This document is an Amendment (No. 01) for a solicitation by the District of Columbia Courts for H. Carl Moultrie Courthouse Mechanical Room Heating Upgrades, identified as Solicitation No. DCSC-25-IFB-102. The amendment includes a comprehensive Question and Answers (Q&A) round providing critical project details. Key project specifics include core drilling slabs with an average thickness of 6.5", floor-to-ceiling heights of 16', and work that cannot be performed during normal working hours. The roof, installed in 2014, has a Firestone warranty, and the project involves relocating badge readers and security cameras, with infrastructure work by the General Contractor and end devices handled by a DC Courts vendor.
The proposal submission deadline is Friday, August 29, 2025, by 3:00 pm Eastern Standard Time. The amendment provides additional clarifications about project requirements, including staffing flexibility (part-time quality control supervisor and Site Safety and Health Officer are acceptable) and a time extension for subcontractor pricing. The document includes images of Courtroom CR400, showing the proposed flue location and room layout, with floor finishes identified as Shaw Focus Meditate. Prospective bidders are instructed to sign and attach a copy of the amendment to their proposal and are advised to check the DC Courts website daily for updates and amendments.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Administrative Services Division Phone: 202.879.4264 Office of the Administrative Officer Fax: 202.879.7575
E-mail: Geoffrey.mack@dccsystem.gov
DISTRICT OF COLUMBIA COURTS
Administrative Services Division Office: Cadwalader Wickersham & Taft
700 Sixth Street NW, 12th Floor Washington, DC 20001
Mailing Address: 500 Indiana Avenue NW
Washington, DC 20001-2131
AMENDMENT NO. 01
TO: ALL PROSPECTIVE BIDDERS
AMENDMENT
ISSUE DATE: August 22, 2025
SUBJECT: Solicitation No. DCSC-25-IFB-102
H. Carl Moultrie Courthouse Mechanical Room
Heating Upgrades.
DC
PROPOSAL
SUBMISSION
DATE: Friday, August 29, 2025, by 3:00 pm, Eastern Standard Time
Question and Answers Round – 1
ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED
One (1) copy of this amendment is being sent to all prospective Offerors. The prospective Offeror shall sign below and attach a signed copy of this amendment to each proposal to be submitted to the Courts in response to the subject solicitation or otherwise acknowledge this amendment with the signed offer as stated in the original solicitation documents.
Proposals shall be delivered in accordance with the instructions provided in the original solicitation documents.
Geoffrey A. Mack
Geoffrey Mack
Contracting Officer
Herbert Rouson, Jr.,J.D.
Executive Officer
Dana A. Friend
Deputy Executive Officer
Geoffrey A. Mack Administrative Officer
Acknowledgment of this Amendment, together with the Offeror’s proposal, must be received by the District of Columbia Courts as stated in the solicitation no later than the closing date and time specified above for the receipt of proposals.
Failure by the Offeror to properly acknowledge receipt of this Amendment Number #01 may be cause for rejection of the proposal submitted by the Offeror in response to the subject solicitation.
This Amendment Number #01 is acknowledged and is considered a part of the proposal for Solicitation Number DCSC-25-IFB-102 HCMC Mechanical Room 1000
Heating Upgrades.
Signature of Authorized Representative Date
Name of Authorized Representative
Title of Authorized Representative
Name of Offeror
From: Kenneth L. Evans Q & A
Round:
Program: Capital Project Facilities Management Division Date: August 22, 2025
Email: Kenneth.Evans@dccsystem.gov Pages: 4
Q.1 Outside of core drilling, can the work being done in the shaft be done during normal working hours?
A.1 No.
Q.2 What is the thickness of the slabs that need to be core drilled?
A.2 Average thickness is 6.5".
Q.3 Who is responsible for relocating badge readers and security cameras?
A.3 Infrastructure and conduit for relocation by GC. End devices by DC Courts Vendor
Q.4 What are the floor-to-ceiling heights for each floor where we are installing the flue?
A.4 Average slab to slab 16'
Q.5 Can you provide pictures of the courtroom – CR400?
A.5 Yes. See picture below
Q.6 Can you provide the existing floor finishes for room CR400?
A.6 Shaw Focus Meditate
Q.7 What is the age of the roof?
A.7 Roof installed 2014
Q.8 Is there a warranty on the roof? If so, by who?
A.8 Yes. Firestone.
Q.9 Is a full-time quality control supervisor required for this project?
A.9 No. Part time is acceptable
Q.10 Is a full-time SSHO required for this project?
A.10 No. Part time is acceptable
Q.11 If a full-time QC and SSHO are required, can the superintendent act as all three roles?
A.12 The Superintendent may dual hat as SSHO, but may not act as QC supervisor
Q.12 Can a Time extension be granted for sub-contractor pricing
A.12 Yes, until Friday, August 29, 2025 mailto:Kenneth.Evans@dccsystem.gov
Please remember to check the DC Courts Website daily for posting of amendments and updates.
https://www.dccourts.gov/about/procurement-contracts-branch https://www.dccourts.gov/about/procurement-contracts-branch
File details come from the government source that posted it. Updated .