Amendment_00003_Spec_Page_18.docx

DOCX document 18 KB Posted

Attached to
Longtin Substation, Stage 02 construction project Federal contract opportunity
Solicitation number
DE-SOL-0005448
Issued by
Department of Energy Western Area Power Administration

About this file

AMEND. 000003- SPEC PAGE 18

View the file

Other files for this federal contract opportunity

Other files attached to Longtin Substation, Stage 02 construction project, newest first.
File Type Posted
Amendment_00004_Spec_Page_12.docx DOCX document
SF-30_Amend._000004.pdf PDF
Amendment_00004_Spec_Page_47_.docx DOCX document
Amendment_00004_Spec_Page_22.docx DOCX document
Amendment_00004_Spec_Page_49.docx DOCX document
Amendment_00004_Spec_Page_18.docx DOCX document
Amendment_000004_Spec_Pages_1-9_Table_of_Contents.pdf PDF
Amendment_00004_Spec_Page_23_.docx DOCX document
Amendment_00004_Spec_Page_14.docx DOCX document
Amendment_000004_spec_page_50.docx DOCX document
Amendment_00003_Spec_Page_10_.docx DOCX document
ATTCH_E_-_WD_AZ27-_Building.pdf PDF
Amendment_00003_Spec_Page_12_.docx DOCX document
Amendment_000003_spec_page_104.docx DOCX document
Amendment_00003_Spec_Page_22_.docx DOCX document
Terms_and_Cond._Page_30-6.28.2013.pdf PDF
SF-30-_Amend._000003.pdf PDF
Amendment_00003_Spec_Page_14.docx DOCX document
Amendment_00003_Spec_Page_47_.docx DOCX document
ATTCH_D_-_WD_AZ14-_Heavy.pdf PDF
Amendment_00003_Spec_Page_23_.docx DOCX document
LNG02_Amendment_000003_List_6-28-13_Drawing_List.pdf PDF
ATTCH_A-_Bid_Schedule-_Amendment_00003.pdf PDF
Amendment_000003_spec_page_50.docx DOCX document
Drawings-Amendment_000002.pdf PDF
List_of_Drawings-Amendment_000002.pdf PDF
ATTCH_B-_SPECS_Amendment_000002.pdf PDF
For_Information_Only_Davis_Transformer_Dwgs-Amend._000002.pdf PDF
SF30-Amend._000002.pdf PDF
ATTCH_A-_Bid_Schedule-_Amendment_000002.pdf PDF
Site_Visit_Attendees.pdf PDF
SF30-Amend._000001.pdf PDF
ATTCH_E_-_WD_AZ27-_Building.pdf PDF
ATTCH_A-_Bid_Schedule-4.19.13.pdf PDF
ATTCH_D_-_WD_AZ14-_Heavy.pdf PDF
ATTCH_B-_SPECS_5.7.13.pdf PDF
Solicitation.pdf PDF
ATTCH_C-_DRAWINGS_5.7.2013.pdf PDF
Show all 38

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Amendment 000003 Remove and reuse the conductor and overhead ground wire, complete with accessories listed in Table 2-2 from Station 758+00 (Structure No. 13/2) to Station 772+00 (Structure No. 13/3).

TABLE 2-2 – ELECTRICAL ITEMS TO BE REMOVED AND REUSED

MATERIAL
UNIT
QUANTITY
Three (3) 795 kmcil, ACCR, 26/7, “Drake/3M” Conductors
MI
0.2
Two (2) 1/2-inch, HS, 7-Strand Steel Overhead Ground Wire
MI
0.2
Vibration Dampers – Conductor – Approach Span
LS
Vibration Dampers – Overhead Ground Wire – Approach Span
LS

Remove steel lattice towers and remove or cut off the footings listed in Table 2-3.

TABLE 2-3 – STEEL LATTICE TOWERS TO BE REMOVE AND FOOTINGS

TO BE REMOVED OR CUT OFF

TOWER

TYPE

BODY

HEIGHT

(FT-IN)

STRUCTURE NUMBER
EXISTING

STATION

LEG EXTENSION HEIGHT

(FT-IN)

SL
60
13/2
758+00
25-0
SL
60
13/3
772+00
20-0

Dismantle and dispose the steel towers included in Table 2-3.

Drawings 43-29S-2200 and 2201 are included showing structure outline and member sizes. Type 29S are the same as type SL shown in Table 2-3 above. Drawing PADGNE2009 shows the stem and pad foundation for these type 29S towers. Manufacturer’s drawings can be furnished within 30-days following contract award.

Bidding Schedule does not contain separate items for the following. Include these items in applicable Bidding Schedule items.

Excavations for foundations, structures, and trenches.

Placing and compacting earth material and backfill.

Providing gravelfill for the Service Building and under concrete foundations as shown on the drawings.

Disposing of excavated material. Material from excavations not suitable or required for earthwork shall be removed from the substation and access road right-of-way. The Contractor shall make arrangements required for disposal of waste material on an approved landfill.

Expansion anchors and adhesive anchors.

Clearing as directed by the COR.

Grading for structure and tower sites and line clearance as directed by the COR.

Excavations for foundations.