DEM Floor Plan.pdf

PDF 595 KB Posted

Attached to
DEM - Door Hardware Replacement
Solicitation number
43ADG-S4061
Issued by
Nevada

About this file

This file is a mechanical floor plan document prepared by Petty & Associates, Inc. for the State of Nevada Public Works Division Emergency Operations Center project located at 2478 Fairview Drive in Carson City, Nevada. The drawing, dated March 15, 2024, illustrates the First Floor Mechanical Zoning Plan for HVAC Systems Renovation (PWD Project No. 23-M47) on a scale of 1/8" = 1'-0". The plan details the mechanical system layout across the facility's first floor, including the locations of numerous terminal units (TU), rooftop units (RTU), fan coil units (FC), and air handling units (AHU), all strategically positioned throughout labeled spaces and rooms. The document incorporates a comprehensive keynote system for HVAC sensor work, specifying three primary actions: replacement of existing room temperature sensors with new sensors, removal of room temperature sensors and associated wiring with installation of cover plates over openings, and installation of new room temperature sensors. The plan references a mezzanine plan (M2.2) for additional sensor locations and identifies multiple doors (A through H) throughout the facility.

No pricing information, contract award dates, response deadlines, bidder's meetings, site visit requirements, funding sources, or set-asides are presented in this technical drawing document. The plan serves primarily as a design and construction reference guide for the mechanical systems renovation work at the Emergency Operations Center facility.

View the file

Other files

File Type Posted
DEM Door Hardware Replacement Scope of Work.docx DOCX document
Quote Instructions.pdf PDF
DEM Door Hardware Replacment Invitation to Bid.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

B236

X X

X X

1 2 3 4

A

B

C

D

E

A

B

C

D

E

(E)CAHU-1

(E)FC-2

S FC-2

B206

A119B

A140

A139

A100A

A138

A124

A137

A136

A135

A134

A133

A132

A130 A131

A129 A128

A127

A126

A125

A1

A122

A119A

A120

A118

A117

A116

A115

A113A112

A1

A111

A1

A109

A107

A108

A105

A106

A103

A104

A102

A101

A100B

B255

B254

B244

B252

B2

B224

B2

B249 B248 B247

B246

B225

B223

B245

B242

B243B

B243A

B241

B240

B239

B238

B237

B234

B235

B233

B232B231

B230

B2

B228

B227

B222

B221

B220

B219

B226

B218

B217

B216 B215

B214B213B212B211

B209

B210

B251

B207

B205

B204

B203

B202

B200

B201

A121

(N)TU

1-35

(N) TU

3-7

(N) TU

3-3

(N) TU

3-2

(N) TU

3-1

(N) TU

1-39

(N)TU

1-36

(N)TU

1-37

(N) TU

1-38

(N) TU

1-34

(N) TU

1-32

(N) TU

1-33

(N) TU

1-26

(N) TU

1-31

(N)TU

1-29

(N)TU

1-28

(N)TU

1-30

(N) TU

1-40

(N) TU

1-27

(N) TU

1-43

(N)TU

1-44

(N)TU

1-25

(N) TU

1-24

(N) TU

1-23

(N)TU

1-20

(N) TU

2-4

(N)TU

2-3

(N) TU

1-22

(N) TU

1-21

(N)TU

1-18

(N) TU

1-17

(N)TU

1-16

(N)TU

1-15

(N) TU

1-10(N) TU

1-8

(N) TU

1-46

(N) TU

1-9

(N)TU

1-7

(N)TU

1-14

(N)TU

1-11

(N)TU

1-12

(N)TU

1-13

(N)TU

1-42

(N)TU

1-41

(N) TU

1-6

(N) TU

1-4

(N)TU

1-3

(N) TU

1-5

(N)TU

1-45

(N) TU

1-2

B250

(N) CH

(N) RTU

(ON ROOF)

(N) TU

2-5

(N) TU

3-4

(N) TU

3-5(N) TU

3-6

(N) TU

1-1

(N)RTU

(ON ROOF)

S

TU1-14

S TU1-11

S

S

S

RTU-2

S

S

S

S

S

S

S S

S S

S

S

S

S

S

S

S

S

S

S

S

S

S S

S

S

S

S

S

S

S

S

S

S S

SS

S

S

S

S

S

S

S

S

S

S

S

S

S

S S

S

S

S

S

S

S3

(N)TU2-1

(ON MEZZANINE)

(N)TU2-1

(ON MEZZANINE)

(N)RTU

(ON ROOF)

(E)FC-1

(E)UH-2

(E)UH-1

1 1 1

1 1

1 1

1 1

1 1 1 1

1 1

11 1

C A

R

SO

N C

IT

Y

N V, EM

ER

G

EN

C Y

O

PE

R A

TI

O

N S

C

EN

TE

R

PR

O

JE

C

T:

F A

IR

VI

EW

D

R

IV

E

E.

M U

SS

ER

S

TR

EE

T, S U

IT

E

C A

R

SO

N C

IT

Y, N V.

ST

A

TE

O

F N

EV

A

D A

P U

B

LI

C W

O R

K S

D

IV

IS

IO

N

H

VA

C S

YS

TE

M S

R

EN

O

VA

TI

O

N

SP

W D

P R

O

JE

C T

N O

. 2 3-

M

REVISIONS

DATE:

SCALE: AS NOTED

DRAWN:

CHECK:

MARCH 15, 2024

SHEET TITLE:

EM

CJL

O W

N

ER

R

EN

O , N

EV

AD

A

(7

) 3

-5

FA

X:

-1

M

AR

G R

AV

E

D R

IV

E, S U

IT

E

C O

N

SU

LT

AN

TS

EN

G

IN

EE

R

IN

G

M

EC

H

AN

IC

AL

PE

TT

Y

AS

SO

C

IA

TE

S, IN

C

PA

CD SET

03/15/2024

M2.0

FIRST FLOOR

MECHANICAL

ZONING PLAN

N

SCALE: 1/8'' = 1'-0''

4'-0" 12'-0" 24'-0"0'

FIRST FLOOR MECHANICAL ZONING PLAN A

M2.0

GENERAL NOTES:

1. SEE MEZZANINE PLAN M2.2 FOR SENSOR LOCATIONS

KEYNOTES:

REPLACE (E)ROOM TEMPERATURE SENSOR w/ NEW SENSOR.

REMOVE ROOM TEMPERATURE SENSOR & WIRING. INSTALL COVER

PLATE OVER OPENING.

(N)ROOM TEMPERATURE SENSOR

Door C

Door B

Door D Door E Door F

Door G

Door H

File details come from the government source that posted it. Updated .