This is a Design Standards reference document prepared for the City of Bartow, Florida, supporting an ongoing procurement for water and wastewater utilities supplies, parts, and equipment. The document establishes technical and design specifications that qualified vendors must adhere to when providing catalog or retail discounts for supplies, parts, and equipment to the City of Bartow Public Works Department and other city departments on an as-needed basis. The design standards ensure consistency and compatibility across the city's water and wastewater utility systems and infrastructure. All departments utilizing these supplies and equipment are located throughout the city within its municipal limits.
The design standards document serves as a technical reference to guide vendor submissions and product specifications for this indefinite-term supply contract. Vendors interested in participating must ensure their offered products and services comply with the standards outlined in this reference document. The standards address technical requirements, material specifications, compatibility parameters, and performance criteria applicable to water and wastewater utility operations. These specifications are integral to the procurement process and protect the city's infrastructure investment while ensuring operational efficiency and system reliability across its water and wastewater utility networks.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CSB_25-17,_Addendum_1.pdf | ||
| Qualified_Vendors_List_(QVL)_8.26.25.pdf | ||
| CSB_Instruction_to_Bidders.pdf | ||
| CSB_25-17,_Bid_Package.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Infrastructure Development Standards
PART 2: UTILITY DESIGN CRITERIA AND CONSTRUCTION STANDARDS
I . UTILITY EXTENSIONS
A. GENERAL
The following provides a means by which the City of Bartow's utility systems may be connected to or extended. In general, developers are responsible for all cost and installation of utility systems within and adjacent to the proposed development, except for portions of individually metered service installations. Developments connecting to the City’s utility systems that are not within the incorporated limits of the City of Bartow shall be designed in accordance with the provisions of the City’s Infrastructure Development Standards.
B. PROCEDURES FOR REQUESTING UTILITY SERVICE
The extension of City of Bartow utility services to properties lying outside and either contiguous or non-contiguous to the corporate limits of the City of Bartow shall be considered by the City Manager. The following procedure shall be utilized in all applications for utility service:
1. In order to initiate the request, the petitioner should contact the Public Works Director and provide the following information in order for the City Administration to properly evaluate the request:
a. A project location map and complete legal description of the subject property.
b. Proof of ownership (e.g. a copy of deed to property site).
c. A comprehensive, itemized breakdown of the proposed land use intended for the subject site.
d. An estimate of the daily water and wastewater demands of the subject property. Unit consumption/generation rates shall be in accordance with City standards unless the developer can provide evidence that other consumption/generation rates would be more appropriate.
2. The Public Works Director will require at least ten (10) working days to consider the request for utility service for noncontiguous properties.
3. The petitioner must execute a "Petition for Utility Service" before the City Manager, will consider the request. The execution of a "Petition for Utility Service" obligates the developer to construct the utility system in compliance with certain conditions:
a. All utilities construction within the subject property shall be in conformance with all applicable City codes, specifications, and requirements.
b. All costs associated with the extension of City of Bartow utility services to the subject property are to be made at no expense to the City of Bartow, except as provided below for over-sizing.
Attachment "A" - Design Standards
4. Prior to the City’s approval of any application to provide water and/or sewer utility services to a location outside the city limits, the owner(s) of property to be served shall:
a. Properly execute at the time of application for utility service, a nonrevocable, recordable petition to annex into the city at such time as the property becomes eligible for annexation pursuant to Florida Statutes.
b. If the property is contiguous to current City limits, pay to the city at the time of such application the prevailing fees charged by the city relating to annexation which shall include, without limitation, fees to amend the future land use and zoning maps. The city clerk shall have the petition to annex duly recorded in the public records of Polk County, Florida, whereupon the petition shall constitute public notice of the matters reflected therein and bind all future owners to terms of the petition.
C. RESPONSIBILITY FOR INSTALLATION:
1. The developer shall be totally responsible for all installation costs within and/or adjacent to his property and all costs incurred except for that cost previously agreed upon by the City as the City's oversizing cost (See Section D) and except as noted below.
2. The City may elect to install any extension of the utility system required from existing facilities to the development on a joint participation agreement, requiring the developer to reimburse the City for the cost incurred by the City or may require the developer to provide the entire installation at his expense. Any portion of the facilities to be installed or materials supplied by the City must be labeled as such on the plans.
3. Where an extension will benefit other property owners and/or developments, the
City may consider the following options for line extensions:
a. The developer may prepay the entire cost of the extension. The developer will be reimbursed using line extension fees collected from other users connecting to the line within a ten-year period. Such reimbursement shall be up to 100% of the certified cost of the extension less the developer’s proportionate share of the cost of the extension. A Development Agreement shall be executed between the City of Bartow and the development to address the procedure for which the reimbursement shall occur. The City Manager shall have the authority to execute the Development Agreement on behalf of the City of Bartow provided that the terms and conditions of the agreement do not deviate from other City codes or regulations that may apply.
b. The City may pay the cost of the extension if a letter of credit or other acceptable collateral is provided by the developer guaranteeing the City reimbursement of the entire cost of the extension over the subsequent ten-year period.
4. Ninety percent of all line extension fees (excluding the developer's proportionate share of the cost of the extension) will be credited to the developer's debt for a five ten-year period. Said ten-year period commences at the time of final acceptance of the extension by the City. These extension fees are in addition to usual impact fees and connection fees as provided for in the Code of Ordinances of the City of Bartow.
5. All line extensions will be of the City's minimum size or greater if needed by the developer.
6. Where it is deemed by the City to be more feasible to serve a development with a new water or wastewater facility rather than by extending existing City utilities, developer shall be responsible for the cost of constructing the required facilities.
Water and/or wastewater treatment plants may be designed by the Developer's Engineer in accordance with City standard details and specifications and requirements of the City. Where desired, the City may require over sizing of the facility and reimburse the developer in accordance with the following procedures.
D. OVERSIZING OF UTILITIES EXTENSIONS
1. The City may, at its discretion, require the oversizing of utility lines, lift stations, and/or other utility facilities to benefit the overall utility system.
2. Where the City elects to oversize any utility line, lift station, or other utility facility, the City shall reimburse the developer for the documented cost differential directly attributable to oversizing or additional facilities of benefit only to the City. The determination of that portion of the extension cost paid by the City shall be made from a minimum of three (3) bids, submitted for evaluation by the City.
II. SANITARY SEWERAGE
A. Where the City determines that public sanitary sewers are feasible, such sewers shall be installed by the City or its agents at the expense of the developer or by the developer to City specifications and design standards and under City supervision.
B. Where the City is unable to provide public sanitary sewers, private septic tanks will be permitted only if approved by the Department of Health. Where a private sewerage plant is proposed, it must be approved by the FDEP and the City. Any such private sewerage plant shall be designed as an extended aeration facility in accordance with FDEP and Ten State standards. Plants shall be sized according to the below sewerage flows:
SEWAGE FLOW ESTIMATE TABLE
AVERAGE DAILY FLOW (ADF)
TYPE OF ESTABLISHMENT ESTIMATED SEWAGE FLOW
Single Family Residences 350 GPD/residence
Apartments, Condominiums & Mobile Home Parks (includes all types of permanent dwelling units):
1 bedroom 150 GPD/unit 2 bedrooms & duplex 250 GPD/unit 3 & more bedrooms 350 GPD/unit
Car Washes 4.78 GPD/sq. ft.
Service Stations 1000 GPD/first bay & 500 GPD each additional bay
Laundromats 400 GPD/machine
Restaurants:
Drive In (Parking only) 20 GPD/car space Drive In (Parking & seating) 40 GPD/car space & seat Conventional Restaurant 70 GPD/seat 24 Hour Restaurant 100 GPD/seat
Clubs:
Country or Golf Clubs 66 GPD/member Swimming Club or Pools 17 GPD/member Boating Club 11 GPD/member
Barber Shops 55 GPD/chair
Beauty Salons 270 GPD/chair
Tourist Campgrounds & Recreational Vehicle Parks:
With Central Facilities 100 GPD/space With Individual Facilities 150 GPD/space
Motels (no food service) 100 GPD/unit
Cocktail Lounges 40 GPD/seat
Elementary Schools 15 GPD/pupil
High Schools 20 GPD/pupil
Hospitals (no resident personnel) 200 GPD/bed
Nursing & Rest Homes 100 GPD/person
TYPE OF ESTABLISHMENT ESTIMATED SEWAGE FLOW
Institutions (resident) 100 GPD/person
Factories (no showers – no industrial waste) 25 GPD/employee/shift
Factories (with showers -no industrial waste) 35 GPD/employee/shift
Youth & Recreation Camps 50 GPD/camper
Assembly Hall, Auditoriums (no food service) 3 GPD/seat
Vacation Cottage 50 GPD/person
Churches 3-5 GPD/seat
Shopping Centers including Department Stores without food service or laundries 0.16 GPD/sq. ft.
Office Building:
General Offices 0.14 GPD/sq. ft.
Medical Offices 0.62 GPD/sq. ft.
Warehouse (without showers) 100 GPD/water closet
Warehouse (with showers) 200 GPD/water closet
Bowling Alleys (no food service) 75 GPD/lane
Light Industrial Parks 3000 GPD/acre
Heavy Industry Flow to be based on type of facilities
Stadiums, Frontons, Ball Parks, etc. 3 GPD/seat
Theaters:
Drive-in 5 GPD/car space Indoor 5 GPD/seat
Boarding Schools 75 GPD/pupil
C. In the event that septic tanks or private sewerage plants are permitted in areas where public sanitary sewers are planned for later extension, such systems shall be located in such a manner as to facilitate later connection with public systems. All such private systems shall be required to connect to the City public system when the public system is within 600 feet, measured along public rights-of-way, of the private system.
D. All improvements as stated above shall be subject to approval of appropriate State agencies regarding minimum standards for guidance on sewerage and subdivision development.
III. WATER: DOMESTIC AND FIRE PROTECTION.
A. All residential and nonresidential structures in subdivisions shall be connected to a public water supply.
B. The City's latest standard details shall be minimum standards for guidance on constructing water lines. Fire hydrants shall be not more than 700 feet apart and no home shall be more than 350 feet from a fire hydrant measured along public rights-of-way in residential areas, or as may be determined by the Fire Chief. Fire hydrant spacing shall be decreased to 600 feet or a radius of not more than 300 feet apart along public rights-of-way or private drives within residential developments other than single family detached dwellings.
All fire hydrants shall be serviced by not less than 6 inch water mains or lines.
C. For nonresidential construction and development orders, all development shall be required to provide at developers expense, fire hydrants at a maximum of 300 feet separation, measured along the public right-of-way.
PART 3: LIFT STATION POLICY
I. MAINTENANCE RESPONSIBILITY
A. INTENT
1. To better manage the expansion of the City's wastewater service area, the City has established a policy relevant to the maintenance responsibility for wastewater pump stations. This policy is intended to encourage developers to plan the expansion of wastewater systems in an orderly fashion and to limit the number of pump stations that are to be maintained by the City.
2. In order for the City to consider accepting the maintenance responsibility for a wastewater pump station, the following minimum requirements must be met:
a. The pump station site must be accessible by a paved road (minimum 12’ wide).
b. The pump station site and force main easements, as required, must be dedicated to the City.
c. The pump station pumps and motors must be of a make, size, and specification approved by the City Utilities Department.
d. The development must generate a minimum average wastewater flow of
5,000 gallons per day.
e. Where the sizing of the pump station pumps and motors is dependent upon the pump station serving future phases of development, either on or off-site, then the developer must sufficiently document this future flow and provide a reasonable time frame for this additional capacity to be required of the station.
f. The design and construction of the pump station and the wastewater force main shall be approved by the City Water/Wastewater Director and Public Works Director.
g. If required, the lift station shall be provided with either of the following:
(1) An emergency generator, permanently installed, of sufficient size to operate all pumps and equipment. The generator shall be of a make and model approved by the City, and shall be provided with a UL approved fuel tank (belly tanks preferred) and a sound-attenuating enclosure. Fuel tank shall be large enough to provide a minimum operating time of 60 hours at 75% load. Residential grade or quieter mufflers shall be utilized. Generator shall be sized based on “standby” criteria. Automatic transfer switches shall be provided, with an auto exercise feature.
(2) A diesel-powered, self-priming standby pump, permanently installed, with permanent connections to both the wet well and the discharge piping. Pump shall be sized for the peak design flow rate for the lift station. The pump shall be as manufactured by Godwin Pumps, Acme Dynamics, or City-approved equal. Fuel tanks shall be UL approved and shall be sized to provide a minimum operating time of 60 hours. Residential grade or quieter mufflers shall be utilized, and a sound-attenuating enclosure provided. Provide auto-start controller.
3. If the above conditions can not be met, then the maintenance responsibility for the operation of the pump station shall remain private.
4. The pumping rate of any pump station, whether privately- or publicly-maintained, shall be restricted, as nearly as possible, to the theoretical peak flow of the gravity collection system which drains to the pump station.
5. Manifolded force mains, where multiple lift stations pump into a common force main, shall not be allowed unless approved by the City. The City may request hydraulic analyses from the developer documenting the effect of the manifolded pump stations. Such analyses shall be performed using KYPIPE, or other approved program, and shall include all potential scenarios of pump operation.
PART 6: DETAILED SPECIFICATIONS - WATER SYSTEMS
I. GENERAL
A. Contractor shall furnish all labor, equipment, and materials and shall perform all operations in connection with installation of a complete water distribution system ready for use in accordance with the specifications and the City's requirements, either specific or implied.
This includes any and all restoration required to duplicate original site conditions prior to the commencement of construction. All excavation, trenching, and backfill for the installation of underground piping systems shall be conducted as specified hereunder.
II. SUBMITTALS
A. Two (2) copies of shop drawings shall be submitted to the City for review on any materials which are requested as a substitute for previously approved materials. The City retains the right to refuse any proposed substitution.
III. MINIMUM LINE SIZE
A. All new water mains shall be a minimum of eight (8) inches in diameter. Where there is no possibility of a future extension, the water main size may be reduced, at the City Public Works Director’s discretion.
IV. LOOPING OF DISTRIBUTION SYSTEM
A. It is the City's policy that all new water lines shall be looped to minimize dead-end conditions and the need for flushing of the system. Wherever possible, lines shall be looped to provide at least two points of connection to the existing system. Where this is not feasible, as determined by the City staff, then easements and/or rights-of-way shall be provided to facilitate looping as future construction allows.
V. PRODUCTS
A. All materials shall be new, of first quality, manufactured in the United States, and shall conform to the appropriate AWWA standard, latest revision.
B. All components in contact with potable water shall conform to NSF Standard 61, and shall be appropriately certified.
C. All fittings and materials shall be inspected by the City Public Works Department after delivery and prior to being installed.
D. Ductile Iron Pipe
1. Shall comply with the requirements of ANSI A21.50-81 (AWWA C150-81).
2. All underground pipe shall be a minimum of Pressure Class 150 with push-on or mechanical joints, unless otherwise indicated. Where cover exceeds 4.5', the pipe manufacturer shall determine the additional wall thickness required, if any. All aboveground pipe to be Class 53 with flanged joints.
3. Bolts for all flanged and mechanical joints shall be high strength, low allow steel bolts only, meeting the current provisions of AWWA C111. Bolt manufacturer's certification of compliance must accompany each shipment, with copy to City.
4. Pipe manufacturing shall be in accordance with ANSI A21.51-81 (AWWA C151-81).
5. Pipe shall be cement lined/bituminous coated in accordance with ANSI A21.4-71
(AWWA C104-71).
E. Polyvinyl Chloride (PVC) Pipe
1. Six (6) inches diameter to twelve (12) inches diameter shall be Class 150 pipe meeting the requirements of AWWA C-900 with a DR of 18.
2. PVC pipe larger than 12 inches shall meet the requirements of AWWA C-905, with a cast iron pipe outside diameter. Pipe shall have a pressure rating of 165 psi, and shall have a DR of 25.
3. Each length shall be clearly labeled so as to allow identification and specification conformance. Pipe shall bear the National Sanitation Foundation Seal for potable water pipe.
4. All PVC pipe shall be blue in color or bear an acceptable indelible blue marking in three (3) locations for the length of the pipe.
5. Connection for PVC water pipe two (2) inches and larger shall be rubber compression ring type. Bell shall consist of an integral wall section with a solid cross-section elastomeric ring which meets the requirements of ASTM D-1869.
6. PVC water pipe two (2) inches diameter and smaller shall conform to ASTM-2241 with an SDR of 21.
7. Trace wire shall be 14-gauge UF wire with joint seal and blue insulation.
F. Fittings
1. All fittings shall be rated for not less than 150 psi working pressure.
2. Grade for ductile-iron fittings shall conform with ANSI/AWWA Standard C110-77 or
ANSI/AWWA C111/A21.11-80, and shall be cement lined inside and bituminous coated outside. Mechanical joint ductile-iron fittings complying with AWWA C153 are acceptable.
3. Bolts for all flanged and mechanical joints shall be high strength, low allow steel bolts only, meeting the current provisions of AWWA C11. Bolt manufacturer's certification of compliance must accompany each shipment, with copy to City.
4. Malleable iron fittings shall be galvanized conforming to the applicable provision of
Federal Specification WW-P-521D, Type II, and may be used in sizes two (2) inches and under only.
5. Polyvinyl chloride (PVC) fittings shall be minimum Schedule 40 and may be used in size two (2) inches and under only.
G. Gate Valves
1. Gate valves larger than two (2) inches shall be of the resilient wedge type and shall be in accordance with ANSI/AWWA C509 (latest edition) with O-ring type stem seal and two (2) inch square operating nut for buried services. Gate valves for above-ground service shall be outside screw and yoke (OS&Y), rising stem type with cast iron hand wheels. Valves shall be mechanical joint unless otherwise noted and open left (counter clockwise). Valves shall have a fusion-bonded epoxy lining complying with AWWA C-550.
2. Gate valves two (2) inches and under shall conform with Federal Specifications
WW-V-54, Type II, solid wedge disc, rising stem, secured joints and of bronze construction. Valves shall have malleable iron hand wheels.
3. All valves shall be American made, minimum 150 psi cold water rated and shall be cast with manufacturer's name and pressure rating. All exposed studs, bolts, nuts and fasteners shall be stainless steel.
H. Valve Boxes
1. Boxes shall be cast iron of standard design with adjustable drop section to fit disc or cover over valve. Interior diameter shall be not less than five (5) inches, with cast iron cover marked "WATER" and set in 24” square or round concrete pad 8” thick.
Top of the pad shall be flush with finish grade.
I. Fire Hydrants - Shall be in compliance with ANSI/AWWA C502 and the following requirements:
1. Dry barrel compression type.
2. O-ring seal at operating nut stem and means for lubrication.
3. Traffic model with frangible sections at ground line.
4. Open left (counter clockwise).
5. Two 2-1/2 inch hose nozzles and one 4-1/2 inch pump nozzle with National
Standard threads.
6. Main valve openings shall be not less than 5-1/4 inches.
7. Paint shall be one (1) coat primer and two (2) coats finish to match City standard.
8. Pipe outlet shall be six (6) inch mechanical joint.
9. Operating nut shall be pentagonal measuring 1-1/2 inch point to flat.
10. Hydrant interior shall be fusion-bond lined in accordance with AWWA C-550.
11. All exposed bolts, nuts and fasteners shall be stainless steel.
12. All hydrant leads shall be valved.
13. All hydrants shall be installed plumb and in true alignment with the connection pipe to the water main. A minimum of 18" clearance shall be provided between hose nozzles and finish grade. Pump nozzle shall face roadway.
J. Steel Pipe Sleeves and Carrier Pipe - Steel casing pipe shall conform to AWWA C-200 and shall be coated inside and out with coal tar epoxy. All construction projects requiring steel sleeves shall conform to the minimum D.O.T. requirements for roadway crossings. Railroad crossings shall conform to railroad requirements. The following casing sizes shall be used for the corresponding carrier pipes:
CARRIER PIPE STEEL CASING
(Normal O.D.) (Required Dia.)
4" 10" 6" 12" 8" 16" 10" 18" 12" 24" 16" 30" 20" 36"
K. Air-Vacuum Valves - shall be approved on a case-by-case basis.
L. Tapping Saddles & Tapping Valve - All connections to the existing City system shall be made by the developer at his expense.
M. All meter boxes shall be supplied and installed by the developer. Meter boxes 3" and larger shall be installed by the contractor and shall conform to approved City standards. All meters on commercial accounts shall be installed on risers along with City approved backflow devices. All shop drawings shall be reviewed and approved by the City’s Public Works Director.
N. Thrust Restraints
1. All mechanical joint fittings shall be restrained with retainer glands and pre-cast thrust blocks in accordance with City requirements. Where indicated, pipe joints shall be restrained.
2. Retainer Glands for Fittings on PVC Pipe: Where PVC pipe is being connected to mechanical joint fittings, retainer glands shall be Ebaa Megalug Series 2000PV.
Retainer glands shall be designed to meet Uni-Bell Standard "Uni-B-13". The restraint mechanism shall consist of a plurality of individually activated gripping surfaces to maximize restraint capability. Glands shall be manufactured of ductile iron conforming to ASTM A536. The gland shall be such that it can replace the standardized mechanical joint gland and can be used with the standardized mechanical joint bell conforming to AWWA C-111 and C-153. Twist-off nuts, sized same as tee-head bolts, shall be used to insure proper actuation of restraining devices. The retaining gland shall have a pressure rating equal to that of the PVC pipe on which it is used.
3. Retainer Glands for Fittings on Ductile Iron Pipe: Where ductile iron pipe is being connected to mechanical joint fittings, retainer glands shall be Ebaa Megalug Series 1100. Mechanical joint restraint shall be incorporated in the design of the follower gland and shall include a restraining mechanism which, when actuated, imparts a multiple wedging action against the pipe, increasing its resistance as pressure increases. Glands shall be manufactured of ductile iron conforming to ASTM A536.
Restraining devices shall be of ductile iron, heat-treated to a minimum Brinnell hardness of 370. The gland shall be such that it can replace the standardized mechanical joint gland and can be used with the standardized mechanical joint bell conforming to AWWA C-111 and C-153. Twist-off nuts, sized same as tee-head bolts, shall be used to insure proper actuation of restraining devices. The retaining gland shall have a pressure rating of at least 250 psi with a minimum safety factor of 2.
4. Retainers for PVC Pipe: Where PVC pipe is required to be restrained, retainers shall be Ebaa Series 1500PV. Retainers shall be manufactured of 60-42-10 ductile iron.
The retainer shall have sufficient number of ductile tie bolts to restrain working and test pressures as stated by the manufacturer. Each ductile clamp shall have serrations on the I.D. sufficient to hold working and test pressures.
5. Retainers for Mechanical Joint Ductile Iron Pipe: Where mechanical joint ductile iron pipe is required to be restrained, retainer glands shall be as specified for mechanical joint fittings above.
VI. INSTALLATION
A. Preparation - Remove scale and dirt, on inside and outside, before assembly.
B. Pipe and Fittings
1. Trenches shall be maintained in a dry condition at all times unless otherwise approved by the City's Inspector.
2. Maintain 10' minimum horizontal or 18" minimum vertical separation of water main from sewer piping in accordance with State requirements.
3. Install pipe to indicated elevation to within tolerance of 5/8 inches. Minimum cover shall 36" unless otherwise stipulated or authorized by the City.
4. Install ductile iron piping and fittings to comply with requirements of ANSI/AWWA
C600. Install PVC Piping to comply with AWWA C605 recommended practices.
5. Route pipe in straight line, except as noted. Deflections from a straight line or grade are not allowed, except with fittings.
6. Install pipe to allow for expansion and contraction without stressing pipe or joints.
7. Install access fittings to permit disinfection of water system.
8. All fittings and valves shall be restrained with retainer glands in accordance with the
City's standard details. All stubs shall be restrained with a minimum of 60 lineal feet of pipe beyond the valve. Where this is not possible, utilize City-approved retaining glands.
9. A blue-coated #14 gauge UF solid tracer wire and joint seal shall be installed along all pipe and service. Trace wire shall be taped to the pipe and stubbed up at all hydrants and valves.
10. Pipe shall be laid in a level trench. Hand trim excavation for accurate placement of pipe to elevations indicated. The width of trenches for installation of all lines shall be in accordance with the pipe manufacturer's recommendations, OSHA safety requirements, and all applicable codes. Trench widths shall not be less than necessary for safe and proper construction. Where required, excavation support systems shall be provided.
11. Contractor shall place bedding material at trench bottom, level fill materials in one continuous layer not exceeding 8 inches compacted depth, compacted to 95 percent.
12. Contractor shall backfill around sides and to top of pipe with fill, tamped in place and compacted to 95 percent. Maintain optimum moisture content of bedding material to attain required compaction density.
13. Installation and restoration operation under roads, shoulders or other level areas shall be performed in compliance with any City, County or State requirement which may apply.
14. Every effort shall be made to cover pipe ends during installation and a watertight plug or other approved seal must be used when installation is not in progress.
15. Length of open trench on existing roads may be limited by the inspector to minimize public inconvenience or danger to life or property.
C. Valves and Hydrants
1. Set valves on solid bearing.
2. Center and plumb valve box over valve. Set box cover flush with finished grade.
Pour concrete pad around valve box in accordance with standard details. Sod 10' in all directions.
3. Set hydrants plumb and locate pumper nozzle perpendicular to roadway.
4. Hydrants shall be set at the bury line with a minimum of 18" clearance from the hose connection to finish grade.
5. The control valve shall be attached directly to the water main by a gland, swivel tee, or a tapping saddle as approved by the City. Restraining rods shall be at least 3/4" stock and shall be galvanized or stainless steel.
6. Hydrants shall be painted in accordance with City requirements.
D. Service Lines
1. Water installation shall include service stubs at alternate lot lines or other locations as required by the City Public Works Department.
2. In all cases, a gate valve shall immediately adjoin the main connection and a second gate valve, equivalent in size to the service crossing, shall be provided at termination adjacent to the property line or other specified point. This valve should be approximately 12" deep, buried and staked. City approved valve boxes shall be required on all valves.
E. Connections to Existing Lines
1. All connections to existing City water mains shall be performed by the developer/contractor. The developer/contractor shall also provide all materials at no expense to the City.
2. Where connections are required to be made between new mains and existing water mains, the connection shall be made in a thorough and workmanlike manner using proper materials, fittings, and labor practices to suit the actual materials and conditions.
3. Where a connection is made to an existing fitting, the contractor shall schedule his work so that the excavation and location of this existing fitting can be completed prior to starting trench work on the line.
4. Cut-ins to existing lines shall be done by the Contractor under the direction of the
City unless otherwise approved.
5. Whenever it is required to interrupt existing water supplies to residences or businesses, the contractor shall notify all concerned parties or agencies at least 48 hours in advance of such cut-off. Contractor must first obtain approval from the Director of Utilities.
F. Terminations - No distribution line shall be terminated without a hydrant or a blow-off.
Blow-offs shall be one-half the size of the distribution main and shall be constructed with galvanized or ductile iron pipe and fittings and enclosed in a meter box in accordance with the City's standard details.
VII. TESTING
A. A 24-hour notice must be provided to the City prior to testing. After installation is completed, the system shall be filled with water and flushed at the highest obtainable velocity and at the furthest points. Velocity must be at least 2.5 feet per second. All air must be expelled. A pressure at least equal to the City's existing system should be maintained for a period of one (1) hours. Flushing of the system and control of the connecting valve shall be under the direct control of the City's inspector. All connections and pipe for fire service shall be flushed prior to entering the structure. No flushing shall take place through backflow preventers. Should the system appear tight, the leakage test may begin.
B. The contractor will pump his lines to a pressure equal to or greater than 150 psi. Should pressure fall below 150 psi during the test period, it shall be voided and restarted. Test period shall be two hours. Allowable leakage shall be computed on the basis of applicable tables in AWWA C600 or AWWA C605, latest revision, or the applicable formula for installed pipe lengths other than eighteen (18) feet.
C. The following table approximates the above for a 1,000 foot segment of ductile iron pipe at
150 psi and may be used in lieu thereof:
ALLOWABLE LEAKAGE PER 1,000 FEET OF PIPELINE
Pipe Size (inches) Allowable Leakage (Gallons)
2" 0.38 4" 0.74 6" 1.10 8" 1.48 10" 1.84 12" 2.20
VIII. DISINFECTION
A. Before any portion of the newly installed system can be placed in service, all mains and appurtenances shall be thoroughly disinfected and tested.
B. Procedures to be used shall conform to AWWA Standard C651. Pertinent requirements are as follow:
1. Chlorine solution shall be added to ensure a 50 ppm residual in all portions of the system. Inspectors may designate points where residual is measured.
2. Retention time shall be not less than 24 hours.
3. A minimum 25 ppm chlorine residual must remain at the end of the 24 hour period.
4. Chlorine may be used in the following forms:
a. Liquid chlorine as gas/water mixture through an approved solution feeding device.
b. Sodium Hypochlorite in a packaged liquid form with 5% to 15% available chlorine.
c. Calcium Hypochlorite in a dry form (powder or tablets) with 80% available solution such as HTH or Perchloron.
C. After the disinfection process has been completed, all lines shall be thoroughly flushed to a condition equal to the normal base residual.
D. A minimum of 2 bacteriological samples shall be drawn from the newly installed system at remote points. Samples shall be taken on two acceptable techniques using a suitable sterile container.
E. Proof of satisfactory results will be required from the Polk County Health Department before service will be provided by the City.
IX. WARRANTY
All portions of the installed water system and site restoration shall be fully warrantied against material defects of improper workmanship for a period of one year from acceptance by the City. During this time, repairs will be made by the developer at no cost to the City. Any repairs made on the newly installed system by the City during this period will be charged to the developer. A warranty bond with a value of 25% of cost of improvements will be provided to the City. The bond will be for a period of one year from acceptance.
This page left intentionally blank
PART 7: DETAILED SPECIFICATIONS - WASTEWATER SYSTEMS
SANITARY SEWER FORCE MAIN
PART 1 - GENERAL
I WORK INCLUDED
A. Pipe
B. Fittings
C. Valves
D. Valve Boxes
E. Air Release Valves
F. Thrust Restraints
II REFERENCE STANDARDS
A. Materials manufactured in United States of America
B. AASHTO T180 - Moisture-Density Relations of Soils Using a 10-lb. (4.54 kg) Rammer and an
18-in. (457 mm) Drop
C. ANSI/AWWA C104 - Epoxy Lining for Ductile-Iron Pipe and Fittings for Water
D. ANSI/AWWA C111 - Rubber-Gasket Joints for Ductile-Iron and Gray-Iron Pressure Pipe and
Fittings
E. ANSI/AWWA C151 - Ductile-Iron Pipe, Centrifugally Cast in Metal Molds or Sand-Lined
Molds, for Water or Other Liquids
F. ANSI/AWWA C600 - Installation of Ductile-Iron Water mains and Appurtenances
G. ANSI/AWWA C900 - Standard for Polyvinyl Chloride (PVC) Pressure Pipe, four (4) inches through twelve (12) inches, for Water
H. ANSI/AWWA C905 - Standard for Polyvinyl Chloride (PVC) Water Transmission Pipe, Nominal Diameters 14 in. through 36 in.
I. ASTM F477 - Elastomeric Seals (Gaskets) for Joining Plastic Pipe
J. Uni-B-3 - Recommended Practice for the Installation of Polyvinyl Chloride (PVC) Pressure
Pipe
K. Uni-B-13 - Recommended Standard Performance Specifications for Joint Restraint Devices for Use with Polyvinyl Chloride (PVC) Pipe
III SUBMITTALS
A. Submit under provisions of Section 01330
B. Product Data: Provide data on pipe materials, pipe fittings, valves, and accessories
C. Manufacturer's Certificate: Certify that products meet or exceed specified requirements
IV PROJECT RECORD DOCUMENTS
A. Submit under provisions of Section 01770
B. Accurately record actual locations of piping mains, valves, and fittings relative to fixed surface features. Record actual installed elevations of pipe and fittings.
C. Identify and describe unexpected variations to subsoil conditions or discovery of uncharted utilities.
D. Accurately record vertical and horizontal clearance between force main and all water lines within 10 feet and all other utilities encountered.
V OPERATIONS AND MAINTENANCE DATA
A. Submit under provisions of Section 01770
B. Provide data on valves, check valves and operators
VI QUALITY ASSURANCE
A. Perform Work in accordance with Owner’s requirements
B. Valves: Manufacturer's name and pressure rating marked on valve body
VII DELIVERY, STORAGE, AND HANDLING
A. Deliver, store, protect and handle products to site under provisions of Section 01600.
B. Deliver and store valves in shipping containers with labeling in place
PART 2 - PRODUCTS
I PIPE
A. Ductile-Iron
1. ANSI A21.50-81 (AWWA C150-81).
2. All ductile iron pipe to be a minimum Pressure Class 150 with push-on or mechanical joints, unless otherwise indicated on the Drawings. All aboveground pipe shall have flanged joints.
3. Bolts for all flanged and mechanical joints shall be high strength, low alloy steel bolts only, meeting the current provisions of AWWA C111. Bolt manufacturer's certification of compliance must accompany each shipment, with copy to Engineer.
4. Pipe manufacturing in accordance with ANSI A21.51-81 (AWWA C151-81).
5. Pipe shall be epoxy-lined or poly-lined. Epoxy lining shall be Protecto 401 ceramic epoxy, 40 mil dry film minimum thickness. Poly lining shall be manufacturer’s standard, factory applied, fusion bonded polyethylene product, 60 mil nominal thickness. Linings applied by individuals other than the manufacturer shall not be acceptable. Cement mortar lined pipe shall not be acceptable.
B. Polyvinyl Chloride (PVC)
1. Four (4) inches diameter to twelve (12) inches diameter - Class 100 pipe meeting AWWA C900 and DR25.
2. Larger than twelve (12) inches diameter - Class 125 C.I. outside diameter pipe meeting AWWA C905, DR 32.5.
3. Each length should be clearly labeled so as to allow identification and verification of specification conformance. Blue pipe shall not be used for force main. PVC force main pipe shall be dyed brown or shall have brown identification markings at 120 degree intervals around the pipe circumference.
4. Connection for PVC pipe two (2) inches and larger shall be rubber compression ring type. Bell shall consist of an integral wall section with a solid cross-section elastomeric ring which meets the requirements of ASTM D-1869.
5. Two (2) inches diameter and smaller - ASTM-2241 with an SDR of 21, unless otherwise noted on Drawings.
6. Trace wire shall be 14-gauge UF wire with joint seal placed directly on top of the pipe and taped at off intervals. Tracer wire shall be connected to provide electrical continuity between all valve stems and air relief valves. Contractor shall demonstrate electrical continuity after installation is complete.
II FITTINGS
A. All fittings shall be rated for not less than 150 psi working pressure.
B. Grade for ductile-iron fittings shall conform with ANSI/AWWA Standard C110-77 or
ANSI/AWWA C111/A21.11-80, and shall be epoxy-lined inside and bituminous coated outside. Mechanical joint ductile-iron fittings complying with AWWA C153 are acceptable.
C. Bolts for all flanged and mechanical joints shall be high strength, low alloy steel bolts only, meeting the current provisions of AWWA C111. Bolt manufacturer's certification of compliance must accompany each shipment, with copy to Engineer.
D. Malleable iron fittings shall be galvanized conforming to the applicable provision of Federal Specification WW-P-521D, Type II, and may be used in sizes two (2) inches and under only.
E. Polyvinyl chloride (PVC) fittings shall be minimum Schedule 40 and may be used in size two
(2) inches and under only.
III VALVES AND BOXES, GENERAL
A. Valves, valve boxes, operators, etc., shall be furnished and installed as shown on the drawings.
B. All valves shall be manufacturer's standard of the design which the manufacturer recommends for the service intended. Each valve shall bear the maker's name or trademark and reference symbol to indicate the service conditions for which it is guaranteed.
C. Valve boxes shall be cast iron of standard design with adjustable drop section to fit disc or cover over valve. Interior diameter shall be not less than five (5) inches, with cast iron cover marked “SEWER” and set in 24 inch square concrete pad 8-inches thick. Top of pad shall be flush with finish grade.
D. A 3-in. diameter bronze identification marker shall be set into the concrete at each valve and air-release device. The disc shall be imprinted with information about the pipe line and the valve. A table of valve numbering and other information to be stamped on the disc will be provided by the City of Bartow.
E. Precast concrete vaults for air relief valves shall conform to the City of Bartow’s standard details.
F. All valves for underground service shall be provided with 2-in. AWWA operating nut. Valves shall open counter clockwise. All valves for above-ground service shall be provided with lever or handwheel actuator. All necessary handwheels, electric operators, chainwheels, operating stems, floor stands, operating nuts, worm and gear operators, chains, and wrenches required for proper completion and operation shall be provided with the valves.
G. All interior ferrous surfaces shall be provided with a fusion- bonded epoxy protective coating. Coating shall be nontoxic, shall have a satin finish, and shall be suitable for field over-coating and touch-up without sanding or special surface preparation or application of heat in excess of room temperature. Coating shall meet requirements of AWWA C-550.
H. Exterior portions of buried service valves shall have two coats of asphalt varnish in accordance with Federal Specification TTC494-A. Valves for above-ground service shall be painted in accordance with the appropriate coating system specified elsewhere.
IV PLUG VALVES
A. Plug valves shall be of the resilient plug, eccentric type with flow area equivalent to 100% of pipe area. Minimum pressure rating shall be 150 psi. Ends shall be flanged for above-ground service and mechanical joint for underground service.
B. Valve shall have cast iron body, ASTM A126, Class B. Plug shall be cast iron with neoprene facing and shall be of the single piece design. Plug shall be of same configuration for all valves and shall require no stiffening member opposite the plug for balance or support.
C. Valve body seats shall have a welded in overlay not less than 90% nickel. Packing shall be nitrile-butadiene, and shall be adjustable and replaceable without removing the valve from service, depressurizing the line, or removing the valve operator.
D. Bushings in both upper and lower journals to be type 316 stainless steel. Valves shall be drip tight in both directions to the full pressure rating. All exposed nuts, bolts, springs, and washers shall be stainless steel.
E. All plug valves larger than 6-in. shall have a geared activator with a handwheel operator if exposed service or with a 2-in. operating nut if buried service. All smaller valves shall be provided with 2-in. operating nuts. Furnish a lever operator for the 2-in. operating nut on each non-buried valve.
F. Coat valve exterior with two (2) coats of Devtar 5A, or City approved equal, epoxy high build coating, twelve (12) miles each coat, in accordance with manufacturer’s directions.
G. Plug valves shall be DeZurik Figure 118 or equal.
V GATE VALVES
A. Gate valves 2-in. and under shall conform to Federal Specifications WW-V-54, Type II, solid wedge disc, rising stem, secured joints and of bronze construction. Valves shall have malleable iron handwheels.
B. All gate valves 3-in. through 12-in. shall be of the resilient wedge type with iron body, bronze-mounted, non-rising stem with operating wheel or nut in accordance with AWWA C509 requirements. Valves shall have a clear waterway opening of full diameter of the valve. The operating nut or wheel shall have cast thereon an arrow indicating the direction of opening. Valves shall be set plumb.
C. All gate valves larger than 12-in. shall be of the double-disc type having iron body, bronze-mounted parallel seats and shall conform to AWWA requirements. Valves shall be provided with bypass valves. Valves shall have a clear water way opening of full diameter of the
VI AIR RELEASE VALVES
A. Air release valves shall be APCO Model 400 as manufactured by Valve & Primer Corporation, or City approved equal.
B. The air release valve shall have a 2” NPT inlet with a ½” NPT outlet, inlet and blow off valves, and a minimum of five (5) feet of rubber hose with quick disconnects for backflushings.
C. Isolation valves shall be bronze gate valves and shall have phenolic red oxide primer.
Isolation valves shall be coated with two (2) coats Koppers Torex 800, or equal, chlorinated rubber base coating to a minimum dry film thickness of 2.0 mils.
VII THRUST RESTRAINTS
A. All mechanical joint fittings shall be restrained with retainer glands and pre-cast thrust blocks in accordance with City of Bartow requirements. Where indicated, pipe joints shall be restrained.
B. Retainer Glands for Fittings on PVC Pipe: Where PVC pipe is being connected to mechanical joint fittings, retainer glands shall be Ebaa Megalug Series 2000PV. Retainer glands shall be designed to meet Uni-Bell Standard "Uni-B-13". The restraint mechanism shall consist of a plurality of individually activated gripping surfaces to maximize restraint capability. Glands shall be manufactured of ductile iron conforming to ASTM A536. The gland shall be such that it can replace the standardized mechanical joint gland and can be used with the standardized mechanical joint bell conforming to AWWA C-111 and C-153. Twist-off nuts, sized same as tee-head bolts, shall be used to insure proper actuation of restraining devices.
The retaining gland shall have a pressure rating equal to that of the PVC pipe on which it is used.
C. Retainer Glands for Fittings on Ductile Iron Pipe: Where ductile iron pipe is being connected to mechanical joint fittings, retainer glands shall be Ebaa Megalug Series 100. Mechanical joint restraint shall be incorporated in the design of the follower gland and shall include a restraining mechanism which, when actuated, imparts a multiple wedging action against the pipe, increasing its resistance as pressure increases. Glands shall be manufactured of ductile iron conforming to ASTM A536. Restraining devices shall be of ductile iron, heat treated to a minimum Brinnell hardness of 370. The gland shall be such that it can replace the standardized mechanical joint gland and can be used with the standardized mechanical joint bell conforming to AWWA C-111 and C-153. Twist-off nuts, sized same as tee-head bolts, shall be used to insure proper actuation of restraining devices. The retaining gland shall have a pressure rating of at least 250 psi with a minimum safety factor of 2.
D. Retainers for PVC Pipe: Where PVC push-joint pipe is required to be restrained, retainers shall be Ebaa Series 1500PV. Retainers shall be manufactured of 60-42-10 ductile iron. The retainer shall have sufficient number of ductile tie bolts to restrain working and test pressures as stated by the manufacturer. Each ductile clamp shall have serrations on the I.D. sufficient to hold working and test pressures.
E. Retainers for Mechanical Joint Ductile Iron Pipe: Where mechanical joint ductile iron pipe is required to be restrained, retainer glands shall be as specified for mechanical joint fittings above.
VIII MISCELLANEOUS
A. Ball valves for PVC pipe shall be of PVC Type 1 with union, socket, threaded or flanged ends as required. Ball valves shall be full port, full flow, all plastic construction. PVC ball valves shall be as manufactured by Wallace and Tiernan, Inc.
B. Ball valves for metal pipe shall be Jamesbury Fig. 21-3600TT-3, or equal. Valves shall be of two-piece construction, with 316SS body and ball and 300 series stainless steel body bolts.
Seat shall be TFE. Actuating handles shall be 300 series stainless steel. Provide locking device for all actuators.
C. Hose bibbs shall be bronze body with renewable composition disc, screw-in bonnet, and threaded inlet. Hose bibbs shall be 1-in. with vacuum breaker.
PART 3 - EXECUTION
I PREPARATION OF TRENCH FOUNDATION
A. Trench preparation shall follow the requirements of Section 02320 - Trenching.
B. Pipe foundation area shall be dewatered sufficiently to provide a solid bearing support for the pipe. Any required dewatering shall be kept in place until trench is backfilled and compacted. Water removed from trench shall be directed to an approved storm water system.
C. If trench foundation is of unsuitable material, the Engineer shall determine the extent of over-excavation that will be required to remove unsuitable soil material. Foundations that are over-excavated shall be restored to design line and grade using compacted suitable material or structural fill material. Only quantities of over-excavation and backfill that are not already identified on the plans and are field ordered by the Engineer will be paid for at pre-determined unit prices. The pay limits for over-excavated unsuitable foundation and backfill shall be based on the volume of the trench taken as the pipe diameter plus 2 feet wide, unless a more precise method of measurement is agreed to and observed by the Engineer.
II BEDDING AND INITIAL BACKFILL
A. Excavate pipe trench in accordance with Section 02320 for Work of this Section. Hand trim excavation for accurate placement of pipe to elevations indicated.
B. Place bedding material at trench bottom, level fill materials in one continuous layer not exceeding 6 inches compacted depth, compact to 100 percent.
C. Backfill around sides and to top of pipe with fill, tamped in place and compacted to 100 percent. Initial backfill, compacted to 100 percent shall extend to 12 inches above pipe.
D. Maintain optimum moisture content of bedding material to attain required compaction density.
III INSTALLATION - PIPE
A. Maintain 10-ft. minimum horizontal or 18-in. minimum vertical separation of water main from sewer piping in accordance with State requirements.
B. Install pipe to indicated elevation to within tolerance of 5/8-in.
C. Install ductile iron piping and fittings…