About this file

This is a Demolition Environmental Screening document prepared by the City of Scranton, Pennsylvania, for the demolition of the structure located at 915 Euclid Avenue. The environmental screening form documents that the property will be cleared and stabilized following demolition, with the city maintaining the vacant site afterward. The structure does not require a separate environmental review based on the screening results, as it does not meet criteria triggering additional reviews, including that it is not located within major block boundaries affecting more than 10 percent of block area, does not appear on the SARA or EPA CERCLIS lists, is not greater than 45 feet tall, and is not located in the 100-year floodplain. The City of Scranton Department of Business Administration is seeking sealed bids for the demolition project, with bids due by 10:00 a.m. on Tuesday, January 6, 2026, and opening to occur in City Council Chambers on the 2nd Floor of City Hall. The bid submission process will occur through the City's e-Procurement Portal at https://secure.procurenow.com/portal/scrantonpa, and prospective bidders must register and follow the project to receive addenda notifications and participate in the bidding process.

The environmental screening determined that the Section 106 consultation with the State Historic Preservation Office (SHPO) concluded with a determination of "no historic resources present" on December 8, 2025. The document confirms that regardless of the structure's age, a pre-demolition inspection will be conducted to determine the presence of lead-based paint and asbestos, and the City will ensure all work complies with federal, state, and local demolition and hazardous materials disposal laws. The screening was approved by City Planner Donald King on December 9, 2025, allowing the project to proceed without requiring a separate environmental review.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Demolition Environmental Screening Address __915 Euclid Ave_____________________________Scranton, Pennsylvania ZIP __18504_____

1. Will the property be cleared and stabilized? If the demolition does not result in a new structure the vacant site must be maintained.

Yes ___XXXX___________________ No ______________________

2. Will the city take ownership of this property? If a new structure is built Part 58 must be completed and must be viewed as a new project.

Yes ______________________ No __XXX____________________

3. Is the structure located on blocks in which major streets do not create block boundaries ?

Yes_____________________ No____XXX____________________

If "no" please proceed to question 4. If "yes" please proceed to question 5.

4. Does the demolition remove more than 10% of a blocks area?

Yes ______________________ No ___XXXX___________________

If "yes" a separate environmental review will be required. If "no" please proceed to #5.

5. Has the percentage of removed demolition increased to 25% of the block area?

Yes ______________________ No __XXX____________________

6. Date of City request for Section 106 consultation with SHPO (attach copy)

Date of SHPO response (attach copy) 12/8/2025

Did the consultation conclude in a determination of "no effect" or "no historic resources present" ?

Yes___XXX______________________ No_____________________ If "yes" proceed to question 7. If "no" the proposed demolition must have a separate environmental review.

7. Is the structure located in the 100 year floodplain?

Yes ______________________ No __XXX____________________

If so a separate review is required.

8. Does this structure appear on the SARA list or on EPA's quarterly CERCLIS as a problem site? If so this structure will not be demolished under this project? Please document using PA DEP EMAP and EPA Enivromapper

Yes ______________________ No ___XXX___________________

9. Is this structure greater than 45' tall?

Yes ______________________ No ___XXX___________________

If so it shall be treated as a separate project?

10. Structures built prior to 1978 have a high probability of containing lead base paint and/or asbestos. Regardless of the age of the structure there should be a pre-demolition inspection and determination of such. The City will assure that the project will be carried out in accordance with all Federal, State and local laws regarding demolition and disposal of materials.

Prepared By: Donald King

_ ______________________________________ Date___12/9/2025______________

Preparer Signature Title City Planner

OK to Proceed Do not proceed, separate ER required

Approved: ___________________________________

City Planner

Date: 12/9/2025 _______________________