DARB Stormwater PhII_Stamped Drawings_Certified Final P3.pdf
PDF 30 MB Posted
- Solicitation number
- FGWB21000AB_2
About this file
This file contains stamped architectural and engineering drawings for the Repair & Maintain Airfield Stormwater System Phase II project at Dobbins Air Reserve Base. The drawings represent the certified final design documents for the stormwater drainage infrastructure improvements scheduled east of Taxiway 'J'.
The drawings depict the comprehensive stormwater system modifications including regrading and sodding of failed or disturbed slope areas to restore positive drainage and stabilization, cleaning and rehabilitation of existing flumes, pipes, and swales in basins III, IV, and V, and installation of new concrete flumes at multiple airfield locations to prevent erosion and standing water. The stamped and certified nature of these final drawings indicates they have been approved by a licensed professional engineer and are ready for construction implementation. These technical documents serve as the baseline specifications and spatial requirements for contractors responding to the Phase II solicitation and will guide all earthwork, drainage infrastructure installation, and site restoration activities required to achieve proper surface and subsurface drainage across the designated airfield areas.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
100810101011
10301035
10301030
1025 1020
985995
1010 1005
WETLAND
111b
OPEN
WATER
OPEN
WATER
S-100
1.6 Ac
S-110
3.3 Ac
S-180
0.93 Ac
S-50
0.08 Ac
S-51
0.17 Ac
TPF
TPF
4T H
ST
RE
ET
10301035
10301030
1025 1020
985995
1010 1005
25' STATE BU
FFER
50' C O
U N
TY BU
FFER
75' IM
PERVIO
US BUFFER
25' STATE BUFFER
50' COUNTY BUFFER
75' IMPERVIOUS BUFFER
25' STATE BUFFER
50' COUNTY BUFFER
75' IM
PERVIOUS BUFFER
EX. WETLANDS
EX. WETLANDS
LOD
LOD
LOD LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LOD
LOD LOD
LODLOD
LODLO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LO
D
LO
D
LO
D LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D LOD
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LO
D
LO
D
LOD
LO
D
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
TANYA NORMAN, P.E.
P.E. No. 0038055, GA
DATE: 01/09/2026 ______________
1 2 3 4 5
A
B
C
D
SHEET ID
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
LO
U
IS
VI
LL
E
D
IS
TR
IC
T
LO
U
IS
VI
LL
E, K
EN
TU
C
KY
-0
P A
R K
W A
Y L
A N
E S
U
IT
E
P
E A
C H
TR
E
E C
O R
N E
R S
, G A
P
H O
N E
(6
) 3
-7
P
O N
D J
O B
N o.
SI
ZE
FI
LE
N
AM
E:
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SO
LI
C
IT
AT
IO
N N
O
C O
N
TR
AC
T
N O
FI
LE
N U
M
BE
R
US Army Corps of Engineers®
Louisville District
FI
LE
P
AT
H : X
:\F Y2
3\
8\
.C
AD
B
IM
\0 4.
.C
AD
PH
S H
EE
TS
\C E3
P
LO
TT
ED
: 0 1/
/2
B Y:
N O
R M
AN
, T
AN
YA
IS
SU
E D
AT
E:
JA
N
U
AR
Y 9, AN
SI
D
A.
D
U
EH
R
D .M
. L
EC
KI
E
T.
N
O R
M
AN
D
AT
E D
ES
C
R
IP
TI
O
N M
AR
K
R
EP
AI
R
M
AI
N
TA
IN
A
IR
FI
EL
D S
TO
R
M W
AT
ER
S
YS
TE
M
PH
AS
E
II
D O
BB
IN
S
AI
R R
ES
ER
VE
B
AS
E, G
EO
R G
IA
PR
O
JE
C T
N O
FG
W B
-0
FG
W B
-0
P2
CERTIFIED FINAL
J.
P.
AR
IS
TI
ZA
BA
L
MATCHLINE-SEE SHEET CE307
M
AT
C H
LI
N
E-
SE
E
SH
EE
T
C
ER
O
SI
O
N A
N D
S
ED
IM
EN
T C
O N
TR
O
L
FI
N
AL
P
LA
N
CE301
C E3
.d w g
START
SILT FENCE
Ds4
Ds4
Ds4
Ds4
Ds4
Sd1-S
Sd2-B
Sd1-S Sd2-B
Ch-2
Sd2-F
START
SILT FENCE
START
SILT FENCE
END
SILT FENCE
Sd1-SCo
Sd2-F
Sd2-F
CONCRETE WASHDOWN
SEE DETAIL B1/CE501
KEY MAP
CLIN I
C
LI
N I
CE329
CE330
CE331
CE301 CE302 CE303 CE304
CE307
CE308 CE309 CE310 CE311
CE313 CE314 CE315 CE316 CE317
CE320 CE321 CE322
CE325 CE326
CE306 CE312
CE318
CE223
CLIN IV
C
LI
N
II
CLIN III
PLAN
NORTH
A1 EROSION AND SEDIMENT CONTROL FINAL PLAN
GENERAL SHEET NOTES
1. REFER TO SHEETS CE001-CE006 FOR EROSION AND
SEDIMENT CONTROL NOTES.
2. REFER TO SHEETS C-001 AND C-002 FOR PROJECT
ABBREVIATIONS AND GENERAL, AIRFIELD, AND STORM
SEWER NOTES.
3. EXISTING INFORMATION AND TOPOGRAPHY PROVIDED
BY GIS DATA AND GEOSURVEY, LTD., DATED 07/19/2018,
REVISED: 11/03/2023. FIELD VERIFICATION IS REQUIRED
TO ENSURE POSITIVE DRAINAGE AND ELIMINATION OF
ALL STANDING WATER.
4. REFER TO SHEET CE007 FOR SHEET KEY MAP.
5. CONTRACTOR IS RESPONSIBLE FOR RETURNING ALL
DISTURBED AREA TO PRE-CONSTRUCTION CONDITION.
6. THE CONTRACTOR AND THEIR SUBCONTRACTORS SHALL
PERFORM A FOD CHECK WHEN ENTERING AND EXITING
THE AIRFIELD.
7. THE CONTRACTOR SHALL ONLY REMOVE, REGRADE,
AND REPLACE SOD ON SHOULDER THAT CAN BE
REESTABLISHED AT THE END OF THE WORK DAY.
8. ANY DISTURBED AREA LEFT EXPOSED FOR A PERIOD
GREATER THAN 14 DAYS SHALL BE STABILIZED WITH
MULCH OR TEMPORARY SEEDING.
9. NO MORE THAN 5 ACRES OF LAND CAN BE DISTURBED
AT A TIME. CONSTRUCTION MUST BE PHASED TO LIMIT
LAND DISTURBANCES TO 5 ACRES OR LESS.
M
AT
C H
LI
N
E-
SE
E
SH
EE
T
C
S-130
3.0 Ac
S-330
0.66 Ac
TPF
TPF
TPF
TPF
TPF
TPF
TPF
TPF
TPF
TPF
TPF
TPF
TPF
TPF
TPF
TPF
TPF
TPF
TPF
TPF
TPF
TPF
TPF
TPF
TPF
TPF
22 10
25' STATE BUFFER
50' COUNTY BUFFER
75' IMPERVIOUS BUFFER
EX. WETLANDS
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LOD
LOD
LOD
LO
D
LO
DLOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LODLOD
LOD
LOD
LOD
LOD
LO
D
LOD
LOD
LOD
LOD LO
D LOD
LOD
LOD
LOD
LOD
LOD
LOD LOD
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD LO
D
LOD
LOD
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD LOD
LO
D
LO
D
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
TANYA NORMAN, P.E.
P.E. No. 0038055, GA
DATE: 01/09/2026 ______________
1 2 3 4 5
A
B
C
D
SHEET ID
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
LO
U
IS
VI
LL
E
D
IS
TR
IC
T
LO
U
IS
VI
LL
E, K
EN
TU
C
KY
-0
P A
R K
W A
Y L
A N
E S
U
IT
E
P
E A
C H
TR
E
E C
O R
N E
R S
, G A
P
H O
N E
(6
) 3
-7
P
O N
D J
O B
N o.
SI
ZE
FI
LE
N
AM
E:
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SO
LI
C
IT
AT
IO
N N
O
C O
N
TR
AC
T
N O
FI
LE
N U
M
BE
R
US Army Corps of Engineers®
Louisville District
FI
LE
P
AT
H : X
:\F Y2
3\
8\
.C
AD
B
IM
\0 4.
.C
AD
PH
S H
EE
TS
\C
TT
ED
: 0 1/
/2
B Y:
N O
R M
AN
, T
AN
YA
IS
SU
E D
AT
E:
JA
N
U
AR
Y 9, AN
SI
D
A.
D
U
EH
R
D .M
. L
EC
KI
E
T.
N
O R
M
AN
D
AT
E D
ES
C
R
IP
TI
O
N M
AR
K
R
EP
AI
R
M
AI
N
TA
IN
A
IR
FI
EL
D S
TO
R
M W
AT
ER
S
YS
TE
M
PH
AS
E
II
D O
BB
IN
S
AI
R R
ES
ER
VE
B
AS
E, G
EO
R G
IA
PR
O
JE
C T
N O
FG
W B
-0
FG
W B
-0
P2
CERTIFIED FINAL
J.
P.
AR
IS
TI
ZA
BA
L
M
AT
C H
LI
N
E-
SE
E
SH
EE
T
C E3
Sd2-F
Ds4
SI
O
N A
N D
S
ED
IM
EN
T C
O N
TR
O
L
FI
N
AL
P
LA
N
CE302
C E3
.d w g
MATCHLINE-SEE SHEET CE308
M
AT
C H
LI
N
E-
SE
E
SH
EE
T
C E3
END
SILT FENCE
Ds4
Ds4
Ds4
Ds4 Ds4
Ds4
Sd1-S
KEY MAP
CLIN I
C
LI
N I
CE329
CE330
CE331
CE301 CE302 CE303 CE304
CE307
CE308 CE309 CE310 CE311
CE313 CE314 CE315 CE316 CE317
CE320 CE321 CE322
CE325 CE326
CE306 CE312
CE318
CE223
CLIN IV
C
LI
N
II
CLIN III
SEE SHEET CE403 FOR ENLARGEMENT
SEE SHEET CE404 FOR ENLARGEMENT
STREAM SAMPLING POINT #2
PLAN
NORTH
A1 EROSION AND SEDIMENT CONTROL FINAL PLAN
GENERAL SHEET NOTES
1. REFER TO SHEETS CE001-CE006 FOR EROSION AND
SEDIMENT CONTROL NOTES.
2. REFER TO SHEETS C-001 AND C-002 FOR PROJECT
ABBREVIATIONS AND GENERAL, AIRFIELD, AND STORM
SEWER NOTES.
3. EXISTING INFORMATION AND TOPOGRAPHY PROVIDED
BY GIS DATA AND GEOSURVEY, LTD., DATED 07/19/2018,
REVISED: 11/03/2023. FIELD VERIFICATION IS REQUIRED
TO ENSURE POSITIVE DRAINAGE AND ELIMINATION OF
ALL STANDING WATER.
4. REFER TO SHEET CE007 FOR SHEET KEY MAP.
5. CONTRACTOR IS RESPONSIBLE FOR RETURNING ALL
DISTURBED AREA TO PRE-CONSTRUCTION CONDITION.
6. THE CONTRACTOR AND THEIR SUBCONTRACTORS SHALL
PERFORM A FOD CHECK WHEN ENTERING AND EXITING
THE AIRFIELD.
7. THE CONTRACTOR SHALL ONLY REMOVE, REGRADE,
AND REPLACE SOD ON SHOULDER THAT CAN BE
REESTABLISHED AT THE END OF THE WORK DAY.
8. ANY DISTURBED AREA LEFT EXPOSED FOR A PERIOD
GREATER THAN 14 DAYS SHALL BE STABILIZED WITH
MULCH OR TEMPORARY SEEDING.
9. NO MORE THAN 5 ACRES OF LAND CAN BE DISTURBED
AT A TIME. CONSTRUCTION MUST BE PHASED TO LIMIT
LAND DISTURBANCES TO 5 ACRES OR LESS.
St
Ch-2
Ch-2
Ch-2
D O
BB
IN
S
PL
AC
E
RE
FU
EL
IN
G R
O
AD
LO
D
LO
D
LOD
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LOD
LO
DLOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD LOD
LO
DLOD
LOD
LOD
LOD
LODLO
D
LOD
LOD
LOD
LO
D
LOD
LO
D
LO
D
TANYA NORMAN, P.E.
P.E. No. 0038055, GA
DATE: 01/09/2026 ______________
1 2 3 4 5
A
B
C
D
SHEET ID
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
LO
U
IS
VI
LL
E
D
IS
TR
IC
T
LO
U
IS
VI
LL
E, K
EN
TU
C
KY
-0
P A
R K
W A
Y L
A N
E S
U
IT
E
P
E A
C H
TR
E
E C
O R
N E
R S
, G A
P
H O
N E
(6
) 3
-7
P
O N
D J
O B
N o.
SI
ZE
FI
LE
N
AM
E:
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SO
LI
C
IT
AT
IO
N N
O
C O
N
TR
AC
T
N O
FI
LE
N U
M
BE
R
US Army Corps of Engineers®
Louisville District
FI
LE
P
AT
H : X
:\F Y2
3\
8\
.C
AD
B
IM
\0 4.
.C
AD
PH
S H
EE
TS
\C
TT
ED
: 0 1/
/2
B Y:
N O
R M
AN
, T
AN
YA
IS
SU
E D
AT
E:
JA
N
U
AR
Y 9, AN
SI
D
A.
D
U
EH
R
D .M
. L
EC
KI
E
T.
N
O R
M
AN
D
AT
E D
ES
C
R
IP
TI
O
N M
AR
K
R
EP
AI
R
M
AI
N
TA
IN
A
IR
FI
EL
D S
TO
R
M W
AT
ER
S
YS
TE
M
PH
AS
E
II
D O
BB
IN
S
AI
R R
ES
ER
VE
B
AS
E, G
EO
R G
IA
PR
O
JE
C T
N O
FG
W B
-0
FG
W B
-0
P2
CERTIFIED FINAL
J.
P.
AR
IS
TI
ZA
BA
L
MATCHLINE-SEE SHEET CE309
M
AT
C H
LI
N
E-
SE
E
SH
EE
T
C E3
M
AT
C H
LI
N
E-
SE
E
SH
EE
T
C E3
MATCHLINE-AA
MATCHLINE-AA
SI
O
N A
N D
S
ED
IM
EN
T C
O N
TR
O
L
FI
N
AL
P
LA
N
CE303
C E3
.d w g
START
SILT FENCE
END
SILT FENCE
Ds4
Sd1-S
Sd2-F
Sd2-F
Sd2-F
Sd2-F
Sd2-F
Ds4
Ds4
Ds4
St
KEY MAP
CLIN I
C
LI
N I
CE329
CE330
CE331
CE301 CE302 CE303 CE304
CE307
CE308 CE309 CE310 CE311
CE313 CE314 CE315 CE316 CE317
CE320 CE321 CE322
CE325 CE326
CE306 CE312
CE318
CE223
CLIN IV
C
LI
N
II
CLIN III
PLAN
NORTH
A1 EROSION AND SEDIMENT CONTROL FINAL PLAN
GENERAL SHEET NOTES
1. REFER TO SHEETS CE001-CE006 FOR EROSION AND
SEDIMENT CONTROL NOTES.
2. REFER TO SHEETS C-001 AND C-002 FOR PROJECT
ABBREVIATIONS AND GENERAL, AIRFIELD, AND STORM
SEWER NOTES.
3. EXISTING INFORMATION AND TOPOGRAPHY PROVIDED
BY GIS DATA AND GEOSURVEY, LTD., DATED 07/19/2018,
REVISED: 11/03/2023. FIELD VERIFICATION IS REQUIRED
TO ENSURE POSITIVE DRAINAGE AND ELIMINATION OF
ALL STANDING WATER.
4. REFER TO SHEET CE007 FOR SHEET KEY MAP.
5. CONTRACTOR IS RESPONSIBLE FOR RETURNING ALL
DISTURBED AREA TO PRE-CONSTRUCTION CONDITION.
6. THE CONTRACTOR AND THEIR SUBCONTRACTORS SHALL
PERFORM A FOD CHECK WHEN ENTERING AND EXITING
THE AIRFIELD.
7. THE CONTRACTOR SHALL ONLY REMOVE, REGRADE,
AND REPLACE SOD ON SHOULDER THAT CAN BE
REESTABLISHED AT THE END OF THE WORK DAY.
8. ANY DISTURBED AREA LEFT EXPOSED FOR A PERIOD
GREATER THAN 14 DAYS SHALL BE STABILIZED WITH
MULCH OR TEMPORARY SEEDING.
9. NO MORE THAN 5 ACRES OF LAND CAN BE DISTURBED
AT A TIME. CONSTRUCTION MUST BE PHASED TO LIMIT
LAND DISTURBANCES TO 5 ACRES OR LESS.
ATLANTIC AVENUE
3R D
S
TR
EE
T
D O
BB
IN
S
PL
AC
E
BARRACKS AVENUE
MIMOSA DRIVE
DOBBINS PLACE
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D LOD
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LOD
LOD
LO
D
LO
D
LO
D
LO
DLO
D
LO
D
LO
D
LO
D
LOD
LOD
LO
D
LO
D
LO
D
LOD
LOD
LOD
LODLODLOD
LOD
LO
D
LOD
LOD
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LO
D
LO
D
LO
DLO
D
LO
D
LO
D
LO
D
TANYA NORMAN, P.E.
P.E. No. 0038055, GA
DATE: 01/09/2026 ______________
1 2 3 4 5
A
B
C
D
SHEET ID
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
LO
U
IS
VI
LL
E
D
IS
TR
IC
T
LO
U
IS
VI
LL
E, K
EN
TU
C
KY
-0
P A
R K
W A
Y L
A N
E S
U
IT
E
P
E A
C H
TR
E
E C
O R
N E
R S
, G A
P
H O
N E
(6
) 3
-7
P
O N
D J
O B
N o.
SI
ZE
FI
LE
N
AM
E:
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SO
LI
C
IT
AT
IO
N N
O
C O
N
TR
AC
T
N O
FI
LE
N U
M
BE
R
US Army Corps of Engineers®
Louisville District
FI
LE
P
AT
H : X
:\F Y2
3\
8\
.C
AD
B
IM
\0 4.
.C
AD
PH
S H
EE
TS
\C
TT
ED
: 0 1/
/2
B Y:
N O
R M
AN
, T
AN
YA
IS
SU
E D
AT
E:
JA
N
U
AR
Y 9, AN
SI
D
A.
D
U
EH
R
D .M
. L
EC
KI
E
T.
N
O R
M
AN
D
AT
E D
ES
C
R
IP
TI
O
N M
AR
K
R
EP
AI
R
M
AI
N
TA
IN
A
IR
FI
EL
D S
TO
R
M W
AT
ER
S
YS
TE
M
PH
AS
E
II
D O
BB
IN
S
AI
R R
ES
ER
VE
B
AS
E, G
EO
R G
IA
PR
O
JE
C T
N O
FG
W B
-0
FG
W B
-0
P2
CERTIFIED FINAL
J.
P.
AR
IS
TI
ZA
BA
L
MATCHLINE-SEE SHEET CE110
M
AT
C H
LI
N
E-
SE
E
SH
EE
T
C
SI
O
N A
N D
S
ED
IM
EN
T C
O N
TR
O
L
FI
N
AL
P
LA
N
CE304
C E3
.d w g
MATCHLINE-SEE SHEET CE310
Ds4
Ds4
Sd2-F
Sd2-F
Sd2-F
Sd2-F
Sd2-F
Sd2-F
Sd2-F
Sd2-F
Ds4
KEY MAP
CLIN I
C
LI
N I
CE329
CE330
CE331
CE301 CE302 CE303 CE304
CE307
CE308 CE309 CE310 CE311
CE313 CE314 CE315 CE316 CE317
CE320 CE321 CE322
CE325 CE326
CE306 CE312
CE318
CE223
CLIN IV
C
LI
N
II
CLIN III
PLAN
NORTH
A1 EROSION AND SEDIMENT CONTROL FINAL PLAN
GENERAL SHEET NOTES
1. REFER TO SHEETS CE001-CE006 FOR EROSION AND
SEDIMENT CONTROL NOTES.
2. REFER TO SHEETS C-001 AND C-002 FOR PROJECT
ABBREVIATIONS AND GENERAL, AIRFIELD, AND STORM
SEWER NOTES.
3. EXISTING INFORMATION AND TOPOGRAPHY PROVIDED
BY GIS DATA AND GEOSURVEY, LTD., DATED 07/19/2018,
REVISED: 11/03/2023. FIELD VERIFICATION IS REQUIRED
TO ENSURE POSITIVE DRAINAGE AND ELIMINATION OF
ALL STANDING WATER.
4. REFER TO SHEET CE007 FOR SHEET KEY MAP.
5. CONTRACTOR IS RESPONSIBLE FOR RETURNING ALL
DISTURBED AREA TO PRE-CONSTRUCTION CONDITION.
6. THE CONTRACTOR AND THEIR SUBCONTRACTORS SHALL
PERFORM A FOD CHECK WHEN ENTERING AND EXITING
THE AIRFIELD.
7. THE CONTRACTOR SHALL ONLY REMOVE, REGRADE,
AND REPLACE SOD ON SHOULDER THAT CAN BE
REESTABLISHED AT THE END OF THE WORK DAY.
8. ANY DISTURBED AREA LEFT EXPOSED FOR A PERIOD
GREATER THAN 14 DAYS SHALL BE STABILIZED WITH
MULCH OR TEMPORARY SEEDING.
9. NO MORE THAN 5 ACRES OF LAND CAN BE DISTURBED
10551055
1040 1040 S-50
16.60 Ac
SU
R
VE
Y
D
AT
E:
1-
-2
BE
G
IN
P H
AS
E
II
PH
AS
E I S
U R
VE
Y
LI
M
IT
S
SU
R
VE
Y
D
AT
E:
-1 9-
10551055
1040 1040
LO
D
LO
D
LO
D
LO
D
LO
D
LOD
LO
D
LO
D
LO
D
LO
D
LOD
LO
D
LO
D
LO
D
LO
D
LOD
LO
D
LOD
LOD
LO
D
LOD
LO
D
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LOD
LODLO
D
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LOD
LOD
LOD
TANYA NORMAN, P.E.
P.E. No. 0038055, GA
DATE: 01/09/2026 ______________
1 2 3 4 5
A
B
C
D
SHEET ID
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
LO
U
IS
VI
LL
E
D
IS
TR
IC
T
LO
U
IS
VI
LL
E, K
EN
TU
C
KY
-0
P A
R K
W A
Y L
A N
E S
U
IT
E
P
E A
C H
TR
E
E C
O R
N E
R S
, G A
P
H O
N E
(6
) 3
-7
P
O N
D J
O B
N o.
SI
ZE
FI
LE
N
AM
E:
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SO
LI
C
IT
AT
IO
N N
O
C O
N
TR
AC
T
N O
FI
LE
N U
M
BE
R
US Army Corps of Engineers®
Louisville District
FI
LE
P
AT
H : X
:\F Y2
3\
8\
.C
AD
B
IM
\0 4.
.C
AD
PH
S H
EE
TS
\C
TT
ED
: 0 1/
/2
B Y:
N O
R M
AN
, T
AN
YA
IS
SU
E D
AT
E:
JA
N
U
AR
Y 9, AN
SI
D
A.
D
U
EH
R
D .M
. L
EC
KI
E
T.
N
O R
M
AN
D
AT
E D
ES
C
R
IP
TI
O
N M
AR
K
R
EP
AI
R
M
AI
N
TA
IN
A
IR
FI
EL
D S
TO
R
M W
AT
ER
S
YS
TE
M
PH
AS
E
II
D O
BB
IN
S
AI
R R
ES
ER
VE
B
AS
E, G
EO
R G
IA
PR
O
JE
C T
N O
FG
W B
-0
FG
W B
-0
P2
CERTIFIED FINAL
J.
P.
AR
IS
TI
ZA
BA
L
M
AT
C H
LI
N
E-
SE
E
SH
EE
T
C
SI
O
N A
N D
S
ED
IM
EN
T C
O N
TR
O
L
FI
N
AL
P
LA
N
CE306
C E3
.d w g
Ds4
Ds4
Ds4
Ds4
Ds4
KEY MAP
CLIN I
C
LI
N I
CE329
CE330
CE331
CE301 CE302 CE303 CE304
CE307
CE308 CE309 CE310 CE311
CE313 CE314 CE315 CE316 CE317
CE320 CE321 CE322
CE325 CE326
CE306 CE312
CE318
CE223
CLIN IV
C
LI
N
II
CLIN III
PLAN
NORTH
A1 EROSION AND SEDIMENT CONTROL FINAL PLAN
GENERAL SHEET NOTES
1. REFER TO SHEETS CE001-CE006 FOR EROSION AND
SEDIMENT CONTROL NOTES.
2. REFER TO SHEETS C-001 AND C-002 FOR PROJECT
ABBREVIATIONS AND GENERAL, AIRFIELD, AND STORM
SEWER NOTES.
3. EXISTING INFORMATION AND TOPOGRAPHY PROVIDED
BY GIS DATA AND GEOSURVEY, LTD., DATED 07/19/2018,
REVISED: 11/03/2023. FIELD VERIFICATION IS REQUIRED
TO ENSURE POSITIVE DRAINAGE AND ELIMINATION OF
ALL STANDING WATER.
4. REFER TO SHEET CE007 FOR SHEET KEY MAP.
5. CONTRACTOR IS RESPONSIBLE FOR RETURNING ALL
DISTURBED AREA TO PRE-CONSTRUCTION CONDITION.
6. THE CONTRACTOR AND THEIR SUBCONTRACTORS SHALL
PERFORM A FOD CHECK WHEN ENTERING AND EXITING
THE AIRFIELD.
7. THE CONTRACTOR SHALL ONLY REMOVE, REGRADE,
AND REPLACE SOD ON SHOULDER THAT CAN BE
REESTABLISHED AT THE END OF THE WORK DAY.
8. ANY DISTURBED AREA LEFT EXPOSED FOR A PERIOD
GREATER THAN 14 DAYS SHALL BE STABILIZED WITH
MULCH OR TEMPORARY SEEDING.
9. NO MORE THAN 5 ACRES OF LAND CAN BE DISTURBED
PH
AS
E I S
U
RV
EY
L
IM
IT
S
SU
RV
EY
D
AT
E:
1-
-2
BE
G
IN
P
H
AS
E
II
SU
RV
EY
D
AT
E:
-1
9-
RE
VI
SE
D
D
AT
E:
-2 5-
S-200
12.7 Ac
S-190
9.2 Ac
PH
AS
E I S
U
RV
EY
L
IM
IT
S
SU
RV
EY
D
AT
E:
1-
-2
BE
G
IN
P
H
AS
E
II
SU
RV
EY
D
AT
E:
-1
9-
RE
VI
SE
D
D
AT
E:
-2 5-
LOD
LOD
LOD
LO
D
LO
D
LO
D
LOD
LOD
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LOD
LOD
LOD
LO
D
LO
D
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD LOD LOD LOD LOD
LO
D
LOD
LO
D
LOD
LO
D
LOD LOD LOD
LOD
LOD
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LOD
LOD
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LODLOD
LOD
LODLOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LODLOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
TANYA NORMAN, P.E.
P.E. No. 0038055, GA
DATE: 01/09/2026 ______________
1 2 3 4 5
A
B
C
D
SHEET ID
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
LO
U
IS
VI
LL
E
D
IS
TR
IC
T
LO
U
IS
VI
LL
E, K
EN
TU
C
KY
-0
P A
R K
W A
Y L
A N
E S
U
IT
E
P
E A
C H
TR
E
E C
O R
N E
R S
, G A
P
H O
N E
(6
) 3
-7
P
O N
D J
O B
N o.
SI
ZE
FI
LE
N
AM
E:
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SO
LI
C
IT
AT
IO
N N
O
C O
N
TR
AC
T
N O
FI
LE
N U
M
BE
R
US Army Corps of Engineers®
Louisville District
FI
LE
P
AT
H : X
:\F Y2
3\
8\
.C
AD
B
IM
\0 4.
.C
AD
PH
S H
EE
TS
\C
TT
ED
: 0 1/
/2
B Y:
N O
R M
AN
, T
AN
YA
IS
SU
E D
AT
E:
JA
N
U
AR
Y 9, AN
SI
D
A.
D
U
EH
R
D .M
. L
EC
KI
E
T.
N
O R
M
AN
D
AT
E D
ES
C
R
IP
TI
O
N M
AR
K
R
EP
AI
R
M
AI
N
TA
IN
A
IR
FI
EL
D S
TO
R
M W
AT
ER
S
YS
TE
M
PH
AS
E
II
D O
BB
IN
S
AI
R R
ES
ER
VE
B
AS
E, G
EO
R G
IA
PR
O
JE
C T
N O
FG
W B
-0
FG
W B
-0
P2
CERTIFIED FINAL
J.
P.
AR
IS
TI
ZA
BA
L
MATCHLINE-SEE SHEET CE313
M
AT
C H
LI
N
E-
SE
E
SH
EE
T
C E3
M
AT
C H
LI
N
E-
SE
E
SH
EE
T
C E3
MATCHLINE-SEE SHEET CE301
Sd2-F
SI
O
N A
N D
S
ED
IM
EN
T C
O N
TR
O
L
FI
N
AL
P
LA
N
CE307
C E3
.d w g
Ds4
Ds4
Ds4
Ds4
Ds4
Ds4
Ds4
Ds4
Ds4
Ds4
Ds4
KEY MAP
CLIN I
C
LI
N I
CE329
CE330
CE331
CE301 CE302 CE303 CE304
CE307
CE308 CE309 CE310 CE311
CE313 CE314 CE315 CE316 CE317
CE320 CE321 CE322
CE325 CE326
CE306 CE312
CE318
CE223
CLIN IV
C
LI
N
II
CLIN III
PLAN
NORTH
A1 EROSION AND SEDIMENT CONTROL FINAL PLAN
GENERAL SHEET NOTES
1. REFER TO SHEETS CE001-CE006 FOR EROSION AND SEDIMENT CONTROL NOTES.
2. REFER TO SHEETS C-001 AND C-002 FOR PROJECT ABBREVIATIONS AND GENERAL, AIRFIELD, AND STORM SEWER NOTES.
3. EXISTING INFORMATION AND TOPOGRAPHY PROVIDED BY GIS DATA AND GEOSURVEY, LTD.,
DATED 07/19/2018, REVISED: 11/03/2023. FIELD VERIFICATION IS REQUIRED TO ENSURE
POSITIVE DRAINAGE AND ELIMINATION OF ALL STANDING WATER.
4. REFER TO SHEET CE007 FOR SHEET KEY MAP.
5. CONTRACTOR IS RESPONSIBLE FOR RETURNING ALL DISTURBED AREA TO
PRE-CONSTRUCTION CONDITION.
6. THE CONTRACTOR AND THEIR SUBCONTRACTORS SHALL PERFORM A FOD CHECK WHEN
ENTERING AND EXITING THE AIRFIELD.
7. THE CONTRACTOR SHALL ONLY REMOVE, REGRADE, AND REPLACE SOD ON SHOULDER THAT
CAN BE REESTABLISHED AT THE END OF THE WORK DAY.
8. ANY DISTURBED AREA LEFT EXPOSED FOR A PERIOD GREATER THAN 14 DAYS SHALL BE
STABILIZED WITH MULCH OR TEMPORARY SEEDING.
9. NO MORE THAN 5 ACRES OF LAND CAN BE DISTURBED AT A TIME. CONSTRUCTION MUST BE
PHASED TO LIMIT LAND DISTURBANCES TO 5 ACRES OR LESS.
10251025
S-230
3.3 Ac
S-240
2.6 Ac
S-1900
8.0 Ac
S-250
5.67 Ac
S-220
1.93 Ac
S-293 1.77Ac
10251025
999 1018
LO
D
LOD
LOD
LOD
LOD
LO
D
LO
D
LOD
LOD LOD
LOD
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LOD
LOD
LOD
LO
D
LO
D
LOD
LO
D
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LO
D
LOD
LOD
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LOD
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LO
D
LO
D
LO
D
LO
D
LO
DLO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD LOD
LOD
LOD
LOD
LO
D
LOD
LOD
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LODLO
D
LODLOD
LOD
LO
D
LO
D
LO
DLOD
LOD
LOD
LOD
LOD
TANYA NORMAN, P.E.
P.E. No. 0038055, GA
DATE: 01/09/2026 ______________
1 2 3 4 5
A
B
C
D
SHEET ID
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
LO
U
IS
VI
LL
E
D
IS
TR
IC
T
LO
U
IS
VI
LL
E, K
EN
TU
C
KY
-0
P A
R K
W A
Y L
A N
E S
U
IT
E
P
E A
C H
TR
E
E C
O R
N E
R S
, G A
P
H O
N E
(6
) 3
-7
P
O N
D J
O B
N o.
SI
ZE
FI
LE
N
AM
E:
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SO
LI
C
IT
AT
IO
N N
O
C O
N
TR
AC
T
N O
FI
LE
N U
M
BE
R
US Army Corps of Engineers®
Louisville District
FI
LE
P
AT
H : X
:\F Y2
3\
8\
.C
AD
B
IM
\0 4.
.C
AD
PH
S H
EE
TS
\C
TT
ED
: 0 1/
/2
B Y:
N O
R M
AN
, T
AN
YA
IS
SU
E D
AT
E:
JA
N
U
AR
Y 9, AN
SI
D
A.
D
U
EH
R
D .M
. L
EC
KI
E
T.
N
O R
M
AN
D
AT
E D
ES
C
R
IP
TI
O
N M
AR
K
R
EP
AI
R
M
AI
N
TA
IN
A
IR
FI
EL
D S
TO
R
M W
AT
ER
S
YS
TE
M
PH
AS
E
II
D O
BB
IN
S
AI
R R
ES
ER
VE
B
AS
E, G
EO
R G
IA
PR
O
JE
C T
N O
FG
W B
-0
FG
W B
-0
P2
CERTIFIED FINAL
J.
P.
AR
IS
TI
ZA
BA
L
MATCHLINE-SEE SHEET CE314
M
AT
C H
LI
N
E-
SE
E
SH
EE
T
C E3
M
AT
C H
LI
N
E-
SE
E
SH
EE
T
C E3
MATCHLINE-SEE SHEET CE302
Sd1-S
Sd1-S
SI
O
N A
N D
S
ED
IM
EN
T C
O N
TR
O
L
FI
N
AL
P
LA
N
CE308
C E3
.d w g
START SILT FENCE
END SILT FENCE
Ds4
Ds4
Ds4 Ds4
Ds4
Ds4
Ds4
Ds4
Ds4
Ds4
Ds4
Sd2-B Sd2-B
Sd2-B
Sd2-B
Sd2-B
KEY MAP
CLIN I
C
LI
N I
CE329
CE330
CE331
CE301 CE302 CE303 CE304
CE307
CE308 CE309 CE310 CE311
CE313 CE314 CE315 CE316 CE317
CE320 CE321 CE322
CE325 CE326
CE306 CE312
CE318
CE223
CLIN IV
C
LI
N
II
CLIN III
PLAN
NORTH
A1 EROSION AND SEDIMENT CONTROL FINAL PLAN
GENERAL SHEET NOTES
1. REFER TO SHEETS CE001-CE006 FOR EROSION AND
SEDIMENT CONTROL NOTES.
2. REFER TO SHEETS C-001 AND C-002 FOR PROJECT
ABBREVIATIONS AND GENERAL, AIRFIELD, AND STORM
SEWER NOTES.
3. EXISTING INFORMATION AND TOPOGRAPHY PROVIDED
BY GIS DATA AND GEOSURVEY, LTD., DATED 07/19/2018,
REVISED: 11/03/2023. FIELD VERIFICATION IS REQUIRED
TO ENSURE POSITIVE DRAINAGE AND ELIMINATION OF
ALL STANDING WATER.
4. REFER TO SHEET CE007 FOR SHEET KEY MAP.
5. CONTRACTOR IS RESPONSIBLE FOR RETURNING ALL
DISTURBED AREA TO PRE-CONSTRUCTION CONDITION.
6. THE CONTRACTOR AND THEIR SUBCONTRACTORS SHALL
PERFORM A FOD CHECK WHEN ENTERING AND EXITING
THE AIRFIELD.
7. THE CONTRACTOR SHALL ONLY REMOVE, REGRADE,
AND REPLACE SOD ON SHOULDER THAT CAN BE
REESTABLISHED AT THE END OF THE WORK DAY.
8. ANY DISTURBED AREA LEFT EXPOSED FOR A PERIOD
GREATER THAN 14 DAYS SHALL BE STABILIZED WITH
MULCH OR TEMPORARY SEEDING.
9. NO MORE THAN 5 ACRES OF LAND CAN BE DISTURBED
S-692
7.7 Ac
S-310
6.5 Ac
S-680
3.41 Ac
S-690
1.74 Ac
S-994
5.25 AC
S-698
0.56 Ac
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
DLO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD LO
D
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LO
D
LOD
LO
D
LO
D
LO
D
LO
D
LOD
LOD
LOD LOD
LOD
LOD
LO
D
LO
D
LOD
LOD
LOD
LOD
LODLOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LOD
LOD
LOD
LOD
LOD
LO
D
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LO
D
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LO
D
LO
D
LOD
LOD
LODLOD
LOD
LO
D
LOD LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LOD
LOD
LOD
LOD
LOD
LO
D
LO
D
LOD
LO
D
LO
D LOD
TANYA NORMAN, P.E.
P.E. No. 0038055, GA
DATE: 01/09/2026 ______________
1 2 3 4 5
A
B
C
D
SHEET ID
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
LO
U
IS
VI
LL
E
D
IS
TR
IC
T
LO
U
IS
VI
LL
E, K
EN
TU
C
KY
-0
P A
R K
W A
Y L
A N
E S
U
IT
E
P
E A
C H
TR
E
E C
O R
N E
R S
, G A
P
H O
N E
(6
) 3
-7
P
O N
D J
O B
N o.
SI
ZE
FI
LE
N
AM
E:
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SO
LI
C
IT
AT
IO
N N
O
C O
N
TR
AC
T
N O
FI
LE
N U
M
BE
R
US Army Corps of Engineers®
Louisville District
FI
LE
P
AT
H : X
:\F Y2
3\
8\
.C
AD
B
IM
\0 4.
.C
AD
PH
S H
EE
TS
\C
TT
ED
: 0 1/
/2
B Y:
N O
R M
AN
, T
AN
YA
IS
SU
E D
AT
E:
JA
N
U
AR
Y 9, AN
SI
D
A.
D
U
EH
R
D .M
. L
EC
KI
E
T.
N
O R
M
AN
D
AT
E D
ES
C
R
IP
TI
O
N M
AR
K
R
EP
AI
R
M
AI
N
TA
IN
A
IR
FI
EL
D S
TO
R
M W
AT
ER
S
YS
TE
M
PH
AS
E
II
D O
BB
IN
S
AI
R R
ES
ER
VE
B
AS
E, G
EO
R G
IA
PR
O
JE
C T
N O
FG
W B
-0
FG
W B
-0
P2
CERTIFIED FINAL
J.
P.
AR
IS
TI
ZA
BA
L
MATCHLINE-SEE SHEET CE315
M
AT
C H
LI
N
E-
SE
E
SH
EE
T
C E3
M
AT
C H
LI
N
E-
SE
E
SH
EE
T
C E3
MATCHLINE-SEE SHEET CE303
SI
O
N A
N D
S
ED
IM
EN
T C
O N
TR
O
L
FI
N
AL
P
LA
N
CE309
C E3
.d w g
Sd2-F
Sd2-F Sd2-B
Sd2-B
Sd2-B
Sd2-B
Ds4
Ds4
Ds4
Sd2-F
Sd2-B
KEY MAP
CLIN I
C
LI
N I
CE329
CE330
CE331
CE301 CE302 CE303 CE304
CE307
CE308 CE309 CE310 CE311
CE313 CE314 CE315 CE316 CE317
CE320 CE321 CE322
CE325 CE326
CE306 CE312
CE318
CE223
CLIN IV
C
LI
N
II
CLIN III
PLAN
NORTH
A1 EROSION AND SEDIMENT CONTROL FINAL PLAN
GENERAL SHEET NOTES
1. REFER TO SHEETS CE001-CE006 FOR EROSION AND
SEDIMENT CONTROL NOTES.
2. REFER TO SHEETS C-001 AND C-002 FOR PROJECT
ABBREVIATIONS AND GENERAL, AIRFIELD, AND STORM
SEWER NOTES.
3. EXISTING INFORMATION AND TOPOGRAPHY PROVIDED
BY GIS DATA AND GEOSURVEY, LTD., DATED 07/19/2018,
REVISED: 11/03/2023. FIELD VERIFICATION IS REQUIRED
TO ENSURE POSITIVE DRAINAGE AND ELIMINATION OF
ALL STANDING WATER.
4. REFER TO SHEET CE007 FOR SHEET KEY MAP.
5. CONTRACTOR IS RESPONSIBLE FOR RETURNING ALL
DISTURBED AREA TO PRE-CONSTRUCTION CONDITION.
6. THE CONTRACTOR AND THEIR SUBCONTRACTORS SHALL
PERFORM A FOD CHECK WHEN ENTERING AND EXITING
THE AIRFIELD.
7. THE CONTRACTOR SHALL ONLY REMOVE, REGRADE,
AND REPLACE SOD ON SHOULDER THAT CAN BE
REESTABLISHED AT THE END OF THE WORK DAY.
8. ANY DISTURBED AREA LEFT EXPOSED FOR A PERIOD
GREATER THAN 14 DAYS SHALL BE STABILIZED WITH
MULCH OR TEMPORARY SEEDING.
9. NO MORE THAN 5 ACRES OF LAND CAN BE DISTURBED
S-696
7.58 Ac
LO
D
LO
D
LO
D
LO
DLO
D
LO
D
LO
D
LO
D
LOD
LOD
LO
D
LO
D
LOD
LOD
LOD LOD
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LOD
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LO
D
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LODLOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LO
D
LOD
LOD
LO
D
LO
D
TANYA NORMAN, P.E.
P.E. No. 0038055, GA
DATE: 01/09/2026 ______________
1 2 3 4 5
A
B
C
D
SHEET ID
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
LO
U
IS
VI
LL
E
D
IS
TR
IC
T
LO
U
IS
VI
LL
E, K
EN
TU
C
KY
-0
P A
R K
W A
Y L
A N
E S
U
IT
E
P
E A
C H
TR
E
E C
O R
N E
R S
, G A
P
H O
N E
(6
) 3
-7
P
O N
D J
O B
N o.
SI
ZE
FI
LE
N
AM
E:
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SO
LI
C
IT
AT
IO
N N
O
C O
N
TR
AC
T
N O
FI
LE
N U
M
BE
R
US Army Corps of Engineers®
Louisville District
FI
LE
P
AT
H : X
:\F Y2
3\
8\
.C
AD
B
IM
\0 4.
.C
AD
PH
S H
EE
TS
\C
TT
ED
: 0 1/
/2
B Y:
N O
R M
AN
, T
AN
YA
IS
SU
E D
AT
E:
JA
N
U
AR
Y 9, AN
SI
D
A.
D
U
EH
R
D .M
. L
EC
KI
E
T.
N
O R
M
AN
D
AT
E D
ES
C
R
IP
TI
O
N M
AR
K
R
EP
AI
R
M
AI
N
TA
IN
A
IR
FI
EL
D S
TO
R
M W
AT
ER
S
YS
TE
M
PH
AS
E
II
D O
BB
IN
S
AI
R R
ES
ER
VE
B
AS
E, G
EO
R G
IA
PR
O
JE
C T
N O
FG
W B
-0
FG
W B
-0
P2
CERTIFIED FINAL
J.
P.
AR
IS
TI
ZA
BA
L
MATCHLINE-SEE SHEET CE316
M
AT
C H
LI
N
E-
SE
E
SH
EE
T
C E3
M
AT
C H
LI
N
E-
SE
E
SH
EE
T
C E3
MATCHLINE-SEE SHEET CE304
SI
O
N A
N D
S
ED
IM
EN
T C
O N
TR
O
L
FI
N
AL
P
LA
N
CE310
C E3
.d w g
Sd1-S
Sd2-B
Sd2-F
Sd2-F
Ds4
Ds4
Ds4
Ds4
KEY MAP
CLIN I
C
LI
N I
CE329
CE330
CE331
CE301 CE302 CE303 CE304
CE307
CE308 CE309 CE310 CE311
CE313 CE314 CE315 CE316 CE317
CE320 CE321 CE322
CE325 CE326
CE306 CE312
CE318
CE223
CLIN IV
C
LI
N
II
CLIN III
PLAN
NORTH
A1 EROSION AND SEDIMENT CONTROL FINAL PLAN
GENERAL SHEET NOTES
1. REFER TO SHEETS CE001-CE006 FOR EROSION AND
SEDIMENT CONTROL NOTES.
2. REFER TO SHEETS C-001 AND C-002 FOR PROJECT
ABBREVIATIONS AND GENERAL, AIRFIELD, AND STORM
SEWER NOTES.
3. EXISTING INFORMATION AND TOPOGRAPHY PROVIDED
BY GIS DATA AND GEOSURVEY, LTD., DATED 07/19/2018,
REVISED: 11/03/2023. FIELD VERIFICATION IS REQUIRED
TO ENSURE POSITIVE DRAINAGE AND ELIMINATION OF
ALL STANDING WATER.
4. REFER TO SHEET CE007 FOR SHEET KEY MAP.
5. CONTRACTOR IS RESPONSIBLE FOR RETURNING ALL
DISTURBED AREA TO PRE-CONSTRUCTION CONDITION.
6. THE CONTRACTOR AND THEIR SUBCONTRACTORS SHALL
PERFORM A FOD CHECK WHEN ENTERING AND EXITING
THE AIRFIELD.
7. THE CONTRACTOR SHALL ONLY REMOVE, REGRADE,
AND REPLACE SOD ON SHOULDER THAT CAN BE
REESTABLISHED AT THE END OF THE WORK DAY.
8. ANY DISTURBED AREA LEFT EXPOSED FOR A PERIOD
GREATER THAN 14 DAYS SHALL BE STABILIZED WITH
MULCH OR TEMPORARY SEEDING.
9. NO MORE THAN 5 ACRES OF LAND CAN BE DISTURBED
S-1125
10.64 AC
S-1280
4.72 AC
3994995996
993 99
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LO
D
LO
D
LOD
LOD
LOD
LOD
LO
D
LO
D
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LO
D
LO
D
LO
D
LOD
LO
D
LOD
LO
D
LOD
LOD
LO
D
LO
D
LOD
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LO
D
LO
D
LOD
LO
D
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD LOD
LOD
LOD
LO
D
LOD
LOD
LODLOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
TANYA NORMAN, P.E.
P.E. No. 0038055, GA
DATE: 01/09/2026 ______________
1 2 3 4 5
A
B
C
D
SHEET ID
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
LO
U
IS
VI
LL
E
D
IS
TR
IC
T
LO
U
IS
VI
LL
E, K
EN
TU
C
KY
-0
P A
R K
W A
Y L
A N
E S
U
IT
E
P
E A
C H
TR
E
E C
O R
N E
R S
, G A
P
H O
N E
(6
) 3
-7
P
O N
D J
O B
N o.
SI
ZE
FI
LE
N
AM
E:
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SO
LI
C
IT
AT
IO
N N
O
C O
N
TR
AC
T
N O
FI
LE
N U
M
BE
R
US Army Corps of Engineers®
Louisville District
FI
LE
P
AT
H : X
:\F Y2
3\
8\
.C
AD
B
IM
\0 4.
.C
AD
PH
S H
EE
TS
\C
TT
ED
: 0 1/
/2
B Y:
N O
R M
AN
, T
AN
YA
IS
SU
E D
AT
E:
JA
N
U
AR
Y 9, AN
SI
D
A.
D
U
EH
R
D .M
. L
EC
KI
E
T.
N
O R
M
AN
D
AT
E D
ES
C
R
IP
TI
O
N M
AR
K
R
EP
AI
R
M
AI
N
TA
IN
A
IR
FI
EL
D S
TO
R
M W
AT
ER
S
YS
TE
M
PH
AS
E
II
D O
BB
IN
S
AI
R R
ES
ER
VE
B
AS
E, G
EO
R G
IA
PR
O
JE
C T
N O
FG
W B
-0
FG
W B
-0
P2
CERTIFIED FINAL
J.
P.
AR
IS
TI
ZA
BA
L
MATCHLINE-SEE SHEET CE317
M
AT
C H
LI
N
E-
SE
E
SH
EE
T
C E3
MATCHLINE-SEE SHEET C-105
SI
O
N A
N D
S
ED
IM
EN
T C
O N
TR
O
L
FI
N
AL
P
LA
N
CE311
C E3
.d w g
Ds4
Ds4
Ds4
Ds4
Ds4
Ds4
Sd1-S
Sd2-B
Sd2-B
KEY MAP
CLIN I
C
LI
N I
CE329
CE330
CE331
CE301 CE302 CE303 CE304
CE307
CE308 CE309 CE310 CE311
CE313 CE314 CE315 CE316 CE317
CE320 CE321 CE322
CE325 CE326
CE306 CE312
CE318
CE223
CLIN IV
C
LI
N
II
CLIN III
PLAN
NORTH
A1 EROSION AND SEDIMENT CONTROL FINAL PLAN
GENERAL SHEET NOTES
1. REFER TO SHEETS CE001-CE006 FOR EROSION AND
SEDIMENT CONTROL NOTES.
2. REFER TO SHEETS C-001 AND C-002 FOR PROJECT
ABBREVIATIONS AND GENERAL, AIRFIELD, AND STORM
SEWER NOTES.
3. EXISTING INFORMATION AND TOPOGRAPHY PROVIDED
BY GIS DATA AND GEOSURVEY, LTD., DATED 07/19/2018,
REVISED: 11/03/2023. FIELD VERIFICATION IS REQUIRED
TO ENSURE POSITIVE DRAINAGE AND ELIMINATION OF
ALL STANDING WATER.
4. REFER TO SHEET CE007 FOR SHEET KEY MAP.
5. CONTRACTOR IS RESPONSIBLE FOR RETURNING ALL
DISTURBED AREA TO PRE-CONSTRUCTION CONDITION.
6. THE CONTRACTOR AND THEIR SUBCONTRACTORS SHALL
PERFORM A FOD CHECK WHEN ENTERING AND EXITING
THE AIRFIELD.
7. THE CONTRACTOR SHALL ONLY REMOVE, REGRADE,
AND REPLACE SOD ON SHOULDER THAT CAN BE
REESTABLISHED AT THE END OF THE WORK DAY.
8. ANY DISTURBED AREA LEFT EXPOSED FOR A PERIOD
GREATER THAN 14 DAYS SHALL BE STABILIZED WITH
MULCH OR TEMPORARY SEEDING.
9. NO MORE THAN 5 ACRES OF LAND CAN BE DISTURBED
AT A TIME. CONSTRUCTION MUST BE PHASED TO LIMIT
LAND DISTURBANCES TO 5 ACRES OR LESS.
M
AT
C H
LI
N
E-
SE
E
SH
EE
T
C E3
Sd2-B
COBB PARKW
AY
(U.S. HIGHW
AY 41)
(VARIABLE R/W
1000 1000
1ST STREET
COBB PARKW
AY
COBB PARKW
AY
(U.S. HIGHW
AY 41)
(VARIABLE R/W
COBB PARKW
AY
(U.S. HIGHW
AY 41)
(VARIABLE R/W
1000 1000
LO
D
LO
D
LOD
LOD
LO
D
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
TANYA NORMAN, P.E.
P.E. No. 0038055, GA
DATE: 01/09/2026 ______________
1 2 3 4 5
A
B
C
D
SHEET ID
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
LO
U
IS
VI
LL
E
D
IS
TR
IC
T
LO
U
IS
VI
LL
E, K
EN
TU
C
KY
-0
P A
R K
W A
Y L
A N
E S
U
IT
E
P
E A
C H
TR
E
E C
O R
N E
R S
, G A
P
H O
N E
(6
) 3
-7
P
O N
D J
O B
N o.
SI
ZE
FI
LE
N
AM
E:
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SO
LI
C
IT
AT
IO
N N
O
C O
N
TR
AC
T
N O
FI
LE
N U
M
BE
R
US Army Corps of Engineers®
Louisville District
FI
LE
P
AT
H : X
:\F Y2
3\
8\
.C
AD
B
IM
\0 4.
.C
AD
PH
S H
EE
TS
\C
TT
ED
: 0 1/
/2
B Y:
N O
R M
AN
, T
AN
YA
IS
SU
E D
AT
E:
JA
N
U
AR
Y 9, AN
SI
D
A.
D
U
EH
R
D .M
. L
EC
KI
E
T.
N
O R
M
AN
D
AT
E D
ES
C
R
IP
TI
O
N M
AR
K
R
EP
AI
R
M
AI
N
TA
IN
A
IR
FI
EL
D S
TO
R
M W
AT
ER
S
YS
TE
M
PH
AS
E
II
D O
BB
IN
S
AI
R R
ES
ER
VE
B
AS
E, G
EO
R G
IA
PR
O
JE
C T
N O
FG
W B
-0
FG
W B
-0
P2
CERTIFIED FINAL
J.
P.
AR
IS
TI
ZA
BA
L
MATCHLINE-SEE SHEET CE318
M
AT
C H
LI
N
E-
SE
E
SH
EE
T
C
SI
O
N A
N D
S
ED
IM
EN
T C
O N
TR
O
L
FI
N
AL
P
LA
N
CE312
C E3
.d w g
Du
KEY MAP
CLIN I
C
LI
N I
CE329
CE330
CE331
CE301 CE302 CE303 CE304
CE307
CE308 CE309 CE310 CE311
CE313 CE314 CE315 CE316 CE317
CE320 CE321 CE322
CE325 CE326
CE306 CE312
CE318
CE223
CLIN IV
C
LI
N
II
CLIN III
PLAN
NORTH
A1 EROSION AND SEDIMENT CONTROL FINAL PLAN
GENERAL SHEET NOTES
1. REFER TO SHEETS CE001-CE006 FOR EROSION AND
SEDIMENT CONTROL NOTES.
2. REFER TO SHEETS C-001 AND C-002 FOR PROJECT
ABBREVIATIONS AND GENERAL, AIRFIELD, AND STORM
SEWER NOTES.
3. EXISTING INFORMATION AND TOPOGRAPHY PROVIDED
BY GIS DATA AND GEOSURVEY, LTD., DATED 07/19/2018,
REVISED: 11/03/2023. FIELD VERIFICATION IS REQUIRED
TO ENSURE POSITIVE DRAINAGE AND ELIMINATION OF
ALL STANDING WATER.
4. REFER TO SHEET CE007 FOR SHEET KEY MAP.
5. CONTRACTOR IS RESPONSIBLE FOR RETURNING ALL
DISTURBED AREA TO PRE-CONSTRUCTION CONDITION.
6. THE CONTRACTOR AND THEIR SUBCONTRACTORS SHALL
PERFORM A FOD CHECK WHEN ENTERING AND EXITING
THE AIRFIELD.
7. THE CONTRACTOR SHALL ONLY REMOVE, REGRADE,
AND REPLACE SOD ON SHOULDER THAT CAN BE
REESTABLISHED AT THE END OF THE WORK DAY.
8. ANY DISTURBED AREA LEFT EXPOSED FOR A PERIOD
GREATER THAN 14 DAYS SHALL BE STABILIZED WITH
MULCH OR TEMPORARY SEEDING.
9. NO MORE THAN 5 ACRES OF LAND CAN BE DISTURBED
S-1500
4.3 Ac
1000' PRIMARY SURFACE LIMIT
DEFLOREZ ROAD
D O
BBIN
S PATR
O L R
O
AD
LOD
LOD
LOD
LOD
LOD
LOD
LODLOD
LO
D
LO
D
LO
D
LOD
LO
D
LO
D
LOD LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LO
D
LOD
LOD
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
TANYA NORMAN, P.E.
P.E. No. 0038055, GA
DATE: 01/09/2026 ______________
1 2 3 4 5
A
B
C
D
SHEET ID
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
LO
U
IS
VI
LL
E
D
IS
TR
IC
T
LO
U
IS
VI
LL
E, K
EN
TU
C
KY
-0
P A
R K
W A
Y L
A N
E S
U
IT
E
P
E A
C H
TR
E
E C
O R
N E
R S
, G A
P
H O
N E
(6
) 3
-7
P
O N
D J
O B
N o.
SI
ZE
FI
LE
N
AM
E:
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SO
LI
C
IT
AT
IO
N N
O
C O
N
TR
AC
T
N O
FI
LE
N U
M
BE
R
US Army Corps of Engineers®
Louisville District
FI
LE
P
AT
H : X
:\F Y2
3\
8\
.C
AD
B
IM
\0 4.
.C
AD
PH
S H
EE
TS
\C
TT
ED
: 0 1/
/2
B Y:
N O
R M
AN
, T
AN
YA
IS
SU
E D
AT
E:
JA
N
U
AR
Y 9, AN
SI
D
A.
D
U
EH
R
D .M
. L
EC
KI
E
T.
N
O R
M
AN
D
AT
E D
ES
C
R
IP
TI
O
N M
AR
K
R
EP
AI
R
M
AI
N
TA
IN
A
IR
FI
EL
D S
TO
R
M W
AT
ER
S
YS
TE
M
PH
AS
E
II
D O
BB
IN
S
AI
R R
ES
ER
VE
B
AS
E, G
EO
R G
IA
PR
O
JE
C T
N O
FG
W B
-0
FG
W B
-0
P2
CERTIFIED FINAL
J.
P.
AR
IS
TI
ZA
BA
L
M
AT
C H
LI
N
E-
SE
E
SH
EE
T
C E3
MATCHLINE-SEE SHEET CE307
SI
O
N A
N D
S
ED
IM
EN
T C
O N
TR
O
L
FI
N
AL
P
LA
N
CE313
C E3
.d w g
Ds4
Ds4
Ds4
Ds4
Ds4
Sd2-B
JURISDICTIONAL
WATERWAY
KEY MAP
CLIN I
C
LI
N I
CE329
CE330
CE331
CE301 CE302 CE303 CE304
CE307
CE308 CE309 CE310 CE311
CE313 CE314 CE315 CE316 CE317
CE320 CE321 CE322
CE325 CE326
CE306 CE312
CE318
CE223
CLIN IV
C
LI
N
II
CLIN III
PLAN
NORTH
A1 EROSION AND SEDIMENT CONTROL FINAL PLAN
GENERAL SHEET NOTES
1. REFER TO SHEETS CE001-CE006 FOR EROSION AND
SEDIMENT CONTROL NOTES.
2. REFER TO SHEETS C-001 AND C-002 FOR PROJECT
ABBREVIATIONS AND GENERAL, AIRFIELD, AND STORM
SEWER NOTES.
3. EXISTING INFORMATION AND TOPOGRAPHY PROVIDED
BY GIS DATA AND GEOSURVEY, LTD., DATED 07/19/2018,
REVISED: 11/03/2023. FIELD VERIFICATION IS REQUIRED
TO ENSURE POSITIVE DRAINAGE AND ELIMINATION OF
ALL STANDING WATER.
4. REFER TO SHEET CE007 FOR SHEET KEY MAP.
5. CONTRACTOR IS RESPONSIBLE FOR RETURNING ALL
DISTURBED AREA TO PRE-CONSTRUCTION CONDITION.
6. THE CONTRACTOR AND THEIR SUBCONTRACTORS SHALL
PERFORM A FOD CHECK WHEN ENTERING AND EXITING
THE AIRFIELD.
7. THE CONTRACTOR SHALL ONLY REMOVE, REGRADE,
AND REPLACE SOD ON SHOULDER THAT CAN BE
REESTABLISHED AT THE END OF THE WORK DAY.
8. ANY DISTURBED AREA LEFT EXPOSED FOR A PERIOD
GREATER THAN 14 DAYS SHALL BE STABILIZED WITH
MULCH OR TEMPORARY SEEDING.
9. NO MORE THAN 5 ACRES OF LAND CAN BE DISTURBED
10251025
S-1510
11.9 Ac
S-1525
8.0 Ac
S-1910
8.79 Ac
S-225
2.19 Ac
S-1520
3.79 Ac
S-1530
1.60 Ac1000' PRIMARY SURFACE LIMIT
10251025
A3 C-502
LOD
LOD
LOD
LOD
LOD
LO
D
LO
D
LOD
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LOD
LOD
LO
D
LOD
LOD
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LOD
LOD
LO
D
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LO
D
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD LOD
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD LOD
LOD
LOD
LO
D
LO
D
LOD
LOD
LODLOD
LO
D
LOD
LOD
LOD
LOD
LO
D
LOD
LOD
LOD LO
D
LO
D
LOD
LOD
LOD
LO
D
LO
D
LOD
LOD
LOD
LO
D
LO
D
LOD
LO
D
LOD
LO
D
LO
D
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LOD LOD LOD LOD LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LOD
LOD
LOD
LOD
LO
D
LO
D
LOD
LOD
LOD
LOD LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LODLOD
LOD
LO
D
LO
D
LOD
LO
D
LOD
LOD LOD
LO
D
LOD
LO
D
LOD
LOD
LOD
LO
D
LO
D
LOD
LOD
LOD
LO
D
LO
D
LOD
LO
D
LOD
LO
D
TANYA NORMAN, P.E.
P.E. No. 0038055, GA
DATE: 01/09/2026 ______________
1 2 3 4 5
A
B
C
D
SHEET ID
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
LO
U
IS
VI
LL
E
D
IS
TR
IC
T
LO
U
IS
VI
LL
E, K
EN
TU
C
KY
-0
P A
R K
W A
Y L
A N
E S
U
IT
E
P
E A
C H
TR
E
E C
O R
N E
R S
, G A
P
H O
N E
(6
) 3
-7
P
O N
D J
O B
N o.
SI
ZE
FI
LE
N
AM
E:
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SO
LI
C
IT
AT
IO
N N
O
C O
N
TR
AC
T
N O
FI
LE
N U
M
BE
R
US Army Corps of Engineers®
Louisville District
FI
LE
P
AT
H : X
:\F Y2
3\
8\
.C
AD
B
IM
\0 4.
.C
AD
PH
S H
EE
TS
\C
TT
ED
: 0 1/
/2
B Y:
N O
R M
AN
, T
AN
YA
IS
SU
E D
AT
E:
JA
N
U
AR
Y 9, AN
SI
D
A.
D
U
EH
R
D .M
. L
EC
KI
E
T.
N
O R
M
AN
D
AT
E D
ES
C
R
IP
TI
O
N M
AR
K
R
EP
AI
R
M
AI
N
TA
IN
A
IR
FI
EL
D S
TO
R
M W
AT
ER
S
YS
TE
M
PH
AS
E
II
D O
BB
IN
S
AI
R R
ES
ER
VE
B
AS
E, G
EO
R G
IA
PR
O
JE
C T
N O
FG
W B
-0
FG
W B
-0
P2
CERTIFIED FINAL
J.
P.
AR
IS
TI
ZA
BA
L
M
AT
C H
LI
N
E-
SE
E
SH
EE
T
C E3
M
AT
C H
LI
N
E-
SE
E
SH
EE
T
C E3
MATCHLINE-SEE SHEET CE308
SI
O
N A
N D
S
ED
IM
EN
T C
O N
TR
O
L
FI
N
AL
P
LA
N
CE314
C E3
.d w g
Ds4
Ds4
Ds4
Ds4
Ds4
Ds4
Ds4
Ds4
Ds4
Ds4
Sd2-B
Sd2-B
Sd2-B
Sd2-B
Sd2-B
Sd2-B
KEY MAP
CLIN I
C
LI
N I
CE329
CE330
CE331
CE301 CE302 CE303 CE304
CE307
CE308 CE309 CE310 CE311
CE313 CE314 CE315 CE316 CE317
CE320 CE321 CE322
CE325 CE326
CE306 CE312
CE318
CE223
CLIN IV
C
LI
N
II
CLIN III
PLAN
NORTH
A1 EROSION AND SEDIMENT CONTROL FINAL PLAN
GENERAL SHEET NOTES
1. REFER TO SHEETS CE001-CE006 FOR EROSION AND SEDIMENT
CONTROL NOTES.
2. REFER TO SHEETS C-001 AND C-002 FOR PROJECT
ABBREVIATIONS AND GENERAL, AIRFIELD, AND STORM SEWER
NOTES.
3. EXISTING INFORMATION AND TOPOGRAPHY PROVIDED BY GIS
DATA AND GEOSURVEY, LTD., DATED 07/19/2018, REVISED:
11/03/2023. FIELD VERIFICATION IS REQUIRED TO ENSURE
POSITIVE DRAINAGE AND ELIMINATION OF ALL STANDING
WATER.
4. REFER TO SHEET CE007 FOR SHEET KEY MAP.
5. CONTRACTOR IS RESPONSIBLE FOR RETURNING ALL
DISTURBED AREA TO PRE-CONSTRUCTION CONDITION.
6. THE CONTRACTOR AND THEIR SUBCONTRACTORS SHALL
PERFORM A FOD CHECK WHEN ENTERING AND EXITING THE
AIRFIELD.
7. THE CONTRACTOR SHALL ONLY REMOVE, REGRADE, AND
REPLACE SOD ON SHOULDER THAT CAN BE REESTABLISHED AT
THE END OF THE WORK DAY.
8. ANY DISTURBED AREA LEFT EXPOSED FOR A PERIOD
GREATER THAN 14 DAYS SHALL BE STABILIZED WITH MULCH
OR TEMPORARY SEEDING.
9. NO MORE THAN 5 ACRES OF LAND CAN BE DISTURBED AT A
TIME. CONSTRUCTION MUST BE PHASED TO LIMIT LAND
DISTURBANCES TO 5 ACRES OR LESS.
10151015
S-2010
8.23 Ac
S-694
2.24 Ac
1000' PRIMARY SURFACE LIMIT
S-1944
4.16 Ac
S-1830
2.02 Ac
S-1840
0.96 Ac
10151015
LOD
LOD
LOD
LOD
LOD
LO
D
LOD
LOD
LOD
LOD
LO
D
LO
D
LOD
LOD LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD LOD
LOD
LOD
LOD
LOD
LO
D
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LODLOD
LOD
LOD
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LO
D
LOD LOD
LOD LOD
LOD LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LO
D
LOD
LO
D LOD
LOD
LOD
LOD
LOD
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD LOD
LOD
LOD LO
D
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LODLOD
LOD
LO
D
LOD
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LO
D
TANYA NORMAN, P.E.
P.E. No. 0038055, GA
DATE: 01/09/2026 ______________
1 2 3 4 5
A
B
C
D
SHEET ID
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
LO
U
IS
VI
LL
E
D
IS
TR
IC
T
LO
U
IS
VI
LL
E, K
EN
TU
C
KY
-0
P A
R K
W A
Y L
A N
E S
U
IT
E
P
E A
C H
TR
E
E C
O R
N E
R S
, G A
P
H O
N E
(6
) 3
-7
P
O N
D J
O B
N o.
SI
ZE
FI
LE
N
AM
E:
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SO
LI
C
IT
AT
IO
N N
O
C O
N
TR
AC
T
N O
FI
LE
N U
M
BE
R
US Army Corps of Engineers®
Louisville District
FI
LE
P
AT
H : X
:\F Y2
3\
8\
.C
AD
B
IM
\0 4.
.C
AD
PH
S H
EE
TS
\C
TT
ED
: 0 1/
/2
B Y:
N O
R M
AN
, T
AN
YA
IS
SU
E D
AT
E:
JA
N
U
AR
Y 9, AN
SI
D
A.
D
U
EH
R
D .M
. L
EC
KI
E
T.
N
O R
M
AN
D
AT
E D
ES
C
R
IP
TI
O
N M
AR
K
R
EP
AI
R
M
AI
N
TA
IN
A
IR
FI
EL
D S
TO
R
M W
AT
ER
S
YS
TE
M
PH
AS
E
II
D O
BB
IN
S
AI
R R
ES
ER
VE
B
AS
E, G
EO
R G
IA
PR
O
JE
C T
N O
FG
W B
-0
FG
W B
-0
P2
CERTIFIED FINAL
J.
P.
AR
IS
TI
ZA
BA
L
MATCHLINE-SEE SHEET CE320
M
AT
C H
LI
N
E-
SE
E
SH
EE
T
C E3
M
AT
C H
LI
N
E-
SE
E
SH
EE
T
C E3
MATCHLINE-SEE SHEET CE309
SI
O
N A
N D
S
ED
IM
EN
T C
O N
TR
O
L
FI
N
AL
P
LA
N
CE315
C E3
.d w g
Ds4
Ds4
Ds4
Ds4
Ds4
Ds4
Ds4
Ds4
Ds4
Ds4
Ds4
Ds4
Ds4
Ds4
Sd2-B
Sd2-B
Sd2-B
Sd2-B
Sd2-B
Sd2-F
Sd2-F Sd2-F
KEY MAP
CLIN I
C
LI
N I
CE329
CE330
CE331
CE301 CE302 CE303 CE304
CE307
CE308 CE309 CE310 CE311
CE313 CE314 CE315 CE316 CE317
CE320 CE321 CE322
CE325 CE326
CE306 CE312
CE318
CE223
CLIN IV
C
LI
N
II
CLIN III
PLAN
NORTH
A1 EROSION AND SEDIMENT CONTROL FINAL PLAN
GENERAL SHEET NOTES
1. REFER TO SHEETS CE001-CE006 FOR EROSION AND
SEDIMENT CONTROL NOTES.
2. REFER TO SHEETS C-001 AND C-002 FOR PROJECT
ABBREVIATIONS AND GENERAL, AIRFIELD, AND STORM
SEWER NOTES.
3. EXISTING INFORMATION AND TOPOGRAPHY PROVIDED
BY GIS DATA AND GEOSURVEY, LTD., DATED 07/19/2018,
REVISED: 11/03/2023. FIELD VERIFICATION IS REQUIRED
TO ENSURE POSITIVE DRAINAGE AND ELIMINATION OF
ALL STANDING WATER.
4. REFER TO SHEET CE007 FOR SHEET KEY MAP.
5. CONTRACTOR IS RESPONSIBLE FOR RETURNING ALL
DISTURBED AREA TO PRE-CONSTRUCTION CONDITION.
6. THE CONTRACTOR AND THEIR SUBCONTRACTORS SHALL
PERFORM A FOD CHECK WHEN ENTERING AND EXITING
THE AIRFIELD.
7. THE CONTRACTOR SHALL ONLY REMOVE, REGRADE,
AND REPLACE SOD ON SHOULDER THAT CAN BE
REESTABLISHED AT THE END OF THE WORK DAY.
8. ANY DISTURBED AREA LEFT EXPOSED FOR A PERIOD
GREATER THAN 14 DAYS SHALL BE STABILIZED WITH
MULCH OR TEMPORARY SEEDING.
9. NO MORE THAN 5 ACRES OF LAND CAN BE DISTURBED
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LODLOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LOD
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LODLO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LOD
LOD
LOD
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
TANYA NORMAN, P.E.
P.E. No. 0038055, GA
DATE: 01/09/2026 ______________
1 2 3 4 5
A
B
C
D
SHEET ID
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
LO
U
IS
VI
LL
E
D
IS
TR
IC
T
LO
U
IS
VI
LL
E, K
EN
TU
C
KY
-0
P A
R K
W A
Y L
A N
E S
U
IT
E
P
E A
C H
TR
E
E C
O R
N E
R S
, G A
P
H O
N E
(6
) 3
-7
P
O N
D J
O B
N o.
SI
ZE
FI
LE
N
AM
E:
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SO
LI
C
IT
AT
IO
N N
O
C O
N
TR
AC
T
N O
FI
LE
N U
M
BE
R
US Army Corps of Engineers®
Louisville District
FI
LE
P
AT
H : X
:\F Y2
3\
8\
.C
AD
B
IM
\0 4.
.C
AD
PH
S H
EE
TS
\C
TT
ED
: 0 1/
/2
B Y:
N O
R M
AN
, T
AN
YA
IS
SU
E D
AT
E:
JA
N
U
AR
Y 9, AN
SI
D
A.
D
U
EH
R
D .M
. L
EC
KI
E
T.
N
O R
M
AN
D
AT
E D
ES
C
R
IP
TI
O
N M
AR
K
R
EP
AI
R
M
AI
N
TA
IN
A
IR
FI
EL
D S
TO
R
M W
AT
ER
S
YS
TE
M
PH
AS
E
II
D O
BB
IN
S
AI
R R
ES
ER
VE
B
AS
E, G
EO
R G
IA
PR
O
JE
C T
N O
FG
W B
-0
FG
W B
-0
P2
CERTIFIED FINAL
J.
P.
AR
IS
TI
ZA
BA
L
MATCHLINE-SEE SHEET CE321
M
AT
C H
LI
N
E-
SE
E
SH
EE
T
C E3
M
AT
C H
LI
N
E-
SE
E
SH
EE
T
C E3
MATCHLINE-SEE SHEET CE310
SI
O
N A
N D
S
ED
IM
EN
T C
O N
TR
O
L
FI
N
AL
P
LA
N
CE316
C E3
.d w g
Ds4 Ds4
Ds4
Ds4
Ds4
Ds4
Ds4
Ds4
Ds4
Ds4
KEY MAP
CLIN I
C
LI
N I
CE329
CE330
CE331
CE301 CE302 CE303 CE304
CE307
CE308 CE309 CE310 CE311
CE313 CE314 CE315 CE316 CE317
CE320 CE321 CE322
CE325 CE326
CE306 CE312
CE318
CE223
CLIN IV
C
LI
N
II
CLIN III
PLAN
NORTH
A1 EROSION AND SEDIMENT CONTROL FINAL PLAN
GENERAL SHEET NOTES
1. REFER TO SHEETS CE001-CE006 FOR EROSION AND
SEDIMENT CONTROL NOTES.
2. REFER TO SHEETS C-001 AND C-002 FOR PROJECT
ABBREVIATIONS AND GENERAL, AIRFIELD, AND STORM
SEWER NOTES.
3. EXISTING INFORMATION AND TOPOGRAPHY PROVIDED
BY GIS DATA AND GEOSURVEY, LTD., DATED 07/19/2018,
REVISED: 11/03/2023. FIELD VERIFICATION IS REQUIRED
TO ENSURE POSITIVE DRAINAGE AND ELIMINATION OF
ALL STANDING WATER.
4. REFER TO SHEET CE007 FOR SHEET KEY MAP.
5. CONTRACTOR IS RESPONSIBLE FOR RETURNING ALL
DISTURBED AREA TO PRE-CONSTRUCTION CONDITION.
6. THE CONTRACTOR AND THEIR SUBCONTRACTORS SHALL
PERFORM A FOD CHECK WHEN ENTERING AND EXITING
THE AIRFIELD.
7. THE CONTRACTOR SHALL ONLY REMOVE, REGRADE,
AND REPLACE SOD ON SHOULDER THAT CAN BE
REESTABLISHED AT THE END OF THE WORK DAY.
8. ANY DISTURBED AREA LEFT EXPOSED FOR A PERIOD
GREATER THAN 14 DAYS SHALL BE STABILIZED WITH
MULCH OR TEMPORARY SEEDING.
9. NO MORE THAN 5 ACRES OF LAND CAN BE DISTURBED
C1 C-502
990990
980980
S-1140
37.48 AC
990990
980980
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LOD
LOD
LO
D
LO
D
LOD
LOD
LOD
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LODLOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LO
D
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D LO
D
LO
D
LO
D
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LO
DLOD
LOD
LOD
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD LOD LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
TANYA NORMAN, P.E.
P.E. No. 0038055, GA
DATE: 01/09/2026 ______________
1 2 3 4 5
A
B
C
D
SHEET ID
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
LO
U
IS
VI
LL
E
D
IS
TR
IC
T
LO
U
IS
VI
LL
E, K
EN
TU
C
KY
-0
P A
R K
W A
Y L
A N
E S
U
IT
E
P
E A
C H
TR
E
E C
O R
N E
R S
, G A
P
H O
N E
(6
) 3
-7
P
O N
D J
O B
N o.
SI
ZE
FI
LE
N
AM
E:
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SO
LI
C
IT
AT
IO
N N
O
C O
N
TR
AC
T
N O
FI
LE
N U
M
BE
R
US Army Corps of Engineers®
Louisville District
FI
LE
P
AT
H : X
:\F Y2
3\
8\
.C
AD
B
IM
\0 4.
.C
AD
PH
S H
EE
TS
\C
TT
ED
: 0 1/
/2
B Y:
N O
R M
AN
, T
AN
YA
IS
SU
E D
AT
E:
JA
N
U
AR
Y 9, AN
SI
D
A.
D
U
EH
R
D .M
. L
EC
KI
E
T.
N
O R
M
AN
D
AT
E D
ES
C
R
IP
TI
O
N M
AR
K
R
EP
AI
R
M
AI
N
TA
IN
A
IR
FI
EL
D S
TO
R
M W
AT
ER
S
YS
TE
M
PH
AS
E
II
D O
BB
IN
S
AI
R R
ES
ER
VE
B
AS
E, G
EO
R G
IA
PR
O
JE
C T
N O
FG
W B
-0
FG
W B
-0
P2
CERTIFIED FINAL
J.
P.
AR
IS
TI
ZA
BA
L
MATCHLINE-SEE SHEET CE322
M
AT
C H
LI
N
E-
SE
E
SH
EE
T
C E3
M
AT
C H
LI
N
E-
SE
E
SH
EE
T
C E3
MATCHLINE-SEE SHEET CE311
SI
O
N A
N D
S
ED
IM
EN
T C
O N
TR
O
L
FI
N
AL
P
LA
N
CE317
C E3
.d w g
Ds4
Ds4
Ds4
Ds4
Ds4
Ds4
Ds4
Ds4
Sd2-B
END SILT
FENCE
START SILT
FENCE
Sd1-SDs4KEY MAP
CLIN I
C
LI
N I
CE329
CE330
CE331
CE301 CE302 CE303 CE304
CE307
CE308 CE309 CE310 CE311
CE313 CE314 CE315 CE316 CE317
CE320 CE321 CE322
CE325 CE326
CE306 CE312
CE318
CE223
CLIN IV
C
LI
N
II
CLIN III
PLAN
NORTH
A1 EROSION AND SEDIMENT CONTROL FINAL PLAN
GENERAL SHEET NOTES
1. REFER TO SHEETS CE001-CE006 FOR EROSION AND SEDIMENT
CONTROL NOTES.
2. REFER TO SHEETS C-001 AND C-002 FOR PROJECT ABBREVIATIONS
AND GENERAL, AIRFIELD, AND STORM SEWER NOTES.
3. EXISTING INFORMATION AND TOPOGRAPHY PROVIDED BY GIS DATA
AND GEOSURVEY, LTD., DATED 07/19/2018, REVISED: 11/03/2023. FIELD
VERIFICATION IS REQUIRED TO ENSURE POSITIVE DRAINAGE AND
ELIMINATION OF ALL STANDING WATER.
4. REFER TO SHEET CE007 FOR SHEET KEY MAP.
5. CONTRACTOR IS RESPONSIBLE FOR RETURNING ALL DISTURBED AREA
TO PRE-CONSTRUCTION CONDITION.
6. THE CONTRACTOR AND THEIR SUBCONTRACTORS SHALL PERFORM A
FOD CHECK WHEN ENTERING AND EXITING THE AIRFIELD.
7. THE CONTRACTOR SHALL ONLY REMOVE, REGRADE, AND REPLACE
SOD ON SHOULDER THAT CAN BE REESTABLISHED AT THE END OF THE
WORK DAY.
8. ANY DISTURBED AREA LEFT EXPOSED FOR A PERIOD GREATER THAN
14 DAYS SHALL BE STABILIZED WITH MULCH OR TEMPORARY
SEEDING.
9. NO MORE THAN 5 ACRES OF LAND CAN BE DISTURBED AT A TIME.
CONSTRUCTION MUST BE PHASED TO LIMIT LAND DISTURBANCES TO 5
ACRES OR LESS.
1ST STREET
COBB PARKW
AY
965966
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD LO
D
LO
D
LO
D
LO
D
LOD
LOD
LO
D
LOD
LOD
LO
D
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LOD
LOD
LODLOD
LOD
LOD
LOD
LOD
LO
D
LO
D
LO
D
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LOD
LOD
LOD
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
TANYA NORMAN, P.E.
P.E. No. 0038055, GA
DATE: 01/09/2026 ______________
1 2 3 4 5
A
B
C
D
SHEET ID
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
LO
U
IS
VI
LL
E
D
IS
TR
IC
T
LO
U
IS
VI
LL
E, K
EN
TU
C
KY
-0
P A
R K
W A
Y L
A N
E S
U
IT
E
P
E A
C H
TR
E
E C
O R
N E
R S
, G A
P
H O
N E
(6
) 3
-7
P
O N
D J
O B
N o.
SI
ZE
FI
LE
N
AM
E:
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SO
LI
C
IT
AT
IO
N N
O
C O
N
TR
AC
T
N O
FI
LE
N U
M
BE
R
US Army Corps of Engineers®
Louisville District
FI
LE
P
AT
H : X
:\F Y2
3\
8\
.C
AD
B
IM
\0 4.
.C
AD
PH
S H
EE
TS
\C
TT
ED
: 0 1/
/2
B Y:
N O
R M
AN
, T
AN
YA
IS
SU
E D
AT
E:
JA
N
U
AR
Y 9, AN
SI
D
A.
D
U
EH
R
D .M
. L
EC
KI
E
T.
N
O R
M
AN
D
AT
E D
ES
C
R
IP
TI
O
N M
AR
K
R
EP
AI
R
M
AI
N
TA
IN
A
IR
FI
EL
D S
TO
R
M W
AT
ER
S
YS
TE
M
PH
AS
E
II
D O
BB
IN
S
AI
R R
ES
ER
VE
B
AS
E, G
EO
R G
IA
PR
O
JE
C T
N O
FG
W B
-0
FG
W B
-0
P2
CERTIFIED FINAL
J.
P.
AR
IS
TI
ZA
BA
L
MATCHLINE-SEE SHEET CE323
M
AT
C H
LI
N
E-
SE
E
SH
EE
T
C
SI
O
N A
N D
S
ED
IM
EN
T C
O N
TR
O
L
FI
N
AL
P
LA
N
CE318
C E3
.d w g
Ds4
Ds4
Ds4
Ds4
Ds4
JURISDICTIONAL WATERWAY
Ds4
Sd2-F
Sd2-F
START SILT
FENCE
END SILT
FENCE
KEY MAP
CLIN I
C
LI
N I
CE329
CE330
CE331
CE301 CE302 CE303 CE304
CE307
CE308 CE309 CE310 CE311
CE313 CE314 CE315 CE316 CE317
CE320 CE321 CE322
CE325 CE326
CE306 CE312
CE318
CE223
CLIN IV
C
LI
N
II
CLIN III
PLAN
NORTH
A1 EROSION AND SEDIMENT CONTROL FINAL PLAN
GENERAL SHEET NOTES
1. REFER TO SHEETS CE001-CE006 FOR EROSION AND
SEDIMENT CONTROL NOTES.
2. REFER TO SHEETS C-001 AND C-002 FOR PROJECT
ABBREVIATIONS AND GENERAL, AIRFIELD, AND STORM
SEWER NOTES.
3. EXISTING INFORMATION AND TOPOGRAPHY PROVIDED
BY GIS DATA AND GEOSURVEY, LTD., DATED 07/19/2018,
REVISED: 11/03/2023. FIELD VERIFICATION IS REQUIRED
TO ENSURE POSITIVE DRAINAGE AND ELIMINATION OF
ALL STANDING WATER.
4. REFER TO SHEET CE007 FOR SHEET KEY MAP.
5. CONTRACTOR IS RESPONSIBLE FOR RETURNING ALL
DISTURBED AREA TO PRE-CONSTRUCTION CONDITION.
6. THE CONTRACTOR AND THEIR SUBCONTRACTORS SHALL
PERFORM A FOD CHECK WHEN ENTERING AND EXITING
THE AIRFIELD.
7. THE CONTRACTOR SHALL ONLY REMOVE, REGRADE,
AND REPLACE SOD ON SHOULDER THAT CAN BE
REESTABLISHED AT THE END OF THE WORK DAY.
8. ANY DISTURBED AREA LEFT EXPOSED FOR A PERIOD
GREATER THAN 14 DAYS SHALL BE STABILIZED WITH
MULCH OR TEMPORARY SEEDING.
9. NO MORE THAN 5 ACRES OF LAND CAN BE DISTURBED
1000' PRIMARY SURFACE LIMIT
25' STATE BUFFER
50' COUNTY BUFFER
75' IMPERVIOUS BUFFER
25' STATE BU
FFER
50' C O
U N
TY BU
FFER
75' IM
PER
VIO
U
S BU
FFER
LOD
LOD
LOD
LOD
LO
D
LO
D
LO
D
LOD
LOD
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LOD
LOD
LOD
LO
D
LO
D
LOD
LO
D
LOD
LOD
LO
D
LO
DLO
D
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LOD
LO
D
LO
D
LO
D
LOD
LOD
LOD
LOD
TANYA NORMAN, P.E.
P.E. No. 0038055, GA
DATE: 01/09/2026 ______________
1 2 3 4 5
A
B
C
D
SHEET ID
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
LO
U
IS
VI
LL
E
D
IS
TR
IC
T
LO
U
IS
VI
LL
E, K
EN
TU
C
KY
-0
P A
R K
W A
Y L
A N
E S
U
IT
E
P
E A
C H
TR
E
E C
O R
N E
R S
, G A
P
H O
N E
(6
) 3
-7
P
O N
D J
O B
N o.
SI
ZE
FI
LE
N
AM
E:
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SO
LI
C
IT
AT
IO
N N
O
C O
N
TR
AC
T
N O
FI
LE
N U
M
BE
R
US Army Corps of Engineers®
Louisville District
FI
LE
P
AT
H : X
:\F Y2
3\
8\
.C
AD
B
IM
\0 4.
.C
AD
PH
S H
EE
TS
\C
TT
ED
: 0 1/
/2
B Y:
N O
R M
AN
, T
AN
YA
IS
SU
E D
AT
E:
JA
N
U
AR
Y 9, AN
SI
D
A.
D
U
EH
R
D .M
. L
EC
KI
E
T.
N
O R
M
AN
D
AT
E D
ES
C
R
IP
TI
O
N M
AR
K
R
EP
AI
R
M
AI
N
TA
IN
A
IR
FI
EL
D S
TO
R
M W
AT
ER
S
YS
TE
M
PH
AS
E
II
D O
BB
IN
S
AI
R R
ES
ER
VE
B
AS
E, G
EO
R G
IA
PR
O
JE
C T
N O
FG
W B
-0
FG
W B
-0
P2
CERTIFIED FINAL
J.
P.
AR
IS
TI
ZA
BA
L
M
AT
C H
LI
N
E-
SE
E
SH
EE
T
C E3
MATCHLINE-SEE SHEET CE315
SI
O
N A
N D
S
ED
IM
EN
T C
O N
TR
O
L
FI
N
AL
P
LA
N
CE320
C E3
.d w g
Ds4
St
Sd1-S
START
SILT FENCE
Sd2-F
Sd2-F Sd2-F Sd1-S
Ds4
END
SILT FENCE
START
SILT FENCE
Sd1-S
Ds4
Sd2-F
KEY MAP
CLIN I
C
LI
N I
CE329
CE330
CE331
CE301 CE302 CE303 CE304
CE307
CE308 CE309 CE310 CE311
CE313 CE314 CE315 CE316 CE317
CE320 CE321 CE322
CE325 CE326
CE306 CE312
CE318
CE223
CLIN IV
C
LI
N
II
CLIN III
PLAN
NORTH
A1 EROSION AND SEDIMENT CONTROL FINAL PLAN
GENERAL SHEET NOTES
1. REFER TO SHEETS CE001-CE006 FOR EROSION AND
SEDIMENT CONTROL NOTES.
2. REFER TO SHEETS C-001 AND C-002 FOR PROJECT
ABBREVIATIONS AND GENERAL, AIRFIELD, AND STORM
SEWER NOTES.
3. EXISTING INFORMATION AND TOPOGRAPHY PROVIDED
BY GIS DATA AND GEOSURVEY, LTD., DATED 07/19/2018,
REVISED: 11/03/2023. FIELD VERIFICATION IS REQUIRED
TO ENSURE POSITIVE DRAINAGE AND ELIMINATION OF
ALL STANDING WATER.
4. REFER TO SHEET CE007 FOR SHEET KEY MAP.
5. CONTRACTOR IS RESPONSIBLE FOR RETURNING ALL
DISTURBED AREA TO PRE-CONSTRUCTION CONDITION.
6. THE CONTRACTOR AND THEIR SUBCONTRACTORS SHALL
PERFORM A FOD CHECK WHEN ENTERING AND EXITING
THE AIRFIELD.
7. THE CONTRACTOR SHALL ONLY REMOVE, REGRADE,
AND REPLACE SOD ON SHOULDER THAT CAN BE
REESTABLISHED AT THE END OF THE WORK DAY.
8. ANY DISTURBED AREA LEFT EXPOSED FOR A PERIOD
GREATER THAN 14 DAYS SHALL BE STABILIZED WITH
MULCH OR TEMPORARY SEEDING.
9. NO MORE THAN 5 ACRES OF LAND CAN BE DISTURBED
AT A TIME. CONSTRUCTION MUST BE PHASED TO LIMIT
EX. WETLANDS
75' IM
PER
VIO
U
S BU
FFER
50' C O
U N
TY BU
FFER
25' STATE BU
FFER
75' IM
PER
VIO
U
S BU
FFER
50' C O
U N
TY BU
FFER
25' STATE BU
FFER75' IM
PER
VIO
U
S BU
FFER
50' C
O U
N
TY BU
FFER
25' STATE BU
FFER
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LODLO
D
LO
D
LO
D
LO
D
LO
D
LODLOD
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LO
D
LO
D
LO
D
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LOD
LOD LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LODLOD
LOD
LOD
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LO
D
LO
D
LO
D
LOD
TANYA NORMAN, P.E.
P.E. No. 0038055, GA
DATE: 01/09/2026 ______________
1 2 3 4 5
A
B
C
D
SHEET ID
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
LO
U
IS
VI
LL
E
D
IS
TR
IC
T
LO
U
IS
VI
LL
E, K
EN
TU
C
KY
-0
P A
R K
W A
Y L
A N
E S
U
IT
E
P
E A
C H
TR
E
E C
O R
N E
R S
, G A
P
H O
N E
(6
) 3
-7
P
O N
D J
O B
N o.
SI
ZE
FI
LE
N
AM
E:
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SO
LI
C
IT
AT
IO
N N
O
C O
N
TR
AC
T
N O
FI
LE
N U
M
BE
R
US Army Corps of Engineers®
Louisville District
FI
LE
P
AT
H : X
:\F Y2
3\
8\
.C
AD
B
IM
\0 4.
.C
AD
PH
S H
EE
TS
\C
TT
ED
: 0 1/
/2
B Y:
N O
R M
AN
, T
AN
YA
IS
SU
E D
AT
E:
JA
N
U
AR
Y 9, AN
SI
D
A.
D
U
EH
R
D .M
. L
EC
KI
E
T.
N
O R
M
AN
D
AT
E D
ES
C
R
IP
TI
O
N M
AR
K
R
EP
AI
R
M
AI
N
TA
IN
A
IR
FI
EL
D S
TO
R
M W
AT
ER
S
YS
TE
M
PH
AS
E
II
D O
BB
IN
S
AI
R R
ES
ER
VE
B
AS
E, G
EO
R G
IA
PR
O
JE
C T
N O
FG
W B
-0
FG
W B
-0
P2
CERTIFIED FINAL
J.
P.
AR
IS
TI
ZA
BA
L
M
AT
C H
LI
N
E-
SE
E
SH
EE
T
C E3
M
AT
C H
LI
N
E-
SE
E
SH
EE
T
C E3
MATCHLINE-SEE SHEET CE316
SI
O
N A
N D
S
ED
IM
EN
T C
O N
TR
O
L
FI
N
AL
P
LA
N
CE321
C E3
.d w g
Ds4
Ds4
Ds4 Ds4
St
Sd1-S
END
SILT FENCE
Sd1-S
Sd2-B
Sd2-B Ds4
CONCRETE WASHDOWN
SEE DETAIL B1/CE501
KEY MAP
CLIN I
C
LI
N I
CE329
CE330
CE331
CE301 CE302 CE303 CE304
CE307
CE308 CE309 CE310 CE311
CE313 CE314 CE315 CE316 CE317
CE320 CE321 CE322
CE325 CE326
CE306 CE312
CE318
CE223
CLIN IV
C
LI
N
II
CLIN III
PLAN
NORTH
A1 EROSION AND SEDIMENT CONTROL FINAL PLAN
GENERAL SHEET NOTES
1. REFER TO SHEETS CE001-CE006 FOR EROSION AND SEDIMENT
CONTROL NOTES.
2. REFER TO SHEETS C-001 AND C-002 FOR PROJECT
ABBREVIATIONS AND GENERAL, AIRFIELD, AND STORM SEWER
NOTES.
3. EXISTING INFORMATION AND TOPOGRAPHY PROVIDED BY GIS
DATA AND GEOSURVEY, LTD., DATED 07/19/2018, REVISED:
11/03/2023. FIELD VERIFICATION IS REQUIRED TO ENSURE
POSIT…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .