DCCTO25-ADDENDUM_1_V2.pdf
PDF 17 MB Posted
- Solicitation number
- Not on record
- Issued by
- District of Columbia Government
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
H.8
H.7
H.4
H.3
H.1
H.8
H.7
H.4
H.3
H.1
H.8
H.7
H.4
H.3
H.1
H.8
H.7
H.4
H.3
H.1
H
J
K
H.8
H.7
H.4H.3
H.1
G.4
5.7
H.8
H.7
H.4
H.3
H.1
H.8
H.7
H.4
H.3
H.1
H
J
K
H.8
H.7
H.4H.3
H.1
G.4
5.7
H.8
H.7
H.4
H.3
H.1
H.8
H.7
H.4
H.3
H.1
H.8
H.7
H.4
H.3
H.1
NORTH
SHEET NUMBER
PROJECT NUMBER
SHEET TITLE
KEYPLAN
SEALS AND SIGNATURES
ISSUED FOR REV DATE
1700 NEW YORK AVENUE NW
SUITE 100
WASHINGTON, DC 20006
202.842.2100 www.smithgroup.com
Pl ot
Da te:
Mechanical Room 1000 Heating System Upgrade 500 Indiana Avenue N.W.
Washington, DC 20001
8/2 7/2
5 3
:54 :11
P M
HVAC OPTION PLANS
G1.2 15749.000
Au tho r
SCALE: 1/8" = 1'-0"5 TO-25 BASE- SECOND LEVEL
SCALE: 1/8" = 1'-0"9 TO-25 BASE - SIXTH LEVEL
SCALE: 1/8" = 1'-0"6 TO-25 BASE - THIRD LEVEL
SCALE: 1/8" = 1'-0"8 TO-25 BASE - FIFTH LEVEL
SCALE: 1/8" = 1'-0"10 TO-25 OPTION 1
SCALE: 1/8" = 1'-0"2 TO-25 BASE - C STREET LEVEL
SCALE: 1/8" = 1'-0"7 TO-25 BASE - FOURTH LEVEL
BASE: BUILD NEW FLUE SHAFT, FLUE, AND NEW HHWS/R RISERS FROM PARKING LEVEL TO SIXTH LEVEL ROOF PENETRATION.
DEMOLISH AND REBUILDING CEILINGS IN THE AFFECTED SPACES ACROSS ALL FLOORS.
REROUTE EXISTING CONDITIONS DUCTWORK AND PIPING TO CONTINUE SERVING ADJACENT SPACES.
OPTION 1: PURCHASE AND INSTALL BOILERS AND PUMPS (EQUIPMENT ONLY).
EXISTING HYDRONIC PIPING AND STEAM PIPING TO REMAIN.
EXISTING HEATING HOT WATER SYSTEMS TO REMAIN AND TO BE FULLY OPERATIONAL.
OPTION 2: INSTALL ALL NEW DIV 23 PROJECT INFASTRUCTURE, INSTALL ALL NEW DIV 22 PIPING.
SCALE: 1/8" = 1'-0"11 TO-25 OPTION 2
SCALE: 1/8" = 1'-0"3 TO-25 - JOHN MARSHALL LEVEL
SCALE: 1/8" = 1'-0"4 TO-25 BASE - INDIANA AVENUE LEVEL
SCALE: 1/8" = 1'-0"1 TO-25 BASE - PARKING LEVEL
ISSUE FOR BID 03 JULY 2025
ADDENDUM 1 27 AUG 2025
3 5 6
H
I
J
K
H.8
H.7
H.4H.3
H.1
G.4
5.7 6.2
NORTH
SHEET NUMBER
PROJECT NUMBER
SHEET TITLE
KEYPLAN
SEALS AND SIGNATURES
ISSUED FOR REV DATE
1700 NEW YORK AVENUE NW
SUITE 100
WASHINGTON, DC 20006
202.842.2100 www.smithgroup.com
Pl ot
Da te:
Mechanical Room 1000 Heating System Upgrade 500 Indiana Avenue N.W.
Washington, DC 20001
8/2 7/2
5 3
:54 :28
P M
HVAC OPTION PLANS
G1.3 15749.000
Au tho r
SCALE: 1/8" = 1'-0"1 TO-25 OPTION 3
OPTION 3: DEMOLISH AND REMOVE EXISTING DIV 23, DIV 26, AND DIV 22 INFRASTRUCTURE.
3 5 6 7 7.8
I
J
K
H.8
H.7 H.4H.3
H.1
G.4
5.7 7.1 7.3 7.6 7.9 8.8 9 9.3 10 10.3 11 12 13 14 14.3 14.76.2
NEW INDIRECT FIRED
WATER HEATERS
3 5 6 7 7.8
H
I
J
K
H.8
H.7 H.4H.3
H.1
G.4
5.7 7.1 7.3 7.6 7.9 8.8 9 9.3 10 10.3 11 12 13 14 14.3 14.76.2
SHEET NUMBER
PROJECT NUMBER
SHEET TITLE
SEALS AND SIGNATURES
ISSUED FOR REV DATE
1700 NEW YORK AVENUE NW
SUITE 100
WASHINGTON, DC 20006
202.842.2100 www.smithgroup.com
P lo t D at e
Mechanical Room 1000 Heating System Upgrade 500 Indiana Avenue N.W.
Washington, DC 20001
8/
/2
1:
:3
P
M
PLUMBING WATER
OPTION PLAN
G1.8
15749.000
A ut h or
OPTION 1: PURCHASE AND INSTALL INDIRECT FIRED WATER HEATERS (EQUIPMENT ONLY).
OPTION 2: INSTALL ALL NEW DIV 22 PIPING. PURCHASE AND INSTALL REDUCED PRESSURE ZONE BACKFLOW PREVENTER.
SCALE: 1/16" = 1'-0"
WATER OPTION 1
SCALE: 1/16" = 1'-0"
WATER OPTION 2
2 3 5 6 7 7.8
I
J
K
H.8
H.7
H.4
H.3
H.1
G.4
5.7 7.1 7.3 7.6 7.9 8.8 96.2
MD006
(E) AHU-12
(E) 6" HHWR
(E) 6" HHWS
MD027
MD028
MD028
MD029
MD030
6" HHWR 6" HHWS
10" MPS(40)
(E) HX-1
MD030
MD0306" HHWR
6" HHWS
8" HHWR
(E)16"x20" SA
(D) HHWP-6
(D) HHWP-5
72"x32" EA84"x48" EA
(D) PRV
(D) PRV-2
4"
4" LPS(#)
5" LPS(#)
A.
B.
C.
D.
E.
F.
G.
SEE DRAWING M0.1 FOR ABBREVIATIONS, SYMBOLS, GENERAL
NOTES.
SYSTEMS WITH AN '(E)' SUBSCRIPT ARE EXISTING TO REMAIN.
MAINTAIN ALL CONDUIT, WIRING, CIRCUIT CONTINUITY. PROTECT
FROM DAMAGE DURING CONSTRUCTION.
WHERE EXISTING BUILDING SERVICES AND/OR EQUIPMENT THAT IS
TO REMAIN IN USE ARE REQUIRED TO BE SHUT DOWN,
COORDINATE WITH THE OWNER 14 DAYS PRIOR TO SHUT DOWN.
INCLUDE ALL ASSOCIATED OVERTIME COSTS TO PERFORM THIS
WORK DURING WEEKENDS AND EVENINGS. INCLUDE ALL COSTS
FOR PROVIDING TEMPORARY POWER WHERE SHUT DOWN MUST
OCCUR FOR PERIODS LONGER THAN THESE HOURS.
FOR ALL WORK ON OR WITHIN EXISTING EQUIPMENT,
CONTRACTOR TO COORDINATE WITH EQUIPMENT MANUFACTURER
TO MAINTAIN WARRANTIES AND UL LISTINGS OF EQUIPMENT AND
SYSTEMS.
THE CONTRACTOR SHALL COORDINATE EXACT LOCATION OF
EQUIPMENT, PANELS, AND CONTROLLERS WITH EQUIPMENT
INSTALLER PRIOR TO ROUGH-IN.
ISOLATION VALVES ARE NORMALLY OPEN (N.O.) UNLESS
SPECIFIED TO BE NORMALLY CLOSED (N.C.)
PRIOR TO ANY DEMOLITION AND NEW WORK, PERFORM TESTING
AND BALANCING OF THE EXISTING HEATING HOT WATER
HYDRONIC PUMPING SYSTEMS SERVING THE MOULTRIE BUILDIGN
AND THE C-STREET ADDITION. MEASURE PUMP FLOW, PUMP
SUCTION PRESSURE, PUMP DISCHARGE PRESSURE, AND TOTAL
SYSTEM FLOW AT EXISTING OPERATING PUMP SPEED. SUBMIT TAB
REPORT TO OWNER AND EOR FOR REVIEW. DO NOT PROCEED
WITH ANY WORK WITHOUT PRIOR TO FORMAL DIRECTION FROM
THE OWNER.
GENERAL SHEET NOTES
(R) HP
MD031
RL
RS
MD022
(R) EF
MD033
(D) HVU
(D) HHWP-5
(D) HHWP-6
MD027
MD025
MD027
(D) P-12 HHW (D) P-11 HHW
(T) BIF-2
(T) BIF-1
(T) HC-BIF 2
(T) HC-BIF 1
(D) HX-2
(D) HX-3
(D) HX-1
MD023
MD024
MD026
(D) HX-2
MD023
5" V
6" HPS(#)
4" LPR(#)
5" LPS(#)
MD032
MD034
NORTH
SHEET NUMBER
PROJECT NUMBER
SHEET TITLE
KEYPLAN
SEALS AND SIGNATURES
ISSUED FOR REV DATE
1700 NEW YORK AVENUE NW
SUITE 100
WASHINGTON, DC 20006
202.842.2100 www.smithgroup.com
Pl ot
Da te:
Mechanical Room 1000 Heating System Upgrade 500 Indiana Avenue N.W.
Washington, DC 20001
8/2 7/2
5 3
:55 :06
P M
PARKING LEVEL FLOOR
PLAN - MECHANICAL
DEMOLITION
MD2.1
15749.000
Au tho r
SCALE: 1/8" = 1'-0"1 PARKING LEVEL FLOOR PLAN - MECHANICAL DEMOLITION PLAN
SHEET KEYNOTES
MD006 DEMOLISH AND REMOVE C-STREET EXISTING HHW SERVICE
PUMPS P-11 AND P-12, PIPING, PIPING ACCESSORIES AND
HOUSEKEEPING PADS.
MD022 DISCONNECT AND RELOCATE EXISTING EXHAUST FAN. SEE
NEW WORK PLAN AND PHASING FOR ADDITIONAL DETAIL.
MD023 DISCONNECT AND REMOVE EXISTING STEAM PIPING AND
ASSOCIATED APPURTENANCES. SEE PHASING PLANS FOR
ADDITIONAL INFORMATION.
MD024 BOILER MAKEUP FANS WILL BE INSTALLED IN A
TEMPORARY LOCATION DURING OPTION 2 AND WILL BE
RELOCATED TO A NEW LOCATION DURING OPTION 3. THIS
CONDITION APPLIES TO ASSOCIATED HEATING COIL,
DUCTWORK, AND SUPPLY GRILLE. PLEASE REFER TO
SHEET G1.2 FOR OPTION 2 LOCATION AND SHEET G1.3 FOR
OPTION 3 LOCATION.
MD025 DEMOLISH EXISTING STEAM PREHEAT COIL. DISCONNECT
AND REMOVE ASSOCIATED EXISTING LOW PRESSURE
STEAM PIPING, LOW PRESSURE CONDENSATE RETURN
PIPING, AND ACCESSORIES. DISCONNECT AND REMOVE
EXISTING HHWS/R PIPING BETWEEN POINTS OF
DISCONNECTION.
MD026 REMOVE EXISTING VENT PIPING GOING THROUGH SHAFT
WALL. PATCH SHAFT WALL AFTER PIPE REMOVAL.
MD027 DISCONNECT AND REMOVE EXISTING HEAVING AND
VENTILATING UNIT. REMOVE ALL ASSOCIATED
APPURTENANCES AND BRANCH PIPING.
MD028 DISCONNECT EXISTING EXHAUST DUCT AS INDICATED.
EXISTING EXHAUST LOUVER SHALL REMAIN IN PLACE AND
SHALL BE RELOCATED AND REUSED. SEE NEW WORK
PLANS FOR ADDITIONAL INFORMATION.
MD029 DISCONNECT EXISTING PIPING AS INDICATED. EXISTING
PIPING SHALL REMAIN IN PLACE AND RECONNECT TO NEW
WORK PIPING. SEE NEW WORK PLANS FOR ADDITIONAL
INFORMATION.
MD030 DISCONNECT AND REMOVE EXISTING PIPING TO HEAT
EXCHANGER DURING OR AFTER THE REMOVAL OF HX-2.
CAP OPEN ENDS OF PIPING THAT REMAIN.
MD031 DISCONNECT AND RELOCATE EXISTING HEAT PUMP.
DISCONNECT REFRIGERANT SUCTION AND REFRIGERANT
LIQUID PIPING AT POINTS OF DISCONNECTION. REMOVE
AND RELOCATE PIPING ACCESSORIES. SEE NEW WORK
PLAN AND PHASING FOR ADDITIONAL DETAIL.
MD032 DISCONNECT AND REMOVE HX-1 AND ALL ASSOCIATED
APPURTENANCES. REMOVE EXISTING PLATFORM
SUSPENDING HX-1 AND ANY CONCRETE PADDING TO
CREATE FLAT CONCRETE FLOOR IN PLACE OF REMOVED
COMPONENTS.
MD033 STEAM AND CONDENSATE PIPING DEMOLISHED IN OPTION
1. SEE OPTION PLANS (G SERIES) FOR ADDITIONAL
INFORMATION.
MD034 STEAM AND CONDENSATE PIPING INSTALLED IN OPTION 1
AND DEMOLISHED IN OPTION 3. SEE OPTION PLANS (G
SERIES) FOR ADDITIONAL INFORMATION.
A.
B.
C.
D.
E.
F.
G.
SEE DRAWING M0.1 FOR ABBREVIATIONS, SYMBOLS, GENERAL
NOTES.
SYSTEMS WITH AN '(E)' SUBSCRIPT ARE EXISTING TO REMAIN.
MAINTAIN ALL CONDUIT, WIRING, CIRCUIT CONTINUITY. PROTECT
FROM DAMAGE DURING CONSTRUCTION.
WHERE EXISTING BUILDING SERVICES AND/OR EQUIPMENT THAT IS
TO REMAIN IN USE ARE REQUIRED TO BE SHUT DOWN,
COORDINATE WITH THE OWNER 14 DAYS PRIOR TO SHUT DOWN.
INCLUDE ALL ASSOCIATED OVERTIME COSTS TO PERFORM THIS
WORK DURING WEEKENDS AND EVENINGS. INCLUDE ALL COSTS
FOR PROVIDING TEMPORARY POWER WHERE SHUT DOWN MUST
OCCUR FOR PERIODS LONGER THAN THESE HOURS.
FOR ALL WORK ON OR WITHIN EXISTING EQUIPMENT,
CONTRACTOR TO COORDINATE WITH EQUIPMENT MANUFACTURER
TO MAINTAIN WARRANTIES AND UL LISTINGS OF EQUIPMENT AND
SYSTEMS.
THE CONTRACTOR SHALL COORDINATE EXACT LOCATION OF
EQUIPMENT, PANELS, AND CONTROLLERS WITH EQUIPMENT
INSTALLER PRIOR TO ROUGH-IN.
ISOLATION VALVES ARE NORMALLY OPEN (N.O.) UNLESS
SPECIFIED TO BE NORMALLY CLOSED (N.C.)
PRIOR TO ANY DEMOLITION AND NEW WORK, PERFORM TESTING
AND BALANCING OF THE EXISTING HEATING HOT WATER
HYDRONIC PUMPING SYSTEMS SERVING THE MOULTRIE BUILDIGN
AND THE C-STREET ADDITION. MEASURE PUMP FLOW, PUMP
SUCTION PRESSURE, PUMP DISCHARGE PRESSURE, AND TOTAL
SYSTEM FLOW AT EXISTING OPERATING PUMP SPEED. SUBMIT TAB
REPORT TO OWNER AND EOR FOR REVIEW. DO NOT PROCEED
WITH ANY WORK WITHOUT PRIOR TO FORMAL DIRECTION FROM
THE OWNER.
GENERAL SHEET NOTES
2 3 5 6 7 7.8
H
I
J
K
H.8
H.7
H.4
H.3
H.1
G.4
5.7 7.1 7.3 7.6 7.9 8.8 96.2
P-11 (C ST)P-12 (C ST)
DHWP-4
DHWP-5
HHWP-3
HHWP-2
HHWP-1
CDU-1
MA
TC
H
LI
NE
SH
EE
T M3
.2
(E) AHU-34(E) AHU-33(E) AHU-32(E) AHU-31(E) CHWBT-1(E) CHWBT-2
(E) P-5 CHW
(E) P-6 CHW
(E) P-7 CHW
(E) CH-3(E) CH-4
(E) HX-1
CB-5 CB-6 CB-3 CB-4 CB-1 CB-2
EVU-2
P-6AP-6P-5
P-7
P-7A
M310
(E) AHU-12
HC-BIF 1
HC-BIF 2
BIF-1
FMP-P-HHW-1
FMP-P-HHW-2
(R) HP
8" HHWR 8" HHWS
(E) 6" HHWS
(E) 6" HHWR
4" HHWR
4" HHWS
M306
M306
ET-DHWP
ET-HHW-1
ET-HHW-2
ET-HHW-3
(TYP)
M308
M301
8" HHWR
8" HHWS
(E) 6" HHWS
(E) 6" HHWR
6" HHWR
8" HHWS
8" HHWR
6" HHWR
6" HHWS
6" HHWS
10" HHWR
10" HHWS
(TYP)
M320
AS-DHW
AS-HHW
EVU-1
M305M307
(E) 4" HHWR
(E) 4" HHWS
(E) 8" HHWS
(E) 8" HHWRM304
(R) EF-1
M319
4" HHWR 4" HHWS
BIF-2
10" HHWS
6" HHWR
6" HHWS
6" HHWR
6" HHWS
(E) 5" HHWR
(E) 5" HHWS
FP-1
FP-2
2" HHWS
2" HHWR
2" HHWS
2" HHWR
6" HHWS UP
6" HHWR UP
M317
M322
(TYP)
M308
(TYP)
M326
M327
RS
RL
(E) RL
(E) RS
EBC31-MP
M314
M314
M314
M315
M314
M314 M314
M314
NORTH
SHEET NUMBER
PROJECT NUMBER
SHEET TITLE
KEYPLAN
SEALS AND SIGNATURES
ISSUED FOR REV DATE
1700 NEW YORK AVENUE NW
SUITE 100
WASHINGTON, DC 20006
202.842.2100 www.smithgroup.com
Pl ot
Da te:
Mechanical Room 1000 Heating System Upgrade 500 Indiana Avenue N.W.
Washington, DC 20001
8/2 7/2
5 3
:55 :49
P M
PARKING LEVEL FLOOR
PLAN WEST - HVAC PIPING
NEW WORK
M3.1 15749.000
Au tho r
SHEET KEYNOTES
M301 PROVIDE HIGH PERFORMANCE SEGMENTED BALL VALVE
WITH A TURNDOWN RATIO OF 300:1. BASIS OF DESIGN: VSI,
SERIES V 1000/S-X WITH MODULATING ELECTRONIC
ACTUATOR. VALVE SIZE INDICATED BELOW KEYNOTE.
BUTTERFLY VALVES ARE NOT ACCEPTABLE FOR THIS
APPLICATION.
M304 CONNECT NEW HHWS/R TO EXISTING HHWS/R PIPING FOR
SECONDARY LOOP SERVING ORIGINAL REHEAT COIL LOOP
AT POINT OF CONNECTION.
M305 CONNECT NEW HHWS/R TO EXISTING HHWS/R PIPING FOR
SECONDARY LOOP SERVING ORIGINAL NORTH FIN TUBE
RADIATOR LOOP AT POINT OF CONNECTION.
M306 CONNECT NEW HHWS/R TO EXISTING HHWS/R PIPING FOR
SECONDARY LOOP SERVING C-STREET HHW LOOP AT
POINT OF CONNECTION.
M307 CAP EXISTING HHWS/R PIPING FOR SECONDARY LOOP
SERVING ORIGINAL SOUTH FIN TUBED RADIATOR LOOP AT
POINT OF CONNECTION.
M308 PROVIDE INLINE ELECTROMAGNETIC FLOWMETER
EQUIPPED WITH REMOTE WALL-MOUNTED TRANSMITTER,
BOD: FT-3200. TYPICAL FOR ALL FLOW METERS ON
PROJECT.
M310 WALL-MOUNTED BOILER EMERGENCY POWER-OFF
BUTTON, WITH SAFETY COVERING. REFER TO M8 SERIES
FOR CONNECTION TO BOILER SEQUENCING SYSTEM.
M314 PROVIDE VICTAULIC FLEX COUPLINGS AND/OR VICTAULIC
EXPANSION JOINTS AS REQUIRED TO ACCOUNT FOR THE
EXPANSION OF ALL NEW PIPING SYSTEMS. CALCULATE
REQUIREMENTS FOR THERMAL EXPANSION OF PIPING
SYSTEMS AND FOR SELECTING AND DESIGNING
EXPANSION JOINTS, LOOPS, AND SWING CONNECTIONS
AND PROVIDE A DELEGATED DESIGN SUBMITTAL FOR
REVIEW AND APPROVAL BY EOR. FOR ADDITIONAL
INFORMATION, SEE SPECIFICATION SECTION 230516 -
EXPANSION FITTINGS AND LOOPS FOR HVAC PIPING.
M315 PROVIDE ANCHORS AT THE BOTTOM OF THE HYDRONIC
PIPING RISERS. FOR ADDITIONAL INFORMATION, SEE
SPECIFICATION SECTION 230516 - EXPANSION FITTINGS
AND LOOPS FOR HVAC PIPING.
M317 PROVIDE NEW HHW PREHEAT COIL TO REPLACE EXISTING
AHU PREHEAT STEAM COIL. FIELD MEASURE THE
DIMENSIONS OF EXISTING STEAM COIL. PROVIDE A COIL
SUBMITTAL TO THE EOR FOR REVIEW. DO NOT PROCEED
WITH ANY WORK UNTIL PRIOR APPROVAL FROM THE
OWNER SEE DETAIL 6 ON M6.1 FOR COIL PIPING
CONNECTIONS.
M319 CONNECT TO HHWS/R RISER INSTALLED IN BASE OPTION.
M320 PROVIDE HIGH PERFORMANCE SEGMENTED BALL VALVE
WITH A TURNDOWN RATIO OF 300:1. BASIS OF DESIGN: VSI,
SERIES V 1000/S-X WITH MODULATING ELECTRONIC
ACTUATOR. BUTTERFLY VALVES ARE NOT ACCEPTABLE
FOR THIS APPLICATION. REFER TO M5 SERIES FOR ALL
LOCATIONS AND VALVE SIZES.
M322 INSTALL NEW CONDENSING UNIT ON NEW CONCRETE PAD.
NEW PAD TO MATCH HEIGHT OF ADJACENT EXISTING
CONCRETE.
M326 REFER TO M5.2 AND M6.1 FOR ADDITIONAL INFORMATION
REGARDING EXPANSION TANK CONNECTIONS. REFER TO
PLUMBING DRAWINGS FOR NEAREST DOMESTIC COLD
WATER LINE.
M327 REROUTE AND RECONNECT EXISTING REFRIGERANT
LIQUID AND REFRIGERANT SUCTION LINES TO SUPPORT
RELOCATION OF EXISTING HEAT PUMP.
SCALE: 1/8" = 1'-0"1 PARKING LEVEL FLOOR PLAN WEST - HVAC PIPING NEW WORK
C.
D.
E.
F.
G.
SEE DRAWING M0.1 FOR ABBREVIATIONS, SYMBOLS, GENERAL
NOTES.
SYSTEMS WITH AN '(E)' SUBSCRIPT ARE EXISTING TO REMAIN.
MAINTAIN ALL CONDUIT, WIRING, CIRCUIT CONTINUITY. PROTECT
FROM DAMAGE DURING CONSTRUCTION.
WHERE EXISTING BUILDING SERVICES AND/OR EQUIPMENT THAT IS
TO REMAIN IN USE ARE REQUIRED TO BE SHUT DOWN,
COORDINATE WITH THE OWNER 14 DAYS PRIOR TO SHUT DOWN.
INCLUDE ALL ASSOCIATED OVERTIME COSTS TO PERFORM THIS
WORK DURING WEEKENDS AND EVENINGS. INCLUDE ALL COSTS
FOR PROVIDING TEMPORARY POWER WHERE SHUT DOWN MUST
OCCUR FOR PERIODS LONGER THAN THESE HOURS.
FOR ALL WORK ON OR WITHIN EXISTING EQUIPMENT,
CONTRACTOR TO COORDINATE WITH EQUIPMENT MANUFACTURER
TO MAINTAIN WARRANTIES AND UL LISTINGS OF EQUIPMENT AND
SYSTEMS.
THE CONTRACTOR SHALL COORDINATE EXACT LOCATION OF
EQUIPMENT, PANELS, AND CONTROLLERS WITH EQUIPMENT
INSTALLER PRIOR TO ROUGH-IN.
ISOLATION VALVES ARE NORMALLY OPEN (N.O.) UNLESS
SPECIFIED TO BE NORMALLY CLOSED (N.C.)
PRIOR TO ANY DEMOLITION AND NEW WORK, PERFORM TESTING
AND BALANCING OF THE EXISTING HEATING HOT WATER
HYDRONIC PUMPING SYSTEMS SERVING THE MOULTRIE BUILDIGN
AND THE C-STREET ADDITION. MEASURE PUMP FLOW, PUMP
SUCTION PRESSURE, PUMP DISCHARGE PRESSURE, AND TOTAL
SYSTEM FLOW AT EXISTING OPERATING PUMP SPEED. SUBMIT TAB
REPORT TO OWNER AND EOR FOR REVIEW. DO NOT PROCEED
WITH ANY WORK WITHOUT PRIOR TO FORMAL DIRECTION FROM
THE OWNER.
GENERAL SHEET NOTES
H
I
J
K
H.8
H.7
H.4
H.3
H.1
G.4
9 9.3 10 10.3 11 12 13 14 14.3 14.7 15 15.7 15.9 16
MA
TC
H
LI
NE
SH
EE
T M3
.1 DWH-4DWH-3DWH-1 DWH-2
(E) AHU-35
6" HHWS
6" HHWR6" HHWR
6" HHWS
6" HHWR
6" HHWS 6" HHWS
6" HHWR
M313
8" HHWR
8" HHWS
M308
M301M301
M301
M301
(TYP)
M321
M314
NORTH
SHEET NUMBER
PROJECT NUMBER
SHEET TITLE
KEYPLAN
SEALS AND SIGNATURES
ISSUED FOR REV DATE
1700 NEW YORK AVENUE NW
SUITE 100
WASHINGTON, DC 20006
202.842.2100 www.smithgroup.com
Pl ot
Da te:
Mechanical Room 1000 Heating System Upgrade 500 Indiana Avenue N.W.
Washington, DC 20001
8/2 7/2
5 3
:55 :54
P M
PARKING LEVEL FLOOR
PLAN EAST - HVAC PIPING
NEW WORK
M3.2 15749.000
Au tho r
SHEET KEYNOTES
M301 PROVIDE HIGH PERFORMANCE SEGMENTED BALL VALVE
WITH A TURNDOWN RATIO OF 300:1. BASIS OF DESIGN: VSI,
SERIES V 1000/S-X WITH MODULATING ELECTRONIC
ACTUATOR. VALVE SIZE INDICATED BELOW KEYNOTE.
BUTTERFLY VALVES ARE NOT ACCEPTABLE FOR THIS
APPLICATION.
M308 PROVIDE INLINE ELECTROMAGNETIC FLOWMETER
EQUIPPED WITH REMOTE WALL-MOUNTED TRANSMITTER,
BOD: FT-3200. TYPICAL FOR ALL FLOW METERS ON
PROJECT.
M313 WALL-MOUNTED REMOTE TRANSMITTERS FOR INLINE
ELECTROMAGNETIC FLOW METERS, BOD: FT-3200.
COORDINATE FINAL LOCATION WITH FACILITIES. EXAMPLE
INSTALLATION SHOWN, TYPICAL FOR ALL FLOW METERS IN
PROJECT.
M314 PROVIDE VICTAULIC FLEX COUPLINGS AND/OR VICTAULIC
EXPANSION JOINTS AS REQUIRED TO ACCOUNT FOR THE
EXPANSION OF ALL NEW PIPING SYSTEMS. CALCULATE
REQUIREMENTS FOR THERMAL EXPANSION OF PIPING
SYSTEMS AND FOR SELECTING AND DESIGNING
EXPANSION JOINTS, LOOPS, AND SWING CONNECTIONS
AND PROVIDE A DELEGATED DESIGN SUBMITTAL FOR
REVIEW AND APPROVAL BY EOR. FOR ADDITIONAL
INFORMATION, SEE SPECIFICATION SECTION 230516 -
EXPANSION FITTINGS AND LOOPS FOR HVAC PIPING.
M321 REFER TO PLUMBING DRAWINGS FOR ADDITIONAL DETAILS
ON HEATING HOT WATER AND DOMESTIC HOT WATER
CONNECTIONS.
SCALE: 1/8" = 1'-0"1 PARKING LEVEL FLOOR PLAN WEST - HVAC PIPING NEW WORK
C.
D.
E.
F.
G.
SEE DRAWING M0.1 FOR ABBREVIATIONS, SYMBOLS, GENERAL
NOTES.
SYSTEMS WITH AN '(E)' SUBSCRIPT ARE EXISTING TO REMAIN.
MAINTAIN ALL CONDUIT, WIRING, CIRCUIT CONTINUITY. PROTECT
FROM DAMAGE DURING CONSTRUCTION.
WHERE EXISTING BUILDING SERVICES AND/OR EQUIPMENT THAT IS
TO REMAIN IN USE ARE REQUIRED TO BE SHUT DOWN,
COORDINATE WITH THE OWNER 14 DAYS PRIOR TO SHUT DOWN.
INCLUDE ALL ASSOCIATED OVERTIME COSTS TO PERFORM THIS
WORK DURING WEEKENDS AND EVENINGS. INCLUDE ALL COSTS
FOR PROVIDING TEMPORARY POWER WHERE SHUT DOWN MUST
OCCUR FOR PERIODS LONGER THAN THESE HOURS.
FOR ALL WORK ON OR WITHIN EXISTING EQUIPMENT,
CONTRACTOR TO COORDINATE WITH EQUIPMENT MANUFACTURER
TO MAINTAIN WARRANTIES AND UL LISTINGS OF EQUIPMENT AND
SYSTEMS.
THE CONTRACTOR SHALL COORDINATE EXACT LOCATION OF
EQUIPMENT, PANELS, AND CONTROLLERS WITH EQUIPMENT
INSTALLER PRIOR TO ROUGH-IN.
ISOLATION VALVES ARE NORMALLY OPEN (N.O.) UNLESS
SPECIFIED TO BE NORMALLY CLOSED (N.C.)
PRIOR TO ANY DEMOLITION AND NEW WORK, PERFORM TESTING
AND BALANCING OF THE EXISTING HEATING HOT WATER
HYDRONIC PUMPING SYSTEMS SERVING THE MOULTRIE BUILDIGN
AND THE C-STREET ADDITION. MEASURE PUMP FLOW, PUMP
SUCTION PRESSURE, PUMP DISCHARGE PRESSURE, AND TOTAL
SYSTEM FLOW AT EXISTING OPERATING PUMP SPEED. SUBMIT TAB
REPORT TO OWNER AND EOR FOR REVIEW. DO NOT PROCEED
WITH ANY WORK WITHOUT PRIOR TO FORMAL DIRECTION FROM
THE OWNER.
GENERAL SHEET NOTES
3 5 6 7 7.8
B.3
D.6
F
G
H
I
H.8
H.7
H.4
H.3
H.1
G.4
G.2
5.7 7.1 7.3 7.6 7.9 8.8 9 9.3 10 10.3 116.2
E.8
D.7
D.4
D.2
B.9
B.7B.6
B.4
B
A.10
A.9
A.7
D
C.7
C
L
E
DHWP-4
DHWP-5
HHWP-3
HHWP-2
HHWP-1
CDU-1CB-5
CB-6
CB-3
CB-4
CB-1
CB-2
EVU-2
P-6AP-6P-5 P-7
P-7A
M310M310
(E) AHU-12
HC-BIF 1
HC-BIF 2
BIF-1
FMP-P-HHW-1
FMP-P-HHW-2
(R) HP
(E) AHU-21
(R) EF-1
4" HHWR
4" HHWS
4" HHWR
4" HHWS
4" HHWR 4" HHWS
4" HHWR
4" HHWS
EVU-1
BIF-2
M317
M314
M314
NORTH
SHEET NUMBER
PROJECT NUMBER
SHEET TITLE
KEYPLAN
SEALS AND SIGNATURES
ISSUED FOR REV DATE
1700 NEW YORK AVENUE NW
SUITE 100
WASHINGTON, DC 20006
202.842.2100 www.smithgroup.com
Pl ot
Da te:
Mechanical Room 1000 Heating System Upgrade 500 Indiana Avenue N.W.
Washington, DC 20001
8/2 7/2
5 3
:56 :16
P M
PARKING LEVEL FLOOR
PLAN NORTH - HVAC
PIPING NEW WORK
M3.3 15749.000
Au tho r
SHEET KEYNOTES
M310 WALL-MOUNTED BOILER EMERGENCY POWER-OFF
BUTTON, WITH SAFETY COVERING. REFER TO M8 SERIES
FOR CONNECTION TO BOILER SEQUENCING SYSTEM.
M314 PROVIDE VICTAULIC FLEX COUPLINGS AND/OR VICTAULIC
EXPANSION JOINTS AS REQUIRED TO ACCOUNT FOR THE
EXPANSION OF ALL NEW PIPING SYSTEMS. CALCULATE
REQUIREMENTS FOR THERMAL EXPANSION OF PIPING
SYSTEMS AND FOR SELECTING AND DESIGNING
EXPANSION JOINTS, LOOPS, AND SWING CONNECTIONS
AND PROVIDE A DELEGATED DESIGN SUBMITTAL FOR
REVIEW AND APPROVAL BY EOR. FOR ADDITIONAL
INFORMATION, SEE SPECIFICATION SECTION 230516 -
EXPANSION FITTINGS AND LOOPS FOR HVAC PIPING.
M317 PROVIDE NEW HHW PREHEAT COIL TO REPLACE EXISTING
AHU PREHEAT STEAM COIL. FIELD MEASURE THE
DIMENSIONS OF EXISTING STEAM COIL. PROVIDE A COIL
SUBMITTAL TO THE EOR FOR REVIEW. DO NOT PROCEED
WITH ANY WORK UNTIL PRIOR APPROVAL FROM THE
OWNER SEE DETAIL 6 ON M6.1 FOR COIL PIPING
CONNECTIONS.
SCALE: 1/16" = 1'-0"1 PARKING LEVEL FLOOR PLAN NORTH - HVAC PIPING NEW WORK
x
T
A.
B.
C.
D.
E.
F.
G.
SEE DRAWING M0.1 FOR ABBREVIATIONS, SYMBOLS, GENERAL
NOTES.
SYSTEMS WITH AN '(E)' SUBSCRIPT ARE EXISTING TO REMAIN.
MAINTAIN ALL CONDUIT, WIRING, CIRCUIT CONTINUITY. PROTECT
FROM DAMAGE DURING CONSTRUCTION.
WHERE EXISTING BUILDING SERVICES AND/OR EQUIPMENT THAT IS
TO REMAIN IN USE ARE REQUIRED TO BE SHUT DOWN,
COORDINATE WITH THE OWNER 14 DAYS PRIOR TO SHUT DOWN.
INCLUDE ALL ASSOCIATED OVERTIME COSTS TO PERFORM THIS
WORK DURING WEEKENDS AND EVENINGS. INCLUDE ALL COSTS
FOR PROVIDING TEMPORARY POWER WHERE SHUT DOWN MUST
OCCUR FOR PERIODS LONGER THAN THESE HOURS.
FOR ALL WORK ON OR WITHIN EXISTING EQUIPMENT,
CONTRACTOR TO COORDINATE WITH EQUIPMENT MANUFACTURER
TO MAINTAIN WARRANTIES AND UL LISTINGS OF EQUIPMENT AND
SYSTEMS.
THE CONTRACTOR SHALL COORDINATE EXACT LOCATION OF
EQUIPMENT, PANELS, AND CONTROLLERS WITH EQUIPMENT
INSTALLER PRIOR TO ROUGH-IN.
ISOLATION VALVES ARE NORMALLY OPEN (N.O.) UNLESS
SPECIFIED TO BE NORMALLY CLOSED (N.C.)
PRIOR TO ANY DEMOLITION AND NEW WORK, PERFORM TESTING
AND BALANCING OF THE EXISTING HEATING HOT WATER
HYDRONIC PUMPING SYSTEMS SERVING THE MOULTRIE BUILDIGN
AND THE C-STREET ADDITION. MEASURE PUMP FLOW, PUMP
SUCTION PRESSURE, PUMP DISCHARGE PRESSURE, AND TOTAL
SYSTEM FLOW AT EXISTING OPERATING PUMP SPEED. SUBMIT TAB
REPORT TO OWNER AND EOR FOR REVIEW. DO NOT PROCEED
WITH ANY WORK WITHOUT PRIOR TO FORMAL DIRECTION FROM
THE OWNER.
GENERAL SHEET NOTES
2 3 5 6 7 7.8
F
G
H
I
H.8
H.7
H.4H.3
H.1
G.4
G.2
5.7 7.1 7.3 7.6 7.96.2
E.8
(E) AHU-3
(E) AHU-19
(E) RF-3
(E) RF-19
(E) SPF-4
EF-1 EF-2
EF-3 EF-4
EF-5
M323
6" HHWS
6" HHWR
EXISTING MECHANICAL
EQUIPMENT TO REMAIN
4" HHWS
4" HHWR
4" HHWR
4" HHWS
4" HHWR
4" HHWS
4" HHWR
4" HHWS
M324
M317
M317
M325
M314
M319
NORTH
SHEET NUMBER
PROJECT NUMBER
SHEET TITLE
KEYPLAN
SEALS AND SIGNATURES
ISSUED FOR REV DATE
1700 NEW YORK AVENUE NW
SUITE 100
WASHINGTON, DC 20006
202.842.2100 www.smithgroup.com
Pl ot
Da te:
Mechanical Room 1000 Heating System Upgrade 500 Indiana Avenue N.W.
Washington, DC 20001
8/2 7/2
5 3
:56 :17
P M
SIXTH LEVEL FLOOR PLAN
- PIPING NEW WORK
M3.4 15749.000
Au tho r
SHEET KEYNOTES
SCALE: 1/8" = 1'-0"1 SIXTH LEVEL FLOOR PLAN - HVAC PIPING NEW WORK
M314 PROVIDE VICTAULIC FLEX COUPLINGS AND/OR VICTAULIC
EXPANSION JOINTS AS REQUIRED TO ACCOUNT FOR THE
EXPANSION OF ALL NEW PIPING SYSTEMS. CALCULATE
REQUIREMENTS FOR THERMAL EXPANSION OF PIPING
SYSTEMS AND FOR SELECTING AND DESIGNING EXPANSION
JOINTS, LOOPS, AND SWING CONNECTIONS AND PROVIDE A
DELEGATED DESIGN SUBMITTAL FOR REVIEW AND
APPROVAL BY EOR. FOR ADDITIONAL INFORMATION, SEE
SPECIFICATION SECTION 230516 - EXPANSION FITTINGS AND
LOOPS FOR HVAC PIPING.
M317 PROVIDE NEW HHW PREHEAT COIL TO REPLACE EXISTING
AHU PREHEAT STEAM COIL. FIELD MEASURE THE
DIMENSIONS OF EXISTING STEAM COIL. PROVIDE A COIL
SUBMITTAL TO THE EOR FOR REVIEW. DO NOT PROCEED
WITH ANY WORK UNTIL PRIOR APPROVAL FROM THE OWNER
SEE DETAIL 6 ON M6.1 FOR COIL PIPING CONNECTIONS.
M319 CONNECT TO HHWS/R RISER INSTALLED IN BASE OPTION.
M323 DELEGATED DESIGN: ENGAGE A REGISTERED DESIGN
PROFESSIONAL, AS DEFINED IN SECTION 013573
"DELEGATED DESIGN REQUIREMENTS AND PROCEDURES"
TO DESIGN THE STEEL SUPPORTS FOR THE BOILER FLUE
EXHAUST FANS. FOR ADDITIONAL INFORMATION, SEE
STRUCTURAL CONSTRUCTION DOCUMENTS, SHEET A.9.1
AND SECTION 230529 - HANGERS AND SUPPORTS FOR HVAC
PIPING AND EQUIPMENT. PROVIDE A DELEGATED-DESIGN
SUBMITTAL: REFER TO SECTION 013573 "DELEGATED
DESIGN REQUIREMENTS AND PROCEDURES" FOR
DELEGATED DESIGN SUBMITTAL PROCEDURES AND
REQUIREMENTS.
M324 PROVIDE ISOLATION VALVES AND CAPPED ENDS FOR 4"
HHWS AND 4" HHWR PIPING FOR FUTURE CONNECTIONS.
M325 6" HHWS RISER AND 6" HHWR RISER ROUTED FROM
PARKING LEVEL. SEE MECHANICAL SECTIONS AND PARKING
LEVEL MECHANICAL PIPING PLANS FOR ADDITIONAL
INFORMATION.
C.
D.
E.
F.
G.
SEE DRAWING M0.1 FOR ABBREVIATIONS, SYMBOLS, GENERAL
NOTES.
SYSTEMS WITH AN '(E)' SUBSCRIPT ARE EXISTING TO REMAIN.
MAINTAIN ALL CONDUIT, WIRING, CIRCUIT CONTINUITY. PROTECT
FROM DAMAGE DURING CONSTRUCTION.
WHERE EXISTING BUILDING SERVICES AND/OR EQUIPMENT THAT IS
TO REMAIN IN USE ARE REQUIRED TO BE SHUT DOWN,
COORDINATE WITH THE OWNER 14 DAYS PRIOR TO SHUT DOWN.
INCLUDE ALL ASSOCIATED OVERTIME COSTS TO PERFORM THIS
WORK DURING WEEKENDS AND EVENINGS. INCLUDE ALL COSTS
FOR PROVIDING TEMPORARY POWER WHERE SHUT DOWN MUST
OCCUR FOR PERIODS LONGER THAN THESE HOURS.
FOR ALL WORK ON OR WITHIN EXISTING EQUIPMENT,
CONTRACTOR TO COORDINATE WITH EQUIPMENT MANUFACTURER
TO MAINTAIN WARRANTIES AND UL LISTINGS OF EQUIPMENT AND
SYSTEMS.
THE CONTRACTOR SHALL COORDINATE EXACT LOCATION OF
EQUIPMENT, PANELS, AND CONTROLLERS WITH EQUIPMENT
INSTALLER PRIOR TO ROUGH-IN.
ISOLATION VALVES ARE NORMALLY OPEN (N.O.) UNLESS
SPECIFIED TO BE NORMALLY CLOSED (N.C.)
PRIOR TO ANY DEMOLITION AND NEW WORK, PERFORM TESTING
AND BALANCING OF THE EXISTING HEATING HOT WATER
HYDRONIC PUMPING SYSTEMS SERVING THE MOULTRIE BUILDIGN
AND THE C-STREET ADDITION. MEASURE PUMP FLOW, PUMP
SUCTION PRESSURE, PUMP DISCHARGE PRESSURE, AND TOTAL
SYSTEM FLOW AT EXISTING OPERATING PUMP SPEED. SUBMIT TAB
REPORT TO OWNER AND EOR FOR REVIEW. DO NOT PROCEED
WITH ANY WORK WITHOUT PRIOR TO FORMAL DIRECTION FROM
THE OWNER.
GENERAL SHEET NOTES
H
H.7
H.4
H.3
H.1 14"ø FE
CB-5 CB-6 CB-3 CB-4 CB-2
HHWP-3
HHWP-2
HHWP-1
(R) HP
(R) EF-1
70"x32" EA
CB-1
56"x40" EA 70"x32" EA
EVU-1
FMP-P-HHW-1
FMP-P-HHW-2
30"ø FE62"x34" EA
10" HHWS
10" HHWS
10" HHWR
30"ø FE
8" HHWR
8" HHWS
10" HHWS
10" HHWR
6" HHWS
4" HHWS
6" HHWR
4" HHWR
4" HHWS
S3-1- 8500 34"x34"
S3-1- 8500 34"x34"
M315 M314
M319
NORTH
SHEET NUMBER
PROJECT NUMBER
SHEET TITLE
KEYPLAN
SEALS AND SIGNATURES
ISSUED FOR REV DATE
1700 NEW YORK AVENUE NW
SUITE 100
WASHINGTON, DC 20006
202.842.2100 www.smithgroup.com
Pl ot
Da te:
Mechanical Room 1000 Heating System Upgrade 500 Indiana Avenue N.W.
Washington, DC 20001
8/2 7/2
5 3
:56 :47
P M
PARKING LEVEL BOILER
ROOM - ENLARGED VIEW
M4.1 15749.000
Au tho r
SHEET KEYNOTES
M314 PROVIDE VICTAULIC FLEX COUPLINGS AND/OR VICTAULIC
EXPANSION JOINTS AS REQUIRED TO ACCOUNT FOR THE
EXPANSION OF ALL NEW PIPING SYSTEMS. CALCULATE
REQUIREMENTS FOR THERMAL EXPANSION OF PIPING
SYSTEMS AND FOR SELECTING AND DESIGNING
EXPANSION JOINTS, LOOPS, AND SWING CONNECTIONS
AND PROVIDE A DELEGATED DESIGN SUBMITTAL FOR
REVIEW AND APPROVAL BY EOR. FOR ADDITIONAL
INFORMATION, SEE SPECIFICATION SECTION 230516 -
EXPANSION FITTINGS AND LOOPS FOR HVAC PIPING.
M315 PROVIDE ANCHORS AT THE BOTTOM OF THE HYDRONIC
PIPING RISERS. FOR ADDITIONAL INFORMATION, SEE
SPECIFICATION SECTION 230516 - EXPANSION FITTINGS
AND LOOPS FOR HVAC PIPING.
M319 CONNECT TO HHWS/R RISER INSTALLED IN BASE OPTION.
SCALE: 1/4" = 1'-0"1 PARKING LEVEL FLOOR PLAN - ENLARGED VIEW
SCALE:3 PARKING LEVEL BOILER ROOM - 3D VIEW (SOUTHEAST CORNER)
SCALE:2 PARKING LEVEL BOILER ROOM - 3D VIEW (NORTHEAST CORNER)
PARKING LEVEL
EL -3' - 2"
C STREET LEVEL
EL +11' - 0"
PARKING LOTNEW BOILER ROOMMOULTRIE MECH. ROOM
TYP. HOUSE KEEPING PAD
M4.2
8" HHWR 8" HHWS
10" HHWS
8" HHWR
10" HHWR
10" HHWS
30"ø FE
34"x34" SA
CB-6
14"ø FE
PARKING LEVEL
EL -3' - 2"
M4.2
2'
- 7
/8
M4.2
10" HHWS
10" HHWS
30"ø FE
14"ø FE
(TYP)
6" HHWS
(TYP)
6" HHWR
(TYP)
4" HHWS
4" HHWR 10" HHWR 14"ø FE
(TYP)
10" HHWS
30"ø FE
PARKING LEVEL
EL -3' - 2"
C STREET LEVEL
EL +11' - 0"
SITE ABOVE C STREET
EL +18' - 0"
JOHN MARSHALL LEVEL
EL +26' - 0"
INDIANA AVE LEVEL
EL +42' - 6"
SECOND LEVEL
EL +59' - 0"
SECOND FLOOR CEILING
EL +69' - 0"
THIRD LEVEL
EL +75' - 6"
FOURTH LEVEL
EL +92' - 0"
FIFTH LEVEL
EL +104' - 6"
SIXTH LEVEL
EL +118' - 0"
M4.2
M402
(TYP)
M316
4" HHWR
4" HHWS
4" HHWR
4" HHWS
4" HHWR
4" HHWS
4" HHWS
4" HHWS
4" HHWS
4" HHWS
4" HHWR
4" HHWR
4" HHWR
4" HHWR
36"x36" EA 30"ø FE
6" HHWS
6" HHWR
6" HHWS
6" HHWR
6" HHWS
6" HHWR
6" HHWS
6" HHWR
EF-1EF-3EF-5
M314
M315
M314
A.
B.
C.
D.
E.
F.
G.
SEE DRAWING M0.1 FOR ABBREVIATIONS, SYMBOLS, GENERAL
NOTES.
SYSTEMS WITH AN '(E)' SUBSCRIPT ARE EXISTING TO REMAIN.
MAINTAIN ALL CONDUIT, WIRING, CIRCUIT CONTINUITY. PROTECT
FROM DAMAGE DURING CONSTRUCTION.
WHERE EXISTING BUILDING SERVICES AND/OR EQUIPMENT THAT IS
TO REMAIN IN USE ARE REQUIRED TO BE SHUT DOWN,
COORDINATE WITH THE OWNER 14 DAYS PRIOR TO SHUT DOWN.
INCLUDE ALL ASSOCIATED OVERTIME COSTS TO PERFORM THIS
WORK DURING WEEKENDS AND EVENINGS. INCLUDE ALL COSTS
FOR PROVIDING TEMPORARY POWER WHERE SHUT DOWN MUST
OCCUR FOR PERIODS LONGER THAN THESE HOURS.
FOR ALL WORK ON OR WITHIN EXISTING EQUIPMENT,
CONTRACTOR TO COORDINATE WITH EQUIPMENT MANUFACTURER
TO MAINTAIN WARRANTIES AND UL LISTINGS OF EQUIPMENT AND
SYSTEMS.
THE CONTRACTOR SHALL COORDINATE EXACT LOCATION OF
EQUIPMENT, PANELS, AND CONTROLLERS WITH EQUIPMENT
INSTALLER PRIOR TO ROUGH-IN.
ISOLATION VALVES ARE NORMALLY OPEN (N.O.) UNLESS
SPECIFIED TO BE NORMALLY CLOSED (N.C.)
PRIOR TO ANY DEMOLITION AND NEW WORK, PERFORM TESTING
AND BALANCING OF THE EXISTING HEATING HOT WATER
HYDRONIC PUMPING SYSTEMS SERVING THE MOULTRIE BUILDIGN
AND THE C-STREET ADDITION. MEASURE PUMP FLOW, PUMP
SUCTION PRESSURE, PUMP DISCHARGE PRESSURE, AND TOTAL
SYSTEM FLOW AT EXISTING OPERATING PUMP SPEED. SUBMIT TAB
REPORT TO OWNER AND EOR FOR REVIEW. DO NOT PROCEED
WITH ANY WORK WITHOUT PRIOR TO FORMAL DIRECTION FROM
THE OWNER.
GENERAL SHEET NOTES
NORTH
SHEET NUMBER
PROJECT NUMBER
SHEET TITLE
KEYPLAN
SEALS AND SIGNATURES
ISSUED FOR REV DATE
1700 NEW YORK AVENUE NW
SUITE 100
WASHINGTON, DC 20006
202.842.2100 www.smithgroup.com
Pl ot
Da te:
Mechanical Room 1000 Heating System Upgrade 500 Indiana Avenue N.W.
Washington, DC 20001
8/2 7/2
5 3
:57 :02
P M
MECHANICAL SECTIONS
M4.2 15749.000
Au tho r
SCALE: 1/2" = 1'-0"2 TYPICAL BOILER INSTALLATION
SCALE: 1/2" = 1'-0"3 BOILER COMMON FLUE BRANCH CONNECTION SECTION
SCALE: 3/16" = 1'-0"1 BOILER COMMON FLUE TO SHAFT SECTION
SHEET KEYNOTES
M314 PROVIDE VICTAULIC FLEX COUPLINGS AND/OR VICTAULIC
EXPANSION JOINTS AS REQUIRED TO ACCOUNT FOR THE
EXPANSION OF ALL NEW PIPING SYSTEMS. CALCULATE
REQUIREMENTS FOR THERMAL EXPANSION OF PIPING
SYSTEMS AND FOR SELECTING AND DESIGNING
EXPANSION JOINTS, LOOPS, AND SWING CONNECTIONS
AND PROVIDE A DELEGATED DESIGN SUBMITTAL FOR
REVIEW AND APPROVAL BY EOR. FOR ADDITIONAL
INFORMATION, SEE SPECIFICATION SECTION 230516 -
EXPANSION FITTINGS AND LOOPS FOR HVAC PIPING.
M315 PROVIDE ANCHORS AT THE BOTTOM OF THE HYDRONIC
PIPING RISERS. FOR ADDITIONAL INFORMATION, SEE
SPECIFICATION SECTION 230516 - EXPANSION FITTINGS
AND LOOPS FOR HVAC PIPING.
M316 PROVIDE ISOLATION VALVES AND CAPPED ENDS PER 4"
HHWS AND 4" HHWR BRANCH PIPING ON EACH FLOOR FOR
FUTURE CONNECTIONS.
M402 DELEGATED DESIGN: ENGAGE A REGISTERED DESIGN
PROFESSIONAL, AS DEFINED IN SECTION 013573
"DELEGATED DESIGN REQUIREMENTS AND PROCEDURES"
TO DESIGN THE STEEL SUPPORTS FOR THE BOILER FLUE
EXHAUST FANS. FOR ADDITIONAL INFORMATION, SEE
STRUCTURAL CONSTRUCTION DOCUMENTS, SHEET A.9.1
AND SECTION 230529 - HANGERS AND SUPPORTS FOR
HVAC PIPING AND EQUIPMENT. PROVIDE A
DELEGATED-DESIGN SUBMITTAL: REFER TO SECTION
013573 "DELEGATED DESIGN REQUIREMENTS AND
PROCEDURES" FOR DELEGATED DESIGN SUBMITTAL
PROCEDURES AND REQUIREMENTS.
I
H.8
H.7
H.4H.3
H.1
5.7 6.2
M401
(E) AHU-12
4" HHWR
4" HHWS
B.3
9 9.3 10 10.3
BA.10
A.9
A.7
A.5
(E) AHU-21
M401
4" HHWR
4" HHWS
G
H
G.4
G.2
(E) AHU-3
4" HHWR
4" HHWS
4" HHWR
4" HHWS
4" HHWR
4" HHWS
M401
F
G
(E) AHU-19
4" HHWS
4" HHWR
M401
NORTH
SHEET NUMBER
PROJECT NUMBER
SHEET TITLE
KEYPLAN
SEALS AND SIGNATURES
ISSUED FOR REV DATE
1700 NEW YORK AVENUE NW
SUITE 100
WASHINGTON, DC 20006
202.842.2100 www.smithgroup.com
Pl ot
Da te:
Mechanical Room 1000 Heating System Upgrade 500 Indiana Avenue N.W.
Washington, DC 20001
8/2 7/2
5 3
:57 :06
P M
AHU NEW WORK - HVAC -
ENLARGED VIEW
M4.3 15749.000
Au tho r
SCALE: 1/4" = 1'-0"1 AHU 12 MECHANICAL EQUIPMENT PLAN ENLARGED VIEW
SHEET KEYNOTES
SCALE: 1/4" = 1'-0"2 AHU 21 MECHANICAL EQUIPMENT PLAN ENLARGED VIEW
M401 CONNECT NEW HHWS/R TO EXISTING HHWS/R PIPING AT
POINT OF CONNECTION. PROVIDE NEW AHU PREHEAT COIL.
REFER TO M6.2 FOR AHU COIL CONNECTION DETAIL.
SCALE: 1/4" = 1'-0"3 AHU 3 MECHANICAL EQUIPMENT PLAN ENLARGED VIEW
SCALE: 1/4" = 1'-0"4 AHU 19 MECHANICAL EQUIPMENT PLAN ENLARGED VIEW
C.
D.
E.
F.
G.
SEE DRAWING M0.1 FOR ABBREVIATIONS, SYMBOLS, GENERAL
NOTES.
SYSTEMS WITH AN '(E)' SUBSCRIPT ARE EXISTING TO REMAIN.
MAINTAIN ALL CONDUIT, WIRING, CIRCUIT CONTINUITY. PROTECT
FROM DAMAGE DURING CONSTRUCTION.
WHERE EXISTING BUILDING SERVICES AND/OR EQUIPMENT THAT IS
TO REMAIN IN USE ARE REQUIRED TO BE SHUT DOWN,
COORDINATE WITH THE OWNER 14 DAYS PRIOR TO SHUT DOWN.
INCLUDE ALL ASSOCIATED OVERTIME COSTS TO PERFORM THIS
WORK DURING WEEKENDS AND EVENINGS. INCLUDE ALL COSTS
FOR PROVIDING TEMPORARY POWER WHERE SHUT DOWN MUST
OCCUR FOR PERIODS LONGER THAN THESE HOURS.
FOR ALL WORK ON OR WITHIN EXISTING EQUIPMENT,
CONTRACTOR TO COORDINATE WITH EQUIPMENT MANUFACTURER
TO MAINTAIN WARRANTIES AND UL LISTINGS OF EQUIPMENT AND
SYSTEMS.
THE CONTRACTOR SHALL COORDINATE EXACT LOCATION OF
EQUIPMENT, PANELS, AND CONTROLLERS WITH EQUIPMENT
INSTALLER PRIOR TO ROUGH-IN.
ISOLATION VALVES ARE NORMALLY OPEN (N.O.) UNLESS
SPECIFIED TO BE NORMALLY CLOSED (N.C.)
PRIOR TO ANY DEMOLITION AND NEW WORK, PERFORM TESTING
AND BALANCING OF THE EXISTING HEATING HOT WATER
HYDRONIC PUMPING SYSTEMS SERVING THE MOULTRIE BUILDIGN
AND THE C-STREET ADDITION. MEASURE PUMP FLOW, PUMP
SUCTION PRESSURE, PUMP DISCHARGE PRESSURE, AND TOTAL
SYSTEM FLOW AT EXISTING OPERATING PUMP SPEED. SUBMIT TAB
REPORT TO OWNER AND EOR FOR REVIEW. DO NOT PROCEED
WITH ANY WORK WITHOUT PRIOR TO FORMAL DIRECTION FROM
THE OWNER.
GENERAL SHEET NOTES
H.8
H.7
H.4H.3
H.1
MD016
MD018
10"x10" SA
6"ø SA 12"x10" SA
S2-1- 200 8"ø
MD017
H.8
H.7
H.4H.3
H.1
M407
M410
6"ø SA
8"ø SA
S2-1- 200 8"ø
M403
(R) VAV
H.8
H.4H.3
H.1
3/4" HHWS
3/4" HHWR
4" HHWR
M404
4" HHWS
(R) VAV
(E) 3/4" HHWR
(E) 3/4" HHWS
M316
M325
H.8
H.7
H.4H.3
H.1
3/4" HHWR
3/4" HHWS
MD015
EXISTING
EXISTING
NORTH
SHEET NUMBER
PROJECT NUMBER
SHEET TITLE
KEYPLAN
SEALS AND SIGNATURES
ISSUED FOR REV DATE
1700 NEW YORK AVENUE NW
SUITE 100
WASHINGTON, DC 20006
202.842.2100 www.smithgroup.com
Pl ot
Da te:
Mechanical Room 1000 Heating System Upgrade 500 Indiana Avenue N.W.
Washington, DC 20001
8/2 7/2
5 3
:57 :10
P M
C STREET LEVEL PLAN -
ENLARGED VIEW
M4.4 15749.000
Au tho r
SHEET KEYNOTES
M316 PROVIDE ISOLATION VALVES AND CAPPED ENDS PER 4"
HHWS AND 4" HHWR BRANCH PIPING ON EACH FLOOR FOR
FUTURE CONNECTIONS.
M325 6" HHWS RISER AND 6" HHWR RISER ROUTED FROM
PARKING LEVEL. SEE MECHANICAL SECTIONS AND
PARKING LEVEL MECHANICAL PIPING PLANS FOR
ADDITIONAL INFORMATION.
M403 PROVIDE NEW 6" AND 8" ROUND SUPPLY DUCT AS
INDICATED. CONNECT TO EXISTING SUPPLY DUCT MAIN.
M404 PROVIDE NEW 3/4" HHWS AND 3/4" HHWR PIPING AS
INDICATED AND CONNECT TO EXISTING 3/4" HHWS AND 3/4"
HHWR PIPING.
M407 REUSE EXISTING VAV BOX AS INDICATED.
M410 REUSE EXISTING DIFFUSER AS INDICATED.
MD015 DISCONNECT AND REMOVE EXISTING 3/4"HHWS AND
3/4"HHWR PIPING AS INDICATED.
MD016 DISCONNECT EXISTING VAV BOX AS INDICATED. SAVE BOX
FOR FUTURE REUSE. SEE NEW WORK PLAN FOR
ADDITIONAL INFORMATION.
MD017 DISCONNECT AND REMOVE EXISTING SUPPLY DUCT AS
INDICATED.
MD018 REMOVE EXISTING DIFFUSER AS INDICATED. SAVE
DIFFUSER FOR FUTURE REUSE. SEE NEW WORK PLAN FOR
ADDITIONAL INFORMATION.
SCALE: 1/4" = 1'-0"1 02 C STREET LEVEL DEMO HVAC - ENLARGED
SCALE: 1/4" = 1'-0"3 02 C STREET LEVEL DEMO PIPING - ENLARGED VIEW
SCALE: 1/4" = 1'-0"2 02 C STREET LEVEL NEW CONSTRUCTION HVAC - ENLARGED VIEW
SCALE: 1/4" = 1'-0"4 02 C STREET LEVEL NEW CONSTRUCTION PIPING - ENLARGED VIEW
C.
D.
E.
F.
G.
SEE DRAWING M0.1 FOR ABBREVIATIONS, SYMBOLS, GENERAL
NOTES.
SYSTEMS WITH AN '(E)' SUBSCRIPT ARE EXISTING TO REMAIN.
MAINTAIN ALL CONDUIT, WIRING, CIRCUIT CONTINUITY. PROTECT
FROM DAMAGE DURING CONSTRUCTION.
WHERE EXISTING BUILDING SERVICES AND/OR EQUIPMENT THAT IS
TO REMAIN IN USE ARE REQUIRED TO BE SHUT DOWN,
COORDINATE WITH THE OWNER 14 DAYS PRIOR TO SHUT DOWN.
INCLUDE ALL ASSOCIATED OVERTIME COSTS TO PERFORM THIS
WORK DURING WEEKENDS AND EVENINGS. INCLUDE ALL COSTS
FOR PROVIDING TEMPORARY POWER WHERE SHUT DOWN MUST
OCCUR FOR PERIODS LONGER THAN THESE HOURS.
FOR ALL WORK ON OR WITHIN EXISTING EQUIPMENT,
CONTRACTOR TO COORDINATE WITH EQUIPMENT MANUFACTURER
TO MAINTAIN WARRANTIES AND UL LISTINGS OF EQUIPMENT AND
SYSTEMS.
THE CONTRACTOR SHALL COORDINATE EXACT LOCATION OF
EQUIPMENT, PANELS, AND CONTROLLERS WITH EQUIPMENT
INSTALLER PRIOR TO ROUGH-IN.
ISOLATION VALVES ARE NORMALLY OPEN (N.O.) UNLESS
SPECIFIED TO BE NORMALLY CLOSED (N.C.)
PRIOR TO ANY DEMOLITION AND NEW WORK, PERFORM TESTING
AND BALANCING OF THE EXISTING HEATING HOT WATER
HYDRONIC PUMPING SYSTEMS SERVING THE MOULTRIE BUILDIGN
AND THE C-STREET ADDITION. MEASURE PUMP FLOW, PUMP
SUCTION PRESSURE, PUMP DISCHARGE PRESSURE, AND TOTAL
SYSTEM FLOW AT EXISTING OPERATING PUMP SPEED. SUBMIT TAB
REPORT TO OWNER AND EOR FOR REVIEW. DO NOT PROCEED
WITH ANY WORK WITHOUT PRIOR TO FORMAL DIRECTION FROM
THE OWNER.
GENERAL SHEET NOTES
H.8
H.7
H.4H.3
H.1
M407
M410
M410
8"x8" RA
8"ø SA
R1-1- 200 8"ø
S2-1- 140 8"ø
M405
M403
(R) VAV
6"ø SA
(E) VAV
30"ø FE
H.8
H.7
H.4H.3
H.1
M409
3/4" HHWR
3/4" HHWS
4" HHWR
M404
10" CWS
10" CWR
(R) VAV
4" HHWS
(E) VAV
M316
M325
H.8
H.7
H.4H.3
H.1
MD018
8"x8" RA
R1-1- 200 8"ø
8"ø SA
12"x12" SA6"ø SA
10"x10" SA S2-1- 140
8"ø
MD017
MD019
MD016
(R) VAV
(E) VAV
H.8
H.7
H.4H.3
H.1
3/4" HHWS
3/4" HHWR
MD015
(R) VAV(E) VAV
10" CWS
10" CWR
NORTH
SHEET NUMBER
PROJECT NUMBER
SHEET TITLE
KEYPLAN
SEALS AND SIGNATURES
ISSUED FOR REV DATE
1700 NEW YORK AVENUE NW
SUITE 100
WASHINGTON, DC 20006
202.842.2100 www.smithgroup.com
Pl ot
Da te:
Mechanical Room 1000 Heating System Upgrade 500 Indiana Avenue N.W.
Washington, DC 20001
8/2 7/2
5 3
:57 :14
P M
JOHN MARSHALL LEVEL
PLAN - ENLARGED VIEW
M4.5 15749.000
Au tho r
SHEET KEYNOTES
M316 PROVIDE ISOLATION VALVES AND CAPPED ENDS
PER 4" HHWS AND 4" HHWR BRANCH PIPING ON
EACH FLOOR FOR FUTURE CONNECTIONS.
M325 6" HHWS RISER AND 6" HHWR RISER ROUTED FROM
PARKING LEVEL. SEE MECHANICAL SECTIONS AND
PARKING LEVEL MECHANICAL PIPING PLANS FOR
ADDITIONAL INFORMATION.
M403 PROVIDE NEW 6" AND 8" ROUND SUPPLY DUCT AS
INDICATED. CONNECT TO EXISTING SUPPLY DUCT
MAIN.
M404 PROVIDE NEW 3/4" HHWS AND 3/4" HHWR PIPING AS
INDICATED AND CONNECT TO EXISTING 3/4" HHWS
AND 3/4" HHWR PIPING.
M405 PROVIDE NEW RETURN DUCT AS INDICATED.
M407 REUSE EXISTING VAV BOX AS INDICATED.
M409 CONNECT NEW 3/4" HHWS AND 3/4" HHWR PIPING TO
EXISTING VAV.
M410 REUSE EXISTING DIFFUSER AS INDICATED.
MD015 DISCONNECT AND REMOVE EXISTING 3/4"HHWS AND
3/4"HHWR PIPING AS INDICATED.
MD016 DISCONNECT EXISTING VAV BOX AS INDICATED.
SAVE BOX FOR FUTURE REUSE. SEE NEW WORK
PLAN FOR ADDITIONAL INFORMATION.
MD017 DISCONNECT AND REMOVE EXISTING SUPPLY DUCT
AS INDICATED.
MD018 REMOVE EXISTING DIFFUSER AS INDICATED. SAVE
DIFFUSER FOR FUTURE REUSE. SEE NEW WORK
PLAN FOR ADDITIONAL INFORMATION.
MD019 DISCONNECT AND REMOVE EXISTING RETURN DUCT
AS INDICATED.
SCALE: 1/4" = 1'-0"2 JOHN MARSHALL LEVEL NEW CONSTRUCTION HVAC- ENLARGED VIEW
SCALE: 1/4" = 1'-0"4 JOHN MARSHALL LEVEL NEW CONSTRUCTION PIPING - ENLARGED VIEW
SCALE: 1/4" = 1'-0"1 JOHN MARSHALL LEVEL DEMO HVAC - ENLARGED VIEW
SCALE: 1/4" = 1'-0"3 JOHN MARSHALL LEVEL DEMO PIPING - ENLARGED VIEW
C.
D.
E.
F.
G.
SEE DRAWING M0.1 FOR ABBREVIATIONS, SYMBOLS, GENERAL
NOTES.
SYSTEMS WITH AN '(E)' SUBSCRIPT ARE EXISTING TO REMAIN.
MAINTAIN ALL CONDUIT, WIRING, CIRCUIT CONTINUITY. PROTECT
FROM DAMAGE DURING CONSTRUCTION.
WHERE EXISTING BUILDING SERVICES AND/OR EQUIPMENT THAT IS
TO REMAIN IN USE ARE REQUIRED TO BE SHUT DOWN,
COORDINATE WITH THE OWNER 14 DAYS PRIOR TO SHUT DOWN.
INCLUDE ALL ASSOCIATED OVERTIME COSTS TO PERFORM THIS
WORK DURING WEEKENDS AND EVENINGS. INCLUDE ALL COSTS
FOR PROVIDING TEMPORARY POWER WHERE SHUT DOWN MUST
OCCUR FOR PERIODS LONGER THAN THESE HOURS.
FOR ALL WORK ON OR WITHIN EXISTING EQUIPMENT,
CONTRACTOR TO COORDINATE WITH EQUIPMENT MANUFACTURER
TO MAINTAIN WARRANTIES AND UL LISTINGS OF EQUIPMENT AND
SYSTEMS.
THE CONTRACTOR SHALL COORDINATE EXACT LOCATION OF
EQUIPMENT, PANELS, AND CONTROLLERS WITH EQUIPMENT
INSTALLER PRIOR TO ROUGH-IN.
ISOLATION VALVES ARE NORMALLY OPEN (N.O.) UNLESS
SPECIFIED TO BE NORMALLY CLOSED (N.C.)
PRIOR TO ANY DEMOLITION AND NEW WORK, PERFORM TESTING
AND BALANCING OF THE EXISTING HEATING HOT WATER
HYDRONIC PUMPING SYSTEMS SERVING THE MOULTRIE BUILDIGN
AND THE C-STREET ADDITION. MEASURE PUMP FLOW, PUMP
SUCTION PRESSURE, PUMP DISCHARGE PRESSURE, AND TOTAL
SYSTEM FLOW AT EXISTING OPERATING PUMP SPEED. SUBMIT TAB
REPORT TO OWNER AND EOR FOR REVIEW. DO NOT PROCEED
WITH ANY WORK WITHOUT PRIOR TO FORMAL DIRECTION FROM
THE OWNER.
GENERAL SHEET NOTES
H.8
H.7
H.4H.3
H.1
8"ø SA
6"ø SA8"x8" RA
R1-1- 100 8"ø
S2-1- 140 8"ø
(E) VAV
30"ø FE
(R) VAV
H.8
H.7
H.4H.3
H.1
3/4" HHWR
3/4" HHWS
4" HHWR4" HHWS
10" CWS
10" CWR
(R) VAV
(E) VAV
3/4" HHWS
3/4" HHWR
M316
M325
H.8
H.7
H.4H.3
H.1
MD018
10"x10" SA
6"ø SA
12"x12" SA
R1-1- 100 8"ø
8"x8" RA
S2-1- 140 8"ø
M403
M405
MD016
MD018
(E) VAV
(R) VAV
H.8
H.7
H.4H.3
H.1
M314
3/4" HHWR
3/4" HHWS
(R) VAV
(E) VAV
10" CWS
10" CWR
NORTH
SHEET NUMBER
PROJECT NUMBER
SHEET TITLE
KEYPLAN
SEALS AND SIGNATURES
ISSUED FOR REV DATE
1700 NEW YORK AVENUE NW
SUITE 100
WASHINGTON, DC 20006
202.842.2100 www.smithgroup.com
Pl ot
Da te:
Mechanical Room 1000 Heating System Upgrade 500 Indiana Avenue N.W.
Washington, DC 20001
8/2 7/2
5 3
:57 :18
P M
INDIANA AVENUE LEVEL
PLAN - ENLARGED VIEW
M4.6 15749.000
Au tho r
SHEET KEYNOTES
M314 PROVIDE VICTAULIC FLEX COUPLINGS AND/OR
VICTAULIC EXPANSION JOINTS AS REQUIRED TO
ACCOUNT FOR THE EXPANSION OF ALL NEW PIPING
SYSTEMS. CALCULATE REQUIREMENTS FOR
THERMAL EXPANSION OF PIPING SYSTEMS AND FOR
SELECTING AND DESIGNING EXPANSION JOINTS,
LOOPS, AND SWING CONNECTIONS AND PROVIDE A
DELEGATED DESIGN SUBMITTAL FOR REVIEW AND
APPROVAL BY EOR. FOR ADDITIONAL INFORMATION,
SEE SPECIFICATION SECTION 230516 - EXPANSION
FITTINGS AND LOOPS FOR HVAC PIPING.
M316 PROVIDE ISOLATION VALVES AND CAPPED ENDS
PER 4" HHWS AND 4" HHWR BRANCH PIPING ON
EACH FLOOR FOR FUTURE CONNECTIONS.
M325 6" HHWS RISER AND 6" HHWR RISER ROUTED FROM
PARKING LEVEL. SEE MECHANICAL SECTIONS AND
PARKING LEVEL MECHANICAL PIPING PLANS FOR
ADDITIONAL INFORMATION.
M403 PROVIDE NEW 6" AND 8" ROUND SUPPLY DUCT AS
INDICATED. CONNECT TO EXISTING SUPPLY DUCT
MAIN.
M405 PROVIDE NEW RETURN DUCT AS INDICATED.
MD016 DISCONNECT EXISTING VAV BOX AS INDICATED.
SAVE BOX FOR FUTURE REUSE. SEE NEW WORK
PLAN FOR ADDITIONAL INFORMATION.
MD018 REMOVE EXISTING DIFFUSER AS INDICATED. SAVE
DIFFUSER FOR FUTURE REUSE. SEE NEW WORK
PLAN FOR ADDITIONAL INFORMATION.
SCALE: 1/4" = 1'-0"2 INDIANA AVENUE LEVEL NEW CONSTRUCTION HVAC- ENLARGED VIEW
SCALE: 1/4" = 1'-0"4 INDIANA AVENUE LEVEL NEW CONSTRUCTION PIPING - ENLARGED VIEW
SCALE: 1/4" = 1'-0"1 INDIANA AVENUE LEVEL DEMO HVAC - ENLARGED VIEW
SCALE: 1/4" = 1'-0"3 INDIANA AVENUE LEVEL DEMO PIPING - ENLARGED VIEW
C.
D.
E.
F.
G.
SEE DRAWING M0.1 FOR ABBREVIATIONS, SYMBOLS, GENERAL
NOTES.
SYSTEMS WITH AN '(E)' SUBSCRIPT ARE EXISTING TO REMAIN.
MAINTAIN ALL CONDUIT, WIRING, CIRCUIT CONTINUITY. PROTECT
FROM DAMAGE DURING CONSTRUCTION.
WHERE EXISTING BUILDING SERVICES AND/OR EQUIPMENT THAT IS
TO REMAIN IN USE ARE REQUIRED TO BE SHUT DOWN,
COORDINATE WITH THE OWNER 14 DAYS PRIOR TO SHUT DOWN.
INCLUDE ALL ASSOCIATED OVERTIME COSTS TO PERFORM THIS
WORK DURING WEEKENDS AND EVENINGS. INCLUDE ALL COSTS
FOR PROVIDING TEMPORARY POWER WHERE SHUT DOWN MUST
OCCUR FOR PERIODS LONGER THAN THESE HOURS.
FOR ALL WORK ON OR WITHIN EXISTING EQUIPMENT,
CONTRACTOR TO COORDINATE WITH EQUIPMENT MANUFACTURER
TO MAINTAIN WARRANTIES AND UL LISTINGS OF EQUIPMENT AND
SYSTEMS.
THE CONTRACTOR SHALL COORDINATE EXACT LOCATION OF
EQUIPMENT, PANELS, AND CONTROLLERS WITH EQUIPMENT
INSTALLER PRIOR TO ROUGH-IN.
ISOLATION VALVES ARE NORMALLY OPEN (N.O.) UNLESS
SPECIFIED TO BE NORMALLY CLOSED (N.C.)
PRIOR TO ANY DEMOLITION AND NEW WORK, PERFORM TESTING
AND BALANCING OF THE EXISTING HEATING HOT WATER
HYDRONIC PUMPING SYSTEMS SERVING THE MOULTRIE BUILDIGN
AND THE C-STREET ADDITION. MEASURE PUMP FLOW, PUMP
SUCTION PRESSURE, PUMP DISCHARGE PRESSURE, AND TOTAL
SYSTEM FLOW AT EXISTING OPERATING PUMP SPEED. SUBMIT TAB
REPORT TO OWNER AND EOR FOR REVIEW. DO NOT PROCEED
WITH ANY WORK WITHOUT PRIOR TO FORMAL DIRECTION FROM
THE OWNER.
GENERAL SHEET NOTES
H.8
H.7
H.4H.3
H.1
H.8
H.7
H.4H.3
H.1
30"ø FE
H.8
H.7
H.4H.3
H.1
4" HHWS 4" HHWR
10" CWS
10" CWR
M316
M325
H.8
H.7
H.4H.3
H.1
10" CWS
10" CWR
NORTH
SHEET NUMBER
PROJECT NUMBER
SHEET TITLE
KEYPLAN
SEALS AND SIGNATURES
ISSUED FOR REV DATE
1700 NEW YORK AVENUE NW
SUITE 100
WASHINGTON, DC 20006
202.842.2100 www.smithgroup.com
Pl ot
Da te:
Mechanical Room 1000 Heating System Upgrade 500 Indiana Avenue N.W.
Washington, DC 20001
8/2 7/2
5 3
:57 :21
P M
SECOND LEVEL FLOOR
PLAN - ENLARGED VIEW
M4.7 15749.000
Au tho r
SHEET KEYNOTES
M316 PROVIDE ISOLATION VALVES AND CAPPED ENDS
PER 4" HHWS AND 4" HHWR BRANCH PIPING ON
EACH FLOOR FOR FUTURE CONNECTIONS.
M325 6" HHWS RISER AND 6" HHWR RISER ROUTED FROM
PARKING LEVEL. SEE MECHANICAL SECTIONS AND
PARKING LEVEL MECHANICAL PIPING PLANS FOR
ADDITIONAL INFORMATION.
SCALE: 1/4" = 1'-0"1 03 SECOND LEVEL DEMO HVAC - ENLARGED VIEW
SCALE: 1/4" = 1'-0"3 03 SECOND LEVEL DEMO PIPING - ENLARGED VIEW
SCALE: 1/4" = 1'-0"2 03 SECOND LEVEL NEW CONSTRUCTION HVAC - ENLARGED VIEW
SCALE: 1/4" = 1'-0"4 03 SECOND LEVEL NEW CONSTRUCTION PIPING - ENLARGED VIEW
C.
D.
E.
F.
G.
SEE DRAWING M0.1 FOR ABBREVIATIONS, SYMBOLS, GENERAL
NOTES.
SYSTEMS WITH AN '(E)' SUBSCRIPT ARE EXISTING TO REMAIN.
MAINTAIN ALL CONDUIT, WIRING, CIRCUIT CONTINUITY. PROTECT
FROM DAMAGE DURING CONSTRUCTION.
WHERE EXISTING BUILDING SERVICES AND/OR EQUIPMENT THAT IS
TO REMAIN IN USE ARE REQUIRED TO BE SHUT DOWN,
COORDINATE WITH THE OWNER 14 DAYS PRIOR TO SHUT DOWN.
INCLUDE ALL ASSOCIATED OVERTIME COSTS TO PERFORM THIS
WORK DURING WEEKENDS AND EVENINGS. INCLUDE ALL COSTS
FOR PROVIDING TEMPORARY POWER WHERE SHUT DOWN MUST
OCCUR FOR PERIODS LONGER THAN THESE HOURS.
FOR ALL WORK ON OR WITHIN EXISTING EQUIPMENT,
CONTRACTOR TO COORDINATE WITH EQUIPMENT MANUFACTURER
TO MAINTAIN WARRANTIES AND UL LISTINGS OF EQUIPMENT AND
SYSTEMS.
THE CONTRACTOR SHALL COORDINATE EXACT LOCATION OF
EQUIPMENT, PANELS, AND CONTROLLERS WITH EQUIPMENT
INSTALLER PRIOR TO ROUGH-IN.
ISOLATION VALVES ARE NORMALLY OPEN (N.O.) UNLESS
SPECIFIED TO BE NORMALLY CLOSED (N.C.)
PRIOR TO ANY DEMOLITION AND NEW WORK, PERFORM TESTING
AND BALANCING OF THE EXISTING HEATING HOT WATER
HYDRONIC PUMPING SYSTEMS SERVING THE MOULTRIE BUILDIGN
AND THE C-STREET ADDITION. MEASURE PUMP FLOW, PUMP
SUCTION PRESSURE, PUMP DISCHARGE PRESSURE, AND TOTAL
SYSTEM FLOW AT EXISTING OPERATING PUMP SPEED. SUBMIT TAB
REPORT TO OWNER AND EOR FOR REVIEW. DO NOT PROCEED
WITH ANY WORK WITHOUT PRIOR TO FORMAL DIRECTION FROM
THE OWNER.
GENERAL SHEET NOTES
H.8
H.7
H.4H.3
H.1
MD020
14"x36" EA 12"x34" EA
H.8
H.7
H.4H.3
H.1
M408
14"x36" EA
12"x34" EA
30"ø FE
H.8
H.7
H.4H.3
H.1
10" CWS
10" CWR
4" HHWS 4" HHWR
M316
M325
H.8
H.7
H.4H.3
H.1
10" CWS
10" CWR
NORTH
SHEET NUMBER
PROJECT NUMBER
SHEET TITLE
KEYPLAN
SEALS AND SIGNATURES
ISSUED FOR REV DATE
1700 NEW YORK AVENUE NW
SUITE 100
WASHINGTON, DC 20006
202.842.2100 www.smithgroup.com
Pl ot
Da te:
Mechanical Room 1000 Heating System Upgrade 500 Indiana Avenue N.W.
Washington, DC 20001
8/2 7/2
5 3
:57 :24
P M
THIRD LEVEL FLOOR PLAN
- ENLARGED VIEW
M4.8 15749.000
Au tho r
SHEET KEYNOTES
SCALE: 1/4" = 1'-0"1 04 THIRD LEVEL DEMO HVAC - ENLARGED VIEW
SCALE: 1/4" = 1'-0"4 04 THIRD LEVEL NEW CONSTRUCTION PIPING - ENLARGED VIEW
SCALE: 1/4" = 1'-0"2 04 THIRD LEVEL NEW CONSTRUCTION HVAC - ENLARGED VIEW
SCALE: 1/4" = 1'-0"3 04 THIRD LEVEL DEMO PIPING - ENLARGED VIEW
ISSUE FOR BID 03 JULY 2025
ADDENDUM 1 27 AUG 2025
M316 PROVIDE ISOLATION VALVES AND CAPPED ENDS
PER 4" HHWS AND 4" HHWR BRANCH PIPING ON
EACH FLOOR FOR FUTURE CONNECTIONS.
M325 6" HHWS RISER AND 6" HHWR RISER ROUTED FROM
PARKING LEVEL. SEE MECHANICAL SECTIONS AND
PARKING LEVEL MECHANICAL PIPING PLANS FOR
ADDITIONAL INFORMATION.
M408 PROVIDE NEW EXHAUST DUCT AS INDICATED.
CONNECT TO EXISTING EXHAUST DUCT.
MD020 DISCONNECT AND REMOVE EXISTING EXHAUST
DUCT
C.
D.
E.
F.
G.
SEE DRAWING M0.1 FOR ABBREVIATIONS, SYMBOLS, GENERAL
NOTES.
SYSTEMS WITH AN '(E)' SUBSCRIPT ARE EXISTING TO REMAIN.
MAINTAIN ALL CONDUIT, WIRING, CIRCUIT CONTINUITY. PROTECT
FROM DAMAGE DURING CONSTRUCTION.
WHERE EXISTING BUILDING SERVICES AND/OR EQUIPMENT THAT IS
TO REMAIN IN USE ARE REQUIRED TO BE SHUT DOWN,
COORDINATE WITH THE OWNER 14 DAYS PRIOR TO SHUT DOWN.
INCLUDE ALL ASSOCIATED OVERTIME COSTS TO PERFORM THIS
WORK DURING WEEKENDS AND EVENINGS. INCLUDE ALL COSTS
FOR PROVIDING TEMPORARY POWER WHERE SHUT DOWN MUST
OCCUR FOR PERIODS LONGER THAN THESE HOURS.
FOR ALL WORK ON OR WITHIN EXISTING EQUIPMENT,
CONTRACTOR TO COORDINATE WITH EQUIPMENT MANUFACTURER
TO MAINTAIN WARRANTIES AND UL LISTINGS OF EQUIPMENT AND
SYSTEMS.
THE CONTRACTOR SHALL COORDINATE EXACT LOCATION OF
EQUIPMENT, PANELS, AND CONTROLLERS WITH EQUIPMENT
INSTALLER PRIOR TO ROUGH-IN.
ISOLATION VALVES ARE NORMALLY OPEN (N.O.) UNLESS
SPECIFIED TO BE NORMALLY CLOSED (N.C.)
PRIOR TO ANY DEMOLITION AND NEW WORK, PERFORM TESTING
AND BALANCING OF THE EXISTING HEATING HOT WATER
HYDRONIC PUMPING SYSTEMS SERVING THE MOULTRIE BUILDIGN
AND THE C-STREET ADDITION. MEASURE PUMP FLOW, PUMP
SUCTION PRESSURE, PUMP DISCHARGE PRESSURE, AND TOTAL
SYSTEM FLOW AT EXISTING OPERATING PUMP SPEED. SUBMIT TAB
REPORT TO OWNER AND EOR FOR REVIEW. DO NOT PROCEED
WITH ANY WORK WITHOUT PRIOR TO FORMAL DIRECTION FROM
THE OWNER.
GENERAL SHEET NOTES
H.8
H.7
H.4H.3
H.1
MD018
8"x6" EA
8"ø SA
R1-1- 150 8"ø
LS2-1- 125
8"ø
LS2-1- 125
8"ø
16"x12" SA
MD020
MD017
8"x6" EA
H.8
H.7
H.4H.3
H.1
M410
16"x12" SA 8"ø SA
8"x6" EA
LS2-1- 150
8"ø
(BELOW)
M411
30"ø FE
8"x6" EA
8"x6" EA 8"x6" EA
LS2-1- 150
8"ø
(BELOW)
M413
M413
H.8
H.7
H.4H.3
H.1
10" CWR
10" CWS
M406
EXISTING 10" CWS
EXISTING 10" CWR
4" HHWS
4" HHWR
M325
M316
H.8
H.7
H.4H.3
H.1
(E) 10" CWS
(E) 10" CWR
MD021
MD021
NORTH
SHEET NUMBER
PROJECT NUMBER
SHEET TITLE
KEYPLAN
SEALS AND SIGNATURES
ISSUED FOR REV DATE
1700 NEW YORK AVENUE NW
SUITE 100
WASHINGTON, DC 20006
202.842.2100 www.smithgroup.com
Pl ot
Da te:
Mechanical Room 1000 Heating System Upgrade 500 Indiana Avenue N.W.
Washington, DC 20001
8/2 7/2
5 3
:57 :28
P M
FOURTH LEVEL FLOOR
PLAN - ENLARGED VIEW
M4.9 15749.000
Au tho r
SHEET KEYNOTES
M316 PROVIDE ISOLATION VALVES AND CAPPED ENDS
PER 4" HHWS AND 4" HHWR BRANCH PIPING ON
EACH FLOOR FOR FUTURE CONNECTIONS.
M325 6" HHWS RISER AND 6" HHWR RISER ROUTED FROM
PARKING LEVEL. SEE MECHANICAL SECTIONS AND
PARKING LEVEL MECHANICAL PIPING PLANS FOR
ADDITIONAL INFORMATION.
M406 PROVIDE NEW CONDENSER WATER PIPING.
CONNECT TO EXISITNG CONDENSER WATER PIPING.
M410 REUSE EXISTING DIFFUSER AS INDICATED.
M411 PROVIDE NEW 8" ROUND SUPPLY DUCT AS
INDICATED. CONNECT TO EXISTING SUPPLY DUCT
MAIN.
M413 INSTALL NEW EXHAUST DUCTWORK AND CONNECT
TO EXISTING EXHAUST DUCTWORK AT POINT OF
CONNECTION AS INDICATED.
MD017 DISCONNECT AND REMOVE EXISTING SUPPLY DUCT
AS INDICATED.
MD018 REMOVE EXISTING DIFFUSER AS INDICATED. SAVE
DIFFUSER FOR FUTURE REUSE. SEE NEW WORK
PLAN FOR ADDITIONAL INFORMATION.
MD020 DISCONNECT AND REMOVE EXISTING EXHAUST
DUCT
MD021 DISCONNECT AND REMOVE EXISTING CONDENSER
WATER SUPPLY AND CONDENSER WATER RETURN
PIPING BETWEEN POINTS OF DISCONNECTION AS
INDICATED TO SUPPORT CONSTRUCTION OF NEW
SHAFT.
SCALE: 1/4" = 1'-0"1 05 FOURTH LEVEL DEMO HVAC - ENLARGED VIEW
SCALE: 1/4" = 1'-0"4 05 FOURTH LEVEL NEW CONSTRUCTION PIPING - ENLARGED VIEW
SCALE: 1/4" = 1'-0"2 05 FOURTH LEVEL NEW CONSTRUCTION HVAC - ENLARGED VIEW
SCALE: 1/4" = 1'-0"3 05 FOURTH LEVEL DEMO PIPING - ENLARGED VIEW
C.
D.
E.
F.
G.
SEE DRAWING M0.1 FOR ABBREVIATIONS, SYMBOLS, GENERAL
NOTES.
SYSTEMS WITH AN '(E)' SUBSCRIPT ARE EXISTING TO REMAIN.
MAINTAIN ALL CONDUIT, WIRING, CIRCUIT CONTINUITY. PROTECT
FROM DAMAGE DURING CONSTRUCTION.
WHERE EXISTING BUILDING SERVICES AND/OR EQUIPMENT THAT IS
TO REMAIN IN USE ARE REQUIRED TO BE SHUT DOWN,
COORDINATE WITH THE OWNER 14 DAYS PRIOR TO SHUT DOWN.
INCLUDE ALL ASSOCIATED OVERTIME COSTS TO PERFORM THIS
WORK DURING WEEKENDS AND EVENINGS. INCLUDE ALL COSTS
FOR PROVIDING TEMPORARY POWER WHERE SHUT DOWN MUST
OCCUR FOR PERIODS LONGER THAN THESE HOURS.
FOR ALL WORK ON OR WITHIN EXISTING EQUIPMENT,
CONTRACTOR TO COORDINATE WITH EQUIPMENT MANUFACTURER
TO MAINTAIN WARRANTIES AND UL LISTINGS OF EQUIPMENT AND