K.1 General Req. & Summary
| Attachment K.1 General Requirments and Summary Price Schedule |
| DCSC-25-IFB-??? |
H. Carl Moultrie Courthouse Mechanical Room 1000 Heating Upgrades Bid / Offer Breakdown Sheet - By Division
DIVISION ITEM LABOR COST MATERIAL COST EQUIPMENT COST TOTAL COST SECTION TOTAL
| Division 1 General Requirements | | | $ - 0 |
| Payment & Performance Bond | $ - 0 | |
| Insurance | $ - 0 | |
| Mobilization | $ - 0 | |
| General Conditions - Construction Supplies / Tools | $ - 0 | |
| General Conditions - Purchased Parking | $ - 0 | |
| General Conditions - Computers | $ - 0 | |
| General Conditions - Copy Machines | $ - 0 | |
| General Conditions - Site Company Truck & Expenditures | $ - 0 | |
| General Conditions - Drawings and Specifications | $ - 0 | |
| General Conditions - Project Manager | $ - 0 | |
| General Conditions - Ass't Project Manager | $ - 0 | |
| General Conditions - Superintendent | $ - 0 | |
| General Conditions - Project Executive | $ - 0 | |
| General Conditions - Administrative Assistant | $ - 0 | |
| General Conditions - Cost Engineer | $ - 0 | |
| General Conditions - Scheduler | $ - 0 | |
| General Conditions - IT Department / Services | $ - 0 | |
| General Conditions - Communication Devices - Cell Phones | $ - 0 | |
| General Conditions - Field Office | $ - 0 | |
| General Conditions - Dumpsters | $ - 0 | |
| General Conditions - Other | $ - 0 | |
| Testing and commissioning , operation and maintenance manuals, punch list activities, project record documents/ as-built drawings, sustainable design documentation, and demonstration and training** | $ - 0 | |
| Subtotal | | $ - 0 | |
| Division 2 Site Work | | | $ 100,000.00 |
| Selective Demolition | $ - 0 | |
| Hazardous Material Abatement Allowance | $ 100,000.00 | |
| | $ - 0 | |
| | $ - 0 | |
| Subtotal | | $ 100,000.00 | |
| Division 3 Concrete | | | $ - 0 |
| Housekeeping pads and trenching for underground sanitary piping | $ - 0 | |
| | $ - 0 | |
| | $ - 0 | |
| Subtotal | | $ - 0 | |
| Division 4 Masonry | | $ - 0 |
| $ - 0 | |
| $ - 0 | |
| $ - 0 | |
| Subtotal | $ - 0 | |
| Division 5 Metals | | | $ - 0 |
| Structural steel framing for the boiler flue shaft | $ - 0 | |
| | $ - 0 | |
| | $ - 0 | |
| Subtotal | | $ - 0 | |
| Division 6 Wood, Plastics, & Composites | | | | $ - 0 |
| Rough Carpentry | . | $ - 0 | |
| | | $ - 0 | |
| | | $ - 0 | |
| Subtotal | | | $ - 0 | |
| Division 7 Thermal & Moisture Protection | | $ - 0 |
| $ - 0 | |
| $ - 0 | |
| $ - 0 | |
| Subtotal | $ - 0 | |
| Division 8 Openings [Doors & Windows] | | $ - 0 |
| $ - 0 | |
| $ - 0 | |
| $ - 0 | |
| Subtotal | $ - 0 | |
| Division 9 Finishes | | | $ - 0 |
| New shaft for the boiler flue | $ - 0 | |
| | $ - 0 | |
| | $ - 0 | |
| | $ - 0 | |
| Subtotal | | $ - 0 | |
| Division 10 Specialties | | $ - 0 |
| $ - 0 | |
| $ - 0 | |
| $ - 0 | |
| Subtotal | $ - 0 | |
| Division 11 Equipment | | $ - 0 | |
| $ - 0 | | |
| $ - 0 | | |
| $ - 0 | | 0 |
| $ - 0 | | |
| $ - 0 | | |
| Division 12 Furnishings | | $ - 0 |
| $ - 0 | |
| $ - 0 | |
| $ - 0 | |
| Subtotal | $ - 0 | |
| Division 13 Special Construction | | $ - 0 |
| $ - 0 | |
| $ - 0 | |
| $ - 0 | |
| Subtotal | $ - 0 | |
| Division 14 Conveying Equipment | | 0.00 |
| $ - 0 | |
| $ - 0 | |
| $ - 0 | |
| Subtotal | 0.00 | |
| Division 21 Fire Suppression | | | $ - 0 |
| Fire Protection Systems and Equipment | $ - 0 | |
| | $ - 0 | |
| | $ - 0 | |
| Subtotal | | $ - 0 | |
| Division 22 Plumbing | | | $ - 0 |
| Storage type indirect domestic water heaters | $ - 0 | |
| Gas service and gas distribution piping | $ - 0 | |
| Domestic water distribution piping | $ - 0 | |
| | $ - 0 | |
| | $ - 0 | |
| Division 23 HVAC | | | $ - 0 |
| Gas fired condensing boilers and associated central controller | $ - 0 | |
| Bolier flue exhaust system, including controls and flue exhaust fans | $ - 0 | |
| Heating Hot Water centrifugal pumps | $ - 0 | |
| Heating Hot Water Distribution piping | $ - 0 | |
| Heating Hot Water Expansion Tanks and Air Separators | $ - 0 | |
| HVAC Controls for the new central heating plant | $ - 0 | |
| T | | $ - 0 | |
| Division 26 Electrical | | | $ - 0 |
| Variable Frequency Drives | $ - 0 | |
| Electrical panelboards and Transformers | $ - 0 | |
| Electrical distribution system | $ - 0 | |
| | $ - 0 | |
| Subtotal | | $ - 0 | |
| Division 27 Communications | | $ - 0 |
| $ - 0 | |
| $ - 0 | |
| $ - 0 | |
| Subtotal | $ - 0 | |
| Division 28 Electronic Safety & Security | | $ - 0 |
| $ - 0 | |
| $ - 0 | |
| $ - 0 | |
| Subtotal | $ - 0 | |
Miscellaneous $ - 0
| $ - 0 |
| $ - 0 |
| Subtotal | $ - 0 |
TOTAL 100,000.00
Note: The Contractor is responsible to provide pricing in accordance with all the requirements of the contract. The items indentified within the CSI Divisions list major scope items, but do not preclude the Contractor from including all costs to execute the Contract.
Page &P
K.2 Hazmat Abatement Unit Price
| Attachment K.2 Hazardous Materials Abatement Unit Prices |
| 0018 |
H. Carl Moultrie Courthouse Mechanical Room 1000 Heating Upgrades Bid / Offer Breakdown Sheet - By Division
No. ITEM UNIT UNIT COST
| Hazardous Material Abatement | |
| 1 | Removal of asbestos-containing pipe mastic/sealant less or equal than |
| 12”OD within negative pressure containment, per linear foot. | | LF |
| 2 | Removal of asbestos-containing pipe mastic/sealant less or equal than |
| 12”OD utilizing glovebag method, per linear foot. | | LF |
| 3 | Removal of asbestos-containing pipe mastic/sealant greater than 12”OD |
| within negative pressure containment, per linear foot. | | LF |
| 4 | Removal of asbestos-containing pipe mastic/sealant greater than 12”OD |
| utilizing glovebag method, per linear foot. | | LF |
| 5 | Removal of asbestos-containing duct mastic on metal duct and |
| fiberglass insulation, per linear foot. | | LF |
| 6 | Removal of asbestos-containing flooring materials (including floor tiles, |
vinyl sheeting, and carpet/linoleum (if not separated) within a reduced
| negative pressure containment, per square foot. | | SF | |
| 7 | Removal of presumed asbestos-containing fire doors, per door. | EA |
| 8 | Removal of asbestos-containing containing drywall/joint compound within negative pressure containment, per square foot. | SF |
| 9 | Removal of presumed asbestos-containing vapor barrier behind brick or | |
| CMU block, per square foot. | | SF | |
| 10 | Removal of presumed asbestos-containing window caulking, per | |
| window. | | EA | |