Amendment_00003_Spec_Page_23_.docx

DOCX document 19 KB Posted

Attached to
Longtin Substation, Stage 02 construction project Federal contract opportunity
Solicitation number
DE-SOL-0005448
Issued by
Department of Energy Western Area Power Administration

About this file

AMEND. 000003- SPEC PAGE 23

View the file

Other files for this federal contract opportunity

Other files attached to Longtin Substation, Stage 02 construction project, newest first.
File Type Posted
Amendment_00004_Spec_Page_12.docx DOCX document
SF-30_Amend._000004.pdf PDF
Amendment_00004_Spec_Page_47_.docx DOCX document
Amendment_00004_Spec_Page_22.docx DOCX document
Amendment_00004_Spec_Page_49.docx DOCX document
Amendment_00004_Spec_Page_18.docx DOCX document
Amendment_000004_Spec_Pages_1-9_Table_of_Contents.pdf PDF
Amendment_00004_Spec_Page_23_.docx DOCX document
Amendment_00004_Spec_Page_14.docx DOCX document
Amendment_000004_spec_page_50.docx DOCX document
Amendment_00003_Spec_Page_10_.docx DOCX document
ATTCH_E_-_WD_AZ27-_Building.pdf PDF
Amendment_00003_Spec_Page_12_.docx DOCX document
Amendment_000003_spec_page_104.docx DOCX document
Amendment_00003_Spec_Page_18.docx DOCX document
Amendment_00003_Spec_Page_22_.docx DOCX document
Terms_and_Cond._Page_30-6.28.2013.pdf PDF
SF-30-_Amend._000003.pdf PDF
Amendment_00003_Spec_Page_14.docx DOCX document
Amendment_00003_Spec_Page_47_.docx DOCX document
ATTCH_D_-_WD_AZ14-_Heavy.pdf PDF
LNG02_Amendment_000003_List_6-28-13_Drawing_List.pdf PDF
ATTCH_A-_Bid_Schedule-_Amendment_00003.pdf PDF
Amendment_000003_spec_page_50.docx DOCX document
Drawings-Amendment_000002.pdf PDF
List_of_Drawings-Amendment_000002.pdf PDF
ATTCH_B-_SPECS_Amendment_000002.pdf PDF
For_Information_Only_Davis_Transformer_Dwgs-Amend._000002.pdf PDF
SF30-Amend._000002.pdf PDF
ATTCH_A-_Bid_Schedule-_Amendment_000002.pdf PDF
Site_Visit_Attendees.pdf PDF
SF30-Amend._000001.pdf PDF
ATTCH_E_-_WD_AZ27-_Building.pdf PDF
ATTCH_A-_Bid_Schedule-4.19.13.pdf PDF
ATTCH_D_-_WD_AZ14-_Heavy.pdf PDF
ATTCH_B-_SPECS_5.7.13.pdf PDF
Solicitation.pdf PDF
ATTCH_C-_DRAWINGS_5.7.2013.pdf PDF
Show all 38

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Amendment 000003

TABLE 4-1 – STEEL TOWERS

TOWER TYPE
BODY HEIGHT (FTIN)
No. BODIES
No.

STUBS

No. LEG EXTENSIONS

5’-0”
7’-6”
10’-0”
12’-6”
15’-0”
17’-6”
20’-0”
22’-6”
25’-0”
27’-6”
30’-0”
32’-6”
35’-0”
25T
70
2
8

Table 4-1 quantities are Western’s best estimate at this time. Western may change leg extension types as required by final survey data. Revised quantities will be furnished by the COR following contract award.

Measurement: Measurement for quantities will be lump sum for both complete structures.

Tower body and leg extension weights, are shown on the Government-furnished drawings. Tower body and leg extension estimated weights are shown on specification drawings. Payment will be included in the lump sum amount for the structures.

Stub angle unit weights are shown on these specification drawings. Payment will be included in the lump sum amount for the structures. Fabricate stub angles directly from the specification drawings.

Bidding Schedule item “Concrete foundations, lattice steel footings” includes providing the following:

Foundations as shown on drawings 43-25-2100 and 2101 for the type 25T tower. A typical drilled auger foundation is shown on drawing 43-25-2100, type VK (unbelled type). There is no geologic data at the new or existing tower locations. The Contractor may obtain such data in helping determine the correct foundation for these two (2) structures. The drawings are provided as a reference for the type that is normally required for these structures. The bore logs at the substation are included in the specification. These two (2) towers will require eight (8) foundations. The concrete will be in accordance with Division 3. Regardless of the concrete quantities actually placed, payment will be based on the quantities of concrete shown on drawings.

Earthwork, formwork, reinforcement, material used in concrete, stub angles, curing, finishing, joints, and other related work and material needed to complete the concrete construction.

GOVERNMENT-FURNISHED DRAWINGS:

Western will furnish, within 30-days following contract award, one reproducible of bills of materials, shop detail, and erection drawings listed in Table 4- 2.

TABLE 4-2 – GOVERNMENT-FURNISHED DRAWINGS

NEW TOWER NAME
ORIGINAL TOWER NAME
SHOP DRAWING FILE NUMBERS
25T
TH
467MD-250-66,67,69,71-78,88,89, and 90

Table 4-2 drawings shall be used to fabricate material. Check drawings carefully, particularly with respect to possible exceptions from the Contractor’s standard notations and practice (such as

File details come from the government source that posted it. Updated .