ATTCH_A-_Bid_Schedule-4.19.13.pdf

PDF 44 KB Posted

Attached to
Longtin Substation, Stage 02 construction project Federal contract opportunity
Solicitation number
DE-SOL-0005448
Issued by
Department of Energy Western Area Power Administration

About this file

Attachment A - Bid Schedule

View the file

Other files for this federal contract opportunity

Other files attached to Longtin Substation, Stage 02 construction project, newest first.
File Type Posted
Amendment_00004_Spec_Page_12.docx DOCX document
SF-30_Amend._000004.pdf PDF
Amendment_00004_Spec_Page_47_.docx DOCX document
Amendment_000004_Spec_Pages_1-9_Table_of_Contents.pdf PDF
Amendment_00004_Spec_Page_23_.docx DOCX document
Amendment_00004_Spec_Page_14.docx DOCX document
Amendment_000004_spec_page_50.docx DOCX document
Amendment_00004_Spec_Page_22.docx DOCX document
Amendment_00004_Spec_Page_49.docx DOCX document
Amendment_00004_Spec_Page_18.docx DOCX document
Amendment_00003_Spec_Page_10_.docx DOCX document
ATTCH_E_-_WD_AZ27-_Building.pdf PDF
Amendment_00003_Spec_Page_12_.docx DOCX document
Amendment_000003_spec_page_104.docx DOCX document
Amendment_00003_Spec_Page_14.docx DOCX document
Amendment_00003_Spec_Page_47_.docx DOCX document
ATTCH_D_-_WD_AZ14-_Heavy.pdf PDF
Amendment_00003_Spec_Page_23_.docx DOCX document
LNG02_Amendment_000003_List_6-28-13_Drawing_List.pdf PDF
ATTCH_A-_Bid_Schedule-_Amendment_00003.pdf PDF
Amendment_000003_spec_page_50.docx DOCX document
Amendment_00003_Spec_Page_18.docx DOCX document
Amendment_00003_Spec_Page_22_.docx DOCX document
Terms_and_Cond._Page_30-6.28.2013.pdf PDF
SF-30-_Amend._000003.pdf PDF
Drawings-Amendment_000002.pdf PDF
List_of_Drawings-Amendment_000002.pdf PDF
ATTCH_B-_SPECS_Amendment_000002.pdf PDF
ATTCH_A-_Bid_Schedule-_Amendment_000002.pdf PDF
Site_Visit_Attendees.pdf PDF
For_Information_Only_Davis_Transformer_Dwgs-Amend._000002.pdf PDF
SF30-Amend._000002.pdf PDF
SF30-Amend._000001.pdf PDF
ATTCH_E_-_WD_AZ27-_Building.pdf PDF
ATTCH_D_-_WD_AZ14-_Heavy.pdf PDF
ATTCH_C-_DRAWINGS_5.7.2013.pdf PDF
ATTCH_B-_SPECS_5.7.13.pdf PDF
Solicitation.pdf PDF
Show all 38

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION B

SUPPLIES OR SERVICES AND PRICES

BIDDING SCHEDULE

LONGTIN SUBSTATION, STAGE 02

CLIN Work or Material

Estimated

Quantity Unit Unit Price Amount

0001 Mobilization and preparatory work (Not to exceed 5% of TOTAL. See Section M.)

LS $

0002 Miscellaneous sitework LS $

0003 Gravel surfacing LS $

0004 Oil detention system LS $

0005 Access road repair LS $

0006 Removing existing transmission line LS $

0007 Concrete foundations 940 CY $ $

0008 Type "C" cable trench LS $

0009 Steel structures, welded (galvanized) 224,300 LB $ $

0010 Modify steel lattice tower LS $

0011 Transmission line lattice steel structures 2 EA $ $

0012 Concrete foundations, lattice steel footings 55 CY $ $

0013 Power transformer, 230-kV, 50 MVA, three-phase

LS $

0014 Connections to 230/69-kV, 100 MVA, three-phase power transformer

LS $

0015 Power circuit breaker, 230-kV, 3,000 amps (Government-furnished)

6 EA $ $

0016 Power circuit breaker, 69-kV, 2000 amps

(Government-furnished)

3 EA $ $

0017 Disconnecting switch, 230-kV, 2,000 amps (Government-furnished)

12 EA $ $

0018 Disconnecting switch, 230-kV, 2,000 amps, with ground blades

(Government-furnished)

2 EA $ $

0019 Disconnecting switch, 69-kV, 2,000 amps

(Government-furnished)

9 EA $ $

0020 Coupling capacitor voltage transformer, 230-kV, single-phase (Government-furnished)

14 EA $ $

0021 Coupling capacitor voltage transformer, 69-kV, single-phase (Government-furnished)

8 EA $ $

0022 Current transformer, 230-kV, single-phase

(Government-furnished)

12 EA $ $

0023 Station service power voltage transformer, 69-kV, 167 kVA, single-phase (Government-furnished)

1 EA $ $

0024 Single-pole fuse disconnecting switch, 69-kV

1 EA $ $

0025 Single-pole fuse disconnecting switch, 25-kV

2 EA $ $

0026 Surge arrester, 69-kV, single-phase 1 EA $ $

0027 Pad mounted transformer, 25-kV, 167 kVA, single-phase

1 EA $ $

0028 Voltage transformer, 27.6-kV, 3 kVA, single-phase

3 EA $ $

0029 Resistor, 208 V, single-phase 1 EA $ $

0030 Manual transfer switch 1 EA $ $

0031 Grounding system LS $

0032 Bus system LS $

0033 Associated and miscellaneous equipment and material

LS $

0034 Furnishing 4/c No. 8 AWG control cable 3,600 LF $ $

0035 Installing 4/c No. 8 AWG control cable 3,600 LF $ $

0036 Furnishing 5/c No. 10 AWG control cable 39,500 LF $ $

0037 Installing 5/c No. 10 AWG control cable 39,500 LF $ $

0038 Furnishing 12/c No. 10 AWG control cable 34,500 LF $ $

0039 Installing 12/c No. 10 AWG control cable 34,500 LF $ $

0040 Vertical switchboard sections (5) CHA3 through CHA7 (Government-furnished)

LS $

0041 Control panels and communication equipment for SWTC (Government-furnished)

LS $

0042 AC and DC distribution panels LS $

0043 Station battery system (Government-furnished)

LS $

0044 Station battery chargers (Government-furnished)

LS $

0045 Furnish and install fiber optics LS $

0046 Electrical testing LS $

0047 Approach spans LS $

Furnishing and installing optical overhead ground wire assemblies, complete with suspension clamp or bolted dead end, suitable for 0.465-inch diameter, 24 fiber optical overhead ground wire, as follows:

0048 Suspension Assemblies Type OPGW-SA

(15,000 lbs)

1 EA $ $

0049 Suspension Assemblies Type OPGW-SL

(15,000 lbs)

25 EA $ $

0050 Tension Assemblies Type OPGW-TH

(20,000 lbs)

2 EA $ $

0051 Tension Assemblies Type OPGW-TLV

(20,000 lbs)

6 EA $ $

0052 Tension Assemblies Type OPGW-TV

(20,000 lbs)

2 EA $ $

0053 Furnishing and installing one 0.465-inch diameter, 24 fiber optical overhead ground wire

7.3 MI $ $

0054 Furnishing and installing optical splice enclosures

3 EA $ $

0055 Furnishing and installing spiral-type vibration dampers for 0.465-inch, 24 fiber optical overhead ground wire

LS $

0056 Service building LS $

TOTAL $

ABBREVIATIONS

CY = cubic yards EA = each LF = linear feet LS = for the lump sum of LB = pounds

CLIN = contract line item number