DARB Stormwater PhII_Stamped Drawings_Certified Final P3.pdf

PDF 30 MB Posted

Attached to
Repair & Maintain Airfield Stormwater System Phase II
Solicitation number
FGWB21000AB_2
Issued by

About this file

This file contains stamped architectural and engineering drawings for the Repair & Maintain Airfield Stormwater System Phase II project at Dobbins Air Reserve Base. The drawings represent the certified final design documents for the stormwater drainage infrastructure improvements scheduled east of Taxiway 'J'.

The drawings depict the comprehensive stormwater system modifications including regrading and sodding of failed or disturbed slope areas to restore positive drainage and stabilization, cleaning and rehabilitation of existing flumes, pipes, and swales in basins III, IV, and V, and installation of new concrete flumes at multiple airfield locations to prevent erosion and standing water. The stamped and certified nature of these final drawings indicates they have been approved by a licensed professional engineer and are ready for construction implementation. These technical documents serve as the baseline specifications and spatial requirements for contractors responding to the Phase II solicitation and will guide all earthwork, drainage infrastructure installation, and site restoration activities required to achieve proper surface and subsurface drainage across the designated airfield areas.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

100810101011

10301035

10301030

1025 1020

985995

1010 1005

WETLAND

111b

OPEN

WATER

OPEN

WATER

S-100

1.6 Ac

S-110

3.3 Ac

S-180

0.93 Ac

S-50

0.08 Ac

S-51

0.17 Ac

TPF

TPF

4T H

ST

RE

ET

10301035

10301030

1025 1020

985995

1010 1005

25' STATE BU

FFER

50' C O

U N

TY BU

FFER

75' IM

PERVIO

US BUFFER

25' STATE BUFFER

50' COUNTY BUFFER

75' IMPERVIOUS BUFFER

25' STATE BUFFER

50' COUNTY BUFFER

75' IM

PERVIOUS BUFFER

EX. WETLANDS

EX. WETLANDS

LOD

LOD

LOD LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LO

D

LOD

LOD LOD

LODLOD

LODLO

D

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LO

D

LO

D

LO

D

LO

D LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LO

D LOD

LO

D

LOD

LOD

LOD

LOD

LOD

LOD

LO

D

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LO

D

LO

D

LO

D

LOD

LO

D

LO

D

LO

D

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

TANYA NORMAN, P.E.

P.E. No. 0038055, GA

DATE: 01/09/2026 ______________

1 2 3 4 5

A

B

C

D

SHEET ID

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

LO

U

IS

VI

LL

E

D

IS

TR

IC

T

LO

U

IS

VI

LL

E, K

EN

TU

C

KY

-0

P A

R K

W A

Y L

A N

E S

U

IT

E

P

E A

C H

TR

E

E C

O R

N E

R S

, G A

P

H O

N E

(6

) 3

-7

P

O N

D J

O B

N o.

SI

ZE

FI

LE

N

AM

E:

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SO

LI

C

IT

AT

IO

N N

O

C O

N

TR

AC

T

N O

FI

LE

N U

M

BE

R

US Army Corps of Engineers®

Louisville District

FI

LE

P

AT

H : X

:\F Y2

3\

8\

.C

AD

B

IM

\0 4.

.C

AD

PH

S H

EE

TS

\C E3

P

LO

TT

ED

: 0 1/

/2

B Y:

N O

R M

AN

, T

AN

YA

IS

SU

E D

AT

E:

JA

N

U

AR

Y 9, AN

SI

D

A.

D

U

EH

R

D .M

. L

EC

KI

E

T.

N

O R

M

AN

D

AT

E D

ES

C

R

IP

TI

O

N M

AR

K

R

EP

AI

R

M

AI

N

TA

IN

A

IR

FI

EL

D S

TO

R

M W

AT

ER

S

YS

TE

M

PH

AS

E

II

D O

BB

IN

S

AI

R R

ES

ER

VE

B

AS

E, G

EO

R G

IA

PR

O

JE

C T

N O

FG

W B

-0

FG

W B

-0

P2

CERTIFIED FINAL

J.

P.

AR

IS

TI

ZA

BA

L

MATCHLINE-SEE SHEET CE307

M

AT

C H

LI

N

E-

SE

E

SH

EE

T

C

ER

O

SI

O

N A

N D

S

ED

IM

EN

T C

O N

TR

O

L

FI

N

AL

P

LA

N

CE301

C E3

.d w g

START

SILT FENCE

Ds4

Ds4

Ds4

Ds4

Ds4

Sd1-S

Sd2-B

Sd1-S Sd2-B

Ch-2

Sd2-F

START

SILT FENCE

START

SILT FENCE

END

SILT FENCE

Sd1-SCo

Sd2-F

Sd2-F

CONCRETE WASHDOWN

SEE DETAIL B1/CE501

KEY MAP

CLIN I

C

LI

N I

CE329

CE330

CE331

CE301 CE302 CE303 CE304

CE307

CE308 CE309 CE310 CE311

CE313 CE314 CE315 CE316 CE317

CE320 CE321 CE322

CE325 CE326

CE306 CE312

CE318

CE223

CLIN IV

C

LI

N

II

CLIN III

PLAN

NORTH

A1 EROSION AND SEDIMENT CONTROL FINAL PLAN

GENERAL SHEET NOTES

1. REFER TO SHEETS CE001-CE006 FOR EROSION AND

SEDIMENT CONTROL NOTES.

2. REFER TO SHEETS C-001 AND C-002 FOR PROJECT

ABBREVIATIONS AND GENERAL, AIRFIELD, AND STORM

SEWER NOTES.

3. EXISTING INFORMATION AND TOPOGRAPHY PROVIDED

BY GIS DATA AND GEOSURVEY, LTD., DATED 07/19/2018,

REVISED: 11/03/2023. FIELD VERIFICATION IS REQUIRED

TO ENSURE POSITIVE DRAINAGE AND ELIMINATION OF

ALL STANDING WATER.

4. REFER TO SHEET CE007 FOR SHEET KEY MAP.

5. CONTRACTOR IS RESPONSIBLE FOR RETURNING ALL

DISTURBED AREA TO PRE-CONSTRUCTION CONDITION.

6. THE CONTRACTOR AND THEIR SUBCONTRACTORS SHALL

PERFORM A FOD CHECK WHEN ENTERING AND EXITING

THE AIRFIELD.

7. THE CONTRACTOR SHALL ONLY REMOVE, REGRADE,

AND REPLACE SOD ON SHOULDER THAT CAN BE

REESTABLISHED AT THE END OF THE WORK DAY.

8. ANY DISTURBED AREA LEFT EXPOSED FOR A PERIOD

GREATER THAN 14 DAYS SHALL BE STABILIZED WITH

MULCH OR TEMPORARY SEEDING.

9. NO MORE THAN 5 ACRES OF LAND CAN BE DISTURBED

AT A TIME. CONSTRUCTION MUST BE PHASED TO LIMIT

LAND DISTURBANCES TO 5 ACRES OR LESS.

M

AT

C H

LI

N

E-

SE

E

SH

EE

T

C

S-130

3.0 Ac

S-330

0.66 Ac

TPF

TPF

TPF

TPF

TPF

TPF

TPF

TPF

TPF

TPF

TPF

TPF

TPF

TPF

TPF

TPF

TPF

TPF

TPF

TPF

TPF

TPF

TPF

TPF

TPF

TPF

22 10

25' STATE BUFFER

50' COUNTY BUFFER

75' IMPERVIOUS BUFFER

EX. WETLANDS

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LOD

LOD

LOD

LO

D

LO

DLOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LODLOD

LOD

LOD

LOD

LOD

LO

D

LOD

LOD

LOD

LOD LO

D LOD

LOD

LOD

LOD

LOD

LOD

LOD LOD

LO

D

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD LO

D

LOD

LOD

LO

D

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD LOD

LO

D

LO

D

LO

D

LO

D

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LO

D

TANYA NORMAN, P.E.

P.E. No. 0038055, GA

DATE: 01/09/2026 ______________

1 2 3 4 5

A

B

C

D

SHEET ID

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

LO

U

IS

VI

LL

E

D

IS

TR

IC

T

LO

U

IS

VI

LL

E, K

EN

TU

C

KY

-0

P A

R K

W A

Y L

A N

E S

U

IT

E

P

E A

C H

TR

E

E C

O R

N E

R S

, G A

P

H O

N E

(6

) 3

-7

P

O N

D J

O B

N o.

SI

ZE

FI

LE

N

AM

E:

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SO

LI

C

IT

AT

IO

N N

O

C O

N

TR

AC

T

N O

FI

LE

N U

M

BE

R

US Army Corps of Engineers®

Louisville District

FI

LE

P

AT

H : X

:\F Y2

3\

8\

.C

AD

B

IM

\0 4.

.C

AD

PH

S H

EE

TS

\C

TT

ED

: 0 1/

/2

B Y:

N O

R M

AN

, T

AN

YA

IS

SU

E D

AT

E:

JA

N

U

AR

Y 9, AN

SI

D

A.

D

U

EH

R

D .M

. L

EC

KI

E

T.

N

O R

M

AN

D

AT

E D

ES

C

R

IP

TI

O

N M

AR

K

R

EP

AI

R

M

AI

N

TA

IN

A

IR

FI

EL

D S

TO

R

M W

AT

ER

S

YS

TE

M

PH

AS

E

II

D O

BB

IN

S

AI

R R

ES

ER

VE

B

AS

E, G

EO

R G

IA

PR

O

JE

C T

N O

FG

W B

-0

FG

W B

-0

P2

CERTIFIED FINAL

J.

P.

AR

IS

TI

ZA

BA

L

M

AT

C H

LI

N

E-

SE

E

SH

EE

T

C E3

Sd2-F

Ds4

SI

O

N A

N D

S

ED

IM

EN

T C

O N

TR

O

L

FI

N

AL

P

LA

N

CE302

C E3

.d w g

MATCHLINE-SEE SHEET CE308

M

AT

C H

LI

N

E-

SE

E

SH

EE

T

C E3

END

SILT FENCE

Ds4

Ds4

Ds4

Ds4 Ds4

Ds4

Sd1-S

KEY MAP

CLIN I

C

LI

N I

CE329

CE330

CE331

CE301 CE302 CE303 CE304

CE307

CE308 CE309 CE310 CE311

CE313 CE314 CE315 CE316 CE317

CE320 CE321 CE322

CE325 CE326

CE306 CE312

CE318

CE223

CLIN IV

C

LI

N

II

CLIN III

SEE SHEET CE403 FOR ENLARGEMENT

SEE SHEET CE404 FOR ENLARGEMENT

STREAM SAMPLING POINT #2

PLAN

NORTH

A1 EROSION AND SEDIMENT CONTROL FINAL PLAN

GENERAL SHEET NOTES

1. REFER TO SHEETS CE001-CE006 FOR EROSION AND

SEDIMENT CONTROL NOTES.

2. REFER TO SHEETS C-001 AND C-002 FOR PROJECT

ABBREVIATIONS AND GENERAL, AIRFIELD, AND STORM

SEWER NOTES.

3. EXISTING INFORMATION AND TOPOGRAPHY PROVIDED

BY GIS DATA AND GEOSURVEY, LTD., DATED 07/19/2018,

REVISED: 11/03/2023. FIELD VERIFICATION IS REQUIRED

TO ENSURE POSITIVE DRAINAGE AND ELIMINATION OF

ALL STANDING WATER.

4. REFER TO SHEET CE007 FOR SHEET KEY MAP.

5. CONTRACTOR IS RESPONSIBLE FOR RETURNING ALL

DISTURBED AREA TO PRE-CONSTRUCTION CONDITION.

6. THE CONTRACTOR AND THEIR SUBCONTRACTORS SHALL

PERFORM A FOD CHECK WHEN ENTERING AND EXITING

THE AIRFIELD.

7. THE CONTRACTOR SHALL ONLY REMOVE, REGRADE,

AND REPLACE SOD ON SHOULDER THAT CAN BE

REESTABLISHED AT THE END OF THE WORK DAY.

8. ANY DISTURBED AREA LEFT EXPOSED FOR A PERIOD

GREATER THAN 14 DAYS SHALL BE STABILIZED WITH

MULCH OR TEMPORARY SEEDING.

9. NO MORE THAN 5 ACRES OF LAND CAN BE DISTURBED

AT A TIME. CONSTRUCTION MUST BE PHASED TO LIMIT

LAND DISTURBANCES TO 5 ACRES OR LESS.

St

Ch-2

Ch-2

Ch-2

D O

BB

IN

S

PL

AC

E

RE

FU

EL

IN

G R

O

AD

LO

D

LO

D

LOD

LO

D

LO

D

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LO

D

LOD

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LOD

LO

DLOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD LOD

LO

DLOD

LOD

LOD

LOD

LODLO

D

LOD

LOD

LOD

LO

D

LOD

LO

D

LO

D

TANYA NORMAN, P.E.

P.E. No. 0038055, GA

DATE: 01/09/2026 ______________

1 2 3 4 5

A

B

C

D

SHEET ID

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

LO

U

IS

VI

LL

E

D

IS

TR

IC

T

LO

U

IS

VI

LL

E, K

EN

TU

C

KY

-0

P A

R K

W A

Y L

A N

E S

U

IT

E

P

E A

C H

TR

E

E C

O R

N E

R S

, G A

P

H O

N E

(6

) 3

-7

P

O N

D J

O B

N o.

SI

ZE

FI

LE

N

AM

E:

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SO

LI

C

IT

AT

IO

N N

O

C O

N

TR

AC

T

N O

FI

LE

N U

M

BE

R

US Army Corps of Engineers®

Louisville District

FI

LE

P

AT

H : X

:\F Y2

3\

8\

.C

AD

B

IM

\0 4.

.C

AD

PH

S H

EE

TS

\C

TT

ED

: 0 1/

/2

B Y:

N O

R M

AN

, T

AN

YA

IS

SU

E D

AT

E:

JA

N

U

AR

Y 9, AN

SI

D

A.

D

U

EH

R

D .M

. L

EC

KI

E

T.

N

O R

M

AN

D

AT

E D

ES

C

R

IP

TI

O

N M

AR

K

R

EP

AI

R

M

AI

N

TA

IN

A

IR

FI

EL

D S

TO

R

M W

AT

ER

S

YS

TE

M

PH

AS

E

II

D O

BB

IN

S

AI

R R

ES

ER

VE

B

AS

E, G

EO

R G

IA

PR

O

JE

C T

N O

FG

W B

-0

FG

W B

-0

P2

CERTIFIED FINAL

J.

P.

AR

IS

TI

ZA

BA

L

MATCHLINE-SEE SHEET CE309

M

AT

C H

LI

N

E-

SE

E

SH

EE

T

C E3

M

AT

C H

LI

N

E-

SE

E

SH

EE

T

C E3

MATCHLINE-AA

MATCHLINE-AA

SI

O

N A

N D

S

ED

IM

EN

T C

O N

TR

O

L

FI

N

AL

P

LA

N

CE303

C E3

.d w g

START

SILT FENCE

END

SILT FENCE

Ds4

Sd1-S

Sd2-F

Sd2-F

Sd2-F

Sd2-F

Sd2-F

Ds4

Ds4

Ds4

St

KEY MAP

CLIN I

C

LI

N I

CE329

CE330

CE331

CE301 CE302 CE303 CE304

CE307

CE308 CE309 CE310 CE311

CE313 CE314 CE315 CE316 CE317

CE320 CE321 CE322

CE325 CE326

CE306 CE312

CE318

CE223

CLIN IV

C

LI

N

II

CLIN III

PLAN

NORTH

A1 EROSION AND SEDIMENT CONTROL FINAL PLAN

GENERAL SHEET NOTES

1. REFER TO SHEETS CE001-CE006 FOR EROSION AND

SEDIMENT CONTROL NOTES.

2. REFER TO SHEETS C-001 AND C-002 FOR PROJECT

ABBREVIATIONS AND GENERAL, AIRFIELD, AND STORM

SEWER NOTES.

3. EXISTING INFORMATION AND TOPOGRAPHY PROVIDED

BY GIS DATA AND GEOSURVEY, LTD., DATED 07/19/2018,

REVISED: 11/03/2023. FIELD VERIFICATION IS REQUIRED

TO ENSURE POSITIVE DRAINAGE AND ELIMINATION OF

ALL STANDING WATER.

4. REFER TO SHEET CE007 FOR SHEET KEY MAP.

5. CONTRACTOR IS RESPONSIBLE FOR RETURNING ALL

DISTURBED AREA TO PRE-CONSTRUCTION CONDITION.

6. THE CONTRACTOR AND THEIR SUBCONTRACTORS SHALL

PERFORM A FOD CHECK WHEN ENTERING AND EXITING

THE AIRFIELD.

7. THE CONTRACTOR SHALL ONLY REMOVE, REGRADE,

AND REPLACE SOD ON SHOULDER THAT CAN BE

REESTABLISHED AT THE END OF THE WORK DAY.

8. ANY DISTURBED AREA LEFT EXPOSED FOR A PERIOD

GREATER THAN 14 DAYS SHALL BE STABILIZED WITH

MULCH OR TEMPORARY SEEDING.

9. NO MORE THAN 5 ACRES OF LAND CAN BE DISTURBED

AT A TIME. CONSTRUCTION MUST BE PHASED TO LIMIT

LAND DISTURBANCES TO 5 ACRES OR LESS.

ATLANTIC AVENUE

3R D

S

TR

EE

T

D O

BB

IN

S

PL

AC

E

BARRACKS AVENUE

MIMOSA DRIVE

DOBBINS PLACE

LOD

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D LOD

LOD

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LOD

LOD

LO

D

LO

D

LO

D

LO

DLO

D

LO

D

LO

D

LO

D

LOD

LOD

LO

D

LO

D

LO

D

LOD

LOD

LOD

LODLODLOD

LOD

LO

D

LOD

LOD

LO

D

LOD

LOD

LOD

LOD

LOD

LOD

LO

D

LO

D

LO

D

LO

DLO

D

LO

D

LO

D

LO

D

TANYA NORMAN, P.E.

P.E. No. 0038055, GA

DATE: 01/09/2026 ______________

1 2 3 4 5

A

B

C

D

SHEET ID

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

LO

U

IS

VI

LL

E

D

IS

TR

IC

T

LO

U

IS

VI

LL

E, K

EN

TU

C

KY

-0

P A

R K

W A

Y L

A N

E S

U

IT

E

P

E A

C H

TR

E

E C

O R

N E

R S

, G A

P

H O

N E

(6

) 3

-7

P

O N

D J

O B

N o.

SI

ZE

FI

LE

N

AM

E:

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SO

LI

C

IT

AT

IO

N N

O

C O

N

TR

AC

T

N O

FI

LE

N U

M

BE

R

US Army Corps of Engineers®

Louisville District

FI

LE

P

AT

H : X

:\F Y2

3\

8\

.C

AD

B

IM

\0 4.

.C

AD

PH

S H

EE

TS

\C

TT

ED

: 0 1/

/2

B Y:

N O

R M

AN

, T

AN

YA

IS

SU

E D

AT

E:

JA

N

U

AR

Y 9, AN

SI

D

A.

D

U

EH

R

D .M

. L

EC

KI

E

T.

N

O R

M

AN

D

AT

E D

ES

C

R

IP

TI

O

N M

AR

K

R

EP

AI

R

M

AI

N

TA

IN

A

IR

FI

EL

D S

TO

R

M W

AT

ER

S

YS

TE

M

PH

AS

E

II

D O

BB

IN

S

AI

R R

ES

ER

VE

B

AS

E, G

EO

R G

IA

PR

O

JE

C T

N O

FG

W B

-0

FG

W B

-0

P2

CERTIFIED FINAL

J.

P.

AR

IS

TI

ZA

BA

L

MATCHLINE-SEE SHEET CE110

M

AT

C H

LI

N

E-

SE

E

SH

EE

T

C

SI

O

N A

N D

S

ED

IM

EN

T C

O N

TR

O

L

FI

N

AL

P

LA

N

CE304

C E3

.d w g

MATCHLINE-SEE SHEET CE310

Ds4

Ds4

Sd2-F

Sd2-F

Sd2-F

Sd2-F

Sd2-F

Sd2-F

Sd2-F

Sd2-F

Ds4

KEY MAP

CLIN I

C

LI

N I

CE329

CE330

CE331

CE301 CE302 CE303 CE304

CE307

CE308 CE309 CE310 CE311

CE313 CE314 CE315 CE316 CE317

CE320 CE321 CE322

CE325 CE326

CE306 CE312

CE318

CE223

CLIN IV

C

LI

N

II

CLIN III

PLAN

NORTH

A1 EROSION AND SEDIMENT CONTROL FINAL PLAN

GENERAL SHEET NOTES

1. REFER TO SHEETS CE001-CE006 FOR EROSION AND

SEDIMENT CONTROL NOTES.

2. REFER TO SHEETS C-001 AND C-002 FOR PROJECT

ABBREVIATIONS AND GENERAL, AIRFIELD, AND STORM

SEWER NOTES.

3. EXISTING INFORMATION AND TOPOGRAPHY PROVIDED

BY GIS DATA AND GEOSURVEY, LTD., DATED 07/19/2018,

REVISED: 11/03/2023. FIELD VERIFICATION IS REQUIRED

TO ENSURE POSITIVE DRAINAGE AND ELIMINATION OF

ALL STANDING WATER.

4. REFER TO SHEET CE007 FOR SHEET KEY MAP.

5. CONTRACTOR IS RESPONSIBLE FOR RETURNING ALL

DISTURBED AREA TO PRE-CONSTRUCTION CONDITION.

6. THE CONTRACTOR AND THEIR SUBCONTRACTORS SHALL

PERFORM A FOD CHECK WHEN ENTERING AND EXITING

THE AIRFIELD.

7. THE CONTRACTOR SHALL ONLY REMOVE, REGRADE,

AND REPLACE SOD ON SHOULDER THAT CAN BE

REESTABLISHED AT THE END OF THE WORK DAY.

8. ANY DISTURBED AREA LEFT EXPOSED FOR A PERIOD

GREATER THAN 14 DAYS SHALL BE STABILIZED WITH

MULCH OR TEMPORARY SEEDING.

9. NO MORE THAN 5 ACRES OF LAND CAN BE DISTURBED

10551055

1040 1040 S-50

16.60 Ac

SU

R

VE

Y

D

AT

E:

1-

-2

BE

G

IN

P H

AS

E

II

PH

AS

E I S

U R

VE

Y

LI

M

IT

S

SU

R

VE

Y

D

AT

E:

-1 9-

10551055

1040 1040

LO

D

LO

D

LO

D

LO

D

LO

D

LOD

LO

D

LO

D

LO

D

LO

D

LOD

LO

D

LO

D

LO

D

LO

D

LOD

LO

D

LOD

LOD

LO

D

LOD

LO

D

LOD

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LOD

LODLO

D

LOD

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LOD

LOD

LOD

LOD

LOD

LOD

LOD LOD

LOD

LOD

LOD

LOD

LOD

LO

D

LO

D

LO

D

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LO

D

LO

D

LO

D

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LO

D

LOD

LOD

LOD

TANYA NORMAN, P.E.

P.E. No. 0038055, GA

DATE: 01/09/2026 ______________

1 2 3 4 5

A

B

C

D

SHEET ID

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

LO

U

IS

VI

LL

E

D

IS

TR

IC

T

LO

U

IS

VI

LL

E, K

EN

TU

C

KY

-0

P A

R K

W A

Y L

A N

E S

U

IT

E

P

E A

C H

TR

E

E C

O R

N E

R S

, G A

P

H O

N E

(6

) 3

-7

P

O N

D J

O B

N o.

SI

ZE

FI

LE

N

AM

E:

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SO

LI

C

IT

AT

IO

N N

O

C O

N

TR

AC

T

N O

FI

LE

N U

M

BE

R

US Army Corps of Engineers®

Louisville District

FI

LE

P

AT

H : X

:\F Y2

3\

8\

.C

AD

B

IM

\0 4.

.C

AD

PH

S H

EE

TS

\C

TT

ED

: 0 1/

/2

B Y:

N O

R M

AN

, T

AN

YA

IS

SU

E D

AT

E:

JA

N

U

AR

Y 9, AN

SI

D

A.

D

U

EH

R

D .M

. L

EC

KI

E

T.

N

O R

M

AN

D

AT

E D

ES

C

R

IP

TI

O

N M

AR

K

R

EP

AI

R

M

AI

N

TA

IN

A

IR

FI

EL

D S

TO

R

M W

AT

ER

S

YS

TE

M

PH

AS

E

II

D O

BB

IN

S

AI

R R

ES

ER

VE

B

AS

E, G

EO

R G

IA

PR

O

JE

C T

N O

FG

W B

-0

FG

W B

-0

P2

CERTIFIED FINAL

J.

P.

AR

IS

TI

ZA

BA

L

M

AT

C H

LI

N

E-

SE

E

SH

EE

T

C

SI

O

N A

N D

S

ED

IM

EN

T C

O N

TR

O

L

FI

N

AL

P

LA

N

CE306

C E3

.d w g

Ds4

Ds4

Ds4

Ds4

Ds4

KEY MAP

CLIN I

C

LI

N I

CE329

CE330

CE331

CE301 CE302 CE303 CE304

CE307

CE308 CE309 CE310 CE311

CE313 CE314 CE315 CE316 CE317

CE320 CE321 CE322

CE325 CE326

CE306 CE312

CE318

CE223

CLIN IV

C

LI

N

II

CLIN III

PLAN

NORTH

A1 EROSION AND SEDIMENT CONTROL FINAL PLAN

GENERAL SHEET NOTES

1. REFER TO SHEETS CE001-CE006 FOR EROSION AND

SEDIMENT CONTROL NOTES.

2. REFER TO SHEETS C-001 AND C-002 FOR PROJECT

ABBREVIATIONS AND GENERAL, AIRFIELD, AND STORM

SEWER NOTES.

3. EXISTING INFORMATION AND TOPOGRAPHY PROVIDED

BY GIS DATA AND GEOSURVEY, LTD., DATED 07/19/2018,

REVISED: 11/03/2023. FIELD VERIFICATION IS REQUIRED

TO ENSURE POSITIVE DRAINAGE AND ELIMINATION OF

ALL STANDING WATER.

4. REFER TO SHEET CE007 FOR SHEET KEY MAP.

5. CONTRACTOR IS RESPONSIBLE FOR RETURNING ALL

DISTURBED AREA TO PRE-CONSTRUCTION CONDITION.

6. THE CONTRACTOR AND THEIR SUBCONTRACTORS SHALL

PERFORM A FOD CHECK WHEN ENTERING AND EXITING

THE AIRFIELD.

7. THE CONTRACTOR SHALL ONLY REMOVE, REGRADE,

AND REPLACE SOD ON SHOULDER THAT CAN BE

REESTABLISHED AT THE END OF THE WORK DAY.

8. ANY DISTURBED AREA LEFT EXPOSED FOR A PERIOD

GREATER THAN 14 DAYS SHALL BE STABILIZED WITH

MULCH OR TEMPORARY SEEDING.

9. NO MORE THAN 5 ACRES OF LAND CAN BE DISTURBED

PH

AS

E I S

U

RV

EY

L

IM

IT

S

SU

RV

EY

D

AT

E:

1-

-2

BE

G

IN

P

H

AS

E

II

SU

RV

EY

D

AT

E:

-1

9-

RE

VI

SE

D

D

AT

E:

-2 5-

S-200

12.7 Ac

S-190

9.2 Ac

PH

AS

E I S

U

RV

EY

L

IM

IT

S

SU

RV

EY

D

AT

E:

1-

-2

BE

G

IN

P

H

AS

E

II

SU

RV

EY

D

AT

E:

-1

9-

RE

VI

SE

D

D

AT

E:

-2 5-

LOD

LOD

LOD

LO

D

LO

D

LO

D

LOD

LOD

LO

D

LO

D

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LO

D

LOD

LOD

LOD

LO

D

LO

D

LO

D

LO

D

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LOD

LOD

LOD

LOD

LOD

LO

D

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LO

D LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD LOD LOD LOD LOD

LO

D

LOD

LO

D

LOD

LO

D

LOD LOD LOD

LOD

LOD

LO

D

LO

D

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LO

D

LOD

LOD

LOD

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LO

D LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LODLOD

LOD

LODLOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LODLOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

TANYA NORMAN, P.E.

P.E. No. 0038055, GA

DATE: 01/09/2026 ______________

1 2 3 4 5

A

B

C

D

SHEET ID

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

LO

U

IS

VI

LL

E

D

IS

TR

IC

T

LO

U

IS

VI

LL

E, K

EN

TU

C

KY

-0

P A

R K

W A

Y L

A N

E S

U

IT

E

P

E A

C H

TR

E

E C

O R

N E

R S

, G A

P

H O

N E

(6

) 3

-7

P

O N

D J

O B

N o.

SI

ZE

FI

LE

N

AM

E:

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SO

LI

C

IT

AT

IO

N N

O

C O

N

TR

AC

T

N O

FI

LE

N U

M

BE

R

US Army Corps of Engineers®

Louisville District

FI

LE

P

AT

H : X

:\F Y2

3\

8\

.C

AD

B

IM

\0 4.

.C

AD

PH

S H

EE

TS

\C

TT

ED

: 0 1/

/2

B Y:

N O

R M

AN

, T

AN

YA

IS

SU

E D

AT

E:

JA

N

U

AR

Y 9, AN

SI

D

A.

D

U

EH

R

D .M

. L

EC

KI

E

T.

N

O R

M

AN

D

AT

E D

ES

C

R

IP

TI

O

N M

AR

K

R

EP

AI

R

M

AI

N

TA

IN

A

IR

FI

EL

D S

TO

R

M W

AT

ER

S

YS

TE

M

PH

AS

E

II

D O

BB

IN

S

AI

R R

ES

ER

VE

B

AS

E, G

EO

R G

IA

PR

O

JE

C T

N O

FG

W B

-0

FG

W B

-0

P2

CERTIFIED FINAL

J.

P.

AR

IS

TI

ZA

BA

L

MATCHLINE-SEE SHEET CE313

M

AT

C H

LI

N

E-

SE

E

SH

EE

T

C E3

M

AT

C H

LI

N

E-

SE

E

SH

EE

T

C E3

MATCHLINE-SEE SHEET CE301

Sd2-F

SI

O

N A

N D

S

ED

IM

EN

T C

O N

TR

O

L

FI

N

AL

P

LA

N

CE307

C E3

.d w g

Ds4

Ds4

Ds4

Ds4

Ds4

Ds4

Ds4

Ds4

Ds4

Ds4

Ds4

KEY MAP

CLIN I

C

LI

N I

CE329

CE330

CE331

CE301 CE302 CE303 CE304

CE307

CE308 CE309 CE310 CE311

CE313 CE314 CE315 CE316 CE317

CE320 CE321 CE322

CE325 CE326

CE306 CE312

CE318

CE223

CLIN IV

C

LI

N

II

CLIN III

PLAN

NORTH

A1 EROSION AND SEDIMENT CONTROL FINAL PLAN

GENERAL SHEET NOTES

1. REFER TO SHEETS CE001-CE006 FOR EROSION AND SEDIMENT CONTROL NOTES.

2. REFER TO SHEETS C-001 AND C-002 FOR PROJECT ABBREVIATIONS AND GENERAL, AIRFIELD, AND STORM SEWER NOTES.

3. EXISTING INFORMATION AND TOPOGRAPHY PROVIDED BY GIS DATA AND GEOSURVEY, LTD.,

DATED 07/19/2018, REVISED: 11/03/2023. FIELD VERIFICATION IS REQUIRED TO ENSURE

POSITIVE DRAINAGE AND ELIMINATION OF ALL STANDING WATER.

4. REFER TO SHEET CE007 FOR SHEET KEY MAP.

5. CONTRACTOR IS RESPONSIBLE FOR RETURNING ALL DISTURBED AREA TO

PRE-CONSTRUCTION CONDITION.

6. THE CONTRACTOR AND THEIR SUBCONTRACTORS SHALL PERFORM A FOD CHECK WHEN

ENTERING AND EXITING THE AIRFIELD.

7. THE CONTRACTOR SHALL ONLY REMOVE, REGRADE, AND REPLACE SOD ON SHOULDER THAT

CAN BE REESTABLISHED AT THE END OF THE WORK DAY.

8. ANY DISTURBED AREA LEFT EXPOSED FOR A PERIOD GREATER THAN 14 DAYS SHALL BE

STABILIZED WITH MULCH OR TEMPORARY SEEDING.

9. NO MORE THAN 5 ACRES OF LAND CAN BE DISTURBED AT A TIME. CONSTRUCTION MUST BE

PHASED TO LIMIT LAND DISTURBANCES TO 5 ACRES OR LESS.

10251025

S-230

3.3 Ac

S-240

2.6 Ac

S-1900

8.0 Ac

S-250

5.67 Ac

S-220

1.93 Ac

S-293 1.77Ac

10251025

999 1018

LO

D

LOD

LOD

LOD

LOD

LO

D

LO

D

LOD

LOD LOD

LOD

LO

D

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LO

D

LOD

LOD

LOD

LO

D

LO

D

LOD

LO

D

LO

D

LO

D

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LO

D

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LO

D

LO

D

LOD

LOD

LOD

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LOD

LO

D

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LOD

LOD

LOD

LOD

LOD

LO

D

LO

D

LO

D

LO

D

LO

DLO

D

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD LOD

LOD

LOD

LOD

LO

D

LOD

LOD

LO

D

LO

D

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LODLO

D

LODLOD

LOD

LO

D

LO

D

LO

DLOD

LOD

LOD

LOD

LOD

TANYA NORMAN, P.E.

P.E. No. 0038055, GA

DATE: 01/09/2026 ______________

1 2 3 4 5

A

B

C

D

SHEET ID

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

LO

U

IS

VI

LL

E

D

IS

TR

IC

T

LO

U

IS

VI

LL

E, K

EN

TU

C

KY

-0

P A

R K

W A

Y L

A N

E S

U

IT

E

P

E A

C H

TR

E

E C

O R

N E

R S

, G A

P

H O

N E

(6

) 3

-7

P

O N

D J

O B

N o.

SI

ZE

FI

LE

N

AM

E:

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SO

LI

C

IT

AT

IO

N N

O

C O

N

TR

AC

T

N O

FI

LE

N U

M

BE

R

US Army Corps of Engineers®

Louisville District

FI

LE

P

AT

H : X

:\F Y2

3\

8\

.C

AD

B

IM

\0 4.

.C

AD

PH

S H

EE

TS

\C

TT

ED

: 0 1/

/2

B Y:

N O

R M

AN

, T

AN

YA

IS

SU

E D

AT

E:

JA

N

U

AR

Y 9, AN

SI

D

A.

D

U

EH

R

D .M

. L

EC

KI

E

T.

N

O R

M

AN

D

AT

E D

ES

C

R

IP

TI

O

N M

AR

K

R

EP

AI

R

M

AI

N

TA

IN

A

IR

FI

EL

D S

TO

R

M W

AT

ER

S

YS

TE

M

PH

AS

E

II

D O

BB

IN

S

AI

R R

ES

ER

VE

B

AS

E, G

EO

R G

IA

PR

O

JE

C T

N O

FG

W B

-0

FG

W B

-0

P2

CERTIFIED FINAL

J.

P.

AR

IS

TI

ZA

BA

L

MATCHLINE-SEE SHEET CE314

M

AT

C H

LI

N

E-

SE

E

SH

EE

T

C E3

M

AT

C H

LI

N

E-

SE

E

SH

EE

T

C E3

MATCHLINE-SEE SHEET CE302

Sd1-S

Sd1-S

SI

O

N A

N D

S

ED

IM

EN

T C

O N

TR

O

L

FI

N

AL

P

LA

N

CE308

C E3

.d w g

START SILT FENCE

END SILT FENCE

Ds4

Ds4

Ds4 Ds4

Ds4

Ds4

Ds4

Ds4

Ds4

Ds4

Ds4

Sd2-B Sd2-B

Sd2-B

Sd2-B

Sd2-B

KEY MAP

CLIN I

C

LI

N I

CE329

CE330

CE331

CE301 CE302 CE303 CE304

CE307

CE308 CE309 CE310 CE311

CE313 CE314 CE315 CE316 CE317

CE320 CE321 CE322

CE325 CE326

CE306 CE312

CE318

CE223

CLIN IV

C

LI

N

II

CLIN III

PLAN

NORTH

A1 EROSION AND SEDIMENT CONTROL FINAL PLAN

GENERAL SHEET NOTES

1. REFER TO SHEETS CE001-CE006 FOR EROSION AND

SEDIMENT CONTROL NOTES.

2. REFER TO SHEETS C-001 AND C-002 FOR PROJECT

ABBREVIATIONS AND GENERAL, AIRFIELD, AND STORM

SEWER NOTES.

3. EXISTING INFORMATION AND TOPOGRAPHY PROVIDED

BY GIS DATA AND GEOSURVEY, LTD., DATED 07/19/2018,

REVISED: 11/03/2023. FIELD VERIFICATION IS REQUIRED

TO ENSURE POSITIVE DRAINAGE AND ELIMINATION OF

ALL STANDING WATER.

4. REFER TO SHEET CE007 FOR SHEET KEY MAP.

5. CONTRACTOR IS RESPONSIBLE FOR RETURNING ALL

DISTURBED AREA TO PRE-CONSTRUCTION CONDITION.

6. THE CONTRACTOR AND THEIR SUBCONTRACTORS SHALL

PERFORM A FOD CHECK WHEN ENTERING AND EXITING

THE AIRFIELD.

7. THE CONTRACTOR SHALL ONLY REMOVE, REGRADE,

AND REPLACE SOD ON SHOULDER THAT CAN BE

REESTABLISHED AT THE END OF THE WORK DAY.

8. ANY DISTURBED AREA LEFT EXPOSED FOR A PERIOD

GREATER THAN 14 DAYS SHALL BE STABILIZED WITH

MULCH OR TEMPORARY SEEDING.

9. NO MORE THAN 5 ACRES OF LAND CAN BE DISTURBED

S-692

7.7 Ac

S-310

6.5 Ac

S-680

3.41 Ac

S-690

1.74 Ac

S-994

5.25 AC

S-698

0.56 Ac

LO

D

LO

D

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LO

D

LO

D

LO

D

LO

D

LO

D

LO

DLO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD LO

D

LO

D

LO

D

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LO

D

LO

D

LOD

LO

D

LO

D

LO

D

LO

D

LOD

LOD

LOD LOD

LOD

LOD

LO

D

LO

D

LOD

LOD

LOD

LOD

LODLOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LO

D

LOD

LOD

LOD

LOD

LOD

LO

D

LO

D

LO

D

LOD

LOD

LOD

LOD

LOD

LO

D

LO

D

LO

D

LO

D

LO

D

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LO

D

LO

D

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LO

D

LO

D

LO

D

LO

D

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LO

D

LO

D

LO

D

LOD

LOD

LODLOD

LOD

LO

D

LOD LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LO

D

LOD

LOD

LOD

LOD

LOD

LO

D

LO

D

LOD

LO

D

LO

D LOD

TANYA NORMAN, P.E.

P.E. No. 0038055, GA

DATE: 01/09/2026 ______________

1 2 3 4 5

A

B

C

D

SHEET ID

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

LO

U

IS

VI

LL

E

D

IS

TR

IC

T

LO

U

IS

VI

LL

E, K

EN

TU

C

KY

-0

P A

R K

W A

Y L

A N

E S

U

IT

E

P

E A

C H

TR

E

E C

O R

N E

R S

, G A

P

H O

N E

(6

) 3

-7

P

O N

D J

O B

N o.

SI

ZE

FI

LE

N

AM

E:

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SO

LI

C

IT

AT

IO

N N

O

C O

N

TR

AC

T

N O

FI

LE

N U

M

BE

R

US Army Corps of Engineers®

Louisville District

FI

LE

P

AT

H : X

:\F Y2

3\

8\

.C

AD

B

IM

\0 4.

.C

AD

PH

S H

EE

TS

\C

TT

ED

: 0 1/

/2

B Y:

N O

R M

AN

, T

AN

YA

IS

SU

E D

AT

E:

JA

N

U

AR

Y 9, AN

SI

D

A.

D

U

EH

R

D .M

. L

EC

KI

E

T.

N

O R

M

AN

D

AT

E D

ES

C

R

IP

TI

O

N M

AR

K

R

EP

AI

R

M

AI

N

TA

IN

A

IR

FI

EL

D S

TO

R

M W

AT

ER

S

YS

TE

M

PH

AS

E

II

D O

BB

IN

S

AI

R R

ES

ER

VE

B

AS

E, G

EO

R G

IA

PR

O

JE

C T

N O

FG

W B

-0

FG

W B

-0

P2

CERTIFIED FINAL

J.

P.

AR

IS

TI

ZA

BA

L

MATCHLINE-SEE SHEET CE315

M

AT

C H

LI

N

E-

SE

E

SH

EE

T

C E3

M

AT

C H

LI

N

E-

SE

E

SH

EE

T

C E3

MATCHLINE-SEE SHEET CE303

SI

O

N A

N D

S

ED

IM

EN

T C

O N

TR

O

L

FI

N

AL

P

LA

N

CE309

C E3

.d w g

Sd2-F

Sd2-F Sd2-B

Sd2-B

Sd2-B

Sd2-B

Ds4

Ds4

Ds4

Sd2-F

Sd2-B

KEY MAP

CLIN I

C

LI

N I

CE329

CE330

CE331

CE301 CE302 CE303 CE304

CE307

CE308 CE309 CE310 CE311

CE313 CE314 CE315 CE316 CE317

CE320 CE321 CE322

CE325 CE326

CE306 CE312

CE318

CE223

CLIN IV

C

LI

N

II

CLIN III

PLAN

NORTH

A1 EROSION AND SEDIMENT CONTROL FINAL PLAN

GENERAL SHEET NOTES

1. REFER TO SHEETS CE001-CE006 FOR EROSION AND

SEDIMENT CONTROL NOTES.

2. REFER TO SHEETS C-001 AND C-002 FOR PROJECT

ABBREVIATIONS AND GENERAL, AIRFIELD, AND STORM

SEWER NOTES.

3. EXISTING INFORMATION AND TOPOGRAPHY PROVIDED

BY GIS DATA AND GEOSURVEY, LTD., DATED 07/19/2018,

REVISED: 11/03/2023. FIELD VERIFICATION IS REQUIRED

TO ENSURE POSITIVE DRAINAGE AND ELIMINATION OF

ALL STANDING WATER.

4. REFER TO SHEET CE007 FOR SHEET KEY MAP.

5. CONTRACTOR IS RESPONSIBLE FOR RETURNING ALL

DISTURBED AREA TO PRE-CONSTRUCTION CONDITION.

6. THE CONTRACTOR AND THEIR SUBCONTRACTORS SHALL

PERFORM A FOD CHECK WHEN ENTERING AND EXITING

THE AIRFIELD.

7. THE CONTRACTOR SHALL ONLY REMOVE, REGRADE,

AND REPLACE SOD ON SHOULDER THAT CAN BE

REESTABLISHED AT THE END OF THE WORK DAY.

8. ANY DISTURBED AREA LEFT EXPOSED FOR A PERIOD

GREATER THAN 14 DAYS SHALL BE STABILIZED WITH

MULCH OR TEMPORARY SEEDING.

9. NO MORE THAN 5 ACRES OF LAND CAN BE DISTURBED

S-696

7.58 Ac

LO

D

LO

D

LO

D

LO

DLO

D

LO

D

LO

D

LO

D

LOD

LOD

LO

D

LO

D

LOD

LOD

LOD LOD

LOD

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LOD

LOD

LO

D

LO

D

LO

D

LO

D

LO

D

LOD

LOD

LOD

LOD

LOD

LO

D

LO

D

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LO

D

LO

D

LO

D

LO

D

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LO

D

LO

D

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LODLOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LO

D

LO

D

LOD

LOD

LO

D

LO

D

TANYA NORMAN, P.E.

P.E. No. 0038055, GA

DATE: 01/09/2026 ______________

1 2 3 4 5

A

B

C

D

SHEET ID

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

LO

U

IS

VI

LL

E

D

IS

TR

IC

T

LO

U

IS

VI

LL

E, K

EN

TU

C

KY

-0

P A

R K

W A

Y L

A N

E S

U

IT

E

P

E A

C H

TR

E

E C

O R

N E

R S

, G A

P

H O

N E

(6

) 3

-7

P

O N

D J

O B

N o.

SI

ZE

FI

LE

N

AM

E:

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SO

LI

C

IT

AT

IO

N N

O

C O

N

TR

AC

T

N O

FI

LE

N U

M

BE

R

US Army Corps of Engineers®

Louisville District

FI

LE

P

AT

H : X

:\F Y2

3\

8\

.C

AD

B

IM

\0 4.

.C

AD

PH

S H

EE

TS

\C

TT

ED

: 0 1/

/2

B Y:

N O

R M

AN

, T

AN

YA

IS

SU

E D

AT

E:

JA

N

U

AR

Y 9, AN

SI

D

A.

D

U

EH

R

D .M

. L

EC

KI

E

T.

N

O R

M

AN

D

AT

E D

ES

C

R

IP

TI

O

N M

AR

K

R

EP

AI

R

M

AI

N

TA

IN

A

IR

FI

EL

D S

TO

R

M W

AT

ER

S

YS

TE

M

PH

AS

E

II

D O

BB

IN

S

AI

R R

ES

ER

VE

B

AS

E, G

EO

R G

IA

PR

O

JE

C T

N O

FG

W B

-0

FG

W B

-0

P2

CERTIFIED FINAL

J.

P.

AR

IS

TI

ZA

BA

L

MATCHLINE-SEE SHEET CE316

M

AT

C H

LI

N

E-

SE

E

SH

EE

T

C E3

M

AT

C H

LI

N

E-

SE

E

SH

EE

T

C E3

MATCHLINE-SEE SHEET CE304

SI

O

N A

N D

S

ED

IM

EN

T C

O N

TR

O

L

FI

N

AL

P

LA

N

CE310

C E3

.d w g

Sd1-S

Sd2-B

Sd2-F

Sd2-F

Ds4

Ds4

Ds4

Ds4

KEY MAP

CLIN I

C

LI

N I

CE329

CE330

CE331

CE301 CE302 CE303 CE304

CE307

CE308 CE309 CE310 CE311

CE313 CE314 CE315 CE316 CE317

CE320 CE321 CE322

CE325 CE326

CE306 CE312

CE318

CE223

CLIN IV

C

LI

N

II

CLIN III

PLAN

NORTH

A1 EROSION AND SEDIMENT CONTROL FINAL PLAN

GENERAL SHEET NOTES

1. REFER TO SHEETS CE001-CE006 FOR EROSION AND

SEDIMENT CONTROL NOTES.

2. REFER TO SHEETS C-001 AND C-002 FOR PROJECT

ABBREVIATIONS AND GENERAL, AIRFIELD, AND STORM

SEWER NOTES.

3. EXISTING INFORMATION AND TOPOGRAPHY PROVIDED

BY GIS DATA AND GEOSURVEY, LTD., DATED 07/19/2018,

REVISED: 11/03/2023. FIELD VERIFICATION IS REQUIRED

TO ENSURE POSITIVE DRAINAGE AND ELIMINATION OF

ALL STANDING WATER.

4. REFER TO SHEET CE007 FOR SHEET KEY MAP.

5. CONTRACTOR IS RESPONSIBLE FOR RETURNING ALL

DISTURBED AREA TO PRE-CONSTRUCTION CONDITION.

6. THE CONTRACTOR AND THEIR SUBCONTRACTORS SHALL

PERFORM A FOD CHECK WHEN ENTERING AND EXITING

THE AIRFIELD.

7. THE CONTRACTOR SHALL ONLY REMOVE, REGRADE,

AND REPLACE SOD ON SHOULDER THAT CAN BE

REESTABLISHED AT THE END OF THE WORK DAY.

8. ANY DISTURBED AREA LEFT EXPOSED FOR A PERIOD

GREATER THAN 14 DAYS SHALL BE STABILIZED WITH

MULCH OR TEMPORARY SEEDING.

9. NO MORE THAN 5 ACRES OF LAND CAN BE DISTURBED

S-1125

10.64 AC

S-1280

4.72 AC

3994995996

993 99

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LO

D

LO

D

LO

D

LOD

LOD

LOD

LOD

LO

D

LO

D

LO

D

LO

D

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LO

D

LO

D

LO

D

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LO

D

LO

D

LO

D

LO

D

LOD

LO

D

LOD

LO

D

LOD

LOD

LO

D

LO

D

LOD

LO

D

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LO

D

LO

D

LO

D

LOD

LO

D

LO

D

LO

D

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD LOD

LOD

LOD

LO

D

LOD

LOD

LODLOD

LOD

LOD

LOD

LOD

LOD

LOD

LO

D

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

TANYA NORMAN, P.E.

P.E. No. 0038055, GA

DATE: 01/09/2026 ______________

1 2 3 4 5

A

B

C

D

SHEET ID

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

LO

U

IS

VI

LL

E

D

IS

TR

IC

T

LO

U

IS

VI

LL

E, K

EN

TU

C

KY

-0

P A

R K

W A

Y L

A N

E S

U

IT

E

P

E A

C H

TR

E

E C

O R

N E

R S

, G A

P

H O

N E

(6

) 3

-7

P

O N

D J

O B

N o.

SI

ZE

FI

LE

N

AM

E:

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SO

LI

C

IT

AT

IO

N N

O

C O

N

TR

AC

T

N O

FI

LE

N U

M

BE

R

US Army Corps of Engineers®

Louisville District

FI

LE

P

AT

H : X

:\F Y2

3\

8\

.C

AD

B

IM

\0 4.

.C

AD

PH

S H

EE

TS

\C

TT

ED

: 0 1/

/2

B Y:

N O

R M

AN

, T

AN

YA

IS

SU

E D

AT

E:

JA

N

U

AR

Y 9, AN

SI

D

A.

D

U

EH

R

D .M

. L

EC

KI

E

T.

N

O R

M

AN

D

AT

E D

ES

C

R

IP

TI

O

N M

AR

K

R

EP

AI

R

M

AI

N

TA

IN

A

IR

FI

EL

D S

TO

R

M W

AT

ER

S

YS

TE

M

PH

AS

E

II

D O

BB

IN

S

AI

R R

ES

ER

VE

B

AS

E, G

EO

R G

IA

PR

O

JE

C T

N O

FG

W B

-0

FG

W B

-0

P2

CERTIFIED FINAL

J.

P.

AR

IS

TI

ZA

BA

L

MATCHLINE-SEE SHEET CE317

M

AT

C H

LI

N

E-

SE

E

SH

EE

T

C E3

MATCHLINE-SEE SHEET C-105

SI

O

N A

N D

S

ED

IM

EN

T C

O N

TR

O

L

FI

N

AL

P

LA

N

CE311

C E3

.d w g

Ds4

Ds4

Ds4

Ds4

Ds4

Ds4

Sd1-S

Sd2-B

Sd2-B

KEY MAP

CLIN I

C

LI

N I

CE329

CE330

CE331

CE301 CE302 CE303 CE304

CE307

CE308 CE309 CE310 CE311

CE313 CE314 CE315 CE316 CE317

CE320 CE321 CE322

CE325 CE326

CE306 CE312

CE318

CE223

CLIN IV

C

LI

N

II

CLIN III

PLAN

NORTH

A1 EROSION AND SEDIMENT CONTROL FINAL PLAN

GENERAL SHEET NOTES

1. REFER TO SHEETS CE001-CE006 FOR EROSION AND

SEDIMENT CONTROL NOTES.

2. REFER TO SHEETS C-001 AND C-002 FOR PROJECT

ABBREVIATIONS AND GENERAL, AIRFIELD, AND STORM

SEWER NOTES.

3. EXISTING INFORMATION AND TOPOGRAPHY PROVIDED

BY GIS DATA AND GEOSURVEY, LTD., DATED 07/19/2018,

REVISED: 11/03/2023. FIELD VERIFICATION IS REQUIRED

TO ENSURE POSITIVE DRAINAGE AND ELIMINATION OF

ALL STANDING WATER.

4. REFER TO SHEET CE007 FOR SHEET KEY MAP.

5. CONTRACTOR IS RESPONSIBLE FOR RETURNING ALL

DISTURBED AREA TO PRE-CONSTRUCTION CONDITION.

6. THE CONTRACTOR AND THEIR SUBCONTRACTORS SHALL

PERFORM A FOD CHECK WHEN ENTERING AND EXITING

THE AIRFIELD.

7. THE CONTRACTOR SHALL ONLY REMOVE, REGRADE,

AND REPLACE SOD ON SHOULDER THAT CAN BE

REESTABLISHED AT THE END OF THE WORK DAY.

8. ANY DISTURBED AREA LEFT EXPOSED FOR A PERIOD

GREATER THAN 14 DAYS SHALL BE STABILIZED WITH

MULCH OR TEMPORARY SEEDING.

9. NO MORE THAN 5 ACRES OF LAND CAN BE DISTURBED

AT A TIME. CONSTRUCTION MUST BE PHASED TO LIMIT

LAND DISTURBANCES TO 5 ACRES OR LESS.

M

AT

C H

LI

N

E-

SE

E

SH

EE

T

C E3

Sd2-B

COBB PARKW

AY

(U.S. HIGHW

AY 41)

(VARIABLE R/W

1000 1000

1ST STREET

COBB PARKW

AY

COBB PARKW

AY

(U.S. HIGHW

AY 41)

(VARIABLE R/W

COBB PARKW

AY

(U.S. HIGHW

AY 41)

(VARIABLE R/W

1000 1000

LO

D

LO

D

LOD

LOD

LO

D

LOD

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

TANYA NORMAN, P.E.

P.E. No. 0038055, GA

DATE: 01/09/2026 ______________

1 2 3 4 5

A

B

C

D

SHEET ID

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

LO

U

IS

VI

LL

E

D

IS

TR

IC

T

LO

U

IS

VI

LL

E, K

EN

TU

C

KY

-0

P A

R K

W A

Y L

A N

E S

U

IT

E

P

E A

C H

TR

E

E C

O R

N E

R S

, G A

P

H O

N E

(6

) 3

-7

P

O N

D J

O B

N o.

SI

ZE

FI

LE

N

AM

E:

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SO

LI

C

IT

AT

IO

N N

O

C O

N

TR

AC

T

N O

FI

LE

N U

M

BE

R

US Army Corps of Engineers®

Louisville District

FI

LE

P

AT

H : X

:\F Y2

3\

8\

.C

AD

B

IM

\0 4.

.C

AD

PH

S H

EE

TS

\C

TT

ED

: 0 1/

/2

B Y:

N O

R M

AN

, T

AN

YA

IS

SU

E D

AT

E:

JA

N

U

AR

Y 9, AN

SI

D

A.

D

U

EH

R

D .M

. L

EC

KI

E

T.

N

O R

M

AN

D

AT

E D

ES

C

R

IP

TI

O

N M

AR

K

R

EP

AI

R

M

AI

N

TA

IN

A

IR

FI

EL

D S

TO

R

M W

AT

ER

S

YS

TE

M

PH

AS

E

II

D O

BB

IN

S

AI

R R

ES

ER

VE

B

AS

E, G

EO

R G

IA

PR

O

JE

C T

N O

FG

W B

-0

FG

W B

-0

P2

CERTIFIED FINAL

J.

P.

AR

IS

TI

ZA

BA

L

MATCHLINE-SEE SHEET CE318

M

AT

C H

LI

N

E-

SE

E

SH

EE

T

C

SI

O

N A

N D

S

ED

IM

EN

T C

O N

TR

O

L

FI

N

AL

P

LA

N

CE312

C E3

.d w g

Du

KEY MAP

CLIN I

C

LI

N I

CE329

CE330

CE331

CE301 CE302 CE303 CE304

CE307

CE308 CE309 CE310 CE311

CE313 CE314 CE315 CE316 CE317

CE320 CE321 CE322

CE325 CE326

CE306 CE312

CE318

CE223

CLIN IV

C

LI

N

II

CLIN III

PLAN

NORTH

A1 EROSION AND SEDIMENT CONTROL FINAL PLAN

GENERAL SHEET NOTES

1. REFER TO SHEETS CE001-CE006 FOR EROSION AND

SEDIMENT CONTROL NOTES.

2. REFER TO SHEETS C-001 AND C-002 FOR PROJECT

ABBREVIATIONS AND GENERAL, AIRFIELD, AND STORM

SEWER NOTES.

3. EXISTING INFORMATION AND TOPOGRAPHY PROVIDED

BY GIS DATA AND GEOSURVEY, LTD., DATED 07/19/2018,

REVISED: 11/03/2023. FIELD VERIFICATION IS REQUIRED

TO ENSURE POSITIVE DRAINAGE AND ELIMINATION OF

ALL STANDING WATER.

4. REFER TO SHEET CE007 FOR SHEET KEY MAP.

5. CONTRACTOR IS RESPONSIBLE FOR RETURNING ALL

DISTURBED AREA TO PRE-CONSTRUCTION CONDITION.

6. THE CONTRACTOR AND THEIR SUBCONTRACTORS SHALL

PERFORM A FOD CHECK WHEN ENTERING AND EXITING

THE AIRFIELD.

7. THE CONTRACTOR SHALL ONLY REMOVE, REGRADE,

AND REPLACE SOD ON SHOULDER THAT CAN BE

REESTABLISHED AT THE END OF THE WORK DAY.

8. ANY DISTURBED AREA LEFT EXPOSED FOR A PERIOD

GREATER THAN 14 DAYS SHALL BE STABILIZED WITH

MULCH OR TEMPORARY SEEDING.

9. NO MORE THAN 5 ACRES OF LAND CAN BE DISTURBED

S-1500

4.3 Ac

1000' PRIMARY SURFACE LIMIT

DEFLOREZ ROAD

D O

BBIN

S PATR

O L R

O

AD

LOD

LOD

LOD

LOD

LOD

LOD

LODLOD

LO

D

LO

D

LO

D

LOD

LO

D

LO

D

LOD LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LO

D

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LO

D

LO

D

LOD

LOD

LO

D

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

TANYA NORMAN, P.E.

P.E. No. 0038055, GA

DATE: 01/09/2026 ______________

1 2 3 4 5

A

B

C

D

SHEET ID

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

LO

U

IS

VI

LL

E

D

IS

TR

IC

T

LO

U

IS

VI

LL

E, K

EN

TU

C

KY

-0

P A

R K

W A

Y L

A N

E S

U

IT

E

P

E A

C H

TR

E

E C

O R

N E

R S

, G A

P

H O

N E

(6

) 3

-7

P

O N

D J

O B

N o.

SI

ZE

FI

LE

N

AM

E:

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SO

LI

C

IT

AT

IO

N N

O

C O

N

TR

AC

T

N O

FI

LE

N U

M

BE

R

US Army Corps of Engineers®

Louisville District

FI

LE

P

AT

H : X

:\F Y2

3\

8\

.C

AD

B

IM

\0 4.

.C

AD

PH

S H

EE

TS

\C

TT

ED

: 0 1/

/2

B Y:

N O

R M

AN

, T

AN

YA

IS

SU

E D

AT

E:

JA

N

U

AR

Y 9, AN

SI

D

A.

D

U

EH

R

D .M

. L

EC

KI

E

T.

N

O R

M

AN

D

AT

E D

ES

C

R

IP

TI

O

N M

AR

K

R

EP

AI

R

M

AI

N

TA

IN

A

IR

FI

EL

D S

TO

R

M W

AT

ER

S

YS

TE

M

PH

AS

E

II

D O

BB

IN

S

AI

R R

ES

ER

VE

B

AS

E, G

EO

R G

IA

PR

O

JE

C T

N O

FG

W B

-0

FG

W B

-0

P2

CERTIFIED FINAL

J.

P.

AR

IS

TI

ZA

BA

L

M

AT

C H

LI

N

E-

SE

E

SH

EE

T

C E3

MATCHLINE-SEE SHEET CE307

SI

O

N A

N D

S

ED

IM

EN

T C

O N

TR

O

L

FI

N

AL

P

LA

N

CE313

C E3

.d w g

Ds4

Ds4

Ds4

Ds4

Ds4

Sd2-B

JURISDICTIONAL

WATERWAY

KEY MAP

CLIN I

C

LI

N I

CE329

CE330

CE331

CE301 CE302 CE303 CE304

CE307

CE308 CE309 CE310 CE311

CE313 CE314 CE315 CE316 CE317

CE320 CE321 CE322

CE325 CE326

CE306 CE312

CE318

CE223

CLIN IV

C

LI

N

II

CLIN III

PLAN

NORTH

A1 EROSION AND SEDIMENT CONTROL FINAL PLAN

GENERAL SHEET NOTES

1. REFER TO SHEETS CE001-CE006 FOR EROSION AND

SEDIMENT CONTROL NOTES.

2. REFER TO SHEETS C-001 AND C-002 FOR PROJECT

ABBREVIATIONS AND GENERAL, AIRFIELD, AND STORM

SEWER NOTES.

3. EXISTING INFORMATION AND TOPOGRAPHY PROVIDED

BY GIS DATA AND GEOSURVEY, LTD., DATED 07/19/2018,

REVISED: 11/03/2023. FIELD VERIFICATION IS REQUIRED

TO ENSURE POSITIVE DRAINAGE AND ELIMINATION OF

ALL STANDING WATER.

4. REFER TO SHEET CE007 FOR SHEET KEY MAP.

5. CONTRACTOR IS RESPONSIBLE FOR RETURNING ALL

DISTURBED AREA TO PRE-CONSTRUCTION CONDITION.

6. THE CONTRACTOR AND THEIR SUBCONTRACTORS SHALL

PERFORM A FOD CHECK WHEN ENTERING AND EXITING

THE AIRFIELD.

7. THE CONTRACTOR SHALL ONLY REMOVE, REGRADE,

AND REPLACE SOD ON SHOULDER THAT CAN BE

REESTABLISHED AT THE END OF THE WORK DAY.

8. ANY DISTURBED AREA LEFT EXPOSED FOR A PERIOD

GREATER THAN 14 DAYS SHALL BE STABILIZED WITH

MULCH OR TEMPORARY SEEDING.

9. NO MORE THAN 5 ACRES OF LAND CAN BE DISTURBED

10251025

S-1510

11.9 Ac

S-1525

8.0 Ac

S-1910

8.79 Ac

S-225

2.19 Ac

S-1520

3.79 Ac

S-1530

1.60 Ac1000' PRIMARY SURFACE LIMIT

10251025

A3 C-502

LOD

LOD

LOD

LOD

LOD

LO

D

LO

D

LOD

LO

D

LO

D

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LO

D

LOD

LOD

LO

D

LOD

LOD

LOD

LO

D

LO

D

LO

D

LO

D

LO

D

LOD

LOD

LO

D

LO

D

LO

D

LOD

LOD

LOD

LOD

LOD

LOD

LO

D

LO

D

LO

D

LO

D

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD LOD

LOD

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD LOD

LOD

LOD

LO

D

LO

D

LOD

LOD

LODLOD

LO

D

LOD

LOD

LOD

LOD

LO

D

LOD

LOD

LOD LO

D

LO

D

LOD

LOD

LOD

LO

D

LO

D

LOD

LOD

LOD

LO

D

LO

D

LOD

LO

D

LOD

LO

D

LO

D

LO

D

LO

D

LOD

LOD

LOD

LOD

LOD

LOD LOD LOD LOD LOD

LOD

LOD

LOD

LOD

LOD

LOD

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LOD

LOD

LOD

LOD

LO

D

LO

D

LOD

LOD

LOD

LOD LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LODLOD

LOD

LO

D

LO

D

LOD

LO

D

LOD

LOD LOD

LO

D

LOD

LO

D

LOD

LOD

LOD

LO

D

LO

D

LOD

LOD

LOD

LO

D

LO

D

LOD

LO

D

LOD

LO

D

TANYA NORMAN, P.E.

P.E. No. 0038055, GA

DATE: 01/09/2026 ______________

1 2 3 4 5

A

B

C

D

SHEET ID

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

LO

U

IS

VI

LL

E

D

IS

TR

IC

T

LO

U

IS

VI

LL

E, K

EN

TU

C

KY

-0

P A

R K

W A

Y L

A N

E S

U

IT

E

P

E A

C H

TR

E

E C

O R

N E

R S

, G A

P

H O

N E

(6

) 3

-7

P

O N

D J

O B

N o.

SI

ZE

FI

LE

N

AM

E:

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SO

LI

C

IT

AT

IO

N N

O

C O

N

TR

AC

T

N O

FI

LE

N U

M

BE

R

US Army Corps of Engineers®

Louisville District

FI

LE

P

AT

H : X

:\F Y2

3\

8\

.C

AD

B

IM

\0 4.

.C

AD

PH

S H

EE

TS

\C

TT

ED

: 0 1/

/2

B Y:

N O

R M

AN

, T

AN

YA

IS

SU

E D

AT

E:

JA

N

U

AR

Y 9, AN

SI

D

A.

D

U

EH

R

D .M

. L

EC

KI

E

T.

N

O R

M

AN

D

AT

E D

ES

C

R

IP

TI

O

N M

AR

K

R

EP

AI

R

M

AI

N

TA

IN

A

IR

FI

EL

D S

TO

R

M W

AT

ER

S

YS

TE

M

PH

AS

E

II

D O

BB

IN

S

AI

R R

ES

ER

VE

B

AS

E, G

EO

R G

IA

PR

O

JE

C T

N O

FG

W B

-0

FG

W B

-0

P2

CERTIFIED FINAL

J.

P.

AR

IS

TI

ZA

BA

L

M

AT

C H

LI

N

E-

SE

E

SH

EE

T

C E3

M

AT

C H

LI

N

E-

SE

E

SH

EE

T

C E3

MATCHLINE-SEE SHEET CE308

SI

O

N A

N D

S

ED

IM

EN

T C

O N

TR

O

L

FI

N

AL

P

LA

N

CE314

C E3

.d w g

Ds4

Ds4

Ds4

Ds4

Ds4

Ds4

Ds4

Ds4

Ds4

Ds4

Sd2-B

Sd2-B

Sd2-B

Sd2-B

Sd2-B

Sd2-B

KEY MAP

CLIN I

C

LI

N I

CE329

CE330

CE331

CE301 CE302 CE303 CE304

CE307

CE308 CE309 CE310 CE311

CE313 CE314 CE315 CE316 CE317

CE320 CE321 CE322

CE325 CE326

CE306 CE312

CE318

CE223

CLIN IV

C

LI

N

II

CLIN III

PLAN

NORTH

A1 EROSION AND SEDIMENT CONTROL FINAL PLAN

GENERAL SHEET NOTES

1. REFER TO SHEETS CE001-CE006 FOR EROSION AND SEDIMENT

CONTROL NOTES.

2. REFER TO SHEETS C-001 AND C-002 FOR PROJECT

ABBREVIATIONS AND GENERAL, AIRFIELD, AND STORM SEWER

NOTES.

3. EXISTING INFORMATION AND TOPOGRAPHY PROVIDED BY GIS

DATA AND GEOSURVEY, LTD., DATED 07/19/2018, REVISED:

11/03/2023. FIELD VERIFICATION IS REQUIRED TO ENSURE

POSITIVE DRAINAGE AND ELIMINATION OF ALL STANDING

WATER.

4. REFER TO SHEET CE007 FOR SHEET KEY MAP.

5. CONTRACTOR IS RESPONSIBLE FOR RETURNING ALL

DISTURBED AREA TO PRE-CONSTRUCTION CONDITION.

6. THE CONTRACTOR AND THEIR SUBCONTRACTORS SHALL

PERFORM A FOD CHECK WHEN ENTERING AND EXITING THE

AIRFIELD.

7. THE CONTRACTOR SHALL ONLY REMOVE, REGRADE, AND

REPLACE SOD ON SHOULDER THAT CAN BE REESTABLISHED AT

THE END OF THE WORK DAY.

8. ANY DISTURBED AREA LEFT EXPOSED FOR A PERIOD

GREATER THAN 14 DAYS SHALL BE STABILIZED WITH MULCH

OR TEMPORARY SEEDING.

9. NO MORE THAN 5 ACRES OF LAND CAN BE DISTURBED AT A

TIME. CONSTRUCTION MUST BE PHASED TO LIMIT LAND

DISTURBANCES TO 5 ACRES OR LESS.

10151015

S-2010

8.23 Ac

S-694

2.24 Ac

1000' PRIMARY SURFACE LIMIT

S-1944

4.16 Ac

S-1830

2.02 Ac

S-1840

0.96 Ac

10151015

LOD

LOD

LOD

LOD

LOD

LO

D

LOD

LOD

LOD

LOD

LO

D

LO

D

LOD

LOD LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD LOD

LOD

LOD

LOD

LOD

LO

D

LO

D

LO

D

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LODLOD

LOD

LOD

LO

D

LO

D

LOD

LOD

LOD

LOD

LOD

LO

D

LOD LOD

LOD LOD

LOD LO

D

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LO

D

LO

D

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LO

D

LO

D

LOD

LO

D LOD

LOD

LOD

LOD

LOD

LO

D

LO

D

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD LOD

LOD

LOD LO

D

LO

D

LO

D

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LODLOD

LOD

LO

D

LOD

LO

D

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LO

D

LO

D

LO

D

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LO

D

LO

D

LO

D

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LO

D

LO

D

LO

D

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LO

D

LO

D

TANYA NORMAN, P.E.

P.E. No. 0038055, GA

DATE: 01/09/2026 ______________

1 2 3 4 5

A

B

C

D

SHEET ID

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

LO

U

IS

VI

LL

E

D

IS

TR

IC

T

LO

U

IS

VI

LL

E, K

EN

TU

C

KY

-0

P A

R K

W A

Y L

A N

E S

U

IT

E

P

E A

C H

TR

E

E C

O R

N E

R S

, G A

P

H O

N E

(6

) 3

-7

P

O N

D J

O B

N o.

SI

ZE

FI

LE

N

AM

E:

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SO

LI

C

IT

AT

IO

N N

O

C O

N

TR

AC

T

N O

FI

LE

N U

M

BE

R

US Army Corps of Engineers®

Louisville District

FI

LE

P

AT

H : X

:\F Y2

3\

8\

.C

AD

B

IM

\0 4.

.C

AD

PH

S H

EE

TS

\C

TT

ED

: 0 1/

/2

B Y:

N O

R M

AN

, T

AN

YA

IS

SU

E D

AT

E:

JA

N

U

AR

Y 9, AN

SI

D

A.

D

U

EH

R

D .M

. L

EC

KI

E

T.

N

O R

M

AN

D

AT

E D

ES

C

R

IP

TI

O

N M

AR

K

R

EP

AI

R

M

AI

N

TA

IN

A

IR

FI

EL

D S

TO

R

M W

AT

ER

S

YS

TE

M

PH

AS

E

II

D O

BB

IN

S

AI

R R

ES

ER

VE

B

AS

E, G

EO

R G

IA

PR

O

JE

C T

N O

FG

W B

-0

FG

W B

-0

P2

CERTIFIED FINAL

J.

P.

AR

IS

TI

ZA

BA

L

MATCHLINE-SEE SHEET CE320

M

AT

C H

LI

N

E-

SE

E

SH

EE

T

C E3

M

AT

C H

LI

N

E-

SE

E

SH

EE

T

C E3

MATCHLINE-SEE SHEET CE309

SI

O

N A

N D

S

ED

IM

EN

T C

O N

TR

O

L

FI

N

AL

P

LA

N

CE315

C E3

.d w g

Ds4

Ds4

Ds4

Ds4

Ds4

Ds4

Ds4

Ds4

Ds4

Ds4

Ds4

Ds4

Ds4

Ds4

Sd2-B

Sd2-B

Sd2-B

Sd2-B

Sd2-B

Sd2-F

Sd2-F Sd2-F

KEY MAP

CLIN I

C

LI

N I

CE329

CE330

CE331

CE301 CE302 CE303 CE304

CE307

CE308 CE309 CE310 CE311

CE313 CE314 CE315 CE316 CE317

CE320 CE321 CE322

CE325 CE326

CE306 CE312

CE318

CE223

CLIN IV

C

LI

N

II

CLIN III

PLAN

NORTH

A1 EROSION AND SEDIMENT CONTROL FINAL PLAN

GENERAL SHEET NOTES

1. REFER TO SHEETS CE001-CE006 FOR EROSION AND

SEDIMENT CONTROL NOTES.

2. REFER TO SHEETS C-001 AND C-002 FOR PROJECT

ABBREVIATIONS AND GENERAL, AIRFIELD, AND STORM

SEWER NOTES.

3. EXISTING INFORMATION AND TOPOGRAPHY PROVIDED

BY GIS DATA AND GEOSURVEY, LTD., DATED 07/19/2018,

REVISED: 11/03/2023. FIELD VERIFICATION IS REQUIRED

TO ENSURE POSITIVE DRAINAGE AND ELIMINATION OF

ALL STANDING WATER.

4. REFER TO SHEET CE007 FOR SHEET KEY MAP.

5. CONTRACTOR IS RESPONSIBLE FOR RETURNING ALL

DISTURBED AREA TO PRE-CONSTRUCTION CONDITION.

6. THE CONTRACTOR AND THEIR SUBCONTRACTORS SHALL

PERFORM A FOD CHECK WHEN ENTERING AND EXITING

THE AIRFIELD.

7. THE CONTRACTOR SHALL ONLY REMOVE, REGRADE,

AND REPLACE SOD ON SHOULDER THAT CAN BE

REESTABLISHED AT THE END OF THE WORK DAY.

8. ANY DISTURBED AREA LEFT EXPOSED FOR A PERIOD

GREATER THAN 14 DAYS SHALL BE STABILIZED WITH

MULCH OR TEMPORARY SEEDING.

9. NO MORE THAN 5 ACRES OF LAND CAN BE DISTURBED

LO

D

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LODLOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LOD

LO

D

LO

D

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LODLO

D

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LO

D

LO

D

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LO

D

LOD

LOD

LOD

LOD

LO

D

LO

D

LO

D

LO

D

LO

D

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

TANYA NORMAN, P.E.

P.E. No. 0038055, GA

DATE: 01/09/2026 ______________

1 2 3 4 5

A

B

C

D

SHEET ID

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

LO

U

IS

VI

LL

E

D

IS

TR

IC

T

LO

U

IS

VI

LL

E, K

EN

TU

C

KY

-0

P A

R K

W A

Y L

A N

E S

U

IT

E

P

E A

C H

TR

E

E C

O R

N E

R S

, G A

P

H O

N E

(6

) 3

-7

P

O N

D J

O B

N o.

SI

ZE

FI

LE

N

AM

E:

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SO

LI

C

IT

AT

IO

N N

O

C O

N

TR

AC

T

N O

FI

LE

N U

M

BE

R

US Army Corps of Engineers®

Louisville District

FI

LE

P

AT

H : X

:\F Y2

3\

8\

.C

AD

B

IM

\0 4.

.C

AD

PH

S H

EE

TS

\C

TT

ED

: 0 1/

/2

B Y:

N O

R M

AN

, T

AN

YA

IS

SU

E D

AT

E:

JA

N

U

AR

Y 9, AN

SI

D

A.

D

U

EH

R

D .M

. L

EC

KI

E

T.

N

O R

M

AN

D

AT

E D

ES

C

R

IP

TI

O

N M

AR

K

R

EP

AI

R

M

AI

N

TA

IN

A

IR

FI

EL

D S

TO

R

M W

AT

ER

S

YS

TE

M

PH

AS

E

II

D O

BB

IN

S

AI

R R

ES

ER

VE

B

AS

E, G

EO

R G

IA

PR

O

JE

C T

N O

FG

W B

-0

FG

W B

-0

P2

CERTIFIED FINAL

J.

P.

AR

IS

TI

ZA

BA

L

MATCHLINE-SEE SHEET CE321

M

AT

C H

LI

N

E-

SE

E

SH

EE

T

C E3

M

AT

C H

LI

N

E-

SE

E

SH

EE

T

C E3

MATCHLINE-SEE SHEET CE310

SI

O

N A

N D

S

ED

IM

EN

T C

O N

TR

O

L

FI

N

AL

P

LA

N

CE316

C E3

.d w g

Ds4 Ds4

Ds4

Ds4

Ds4

Ds4

Ds4

Ds4

Ds4

Ds4

KEY MAP

CLIN I

C

LI

N I

CE329

CE330

CE331

CE301 CE302 CE303 CE304

CE307

CE308 CE309 CE310 CE311

CE313 CE314 CE315 CE316 CE317

CE320 CE321 CE322

CE325 CE326

CE306 CE312

CE318

CE223

CLIN IV

C

LI

N

II

CLIN III

PLAN

NORTH

A1 EROSION AND SEDIMENT CONTROL FINAL PLAN

GENERAL SHEET NOTES

1. REFER TO SHEETS CE001-CE006 FOR EROSION AND

SEDIMENT CONTROL NOTES.

2. REFER TO SHEETS C-001 AND C-002 FOR PROJECT

ABBREVIATIONS AND GENERAL, AIRFIELD, AND STORM

SEWER NOTES.

3. EXISTING INFORMATION AND TOPOGRAPHY PROVIDED

BY GIS DATA AND GEOSURVEY, LTD., DATED 07/19/2018,

REVISED: 11/03/2023. FIELD VERIFICATION IS REQUIRED

TO ENSURE POSITIVE DRAINAGE AND ELIMINATION OF

ALL STANDING WATER.

4. REFER TO SHEET CE007 FOR SHEET KEY MAP.

5. CONTRACTOR IS RESPONSIBLE FOR RETURNING ALL

DISTURBED AREA TO PRE-CONSTRUCTION CONDITION.

6. THE CONTRACTOR AND THEIR SUBCONTRACTORS SHALL

PERFORM A FOD CHECK WHEN ENTERING AND EXITING

THE AIRFIELD.

7. THE CONTRACTOR SHALL ONLY REMOVE, REGRADE,

AND REPLACE SOD ON SHOULDER THAT CAN BE

REESTABLISHED AT THE END OF THE WORK DAY.

8. ANY DISTURBED AREA LEFT EXPOSED FOR A PERIOD

GREATER THAN 14 DAYS SHALL BE STABILIZED WITH

MULCH OR TEMPORARY SEEDING.

9. NO MORE THAN 5 ACRES OF LAND CAN BE DISTURBED

C1 C-502

990990

980980

S-1140

37.48 AC

990990

980980

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LO

D

LOD

LOD

LO

D

LO

D

LOD

LOD

LOD

LO

D

LO

D

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LODLOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD LOD

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LO

D

LO

D

LOD

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D LO

D

LO

D

LO

D

LO

D

LO

D

LOD

LOD

LOD

LOD

LOD

LO

DLOD

LOD

LOD

LOD

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD LOD LOD

LO

D

LO

D

LO

D

LO

D

LO

D

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

TANYA NORMAN, P.E.

P.E. No. 0038055, GA

DATE: 01/09/2026 ______________

1 2 3 4 5

A

B

C

D

SHEET ID

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

LO

U

IS

VI

LL

E

D

IS

TR

IC

T

LO

U

IS

VI

LL

E, K

EN

TU

C

KY

-0

P A

R K

W A

Y L

A N

E S

U

IT

E

P

E A

C H

TR

E

E C

O R

N E

R S

, G A

P

H O

N E

(6

) 3

-7

P

O N

D J

O B

N o.

SI

ZE

FI

LE

N

AM

E:

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SO

LI

C

IT

AT

IO

N N

O

C O

N

TR

AC

T

N O

FI

LE

N U

M

BE

R

US Army Corps of Engineers®

Louisville District

FI

LE

P

AT

H : X

:\F Y2

3\

8\

.C

AD

B

IM

\0 4.

.C

AD

PH

S H

EE

TS

\C

TT

ED

: 0 1/

/2

B Y:

N O

R M

AN

, T

AN

YA

IS

SU

E D

AT

E:

JA

N

U

AR

Y 9, AN

SI

D

A.

D

U

EH

R

D .M

. L

EC

KI

E

T.

N

O R

M

AN

D

AT

E D

ES

C

R

IP

TI

O

N M

AR

K

R

EP

AI

R

M

AI

N

TA

IN

A

IR

FI

EL

D S

TO

R

M W

AT

ER

S

YS

TE

M

PH

AS

E

II

D O

BB

IN

S

AI

R R

ES

ER

VE

B

AS

E, G

EO

R G

IA

PR

O

JE

C T

N O

FG

W B

-0

FG

W B

-0

P2

CERTIFIED FINAL

J.

P.

AR

IS

TI

ZA

BA

L

MATCHLINE-SEE SHEET CE322

M

AT

C H

LI

N

E-

SE

E

SH

EE

T

C E3

M

AT

C H

LI

N

E-

SE

E

SH

EE

T

C E3

MATCHLINE-SEE SHEET CE311

SI

O

N A

N D

S

ED

IM

EN

T C

O N

TR

O

L

FI

N

AL

P

LA

N

CE317

C E3

.d w g

Ds4

Ds4

Ds4

Ds4

Ds4

Ds4

Ds4

Ds4

Sd2-B

END SILT

FENCE

START SILT

FENCE

Sd1-SDs4KEY MAP

CLIN I

C

LI

N I

CE329

CE330

CE331

CE301 CE302 CE303 CE304

CE307

CE308 CE309 CE310 CE311

CE313 CE314 CE315 CE316 CE317

CE320 CE321 CE322

CE325 CE326

CE306 CE312

CE318

CE223

CLIN IV

C

LI

N

II

CLIN III

PLAN

NORTH

A1 EROSION AND SEDIMENT CONTROL FINAL PLAN

GENERAL SHEET NOTES

1. REFER TO SHEETS CE001-CE006 FOR EROSION AND SEDIMENT

CONTROL NOTES.

2. REFER TO SHEETS C-001 AND C-002 FOR PROJECT ABBREVIATIONS

AND GENERAL, AIRFIELD, AND STORM SEWER NOTES.

3. EXISTING INFORMATION AND TOPOGRAPHY PROVIDED BY GIS DATA

AND GEOSURVEY, LTD., DATED 07/19/2018, REVISED: 11/03/2023. FIELD

VERIFICATION IS REQUIRED TO ENSURE POSITIVE DRAINAGE AND

ELIMINATION OF ALL STANDING WATER.

4. REFER TO SHEET CE007 FOR SHEET KEY MAP.

5. CONTRACTOR IS RESPONSIBLE FOR RETURNING ALL DISTURBED AREA

TO PRE-CONSTRUCTION CONDITION.

6. THE CONTRACTOR AND THEIR SUBCONTRACTORS SHALL PERFORM A

FOD CHECK WHEN ENTERING AND EXITING THE AIRFIELD.

7. THE CONTRACTOR SHALL ONLY REMOVE, REGRADE, AND REPLACE

SOD ON SHOULDER THAT CAN BE REESTABLISHED AT THE END OF THE

WORK DAY.

8. ANY DISTURBED AREA LEFT EXPOSED FOR A PERIOD GREATER THAN

14 DAYS SHALL BE STABILIZED WITH MULCH OR TEMPORARY

SEEDING.

9. NO MORE THAN 5 ACRES OF LAND CAN BE DISTURBED AT A TIME.

CONSTRUCTION MUST BE PHASED TO LIMIT LAND DISTURBANCES TO 5

ACRES OR LESS.

1ST STREET

COBB PARKW

AY

965966

LOD

LOD

LOD

LOD

LOD

LOD

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD LO

D

LO

D

LO

D

LO

D

LOD

LOD

LO

D

LOD

LOD

LO

D

LO

D

LO

D

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LO

D

LO

D

LOD

LOD

LOD

LOD

LOD

LOD

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LOD

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LO

D

LOD

LOD

LODLOD

LOD

LOD

LOD

LOD

LO

D

LO

D

LO

D

LOD

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LOD

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LOD

LOD

LOD

LOD

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LOD

LOD

LOD

LOD

LOD

TANYA NORMAN, P.E.

P.E. No. 0038055, GA

DATE: 01/09/2026 ______________

1 2 3 4 5

A

B

C

D

SHEET ID

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

LO

U

IS

VI

LL

E

D

IS

TR

IC

T

LO

U

IS

VI

LL

E, K

EN

TU

C

KY

-0

P A

R K

W A

Y L

A N

E S

U

IT

E

P

E A

C H

TR

E

E C

O R

N E

R S

, G A

P

H O

N E

(6

) 3

-7

P

O N

D J

O B

N o.

SI

ZE

FI

LE

N

AM

E:

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SO

LI

C

IT

AT

IO

N N

O

C O

N

TR

AC

T

N O

FI

LE

N U

M

BE

R

US Army Corps of Engineers®

Louisville District

FI

LE

P

AT

H : X

:\F Y2

3\

8\

.C

AD

B

IM

\0 4.

.C

AD

PH

S H

EE

TS

\C

TT

ED

: 0 1/

/2

B Y:

N O

R M

AN

, T

AN

YA

IS

SU

E D

AT

E:

JA

N

U

AR

Y 9, AN

SI

D

A.

D

U

EH

R

D .M

. L

EC

KI

E

T.

N

O R

M

AN

D

AT

E D

ES

C

R

IP

TI

O

N M

AR

K

R

EP

AI

R

M

AI

N

TA

IN

A

IR

FI

EL

D S

TO

R

M W

AT

ER

S

YS

TE

M

PH

AS

E

II

D O

BB

IN

S

AI

R R

ES

ER

VE

B

AS

E, G

EO

R G

IA

PR

O

JE

C T

N O

FG

W B

-0

FG

W B

-0

P2

CERTIFIED FINAL

J.

P.

AR

IS

TI

ZA

BA

L

MATCHLINE-SEE SHEET CE323

M

AT

C H

LI

N

E-

SE

E

SH

EE

T

C

SI

O

N A

N D

S

ED

IM

EN

T C

O N

TR

O

L

FI

N

AL

P

LA

N

CE318

C E3

.d w g

Ds4

Ds4

Ds4

Ds4

Ds4

JURISDICTIONAL WATERWAY

Ds4

Sd2-F

Sd2-F

START SILT

FENCE

END SILT

FENCE

KEY MAP

CLIN I

C

LI

N I

CE329

CE330

CE331

CE301 CE302 CE303 CE304

CE307

CE308 CE309 CE310 CE311

CE313 CE314 CE315 CE316 CE317

CE320 CE321 CE322

CE325 CE326

CE306 CE312

CE318

CE223

CLIN IV

C

LI

N

II

CLIN III

PLAN

NORTH

A1 EROSION AND SEDIMENT CONTROL FINAL PLAN

GENERAL SHEET NOTES

1. REFER TO SHEETS CE001-CE006 FOR EROSION AND

SEDIMENT CONTROL NOTES.

2. REFER TO SHEETS C-001 AND C-002 FOR PROJECT

ABBREVIATIONS AND GENERAL, AIRFIELD, AND STORM

SEWER NOTES.

3. EXISTING INFORMATION AND TOPOGRAPHY PROVIDED

BY GIS DATA AND GEOSURVEY, LTD., DATED 07/19/2018,

REVISED: 11/03/2023. FIELD VERIFICATION IS REQUIRED

TO ENSURE POSITIVE DRAINAGE AND ELIMINATION OF

ALL STANDING WATER.

4. REFER TO SHEET CE007 FOR SHEET KEY MAP.

5. CONTRACTOR IS RESPONSIBLE FOR RETURNING ALL

DISTURBED AREA TO PRE-CONSTRUCTION CONDITION.

6. THE CONTRACTOR AND THEIR SUBCONTRACTORS SHALL

PERFORM A FOD CHECK WHEN ENTERING AND EXITING

THE AIRFIELD.

7. THE CONTRACTOR SHALL ONLY REMOVE, REGRADE,

AND REPLACE SOD ON SHOULDER THAT CAN BE

REESTABLISHED AT THE END OF THE WORK DAY.

8. ANY DISTURBED AREA LEFT EXPOSED FOR A PERIOD

GREATER THAN 14 DAYS SHALL BE STABILIZED WITH

MULCH OR TEMPORARY SEEDING.

9. NO MORE THAN 5 ACRES OF LAND CAN BE DISTURBED

1000' PRIMARY SURFACE LIMIT

25' STATE BUFFER

50' COUNTY BUFFER

75' IMPERVIOUS BUFFER

25' STATE BU

FFER

50' C O

U N

TY BU

FFER

75' IM

PER

VIO

U

S BU

FFER

LOD

LOD

LOD

LOD

LO

D

LO

D

LO

D

LOD

LOD

LOD

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LOD

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LOD

LOD

LOD

LO

D

LO

D

LOD

LO

D

LOD

LOD

LO

D

LO

DLO

D

LOD

LOD

LOD

LOD

LOD

LOD

LO

D

LOD

LO

D

LO

D

LO

D

LOD

LOD

LOD

LOD

TANYA NORMAN, P.E.

P.E. No. 0038055, GA

DATE: 01/09/2026 ______________

1 2 3 4 5

A

B

C

D

SHEET ID

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

LO

U

IS

VI

LL

E

D

IS

TR

IC

T

LO

U

IS

VI

LL

E, K

EN

TU

C

KY

-0

P A

R K

W A

Y L

A N

E S

U

IT

E

P

E A

C H

TR

E

E C

O R

N E

R S

, G A

P

H O

N E

(6

) 3

-7

P

O N

D J

O B

N o.

SI

ZE

FI

LE

N

AM

E:

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SO

LI

C

IT

AT

IO

N N

O

C O

N

TR

AC

T

N O

FI

LE

N U

M

BE

R

US Army Corps of Engineers®

Louisville District

FI

LE

P

AT

H : X

:\F Y2

3\

8\

.C

AD

B

IM

\0 4.

.C

AD

PH

S H

EE

TS

\C

TT

ED

: 0 1/

/2

B Y:

N O

R M

AN

, T

AN

YA

IS

SU

E D

AT

E:

JA

N

U

AR

Y 9, AN

SI

D

A.

D

U

EH

R

D .M

. L

EC

KI

E

T.

N

O R

M

AN

D

AT

E D

ES

C

R

IP

TI

O

N M

AR

K

R

EP

AI

R

M

AI

N

TA

IN

A

IR

FI

EL

D S

TO

R

M W

AT

ER

S

YS

TE

M

PH

AS

E

II

D O

BB

IN

S

AI

R R

ES

ER

VE

B

AS

E, G

EO

R G

IA

PR

O

JE

C T

N O

FG

W B

-0

FG

W B

-0

P2

CERTIFIED FINAL

J.

P.

AR

IS

TI

ZA

BA

L

M

AT

C H

LI

N

E-

SE

E

SH

EE

T

C E3

MATCHLINE-SEE SHEET CE315

SI

O

N A

N D

S

ED

IM

EN

T C

O N

TR

O

L

FI

N

AL

P

LA

N

CE320

C E3

.d w g

Ds4

St

Sd1-S

START

SILT FENCE

Sd2-F

Sd2-F Sd2-F Sd1-S

Ds4

END

SILT FENCE

START

SILT FENCE

Sd1-S

Ds4

Sd2-F

KEY MAP

CLIN I

C

LI

N I

CE329

CE330

CE331

CE301 CE302 CE303 CE304

CE307

CE308 CE309 CE310 CE311

CE313 CE314 CE315 CE316 CE317

CE320 CE321 CE322

CE325 CE326

CE306 CE312

CE318

CE223

CLIN IV

C

LI

N

II

CLIN III

PLAN

NORTH

A1 EROSION AND SEDIMENT CONTROL FINAL PLAN

GENERAL SHEET NOTES

1. REFER TO SHEETS CE001-CE006 FOR EROSION AND

SEDIMENT CONTROL NOTES.

2. REFER TO SHEETS C-001 AND C-002 FOR PROJECT

ABBREVIATIONS AND GENERAL, AIRFIELD, AND STORM

SEWER NOTES.

3. EXISTING INFORMATION AND TOPOGRAPHY PROVIDED

BY GIS DATA AND GEOSURVEY, LTD., DATED 07/19/2018,

REVISED: 11/03/2023. FIELD VERIFICATION IS REQUIRED

TO ENSURE POSITIVE DRAINAGE AND ELIMINATION OF

ALL STANDING WATER.

4. REFER TO SHEET CE007 FOR SHEET KEY MAP.

5. CONTRACTOR IS RESPONSIBLE FOR RETURNING ALL

DISTURBED AREA TO PRE-CONSTRUCTION CONDITION.

6. THE CONTRACTOR AND THEIR SUBCONTRACTORS SHALL

PERFORM A FOD CHECK WHEN ENTERING AND EXITING

THE AIRFIELD.

7. THE CONTRACTOR SHALL ONLY REMOVE, REGRADE,

AND REPLACE SOD ON SHOULDER THAT CAN BE

REESTABLISHED AT THE END OF THE WORK DAY.

8. ANY DISTURBED AREA LEFT EXPOSED FOR A PERIOD

GREATER THAN 14 DAYS SHALL BE STABILIZED WITH

MULCH OR TEMPORARY SEEDING.

9. NO MORE THAN 5 ACRES OF LAND CAN BE DISTURBED

AT A TIME. CONSTRUCTION MUST BE PHASED TO LIMIT

EX. WETLANDS

75' IM

PER

VIO

U

S BU

FFER

50' C O

U N

TY BU

FFER

25' STATE BU

FFER

75' IM

PER

VIO

U

S BU

FFER

50' C O

U N

TY BU

FFER

25' STATE BU

FFER75' IM

PER

VIO

U

S BU

FFER

50' C

O U

N

TY BU

FFER

25' STATE BU

FFER

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LODLO

D

LO

D

LO

D

LO

D

LO

D

LODLOD

LO

D

LO

D

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LO

D

LO

D

LO

D

LO

D

LOD

LO

D

LO

D

LO

D

LO

D

LO

D

LOD

LOD LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LODLOD

LOD

LOD

LO

D

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LO

D

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LO

D

LO

D

LO

D

LO

D

LOD

TANYA NORMAN, P.E.

P.E. No. 0038055, GA

DATE: 01/09/2026 ______________

1 2 3 4 5

A

B

C

D

SHEET ID

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

LO

U

IS

VI

LL

E

D

IS

TR

IC

T

LO

U

IS

VI

LL

E, K

EN

TU

C

KY

-0

P A

R K

W A

Y L

A N

E S

U

IT

E

P

E A

C H

TR

E

E C

O R

N E

R S

, G A

P

H O

N E

(6

) 3

-7

P

O N

D J

O B

N o.

SI

ZE

FI

LE

N

AM

E:

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SO

LI

C

IT

AT

IO

N N

O

C O

N

TR

AC

T

N O

FI

LE

N U

M

BE

R

US Army Corps of Engineers®

Louisville District

FI

LE

P

AT

H : X

:\F Y2

3\

8\

.C

AD

B

IM

\0 4.

.C

AD

PH

S H

EE

TS

\C

TT

ED

: 0 1/

/2

B Y:

N O

R M

AN

, T

AN

YA

IS

SU

E D

AT

E:

JA

N

U

AR

Y 9, AN

SI

D

A.

D

U

EH

R

D .M

. L

EC

KI

E

T.

N

O R

M

AN

D

AT

E D

ES

C

R

IP

TI

O

N M

AR

K

R

EP

AI

R

M

AI

N

TA

IN

A

IR

FI

EL

D S

TO

R

M W

AT

ER

S

YS

TE

M

PH

AS

E

II

D O

BB

IN

S

AI

R R

ES

ER

VE

B

AS

E, G

EO

R G

IA

PR

O

JE

C T

N O

FG

W B

-0

FG

W B

-0

P2

CERTIFIED FINAL

J.

P.

AR

IS

TI

ZA

BA

L

M

AT

C H

LI

N

E-

SE

E

SH

EE

T

C E3

M

AT

C H

LI

N

E-

SE

E

SH

EE

T

C E3

MATCHLINE-SEE SHEET CE316

SI

O

N A

N D

S

ED

IM

EN

T C

O N

TR

O

L

FI

N

AL

P

LA

N

CE321

C E3

.d w g

Ds4

Ds4

Ds4 Ds4

St

Sd1-S

END

SILT FENCE

Sd1-S

Sd2-B

Sd2-B Ds4

CONCRETE WASHDOWN

SEE DETAIL B1/CE501

KEY MAP

CLIN I

C

LI

N I

CE329

CE330

CE331

CE301 CE302 CE303 CE304

CE307

CE308 CE309 CE310 CE311

CE313 CE314 CE315 CE316 CE317

CE320 CE321 CE322

CE325 CE326

CE306 CE312

CE318

CE223

CLIN IV

C

LI

N

II

CLIN III

PLAN

NORTH

A1 EROSION AND SEDIMENT CONTROL FINAL PLAN

GENERAL SHEET NOTES

1. REFER TO SHEETS CE001-CE006 FOR EROSION AND SEDIMENT

CONTROL NOTES.

2. REFER TO SHEETS C-001 AND C-002 FOR PROJECT

ABBREVIATIONS AND GENERAL, AIRFIELD, AND STORM SEWER

NOTES.

3. EXISTING INFORMATION AND TOPOGRAPHY PROVIDED BY GIS

DATA AND GEOSURVEY, LTD., DATED 07/19/2018, REVISED:

11/03/2023. FIELD VERIFICATION IS REQUIRED TO ENSURE

POSIT…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .