Summary of RFP for FEMS-Engine House 15 Facility Modernization
This Request for Proposals (RFP) is issued by the District of Columbia Department of General Services on behalf of the Fire and Emergency Medical Services to solicit architectural and engineering services for the renovation and expansion of Engine House 15 located at 2101 14th Street SE, Washington DC 20020. The project seeks a significant renovation and expansion of the existing District-owned facility with new construction of a second-story addition, and potential expansion onto an adjacent District-owned parcel if program requirements cannot be accommodated within the current site. The scope of work is divided into three design packages: Design Package A includes validation of the Program of Requirements and Schematic Design with Furniture, Fixtures, and Equipment (FF&E) layouts and Net Zero Energy requirements; Design Package B encompasses Design Development Documents, Permit Set of Construction Documents, 100% Construction Documents, Project Specifications, and FF&E schedules; and Design Package C covers Bid Phase services, Construction Administration, and Project Closeout. The Pre-Proposal Conference is scheduled for July 29, 2026, at 10:30 AM via Teams, with a mandatory site visit on July 30, 2026, at 10:30 AM. The deadline for questions is August 3, 2026, at 2:00 PM, and proposals are due August 17, 2026, at 2:00 PM. The Department projects Notice of Award by October 30, 2026, and issuance of Notice to Proceed by November 30, 2026. Design Package A services must be completed within 500 days from Purchase Order issuance, with subsequent design phases following defined milestone schedules.
The solicitation is set-aside exclusively for firms certified as Small Business Enterprises (SBEs) by the District of Columbia Department of Small and Local Business Development. Offerors must propose lump sum fees for each of the three design packages, along with hourly rates for Principal Architect, Project Architect, Project Designer, and various engineering disciplines. The Department includes a $75,000 Owner's Allowance as a reimbursable cost. Economic inclusion requirements mandate that at least 35% of the contract work be awarded to SBE subcontractors, with an additional goal of 50% participation by certified business enterprises and 15% by resident-owned businesses. Certified business enterprises, resident-owned businesses, and other designated entities receive proposal preference points up to a maximum of 12 points on a 100-point evaluation scale. Evaluation criteria emphasize past performance and specialized experience (30 points), professional qualifications and technical competence of key personnel (30 points), capacity to accomplish work within required timeframes (10 points), and acceptability of design approach and management plan (30 points). The selected A/E will remain under contract throughout construction administration and project closeout phases, serving as the Design-Bid-Build delivery method's design consultant. Offerors must comply with Service Contract Act wage determinations, First Source Employment Agreement requirements ensuring at least 51% District residents are hired, Living Wage Act provisions, and various District and federal compliance requirements including the Buy American Act.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GOVERNMENT OF THE DISTRICT OF COLUMBIA
DEPARTMENT OF GENERAL SERVICES
REQUEST FOR PROPOSALS
Solicitation Number: DCAM-26-AE-RFP-0002
Architectural/Engineering Services for the FEMS-Engine House 15 Facility Modernization
This solicitation is being set-aside for Offerors that are certified by the District of Columbia
Department of Small and Local Business Development (“DSLBD”) as certified Small Business
Enterprises (SBEs).
Solicitation Issue Date: July 24, 2026
Pre-Proposal Conference: July 29, 2026, at 10:30 AM (via Teams)
Site Visit July 30, 2026, at 10:30 AM
2101 14th Street S.E.
Washington, D.C. 20020
Due Date for Questions: August 3, 2026, by 2:00 PM
Proposals Due Date: August 17, 2026, at 2:00 PM
Delivery of Proposals: See Section E.1 & E.2
Contact: Concillia Mpofu
Contract Specialist
Department of General Services
3924 Minnesota Avenue, NE, 5TH Floor
Washington, DC 20019 concillia.mpofu@dc.gov mailto:concillia.mpofu@dc.gov
Section A
Executive Summary
The District of Columbia (the “District”) Department of General Services (“DGS” or the
“Department”), on behalf of the Fire and Emergency Medical Services (“FEMS”), is issuing this
Request for Proposals (“RFP”) to solicit the services of an architectural/engineering
(“Architect/Engineer” or “A/E”) firm to provide professional design services for Engine House 15 located at 2101 14th Street SE, Washington DC 20020 (the “Project”).
The Department seeks to deliver a significant renovation and expansion of the existing District-owned facility, with new construction of second-story addition. The preferred approach is to renovate and expand the current structure on the existing site, including a potential vertical expansion (second story). If updated program requirements cannot be fully accommodated within the current parcel (SSL: 5781-0994) and building envelope, the Project may expand onto the adjacent District-owned parcel (SSL-5781-0998) located directly behind Engine House 15 to provide additional capacity to include apparatus bay, living quarters, and parking. (See attached DC
Property Quest information for current and adjacent parcels). This design package will be designated as the “Adjacent Parcel Expansion Study”.
The Project is supported by a complete set of 100% completed, fully stamped, and engineered construction drawings from 2009. These drawings captured the program requirements and design intent at that time, including a proposed second story addition. There is no standalone Program of
Requirements (“POR”); the 2009 drawings will serve as the basis of design and starting point for
POR validation. The selected A/E shall extrapolate and update these requirements to reflect current codes, standards (including the Green Building Act of 2006 and as amended by The Greener
Government Buildings Amendment Act of 2022 and The Clean Energy DC Building Code
Amendment Act of 2022), and operational needs before schematic design.
Design Package A: Program of Requirements (“POR”) and Schematic Design (Title I)
The Architect/Engineer (A/E) shall coordinate with DGS and FEMS to provide the following:
1. Review and validate the 2009 construction drawings as the baseline POR.
2. Update the POR based on current operational requirements, interviews with FEMS end-users, and applicable code updates (building, electrical, energy, and green codes).
3. Confirm whether the program can be accommodated within the existing facility footprint and second-story addition, or if expansion onto the adjacent parcel is required.
4. Validate the schematic design, including Furniture, Fixtures and Equipment (FF&E) layout drawings with schedule, Net Zero Energy & Enhanced Commissioning requirements, and Civil site design.
Lump Sum Fee: The Architect/Engineer (A/E) shall propose a lump sum fee for Design Package A services as further described herein (“Design Package A - Lump Sum Fee”).
Design Package B: Construction Documents for the Main Building and Site Area (Title I)
The Architect/Engineer shall coordinate with DGS and FEMS to provide the following:
1. Design Development Documents.
2. Permit Set of Construction Documents.
3. 100% Construction Documents and Project Specifications.
4. Full FF&E drawings with schedule.
5. Cost estimates at Schematic Design, Design Development, and 100% Construction Documents.
Lump Sum Fee: The A/E shall propose a lump sum fee for Design Package B (items 1–5 above) services, as further described herein (“Design Package B - Lump Sum Fee”).
Design Package C: Bid Phase, Construction Administration, and Project Closeout (Title II)
The A/E shall provide comprehensive support during bidding, construction, and closeout phases of the Project, including:
Bid Phase Services
1. Preparation of final bid documents and responses to bidder questions.
2. Incorporation of DOB review comments into the Construction Documents.
3. Issuance of addenda, clarifications, and updated documents.
4. Assistance during contractor procurement and selection.
Construction Administration Services
1. Participation in pre-construction and regular project meetings.
2. Review and approval of submittals, shop drawings, and product data.
3. Responses to Requests for Information (“RFI(s)”) and coordination of field issues.
4. Periodic site visits, inspections, and Quality Assurance/Quality Control (“QA/QC”) oversight.
Project Closeout
1. Verification of project completion in compliance with Contract Documents.
2. Assistance with occupancy permits, DOB closeout, and final inspections.
3. Preparation of record drawings, Operation & Maintenance (O&M) manuals, and warranties.
4. Final commissioning support to achieve at least LEED Gold certification with Net-Zero energy and enhanced commissioning.
Lump Sum Fee: The A/E shall propose a lump sum fee for Design Package C services as further described herein (“Design Package C - Lump Sum Fee”).
Together, Design Package A - Lump Sum Fee, Design Package B - Lump Sum Fee and Design
Package C - Lump Sum Fee, shall be the Architect/Engineer’s total compensation for services performed for this Project (together, “Lump Sum Design Fee”).
A.1 Project Delivery Method and Services to be Performed
The Department intends to implement the construction of the Project through a Design-Bid-Build delivery method. The Department will engage a general contractor (“General Contractor” or “GC”) based on the completed construction documents. The A/E chosen through this RFP will remain contracted with the Department to provide all necessary Title II Services (Construction
Administration Services), including Preproposal Conferences, Quality Assurance/Quality Control services, and Close-out process for the permitted set of drawings.
The A/E will work directly for the Department by supporting design oversight and implementation throughout the design and construction phases. A/E will be required to actively participate in the development of the construction documents by providing cost estimating, scheduling, identifying long-lead purchasing items, and performing constructability reviews. The Department expects that the construction documents are completed by the A/E and they will submit and secure the permit from the DOB.
The design development process for the A/E shall be consistent with the Department’s budget and schedule for the Project. The scope of work (“Scope of Work” or “SOW”) for the Project will be divided into Design Package A, Design Package B, and Design Package C, as described above.
Initially, as part of Design Package A, the A/E shall validate the POR and Schematic Design, including FF&E Drawings, Net Zero Energy Requirements, Civil site design, for main building, parking lot and site area at the Project site. As part of Design Package B, the A/E will develop Design
Development Documents, complete Construction Documents and Specifications, and a full FF&E
Schedule for Main Building and Site area as. Also, as part of Design Package A and Design Package
B during the Preconstruction Phase, the A/E shall provide Cost Estimates for the Schematic Design including FF&E Drawings, Net Zero Energy Requirements, Civil design for entire site, Design
Development and 100% Construction Documents. Finally, as part of Design Package C, the A/E shall perform Bidding Phase, Construction Administration Phase and Project Closeout services.
The initial Design Package A services will require the A/E to survey the building support system and/or its components and review the Department’s Facility Management Division’s findings to come up with the ultimate recommendations for the final SOW/POR. The review of all recommendations/options will be performed jointly between the A/E and the Department, and the final determination will be used as the basis of the design (“Basis of Design”).
Design Package A will conclude with the A/E taking the agreed upon Basis of Design and validating a Schematic Design, including a Civil design, including main building and parking lot at the Project site. Then, as part of Design Package B, the A/E will advance the design for main Building and
Parking Lot, through Design Development, Permit, and Construction Documents and Specifications of the Project. The A/E shall provide all of the above mentioned services in accordance with Section
B of this RFP and Attachment A1. The A/E shall submit a cost estimate at various stages of the
Project, prior to the development and completion of any reports, construction documents and project specifications, as indicated in Attachment A1.
Upon completion of the Construction Documents, the A/E shall submit a final detailed construction cost estimate to accomplish the work. It will be the responsibility of the A/E to review all existing documentation, interview key personnel, and conduct site visits and assessments as required to prepare the final Construction Documents.
A detailed Scope of Work and technical requirements and submittal guide is attached to this RFP as
Attachment A1 and Attachment A2.
A.2 Coordination to be Performed
The A/E shall meet with all the appropriate regulatory agencies, including, but not limited to the
Historic Preservation Office (“HPO”), DOB, the District Department of Transportation (“DDOT”), the District Department of Energy and Environment (“DOEE”), the National Capital Planning
Commission (“NCPC”), the Commission of Fine Arts (“CFA”), DC Water, Pepco, and Washington
Gas, to ascertain zoning analysis, deed restrictions and requirements, traffic study, and potential environmental considerations. Upon complying with the aforementioned requirements and satisfactorily addressing all comments in the reviews, the Architect/Engineer shall submit the final permitted documents to the Department.
A.2.1 Project Sustainability Requirements
A.2.1.1 Energy Efficient System: The Project shall be designed such that, at a minimum, all new equipment must meet the Environmental Protection Agency (“EPA”) Energy Efficient Goals and
DOEE goals for Energy Star Certification. The A/E will be responsible for applying for and achieving Energy Star Certification and filing with DOEE and/or with any other District and/or
Federal regulatory agencies.
A.2.1.2 Energy Consumption Requirements: The Department requires that the Project become an energy-efficient building, and the Department requires the A/E to achieve as much energy savings as possible.
A.2.1.3 DC Net-zero-energy: The Architect/Engineer shall design this facility following the DC
Net-zero-energy Building Code Requirements. Chapter 14 which includes subchapters 14A and 14B of Title 6 Housing and Building Restrictions and Regulations Green Building. Design Packages shall make note of forthcoming Department requirement for no fossil burning equipment to be allowed starting in Year 2025.
A2.1.4 Green Building, LEED and Enhanced Commissioning: The Architect/Engineer shall design this facility in compliance with the Green Building Act of 2006 (and as amended by The
Greener Government Buildings Amendment Act of 2022 and The Clean Energy DC Building Code
Amendment Act of 2022), Leadership in Energy Efficiency Designation (LEED) Gold Rating with
Net-Zero and Enhanced Commissioning to include commissioning process (Cx) activities for mechanical, electrical, plumbing, and renewable energy systems and assemblies in accordance with
ASHRAE Guideline 0–2013 and ASHRAE Guideline 1.1–2007 for HVAC&R systems, as they relate to energy, water, indoor environmental quality, and durability.
A.3 Form of Contract
Offerors (“Offerors”) responding to this RFP should carefully review the form of the Agreement for
Architectural/Engineering Services (“Form of Contract”) for this Project and DGS Standard
Contract Provisions for Architectural and Engineering Services Contracts (“SCP”), which are attached to this RFP as Attachment F and Attachment G, respectively. To the extent there are any inconsistencies between this RFP, the Form of Contract, and the SCP, the Form of Contract and SCP shall prevail. Offerors are further advised that they are required to submit their proposals premised upon entering into a contract that is substantially similar to the Form of Contract and that any proposed changes to the Form of Contract must be clearly identified and described in the Offeror’s proposal. A Proposal that fails to specifically identify and describe requested changes, if any, shall be deemed non-responsive if such changes are requested after the submission of its Proposal.
A.3.1 Award Schedule
At this time, the Department will issue Notice to Proceed (“NTP”) only for Design Package A:
validate POR and Schematic Design (including FF&E Drawings, Net Zero Energy Requirements and a Civil design). Any future increases to the not-to-exceed (“Not-to-Exceed” or “NTE”) amount to authorize the selected A/E to perform Design Package B and Design Package C services will be authorized via a bilateral modification to the Contract.
A.4 Design Fees
As more fully described in the Form of Contract (Attachment F), the selected A/E will be paid a fixed price for all design phase services through construction administration services. Offerors will be required to propose a Lump Sum Design Fee that covers all of the Offeror’s costs associated with the preparation or provision of:
• Design Package A - Lump Sum Fee: (i) validating the POR; and (ii) validating Schematic
Design and Adjacent Parcel Expansion Study, including a FF&E Drawings, Net Zero Energy
Requirements and Civil Design, for main buildings, parking lot and site area at the Project site.
• Design Package B - Lump Sum Fee: provide full design services for Main Building, Parking
Lot and Site area, including: (i) Design Development Documents; (ii) a Permit Set of
Construction Documents; (iii) 100% Construction Documents and Project Specifications;
(iv) full FF&E Schedule; (v) Cost Estimates;
• Design Package C - Lump Sum Fee: provide full design and support services for: (i) Bid
Phase; (ii) Construction Administration; and (iii) Project Closeout for the Project.
Offerors will also be required to submit a schedule of hourly rates for any additional work that is required:
(See Attachment C - Bid Form)
• Principal Architect hourly rate
• Project Architect hourly rate
• Project Designer hourly rate
• Mechanical Engineer hourly rate
• Electrical Engineer hourly rate
• Structural Engineer hourly rate
• Civil Engineer hourly rate
In addition to the above pricing request, the A/E shall also include the following allowance: Owner’s
Allowance of $75,000.00. The payment of this allowance will be treated as reimbursable cost, and payment will be made based on paid vouchers to DOB.
Offerors shall submit, on the Offeror’s letterhead and an Offer Letter in the form of Attachment C that includes the proposed Lump Sum Design Fee, allowance, and hourly rates.
A.5 Selection Criteria
Proposals will be evaluated in accordance with the evaluation criteria as further described in Section
D of this RFP.
A.6 Estimated Project Schedule
The preliminary Project milestone schedule is as follows:
Design Package A
• Submit 15% Validate POR and provide Adjacent Parcel Expansion Study - 30 calendar days from Notice-to-Proceed (“NTP”)
• Submit 35% Validate Schematic Design - 60 calendar days after POR
Design Package B
• Submit 70% Design Development - 60 calendar days after Schematic Design
• Submit 90% Permit Set Documents - 60 calendar days after Design Development
• Submit 100% Construction Documents - 60 calendar days after 90% Permit Set Documents
Design Package C
• Bid Phase - 60 calendar days from DGS Bid issuance
• Construction Administration - 500 calendar days after Purchase Order (PO) issuance to GC
• Project Closeout - 45 calendar days after Construction Administration
A.7 Procurement Schedule
The procurement schedule for this RFP is as follows:
• Issue RFP -July 24, 2026
• Pre-Proposal Conference -July 29, 2026, at 10:30 AM.
• Site Visit -July 30, 2026, at 10:30 AM.
• Last Day for Questions/Clarifications - August 3, 2026, at 2:00 PM.
• Proposals Due Date - August 17, 2026, at 4:00 p.m.
• Notice of Award - October 30, 2026 (projected)
• Issuance of NTP or Form of Contract - November 30, 2026 (projected)
This proposed schedule is subject to revision. The Department anticipates conducting the procurement of the Project in accordance with the Procurement Schedule. However, the Procurement
Schedule is subject to revision, and the Department reserves the right to modify this schedule as it finds necessary, in its sole discretion.
A.8 Attachments
The RFP contains the following Attachments:
Attachment A1 Scope of Work
Attachment A2 Technical Requirements & Submittal Guide
Attachment B Service Contract Act
Attachment C Form of Offer Letter & Bid Form
Attachment D Bidder/Offeror’s Certification Form
Attachment E Tax Affidavit
Attachment F Form of Contract (To be issued via an addendum)
Attachment G Standard Contract Provisions for Architectural and Engineering Services
Attachment H Equal Employment Opportunity Policy Statement
Attachment I First Source Employment Agreement and Employment Plan
Attachment J Living Wage Act
Attachment K Past Performance Evaluation Form
Attachment L Reserved
Attachment M SBE Subcontracting Plan
Attachment N Conflict of Interest Disclosure Statement
Attachment O Campaign Finance Reform Self-Certification Form
SECTION B
SCOPE OF WORK
The Architect/Engineer (A/E) shall provide services for Design Package A, Design Package B and
Design Package C of the Project, with different levels of effort, as described in the sections below.
The A/E shall submit Cost Estimates during Design Packages A and B, as well as during the development and completion of the construction documents. Upon completion of each phase, the
A/E shall submit a final detailed construction cost estimate to accomplish the work. The A/E will be responsible for reviewing all existing documentation, interviewing key personnel, and conducting site visits and assessments as required to prepare the final documents.
B.1 Scope of Work.
The A/E shall provide design services in three packages:
Design Package A: (i) validating the POR and providing Adjacent Parcel Expansion
Study; and (ii) validating the Schematic Design, including FF&E Drawings, Net Zero Energy and
Enhanced Commissioning Requirements and a Civil design, for main building, parking lot and site area at the Project site.
Design Package B: For Main Building, Parking Lot and Site area: (i) Design Development
Documents; (ii) a Permit Set of Construction Documents; (iii) 100% Construction Documents and
Project Specifications; (iv) full FF&E Schedule; (v) Cost Estimates.
Design Package C: For Main Building, Parking Lot and Site area: (i) Bid Phase; (ii)
Construction Administration; and (iii) Project Closeout.
The detailed Scope of Work is attached as Attachment A1 and Attachment A2.
B.2 Project Close-Out
B.4.1 Provide support services as needed during the Project close-out process.
B.4.2 Obtain and review all Project close-out documents as submitted by the General
Contractors for completeness before transmitting them to the DGS. Close-out documents shall include, but are not limited to:
a. General Contractor’s red lines and as-built notes.
b. Warranty information.
c. Operating and Maintenance Manuals.
d. As-Built record drawings (in digital format, both CAD and PDF).
B.3 General Requirements
The work under this contract shall be performed and documented in a professional manner.
B.3.1. The A/E shall coordinate all work through the Program Manager including but not limited to all site surveys and other field investigations germane to the work.
B.3.2. The A/E shall check all drawings and specifications for accuracy and detailed coordination. At the 100% submission, the A/E shall meet with all the appropriate regulatory agencies to discuss and review the drawings with them for compliance, if required. Upon complying with the aforementioned requirements, the A/E shall submit the final documents for peer review by DGS.
B.3.3. A/E shall apply for and obtain a building permit from DOB prior to releasing the final documents for bids. All costs associated with the work of obtaining the permit shall be included in this proposal. The actual cost of the permit is not to be included in the proposal. The Department may require the A/E to pay the actual cost of the permit, and the Department will reimburse the same upon submitting the paid invoice.
B.3.4. A/E shall validate and submit to DGS the General Contractor’s final as-built drawings both in hard copies and soft copies. The soft copies shall be in pdf and
AutoCAD format. The Department shall reserve the right to re-use the AutoCAD format drawing submitted. Two (2) CD copies each of pdf and AutoCAD submittals shall be submitted to DGS. Two (2) hard copies shall also be submitted.
B.3.5. The A/E may be held financially responsible for all errors and omissions resulting in a deficient design or changes, including funds spent by the Department to correct the documents or redesign and complete construction exercise.
B.3.6. The Department will provide the A/E access to the DGS ProjectTeam system.
The A/E shall be responsible for using ProjectTeam to execute selected contract document requirements in coordination with DGS’ Program Manager to include communication with the General Contractor during the construction phase.
B.4 Meeting Minutes
The A/E shall be responsible for acting as recorder for all meetings with the Government Agencies that the A/E attends. The minutes shall clearly indicate the meeting number and date, numbering of each issue discussed, including description of the issue, who is responsible to address, by what date, and date completed. Minutes shall also record all open items, and will note the schedule of the contract, how far through the contract we are (including how far over schedule, if applicable), the financial status of the contract, and payments and a list of open Change Orders and Requests for Information. Memorandum for the Record of such meetings shall be typewritten and submitted to the Program Manager within five (5) calendar days from the date of the meeting, for review and approval and for such distribution as may be required. A/E compensation for performing these services shall be included as part of the Title I and Title II Services, as applicable.
B.5 Key Personnel (For both Title I and Title II)
In its proposal, each Offeror will be required to identify its key personnel. Key personnel shall include, at a minimum, the following individuals: (i) the Principal Architect; (ii) Project Architect;
(iii) Project Designer; (iv) Mechanical Engineer; (v) Electrical Engineer (vi); Structural Engineer;
(vii) Civil Engineer. The A/E will not be permitted to reassign any of the key personnel unless the Department approves the proposed reassignment and the proposed replacement. The key personnel specified in the contract are considered to be essential to the work being performed.
Prior to diverting any of the specified key personnel for any reason, the A/E shall notify the
Contracting Officer (“CO”) at least thirty (30) calendar days in advance and shall submit justification, including proposed substitutions, in sufficient detail to permit evaluation of the impact upon the contract. The A/E shall obtain written approval of the CO for any proposed substitution for key personnel.
B.6 Licensing, Accreditation, and Registration
The A/E and all of its subcontractors and sub-consultants (regardless of tier) shall comply with all applicable District of Columbia, state, and federal licensing, accreditation, and registration requirements and standards necessary for the performance of the contract. Without limiting the generality of the foregoing, all drawings shall be signed and sealed by a professional architect or engineer licensed in the District of Columbia.
B.7 Conformance with Laws
It shall be the responsibility of the A/E to perform under the Contract in conformance with the
Department’s Procurement Regulations and all applicable District and federal statutes, laws, codes, ordinances, regulations, rules, requirements, orders, and policies of governmental bodies.
B.7.1 Service Contract Act
The A/E agrees that the work performed under the proposed Contract shall be subject to the Service Contract Act Wage Determination in effect on the date the contract is executed and such wages are incorporated as Attachment B. Service Contract Wage Schedules are available at www.wdol.gov.
B.7.2 First Source Employment Agreement and Employment Plan
All beneficiaries of contractual agreements totaling $300,000.00 or more shall enter into a
First Source Employment Agreement Attachment I with the Department of Employment
Services (“DOES”).
The A/E shall ensure that at least fifty-one percent (51%) of each firm and every subconsultant’s and subcontractor’s employees are hired after the effective date of the
Contract, or after such subconsultant or subcontractor enters into a contract with the A/E, to work on the Project shall be residents of the District of Columbia. This percentage shall be applied in the aggregate and not trade by trade. In addition, the A/E shall use commercially reasonable best efforts to comply with the workforce percentage goals established by the recently adopted amendments to the First Source Employment
Agreement Act of 1984 (D.C. Code §§ 2-219.01 et seq.) and any implementing regulations.
http://www.wdol.gov/
B.7.3 Living Wage Act
In addition to the requirements set forth in the First Source Employment Agreement, the
A/E shall comply with all applicable provisions of the Living Wage Act of 2006, Attachment J, as amended (codified at D.C. Official Code §§ 2-220.01 et seq.) and its implementing regulations.
B.7.4 Equal Employment Opportunity (“EEO”)
The A/E shall comply with applicable laws, regulations and special requirements of the
Contract Documents regarding equal employment opportunity and affirmative action programs. In accordance with the District of Columbia Administrative Issuance System, Mayor’s Order 85-85 dated June 10, 1985, the forms for completion of the Equal
Employment Opportunity Information Report are incorporated herein as Attachment H.
A contract award cannot be made to any contractor that has not satisfied the equal employment requirements.
B.7.5 Campaign Finance Reform Act
The A/E agrees to comply with the Campaign Finance Reform Act certification requirement pursuant to D.C. Official Code § 1-1161.01 and will satisfy all self-certification requirements prior to the execution of any contract, as applicable (Attachment
O).
B.7.6. Buy American Act
The A/E shall comply with the provisions of the Buy American Act (41 U.S.C. §§ 8301–
8305), including, but not limited to, the purchase of steel. To the extent that the language in this section contradicts the language under Article 24 of The Department Standard
Contract Provisions for Construction Contracts (Attachment Q) regarding compliance with the Buy American Act, the language in this section should supersede.
In accordance with the Buy American Act (41 U.S.C. §§ 8301–8305), and Executive Order
10582, December 17, 1954 (3 CFR, 1954-58 Comp., p. 230), as amended by Executive
Order 11051, September 27, 1962 (3 CFR, 1059—63 Comp., p. 635), the A/E agrees that only domestic construction material will be used by the A/E, subcontractors, material men and suppliers in the performance of the Agreement, except for non-domestic material listed in the Agreement.
“Components” as used in this Section, means those articles, materials and supplies incorporated directly into the end products.
“Domestic end product”, as used in this section, means, (1) an unmanufactured end product mined or produced in the United States, or (2) an end product manufactured in the United States, if the cost of its components mined, produced, or manufactured in the
United States, exceeds 65 percent of the cost of all its components. For an end product that consists wholly or predominantly of iron or steel or a combination of both, the cost of foreign iron and steel must constitute less than 5 percent of the cost of all the components used in the end product.
Components of foreign origin of the same class or kind as the products shall be treated as domestic. Scrap generated, collected, and prepared for processing in the United
States is considered domestic.
“End Products”, as used in this Section, means those articles, materials, and supplies to be acquired for public use under this Contract.
The A/E shall deliver only domestic end products, except those:
1. For use outside the United States;
2. That the District determines are not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality;
3. For which the District determines that domestic preference would be inconsistent with the public interest; or
4. For which the District determines the cost to be unreasonable.
Domestic Construction Material. “Construction material” means any article, material, or supply brought to the construction site for incorporation in the building or work. An unmanufactured construction material is a “domestic construction material” if it has been mined or produced in the United States. A manufactured construction material is a “domestic construction material” if it has been manufactured in the United States and if the cost of its components which have been mined, produced, or manufactured in the
United States exceeds 65 percent of the cost of all its components. “Component” means any article, material, or supply directly incorporated in construction material. If the construction material consists wholly or predominantly of iron or steel, the iron or steel was produced in the United States; or, for construction material that consists wholly or predominantly of iron or steel or a combination of both, a construction material manufactured in the United States if the cost of foreign iron and steel constitutes less than
5 percent of the cost of all the components used in such construction material.
Domestic Component. A component shall be considered to have been “mined, produced, or manufactured in the United States” regardless of its source, in fact, if the article, material, or supply in which it is incorporated was manufactured in the United
States and the component is of a class or kind determined by the Government to be not mined, produced or manufactured in the United States in sufficient and reasonably available commercial quantities and of satisfactory quality.
Foreign Construction Material. “Foreign construction material” means a construction material other than a domestic construction material.
B.8 Standard Contract Provisions
The Department of General Services Standard Contract Provisions for Architectural and
Engineering Services Contracts Attachment G are applicable to this procurement.
B.9 Time is of the Essence and Substantial Completion Date
Time is of the essence with respect to the proposed Contract. Title I services shall be completed by 500 days from Purchase Order (PO) issuance to GC, or the date of execution of this Contract.
The Title II services shall continue until the construction project achieves substantial completion by the GC.
SECTION C
ECONOMIC INCLUSION
C.1. Preference for Small, Local, and Disadvantaged Business Enterprises
Under the provisions of the “Small and Certified Business Enterprise Development and Assistance
Act of 2005”, D.C. Code § 2-218.01 et seq., as amended (“Act”, as used in this section), the District shall apply preferences in evaluating proposals from businesses that are certified by the
Department of Small and Local Business Development (“DSLBD”) pursuant to Part D of the Act.
a) Any prime contractor that is a small business enterprise (“SBE”) certified by the
DSLBD will receive the addition of three (3) points on a 100-point scale added to the overall score.
b) Any prime contractor that is a resident-owned business (“ROB”) certified by
DSLBD will receive the addition of five (5) points on a 100-point scale added to the overall score.
c) Any prime contractor that is a longtime resident business (“LRB”) certified by
DSLBD will receive the addition of five (5) points on a 100-point scale added to the overall score.
d) Any prime contractor that is a local business enterprise (“LBE”) certified by
DSLBD will receive the addition of two (2) points on a 100-point scale added to the overall score.
e) Any prime contractor that is a local business enterprise with its principal offices located in an enterprise zone (“DZE”) certified by DSLBD will receive the addition of two (2) points on a 100-point scale added to the overall score.
f) Any prime contractor that is a disadvantaged business enterprise (“DBE”) certified by
DSLBD will receive the addition of two (2) points on a 100-point scale added to the overall score.
g) Any prime contractor that is a veteran-owned business (“VOB”) certified by
DSLBD will receive the addition of two (2) points on a 100-point scale added to the overall score.
h) Any prime contractor that is a local manufacturing business enterprise (“LMBE”) certified by DSLBD will receive the addition of two (2) points on a 100-point scale added to the overall score.
i) Any prime contractor that is an equity impact enterprise certified by DSLBD will receive the addition of five (5) points on the 100-point scale added to the overall score.
A certified business enterprise ("CBE") shall be entitled to any or all of the preferences provided in this Section, but in no case shall a CBE be entitled to a preference of more than 12 points.
C.2. LSDBE Participation
The Department requires that significant participation by business enterprises certified by DSLBD as: (i) a local business enterprise; (ii) a small business enterprise; (iii) a disadvantaged business enterprise; (iv) having an owned resident business; (v) being a longtime business resident; or (vi) having a local business enterprise with its principal office located in an enterprise zone.
Accordingly, and in addition to the preference points conferred by Section C.1, the Department requires that business enterprises so certified must participate in at least 50% of the project. At least 35% of the contract work must be awarded to entities that are certified as Small Business
Enterprises by DSLBD. Offerors shall submit a SBE Subcontracting Plan Attachment M with their proposals. The SBE Subcontracting Plan must demonstrate how this requirement will be met and, to the extent possible at this stage in the project, should identify the specific firms that will be used and their respective roles.
C.2.1. Mandatory Subcontracting Plan and Requirements.
C.2.1.1 Unless the Director of DSLBD has approved a waiver in writing, in accordance with D.C. Official Code § 2-218.51, for all contracts in excess of
$250,000, at least 35% of the dollar volume of the contract shall be subcontracted to qualified small business enterprises (SBEs).
C.2.1.2 If there are insufficient SBEs to completely fulfill the requirement of paragraph C.2.1.1, then the subcontracting may be satisfied by subcontracting 35% of the dollar volume to any qualified certified business enterprises (CBEs);
provided, however, that all reasonable efforts shall be made to ensure that SBEs are significant participants in the overall subcontracting work.
C.2.1.3 A prime contractor that is certified by DSLBD as a small, local or disadvantaged business enterprise shall not be required to comply with the provisions of sections C.2.1.1 and C.2.1.2.
C.2.1.4 Except as provided in C.2.1.5 and C.2.1.6, a prime contractor that is a CBE and has been granted a proposal preference pursuant to D.C. Official Code § 2-
218.43, or is selected through a set-aside program, shall perform at least 35% of the contracting effort with its own organization and resources and, if it subcontracts, 35% of the subcontracting effort shall be with CBEs. A CBE prime contractor that performs less than 35% of the contracting effort shall be subject to enforcement actions under D.C. Official Code § 2-218.63.
C.2.1.5 A prime contractor that is a certified joint venture and has been granted a proposal preference pursuant to D.C. Official Code § 2-218.43, or is selected through a set-aside program, shall perform at least 50% of the contracting effort with its own organization and resources and, if it subcontracts, 35% of the subcontracting effort shall be with CBEs. A certified joint venture prime contractor that performs less than 50% of the contracting effort shall be subject to enforcement actions under D.C. Official Code§ 2-218.63.
C.2.1.6 Each CBE utilized to meet these subcontracting requirements shall perform at least 35% of its contracting effort with its own organization and resources.
C.2.1.7 A prime contractor that is a CBE and has been granted a proposal preference pursuant to D.C. Official Code § 2-218.43, or is selected through a set-aside program, shall perform at least 50% of the on-site work with its own organization and resources if the contract is $1 million or less.
C.2.2 Subcontracting Plan
An Offeror responding to this RFP which is obligated to subcontract shall be required to submit with its Proposal, any subcontracting plan required by law. Offeror’s responding to this RFP shall be deemed nonresponsive and shall be rejected if the Offeror fails to submit a subcontracting plan that is required by law. If the Agreement is in excess of $250,000.00, at least 35% of the dollar volume of the Agreement shall be subcontracted with a CBE, 35% with small business enterprises
(“SBE”) and 15% with resident owned business enterprises (“ROB”).
Though the above requirements exceed the statutory requirements set forth in the Small and
Certified Business Enterprise Development and Assistance Amendment Act of 2014, the
Department desires the selected A/E to provide the maximum level of participation for SBEs, CBEs, and ROBs, and views these goals as a minimum with potential to far exceed.
The subcontracting plan shall be submitted as part of the proposal and may only be amended after award with the prior written approval of the CO and Director of DSLBD. Any reduction in the dollar volume of the subcontracted portion resulting from an amendment of the plan after award shall inure to the benefit of the District.
Each subcontracting plan shall include the following:
(1) The name and address of each subcontractor;
(2) A current certification number of the small or certified business enterprise;
(3) The scope of work to be performed by each subcontractor; and
(4) The price that the prime contractor will pay each subcontractor.
C.2.3 Copies of Subcontracts
Within twenty-one (21) days of the date of award, the prime contractor shall provide fully executed copies of all subcontracts identified in the subcontracting plan to the Contracting Officer
(“CO”), the District of Columbia Auditor and the Director of DSLBD.
C.2.4 Subcontracting Plan Compliance Reporting
If the prime contractor has a subcontracting plan required by law for the proposed contract, the prime contractor shall submit a quarterly report to the CO, CA, District of Columbia Auditor and the Director of DSLBD. The quarterly report shall include the following information for each subcontract identified in the subcontracting plan:
a) The price that the prime contractor will pay each subcontractor under the subcontract;
b) A description of the goods procured or the services subcontracted for;
c) The amount paid by the prime contractor under the subcontract; and
d) A copy of the fully executed subcontract, if it was not provided with an earlier quarterly report.
If the fully executed subcontract is not provided with the quarterly report, the prime contractor will not receive credit toward its subcontracting requirements for that subcontract.
C.2.5 Annual Meetings
Upon at least 30-days written notice provided by DSLBD, the prime contractor shall meet annually with the CO, District of Columbia Auditor and the Director of DSLBD to provide an update on its subcontracting plan.
C.2.6 DSLBD Notices
The prime contractor shall provide written notice to the DSLBD and the District of Columbia
Auditor upon commencement of the contract and when the contract is completed.
C.2.7 Enforcement and Penalties for Breach of Subcontracting Plan
C.2.7.1 A prime contractor shall be deemed to have breached a subcontracting plan required by law, if the prime contractor (i) fails to submit subcontracting plan monitoring or compliance reports or other required subcontracting information in a reasonably timely manner; (ii) submits a monitoring or compliance report or other required subcontracting information containing a materially false statement; or (iii) fails to meet its subcontracting requirements.
C.2.7.2 A prime contractor that is found to have breached its subcontracting plan for utilization of CBEs in the performance of a contract shall be subject to the imposition of penalties, including monetary fines in accordance with D.C. Official
Code § 2-218.63.
C.2.7.3 If the CO determines the prime contractor’s failure to be a material breach of the contract, the CO shall have cause to terminate the contract under the default provisions in clause 8 of the SCP, Default.
C.2.7.4 Neither the A/E nor a subcontractor may remove a subcontractor or tier-subcontractor if such subcontractor or tier-subcontractor is certified as an LSDBE company unless the Department approves such removal, in writing. The
Department may condition its approval upon the prime contractor to develop a plan that is, in the Department’s sole and absolute judgment, adequate to maintain the level of LSDBE participation on the Project.
C.2.8. Residency Hiring Requirements for Contractors and Subcontractors
At least fifty-one percent (51%) of the Offeror’s team and every subconsultant’s employees hired after the selected A/E enters into a contract with the Department, or after such subconsultant enters into a contract with the A/E, to work on this Project, shall be residents of the District of
Columbia. This percentage shall be applied in the aggregate and not trade by trade. In addition, the selected A/E firm shall use commercially reasonable best efforts to comply with the workforce percentage goals established by the recently adopted amendments to the First Source
Employment Agreement Act of 1984 (D.C. Code §§ 2-219.01 et seq.) and any implementing regulations, including, but not limited to the following requirements:
(i) At least 20% of journey worker hours by trade shall be performed by District residents;
(ii) At least 60% of apprentice hours by trade shall be performed by District residents;
(iii) At least 51% of the skilled laborer hours by trade shall be performed by District residents; and
(iv) At least 70% of common laborer hours shall be performed by District resident
(v) Thirty-five percent (35%) of all apprentice hours worked on the Project shall be worked by District residents.
C.2.9. Economic Inclusion Reporting Requirements
Upon execution of the Contract, the A/E and all of its member firms, if any, and each of its subcontractors and subconsultants shall submit to the Department a list of current employees that will be assigned to the Project, the date that they were hired and whether or not they live in the
District of Columbia.
The A/E shall comply with subchapter X of Chapter II of Title 2 of the D.C. Code, and all successor acts thereto, including by not limited to the Workforce Intermediary Establishment and Reform of
First Source Amendment Act of 2011, and the rules and regulations promulgated thereunder, and all successor acts thereto and the rules and regulations promulgated thereunder.
The Offeror and all member firms, subcontractors, tier subcontractors, subconsultants, and suppliers with contracts in the amount of $100,000.00 or more shall comply with DOES upon execution of the contract; (ii) submit an executed First Source Agreement to DOES prior to beginning work on the Project; (iii) make best efforts to hire at least 51% District residents for all new jobs created by the project; (iv) list all employment vacancies with DOES; and (v) submit monthly compliance reports to DOES by the 10th of each month.
C.2.10 Apprenticeship Act
The D.C. Apprenticeship Act of D.C. Law 2-156, (as amended, the Act) may apply to this Project.
As applicable, the A/E and its subcontractors selected to perform work on the Project on a craft-by-craft basis may be required to comply with the Act. If applicable, all terms and conditions of the D.C. Apprenticeship Council Rules and Regulations shall be implemented, and the selected
A/E shall be liable for any subcontractor non-compliance. Thirty-five percent (35%) of all apprentice hours shall be worked by District residents.
SECTION D
EVALUATION AND AWARD CRITERIA
D.1 Award
The Department intends to award a contract to the highest rated qualified A/E firm if such contract is satisfactorily negotiated and at a price the CO determines to be fair and reasonable to the District.
D.2 Evaluation Process
The Department will evaluate Offerors’ proposals, qualified A/E firms on file with the Department and any best and final offers (“BAFO(s)”) requested and received in accordance with the provisions of D.C. Official Code § 2-356.04 of the Procurement Practices Reform Act of 2010, as amended, and Sections 2620 – 2633 of the District of Columbia Municipal Regulations
(“DCMR”).
D.2.1 Evaluation Board
D.2.1.1 Selection and Appointment
The Department’s CO shall appoint one (1) or more permanent or ad hoc architect-engineer evaluation board (“Evaluation Board”) composed of members who, collectively, have experience in architecture, engineering, construction, and District and related procurement matters. Members of the Evaluation Board shall include highly qualified professional employees of the District and may include private practitioners of architecture, engineering, or related professions and shall evaluate all Proposals received from A/E(s) firm interested in the proposed contract under this
RFP. The Department’s CO shall designate at least one (1) District employee member of each board as the chairperson. No A/E firm shall be eligible for award of an architect-engineer contract during the period in which any of its principals or associates are participating as members of an
Evaluation Board.
D.2.1.2 Evaluation Board Responsibilities
The Evaluation Board shall:
a. Review the Department’s current data files on eligible A/E firms and Offerors’ proposals received in response to this RFP.
b. Evaluate current statements of A/E firms’ qualifications and performance data on file with the Department and Offerors’ proposals, in accordance with the prescribed criteria in Section D.3.
c. Hold discussions with at least three (3) of the most highly rated qualified A/E firms about concepts and the relative utility of alternative methods of furnishing the required services; the A/E fees will not be discussed.
d. Prepare a selection report for the CO recommending, in order of preference, at least three (3) A/E firms that are evaluated to be the most highly qualified to perform the required services, based on the selection criteria in Section D.3. The selection report shall include a description of the discussions and evaluation conducted by the board to allow the CO to: review the considerations upon which the recommendations are based; and, make a final, independent determination regarding the order of preference of at least three (3) of the most highly qualified A/E firms based on the selection criteria in Section D.3.
Section D.3 Evaluation and Selection Criteria:
Each Offeror’s proposal will be scored on a scale of 1 to 100 points. In addition, Offerors may receive up to 12 preference points as described in Section C.1 and Section D.3.6 of this RFP and their entitlement to preference points as designated by DSLBD. Thus, the maximum total number of points is 112.
The A/E firms will be evaluated in accordance with the following selection criteria:
• Past performance, previous experience and specialized experience in the type of work required under this RFP with government entities or private industry in terms of cost control, quality of work, and compliance with performance schedules – A/E and sub-consultants (30 points)
• Professional qualifications, specialized experience and technical competence in the type of work required under this RFP–Key Personnel (30 points)
• Capacity to accomplish the work in the required time of the RFP – A/E, sub-consultants and Key Personnel (10 points)
• Acceptability of Design Approach and Management Plan (30 Points)
• Preference Points (up to 12 Points)
D.3.1 Past performance, previous experience and specialized experience in the type of work required under this RFP with government entities or private industry in terms of cost control, quality of work, and compliance with performance schedules – A/E and sub-consultants (30 points)
Offerors will be evaluated based on their past performance, previous experience and specialized experience in the type of work required under this RFP with government entities or private industry in terms of cost control, quality of work, and compliance with performance schedules – A/E and sub-consultants.