Amendment_00004_Spec_Page_22.docx

DOCX document 15 KB Posted

Attached to
Longtin Substation, Stage 02 construction project Federal contract opportunity
Solicitation number
DE-SOL-0005448
Issued by
Department of Energy Western Area Power Administration

About this file

Amend. 000004 Spec Page 22

View the file

Other files for this federal contract opportunity

Other files attached to Longtin Substation, Stage 02 construction project, newest first.
File Type Posted
Amendment_00004_Spec_Page_12.docx DOCX document
SF-30_Amend._000004.pdf PDF
Amendment_00004_Spec_Page_47_.docx DOCX document
Amendment_000004_Spec_Pages_1-9_Table_of_Contents.pdf PDF
Amendment_00004_Spec_Page_23_.docx DOCX document
Amendment_00004_Spec_Page_14.docx DOCX document
Amendment_000004_spec_page_50.docx DOCX document
Amendment_00004_Spec_Page_49.docx DOCX document
Amendment_00004_Spec_Page_18.docx DOCX document
Amendment_00003_Spec_Page_10_.docx DOCX document
ATTCH_E_-_WD_AZ27-_Building.pdf PDF
Amendment_00003_Spec_Page_12_.docx DOCX document
Amendment_000003_spec_page_104.docx DOCX document
Amendment_00003_Spec_Page_14.docx DOCX document
Amendment_00003_Spec_Page_47_.docx DOCX document
ATTCH_D_-_WD_AZ14-_Heavy.pdf PDF
Amendment_00003_Spec_Page_23_.docx DOCX document
LNG02_Amendment_000003_List_6-28-13_Drawing_List.pdf PDF
ATTCH_A-_Bid_Schedule-_Amendment_00003.pdf PDF
Amendment_000003_spec_page_50.docx DOCX document
Amendment_00003_Spec_Page_18.docx DOCX document
Amendment_00003_Spec_Page_22_.docx DOCX document
Terms_and_Cond._Page_30-6.28.2013.pdf PDF
SF-30-_Amend._000003.pdf PDF
Drawings-Amendment_000002.pdf PDF
List_of_Drawings-Amendment_000002.pdf PDF
ATTCH_B-_SPECS_Amendment_000002.pdf PDF
ATTCH_A-_Bid_Schedule-_Amendment_000002.pdf PDF
Site_Visit_Attendees.pdf PDF
For_Information_Only_Davis_Transformer_Dwgs-Amend._000002.pdf PDF
SF30-Amend._000002.pdf PDF
SF30-Amend._000001.pdf PDF
ATTCH_E_-_WD_AZ27-_Building.pdf PDF
ATTCH_A-_Bid_Schedule-4.19.13.pdf PDF
ATTCH_D_-_WD_AZ14-_Heavy.pdf PDF
ATTCH_C-_DRAWINGS_5.7.2013.pdf PDF
ATTCH_B-_SPECS_5.7.13.pdf PDF
Solicitation.pdf PDF
Show all 38

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Amendment 000004

One (1) – 69-kV Surge Arrester Support Type I.

One (1) – 69-kV Fuse Disconnect Switch Support Type I.

One (1) – 25-kV Switch & Bus Support Type I.

One (1) – 27.6-kV Transformer Support Type I.

One (1) – Spare Bushing Rack.

Three (3) – Equipment cabinet platforms for the 69-kV circuit breakers including gratings, Type I, MK FR1 as shown on LNG 2925.

Six (6) – Equipment cabinet platforms for the 230-kV circuit breakers including gratings, Type II, MK FR2 as shown on LNG 2925.

Two (2) – Equipment cabinet platforms for the power transformers including gratings, Type III, MK FR3 as shown on LNG 2925.

Twenty-one (21) – Single-switch operating platforms including grating, Type I, MK FR1 as shown on drawing LNG 2926.

Two (2) – Double-switch operating platforms including grating, Type II, MK FR2 as shown on drawing LNG 2926.

The above material including connection bolts, nuts, washers, and lock nuts, shall be galvanized.

Bidding Schedule item “Modify steel lattice tower” includes providing the following:

0. Modifying steel lattice tower located at Structure No. 17/2 by adding one new OPGW plate as shown on drawing 43-27S 2203 to dead end the OPGW at this structure. The OPGW plate will replace the existing OGW plate. Structure 17/2 can handle a dead end load of up to 5000 pounds for installation of the dead end assembly on the tower. A dead end load is a load that is applied to one side of the tower with no load in the other direction. In order to pull this load the Contractor must pull at a location that is a minimum of three (3) times further than the height of the OPGW attachment, to minimize the vertical loading to the tower. This load only applies to one (1) OGW peak. All other OGW and Conductor attachment locations must be intact and have the same loads on both sides of the structure.

Steel materials shall be galvanized.

The wind speed shall be 30 miles per hour (mph) or less for modifying towers.

Bidding Schedule item “Transmission line lattice steel structures” includes providing the following:

0. Tower bodies, stub angles, and leg extensions listed in Table 4-1.