000-1 Rev. A – Service Building Arrangement Conduit and Grounding

138. LNG 4000-2 Rev. A – Service Building Cable Trays Grounding

139. LNG 4000-3 – Service Building Enlarged Battery Room Grounding

140. LNG 6000 – DC Distribution Panel BHA Wiring Diagram

141. LNG 7050 – Front View Rack Layouts THA1-THA5 Arrangement

TOPOCK SUBSTATION DRAWINGS:

142. TOP 0001 Rev. J – Switching Diagram

143. TOP 1000 Rev. D – Arrangement Plan

144. TOP 1010 Rev. D – 230kV Electrical Assembly Plan

145. TOP 1110 Rev. D – 230kV Section A-A

146. TOP 1710 Rev. C EI – 230kV Conduit and Cable Trench Plan (Existing Installation)

147. TOP 1710 Rev. D – 230kV Conduit and Cable Trench Plan

148. TOP 4000 Rev. F FIO – Control Building Arrangement & Grounding (For Information Only)

149. TOP 7051 Rev. A – Front View Rack Layouts THB1-THB4 Arrangement

TRANSMISSION LINE:

150. DAD-PAD 1 1003 – Material Attachment

151. DAD-PAD 1 1004 – Vibration Dampers

152. DAD-PAD 1 1005 – Material Quantities Optical Overhead Ground Wire

153. DAD-PAD 1 4010 Rev. C EI – Davis Dam – Parker Dam No. 1 Plan and Profile (Existing Installation)

154. DAD-PAD 1 4011 Rev. C EI – Davis Dam – Parker Dam No. 1 Plan and Profile (Existing Installation)

155. DAD-PAD 1 4012 Rev. C EI – Davis Dam – Parker Dam No. 1 Plan and Profile (Existing Installation)

156. DAD-PAD 1 4013 Rev. C EI – Davis Dam – Parker Dam No. 1 Plan and Profile (Existing Installation)

157. DAD-PAD 1 4014 Rev. D EI – Davis Dam – Parker Dam No. 1 Plan and Profile (Existing Installation)

158. DAD-PAD 1 4010 Rev. D – Davis Dam – Parker Dam No. 1 Plan and Profile

159. DAD-PAD 1 4011 Rev. D – Davis Dam – Parker Dam No. 1 Plan and Profile

160. DAD-PAD 1 4012 Rev. D – Davis Dam – Parker Dam No. 1 Plan and Profile

161. DAD-PAD 1 4013 Rev. D – Davis Dam – Parker Dam No. 1 Plan and Profile

162. DAD-PAD 1 4014 Rev. E – Davis Dam – Parker Dam No. 1 Plan and Profile

TRANSMISSION LINE LATTICE STEEL STRUCTURES:

163. 43-29S 2200 – Type 29S Tower

164. 43-29S 2201 – Leg Extension Type 29S Tower

165. 43-27S 2203 – OPGW Dead End Attachment

166. 43-25T 2200 – 25T Tower 50FT Body

167. 43-25T 2202 – 25T Tower 70FT Body and Leg Extensions

TRANSMISSION LINE LATTICE STEEL STRUCTURE FOUNDATIONS:

168. PAD-GNE-2009 – Footings SL and TL Towers Outline

169. 43-25 2100 Rev. B – Type 25 Tower Footings Design Selection and Quantities Auger types

170. 43-25 2101 Rev. B – Type 25 Tower Footings Design Selection and Quantities Pad types

171. 43-25 2110 Rev. C – Type 25 Tower Footings Stub Setting and Footing Location Dimensions

GEOLOGY:

172. LNG 8000 – Geological Bore Logs

173. LNG 8001 – Geological Bore Logs

PHOENIX

FLAGSTAFF

KINGMAN

TUCSON

KINGMAN FLAGSTAFF

MOHAVE

COCONINO

LA PAZ

YAVAPAI

GILA

NEVADA

CALIFORNIA

ARIZONA

LOCATION MAP

NTS

COUNTY MAP

NTS

VICINITY MAP

NTS

FORT MOHAVE

EL RODEO RD

CO HWY 153

M

O H

AV

E

VA

LL

EY

H

W Y

SUN VALLEY

AIRPORT

AZTEC RD

WESTERN AREA POWER ADMINISTRATION

UNITED STATES DEPARTMENT OF ENERGY

APPROVED

EAC

DESIGNED

CORPORATE SERVICES OFFICE - LAKEWOOD, COLORADO

CIVIL ENGINEERING MANAGER

LONGTIN SUBSTATION

ARIZONA

LOCATION AND VICINITY MAP

J. SHARP D. HANSON

LNG 0015

DIRECTIONS

LATITUDE/LONGITUDE

35g 00' 32.7338"N, 114g 29' 33.5851"W (NAD 83)

PHONE NUMBERS

AMBULANCE:

NEEDLES, CA 1.760.326.5299

FIRE DEPARTMENT:

1.928.768.9181

SHERIFF:

MOHAVE COUNTY 1.928.768.7055

POLICE DEPARTMENT:

BULLHEAD CITY 1.928.763.9200

FORT MOHAVE

- HEAD EAST ON EL RODEO ROAD 5.5 MILES

TURN RIGHT ONTO GRAVEL ROAD TO SUBSTATION

- FROM FORT MOHAVE

JULY 31, 2012

CORPORATE SERVICES OFFICE - LAKEWOOD, COLORADO

ELECTRICAL ENGINEERING MANAGER

0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 5+00 5+50 6+00

0+50

ACCESS NORTH (1) PROFILE

HORIZ. SCALE: 1" = 40'

VERT. SCALE: 1" = 8'

6+00 6+50 7+00 7+50 8+00 8+50 9+00 9+50 10+00 10+50 11+00 11+50 12+00 12+50 13+00 13+50 14+00 14+50 15+00

ACCESS NORTH (1) PROFILE

HORIZ. SCALE: 1" = 40'

VERT. SCALE: 1" = 8'

SCALE: (H) 1" = 40' (V) 1" = 40' SCALE: (H) 1" = 40' (V) 1" = 40'

EXISTING INSTALLATION

R

LNG02 Drawing Cover PagePDF
lng_project_drawings_4_18_13
Cover Page
Drawing List
lng_0015
dad_0015c
top_0015a
lng_0016
lng_0001a
lng_1000a
lng_1010a
lng_1011a
lng_1012a
lng_1013a
lng_1100a
lng_1110a
lng_1111
lng_1112a
lng_1113a
lng_1114a
lng_1115a
lng_1116a
lng_1117a
lng_1118a
lng_1119a
lng_1500
lng_1510a
lng_1511a
lng_1512a
lng_1513a
lng_1600
lng_1610
lng_1710a
lng_1711a
lng_1712a
lng_1713a
lng_1720
lng_2050_1b_fio
lng_2050_2b_fio
lng_2051_1b_fio
lng_2051_2b_fio
lng_2051_3_fio
lng_2051_4a_fio
lng_2052c_fio
lng_2053c_fio
lng_2054d_fio
lng_2055_fio
lng_2000_ei
lng_2000a
lng_2150a_ei
lng_2150c
lng_2200
lng_2201
lng_2202_ei
lng_2202b
lng_2203_ei
lng_2203b
lng_2300b_ei
lng_2300c
lng_2301b_ei
lng_2301c
lng_2302
lng_2303
lng_2304
lng_2305
lng_2306a
lng_2307
lng_2308
lng_2309
lng_2310
lng_2500
lng_2550
lng_2600
lng_2601
lng_2602
lng_2603
lng_2604
lng_2605
lng_2606
lng_2607
lng_2608
lng_2609
lng_2610
lng_2611a
lng_2612
lng_2613
lng_2614
lng_2615
lng_2616
lng_2925
lng_2926
lng_2900
lng_3000
lng_3001
lng_3002
lng_3003
lng_3004
lng_3005
lng_3006
lng_3007
lng_3008
lng_3009
lng_3010
lng_3011
lng_3012
lng_3200
lng_3201
lng_3202
lng_3203
lng_3204
lng_3205
lng_3206
lng_3207
lng_3208
lng_3209
lng_3210
lng_3211
lng_3212
lng_3213
lng_3214
lng_3215
lng_3216
lng_3217
lng_3218
lng_3219
lng_3220
lng_3221
lng_3300
lng_3301
lng_3302
lng_3303
lng_3304
lng_3305
lng_3400
lng_3401
lng_3402
lng_3403
lng_3404
lng_3405
lng_t600
lng_4000_1a
lng_4000_2a
lng_4000_3
lng_6000
lng_7050
top_0001j
top_1000d
top_1010d
top_1110d
top_1710c_ei
top_1710d
top_4000f_fio
top_7051a
dad_pad_1_1003
dad_pad_1_1004
dad_pad_1_1005
dad_pad_1_4010c_ei
dad_pad_1_4011c_ei
dad_pad_1_4012c_ei
dad_pad_1_4013c_ei
dad_pad_1_4014d_ei
dad_pad_1_4010d
dad_pad_1_4011d
dad_pad_1_4012d
dad_pad_1_4013d
dad_pad_1_4014e
43_29_s_2200
43_29_s_2201
43_27s_2203
43_25_t_2200
43_25_t_2202
pad_gne_2009a
43_25_2100b
43_25_2101b
43_25_2110c
lng_8000
lng_8001

File details come from the government source that posted it. Updated .