Amend. 000004 Spec Page 12

View the file

Other files for this federal contract opportunity

Other files attached to Longtin Substation, Stage 02 construction project, newest first.
File Type Posted
SF-30_Amend._000004.pdf PDF
Amendment_00004_Spec_Page_47_.docx DOCX document
Amendment_000004_Spec_Pages_1-9_Table_of_Contents.pdf PDF
Amendment_00004_Spec_Page_23_.docx DOCX document
Amendment_00004_Spec_Page_14.docx DOCX document
Amendment_000004_spec_page_50.docx DOCX document
Amendment_00004_Spec_Page_22.docx DOCX document
Amendment_00004_Spec_Page_49.docx DOCX document
Amendment_00004_Spec_Page_18.docx DOCX document
Amendment_00003_Spec_Page_10_.docx DOCX document
ATTCH_E_-_WD_AZ27-_Building.pdf PDF
Amendment_00003_Spec_Page_12_.docx DOCX document
Amendment_000003_spec_page_104.docx DOCX document
Amendment_00003_Spec_Page_14.docx DOCX document
Amendment_00003_Spec_Page_47_.docx DOCX document
ATTCH_D_-_WD_AZ14-_Heavy.pdf PDF
Amendment_00003_Spec_Page_23_.docx DOCX document
LNG02_Amendment_000003_List_6-28-13_Drawing_List.pdf PDF
ATTCH_A-_Bid_Schedule-_Amendment_00003.pdf PDF
Amendment_000003_spec_page_50.docx DOCX document
Amendment_00003_Spec_Page_18.docx DOCX document
Amendment_00003_Spec_Page_22_.docx DOCX document
Terms_and_Cond._Page_30-6.28.2013.pdf PDF
SF-30-_Amend._000003.pdf PDF
Drawings-Amendment_000002.pdf PDF
List_of_Drawings-Amendment_000002.pdf PDF
ATTCH_B-_SPECS_Amendment_000002.pdf PDF
ATTCH_A-_Bid_Schedule-_Amendment_000002.pdf PDF
Site_Visit_Attendees.pdf PDF
For_Information_Only_Davis_Transformer_Dwgs-Amend._000002.pdf PDF
SF30-Amend._000002.pdf PDF
SF30-Amend._000001.pdf PDF
ATTCH_E_-_WD_AZ27-_Building.pdf PDF
ATTCH_A-_Bid_Schedule-4.19.13.pdf PDF
ATTCH_D_-_WD_AZ14-_Heavy.pdf PDF
ATTCH_C-_DRAWINGS_5.7.2013.pdf PDF
ATTCH_B-_SPECS_5.7.13.pdf PDF
Solicitation.pdf PDF
Show all 38

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Amendment 000004

COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK:

COMMENCEMENT AND COMPLETION: Refer to Section F clause 52.211-10.

SUBMITTAL APPROVAL TIME: Except as otherwise provided for specific submittals, Western will require 30-calendar days for review of drawings or data submitted for approval.

COMMENCEMENT OF CONTROL WORK: Do not perform any control board or outdoor equipment wiring until receipt of Government-furnished wiring diagrams. Western will furnish outdoor wiring diagrams, schematics diagrams, control board wiring diagrams and RTU interface rack wiring diagrams no later than 20-calendar days after the delivery of the control boards. Include these restrictions in the construction program.

OUTAGE RESTRICTIONS: In addition to the restrictions listed in the construction standards, the following outage restrictions shall apply:

No outages are allowed on the Davis-Topock No. 2, 230-kV transmission line.

Only two (2) outages will be allowed on the Davis-Topock No. 1 230-kV transmission line:

One (1) continuous, 5-day outage between October 1, 2013 and December 1, 2013.

One (1) continuous, 60-day outage from January 2, 2014 through March 1, 2014.

Only one (1) continuous, 5-day outage will be allowed at Davis Substation on transformer KY7A, between October 1, 2013 and November 1, 2013.

CONSTRUCTION SCHEDULE RESTRICTIONS: The following construction schedule restrictions shall apply:

The transformer shall be relocated from Davis Substation to Longtin Substation by NLT November 1, 2013.

All lattice structure foundations shall be installed by NLT December 1, 2013.

The substation and control building (including control board installation and cabling to all equipment) shall be complete and ready for Western commissioning work by NLT January 2, 2014.

All lattice steel structures shall be installed and approach spans strung into the 230kV yard by NLT January 20, 2014.

The fiber optic overhead ground wire and fiber duct cable shall be installed and tested by NLT February 10, 2014.

MAXIMUM AVAILABLE FAULT CURRENT: When protective ground leads are required, the protective ground leads shall be sized to carry the maximum available fault current in accordance with the Standard 1 – General Requirements, Section 1.4 “Safety and Health” and the following:

Longtin Substation:

The maximum available fault current in the 230-kV area is 11,100 amperes.

The maximum available fault current in the 69-kV area is 8,400 amperes.

The maximum available fault current in the 24.9-kV area is 4,200 amperes.

File details come from the government source that posted it. Updated .