SF-30_Amend._000004.pdf

PDF 88 KB Posted

Attached to
Longtin Substation, Stage 02 construction project Federal contract opportunity
Solicitation number
DE-SOL-0005448
Issued by
Department of Energy Western Area Power Administration

About this file

SF-30 Amendment 000004

View the file

Other files for this federal contract opportunity

Other files attached to Longtin Substation, Stage 02 construction project, newest first.
File Type Posted
Amendment_00004_Spec_Page_12.docx DOCX document
Amendment_00004_Spec_Page_47_.docx DOCX document
Amendment_000004_Spec_Pages_1-9_Table_of_Contents.pdf PDF
Amendment_00004_Spec_Page_23_.docx DOCX document
Amendment_00004_Spec_Page_14.docx DOCX document
Amendment_000004_spec_page_50.docx DOCX document
Amendment_00004_Spec_Page_22.docx DOCX document
Amendment_00004_Spec_Page_49.docx DOCX document
Amendment_00004_Spec_Page_18.docx DOCX document
Amendment_00003_Spec_Page_10_.docx DOCX document
ATTCH_E_-_WD_AZ27-_Building.pdf PDF
Amendment_00003_Spec_Page_12_.docx DOCX document
Amendment_000003_spec_page_104.docx DOCX document
Amendment_00003_Spec_Page_14.docx DOCX document
Amendment_00003_Spec_Page_47_.docx DOCX document
ATTCH_D_-_WD_AZ14-_Heavy.pdf PDF
Amendment_00003_Spec_Page_23_.docx DOCX document
LNG02_Amendment_000003_List_6-28-13_Drawing_List.pdf PDF
ATTCH_A-_Bid_Schedule-_Amendment_00003.pdf PDF
Amendment_000003_spec_page_50.docx DOCX document
Amendment_00003_Spec_Page_18.docx DOCX document
Amendment_00003_Spec_Page_22_.docx DOCX document
Terms_and_Cond._Page_30-6.28.2013.pdf PDF
SF-30-_Amend._000003.pdf PDF
Drawings-Amendment_000002.pdf PDF
List_of_Drawings-Amendment_000002.pdf PDF
ATTCH_B-_SPECS_Amendment_000002.pdf PDF
ATTCH_A-_Bid_Schedule-_Amendment_000002.pdf PDF
Site_Visit_Attendees.pdf PDF
For_Information_Only_Davis_Transformer_Dwgs-Amend._000002.pdf PDF
SF30-Amend._000002.pdf PDF
SF30-Amend._000001.pdf PDF
ATTCH_E_-_WD_AZ27-_Building.pdf PDF
ATTCH_A-_Bid_Schedule-4.19.13.pdf PDF
ATTCH_D_-_WD_AZ14-_Heavy.pdf PDF
ATTCH_C-_DRAWINGS_5.7.2013.pdf PDF
ATTCH_B-_SPECS_5.7.13.pdf PDF
Solicitation.pdf PDF
Show all 38

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

DE-SOL-0005448

x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

PHOENIX AZ 85005-6457

DSW

PO BOX 6457

DESERT SOUTHWEST REGIONAL OFFICE

US DOEWESTERN AREA POWER

WAPA DSW

PHOENIX AZ 85005-6457

DSW

PO BOX 6457

DESERT SOUTHWEST REGIONAL OFFICE

US DOEWESTERN AREA POWER

WAPA DSW

07/03/2013000004

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

05/16/2013

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

LONGTIN SUBSTATION, STAGE 02, SOLICITATION DE-SOL-0005448

SEE CONTINUATION PAGE...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Susan M. Ethridge

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

07/03/2013

Longtin Substation, Stage 02

Solicitation DE-SOL-0005448

Amendment 000004

The purpose of this amendment is to update the specifications (formatting changes only), and extend the bid due date/opening date.

A. Project Specifications

1. Remove and replace pages 1 through 9 (table of contents), and pages 12,14,18,22, 23, 47 and

50 of the project specifications with the attached revised project specification pages, to reflect formatting (bullets/numbering) corrections.

2. Page 49 of the project specification was inadvertently not attached as part of amendment

000002, even though it was referenced in the amendment. It is now attached as part of this amendment 000004.

B. Extend Bid Opening/Due Date

1. Standard Form 1442- change block 13, paragraph A, bid due date to July 12, 2013. The time remains unchanged.

2. Section L, Page 41, Clause WES-L-1005 Mailed or Handcarried Bid/Proposal, c., change

Due Date to July 12, 2013. The time remains unchanged.

N O T H I N G F O L L O W S

File details come from the government source that posted it. Updated .