This is a Certified Final Erosion and Sediment Control Plan consisting of stamped engineering drawings for stormwater system repairs at Dobbins Air Reserve Base in Marietta, Georgia. The plan covers Project Nos. FGWB 21-0002 and FGWB 25-0006, with a total disturbed area of 55.34 acres and a 67 cubic yard sediment storage requirement per inlet. The project involves repair and maintenance of the airfield stormwater system east of Taxiway 'J', including regrading failed slopes, sod application for stabilization, cleaning of existing flumes and pipes, installation of new concrete flumes, and swale maintenance across basins III, IV, and V. Construction is scheduled to begin August 1, 2026 and end September 23, 2027, with no more than 5 acres disturbed at any one time.
The plan incorporates erosion and sediment control best management practices compliant with Georgia's NPDES General Permit No. GAR 100001 and the Manual for Erosion and Sediment Control in Georgia. Key control measures include silt fence installation, construction exits, inlet protection via baffle boxes and silt savers, temporary and permanent seeding, mulching, turf reinforcement matting, dust control, and check dams. The project includes two stormwater sampling points requiring turbidity monitoring with a standard of 50-75 NTU since the site is located near warm water fisheries within 1-10 acres with drainage areas less than 5 square miles. The design professional, Tanya Norman, P.E., maintains Georgia Level II Certification No. 0000058386 (expiring 05-29-2028) and certified the plan on January 9, 2026. Wetlands totaling 0.37 acres exist on-site, and the receiving waters are Rottenwood Creek and Poorhouse Creek, with Rottenwood Creek being impaired for biota M.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Hull Place
WASH RACK
BEACON
TOWER
D ob bi ns
P la ce
L-64
L-63
B-56
B-57S
B-57N
T-742
B-128
L-59
HELIPAD
At la nt a
Ro ad
Rottenwood Creek
TCC SITE 1
ILS ANTENNA
FUEL TANK
FARM
ASR ANTENNA
PLAYGROUND
Cobb St
Tow Strip
GA280
GA280
TPC TRAINING AREA
Walker St
RWY II
GLIDE SLOPE
ANT.
HAWK PAD
GATE #3
TCC
Readiness Circle
Sea Service Road
Barclay Circle
B-112B-9-5 B-106
B-70
B-96B-40
St Fa irg ro un d
931905
TACAN
VEDA LZ
ASSAULT RW
TEST CELL
TCC SITE #2
EOD RANGE
FIRE TRAINING
AREA
HOT CARGO
PAD
USAF AMMO AREA
LMAS TERTIARY
TREATMENT
PLANT
9B
9A
L-8
L-22
L-11 L-12
L-65
B-23
B-22
1250'
TRANSIENT PARKING
Cobb Parkway (US 41)
Patrol Road
Sabre Street
Hun Street
TAXIWAY N
TAXIW
AY M
TANKS
BIG LAKE
BALL FIELD
TAXIW
AY L
TAXIWAY E
TAXIWAY E
COMPASS
ROSE
TAXIW
AY GEAST WEST INSTRUMENT RUNWAY 11/29 300' X 10,000' - TRUE AZIMUTH FROM NORTH 286°24'10" - BEARING N73°35'50"E
TAXIWAY B
TAXIW
AY C
TAXIW
AY A
TAXIWAY D
HUSH HOUSE
TA
XI
W
AY
J
FAM CAMP
LOCKHEED MARTIN AERONAUTICAL
RUNWAY DISTANCE
MARKERS
(SOUTH PARALLEL TAXIWAY)
TAXIWAY E
(NORTHEAST PARALLEL TAXIWAY)
TAXIW
AY A
TAXIW
AY A NORTHW
EST-SOUTHEAST RUNW
AY (CLOSED)
TA
XI
W
AY
G
N O
R
TH
-S O
U
TH
R U
N W
(C
LO
SE
D
GCA TURNTABLE
ARRESTING
BARRIER
ARRESTING
BARRIER
POND #3
CEMETERY
SEWAGE LIFT STATION
(LOCKHEED)
AF POL
POND #5
South Cobb Drive
POND #4
GATE #1
POND #6
FIRING RANGE
TAXIWAY F
U. S. ARMY
RESERVE AREA
AIRCRAFT PARKING
APRON
HIGH EXPLOSIVE
MAGAZINE
NAVY AMMO
AREA
NAVY
AVGAS
AREA
FORMER
LOCKHEED
AVGAS
AREA
HANGAR
AIRCRAFT
PARKING APRON
TAXIW
AY K
PRIVATELY OWNED
PROPERTY
NAVAL
AIR STATION
ATLANTA
RESERVOIR
TA
XI
W
AY
P
FIRE DEPT.
TRAINING AREA
LITTLE
LAKE
ARMY RES. AVIATION
SUPPORT FACILITY
AF REFUELER VEHICLE
PARKING
Former
S.A.D. LAB
TENNIS
COURT
AIRCRAFT PARKING
SMOKEHOUSE
NAVY AIRCRAFT
MAINTENANCE AREA
TANK
2174 747
732 812
920900
1012 1011
709 832
558 559
10451047
440 441
U-150
S-129
T-130
AF GATE 2
POND #7
B110
B111
50 51
65 60
38 19
U121
83 655
B-98
B-52
B-24
B-69
B-25
B-86
T-603
B-56
B-82
B-83
B-84
B104
B-88
B-89
B-66
B-55
T-563L
L-10
B-78
L-45
C-31
L-48
L-9
L-6
L-1
L-3
L-4
L-2
L-47
L-43
U-151
POND #1
POND #2
T-400
U-152
B-95
B-68
B-67
B-9-1
B-9-2
B-9-3
B-9-4
B-2
B-107
B-27
B-28
B-91
B-1
B-102
B-99L
B-4B-3
B-29
B-6
B-76
B-7
B-31
B-32 B-33
B-30
B-44
B-65L
B-54
B-79
B-26
B-58
B-80
B-62
U124
U126 B-64L
7492016
696867
200 3674 35
352351
Atlantic Ave
Tinker St
Seventh Stre et
In du str ial
D riv e
Perrin Road
Andrews Drive
W al ke r S t
Atlantic Ave.
Industrial Drive
M orris Street
Dobbins Patrol Road
Fo ur th S tre et
Si xt h St re et
G ib bs s t
Atlantic Ave
Ridenour Drive
South Cobb Drive
R ef ue lin g R oa d
Second St.
Warehouse Road
Mimosa Drive
Perry Street
Hercules W ay
Barrack D rive
South Patrol Road
South Patrol Road
East Patrol Road
Richardson Road
Homer Corn Drive
Hillside Avenue
Atlanta Road (US 755)
Fourth Street
Fifth Street
Lake Circle
Lit tle
L ak e Dr
Colonels Loop
Atlantic Ave.
Generals Road
Gym Roa d
First Street
Halsey Avenue
Nimitz Drive M its ch ne r D r.
Halsey Avenue
NAVY GATE
Buchanan Way
Halsey Avenue
Tu sk ee ge e Ai rm en
A ve
Park Street
Broad Street
Davis Road
South Cobb Pkwy. (U. S. Highway 41)
Dixie Ave.
Atlanta R oad
Dobbins Patrol Road
NO SCALE
PROJECT LOCATION MAP
AREA OF
WORK
BMP SYMBOLS LEGENDGENERAL NOTES
1. ADHERE TO THE "MANUAL FOR EROSION AND SEDIMENT
CONTROL" IN GEORGIA.
2. EROSION AND SEDIMENT CONTROL FACILITIES SHALL BE
INSTALLED PRIOR TO ANY OTHER CONSTRUCTION.
3. CONTRACTOR WILL BE RESPONSIBLE THROUGHOUT
CONSTRUCTION FOR CONTINUAL MAINTENANCE OF
EROSION AND SEDIMENT CONTROL MEASURES AS SHOWN
4. TAKE MEASURES AS NECESSARY TO PREVENT EROSION
AND SEDIMENT TRANSPORT DURING CONSTRUCTION.
5. ADDITIONAL EROSION AND SEDIMENT CONTROL
MEASURES, IF NECESSARY, SHALL BE IMPLEMENTED AS
DIRECTED BY THE COR OR EROSION AND SEDIMENT
CONTROL INSPECTOR.
6. THE CONTRACTOR SHALL MAINTAIN ALL EROSION AND
SEDIMENT CONTROL MEASURES UNTIL PERMANENT
VEGETATION HAS BEEN ESTABLISHED. THE CONTRACTOR
MUST CLEAN ALL SEDIMENT TRAPS AS REQUIRED BY THE
PROJECT DRAWINGS, SPECIFICATIONS, AND THE GEORGIA
GENERAL PERMIT GAR 100001.
7. FAILURE TO INSTALL, OPERATE AND MAINTAIN ALL
EROSION AND SEDIMENT CONTROL MEASURES AS SHOWN
ON THE APPROVED PLANS OR AS DIRECTED BY THE COR
AND/OR COUNTY AND/OR STATE MAY RESULT IN ALL
WORK ON THE CONSTRUCTION SITE BEING STOPPED
UNTIL PROPER CORRECTIVE MEASURES HAVE BEEN MET,
AS REQUIRED AND/OR DIRECTED.
8. THERE ARE NO KNOWN ENDANGERED SPECIES OR
CULTURAL RESOURCES LOCATED WITHIN 200 FT. OF THE
AREA OF DISTURBANCE FOR THIS SITE.
9. THERE ARE WETLANDS AND STATE WATERS LOCATED
WITHIN 200 FEET OF THE AREA OF DISTURBANCE FOR THIS
SITE. SEE PLAN SHEETS FOR LOCATIONS.
10. TEMPORARY EROSION AND SEDIMENT CONTROL
MEASURES SHALL REMAIN IN PLACE UNTIL THE SITE IS
STABILIZED AND INSPECTED. All TEMPORARY MEASURES
SHALL BE REMOVED BY THE CONTRACTOR UPON
SUBMITTAL OF NOTICE OF TERMINATION.
11. SILT FENCE SHALL BE REMOVED 7 DAYS AFTER
STABILIZATION WITH SOD IN COMMON AREAS. IN CRITICAL
AREAS, SILT FENCE SHALL BE REMOVED IN 30 DAYS.
STABILIZE AREAS DISTURBED BY SILT FENCE REMOVAL
WITH SOD.
12. SODDING AREAS: FOR THE FIRST FOURTEEN CALENDAR
DAYS AFTER SODDING, SOD SHALL BE WATERED TWICE
PER DAY WITH 1/2 INCH OF WATER PER APPLICATION. FOR
THE NEXT 14-DAYS SOD SHALL BE WATERED ONCE PER
DAY WITH 1/2 INCH OF WATER PER APPLICATION. THE
CONTRACTOR SHALL USE WATER TRUCKS FOR WATERING.
SOD SHALL BE INSPECTED AT END OF THE THE 28 DAY
PERIOD WITH THE CONTRACTING OFFICER FOR
APPROVAL.
13. FOR SHOULDER SOD REPLACEMENT AREAS, ONLY
DISTURB TO A POINT WITHE THE AREA COULD BE
RESTABLIZED BY THE END OF THE WORKDAY WITH SOD
TANYA NORMAN, P.E.
P.E. No. 0038055, GA
DATE: 01/09/2026 ______________
1 2 3 4 5
A
B
C
D
SHEET ID
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
LO
U
IS
VI
LL
E
D
IS
TR
IC
T
LO
U
IS
VI
LL
E, K
EN
TU
C
KY
-0
P A
R K
W A
Y L
A N
E S
U
IT
E
P
E A
C H
TR
E
E C
O R
N E
R S
, G A
P
H O
N E
(6
) 3
-7
P
O N
D J
O B
N o.
SI
ZE
FI
LE
N
AM
E:
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SO
LI
C
IT
AT
IO
N N
O
C O
N
TR
AC
T
N O
FI
LE
N U
M
BE
R
US Army Corps of Engineers®
Louisville District
FI
LE
P
AT
H : X
:\F Y2
3\
8\
.C
AD
B
IM
\0 4.
.C
AD
PH
S H
EE
TS
\C E0
_P
LO
T
C H
EC
K
O F
O
LD
S H
EE
T
PL
TT
ED
: 0
1/
/2
B
Y:
N
O R
M
AN
, T
AN
YA
IS
SU
E D
AT
E:
JA
N
U
AR
Y 9, AN
SI
D
A.
D
U
EH
R
D .M
. L
EC
KI
E
T.
N
O R
M
AN
D
AT
E D
ES
C
R
IP
TI
O
N M
AR
K
R
EP
AI
R
M
AI
N
TA
IN
A
IR
FI
EL
D S
TO
R
M W
AT
ER
S
YS
TE
M
PH
AS
E
II
D O
BB
IN
S
AI
R R
ES
ER
VE
B
AS
E, G
EO
R G
IA
PR
O
JE
C T
N O
FG
W B
-0
FG
W B
-0
P2
CERTIFIED FINAL
J.
P.
AR
IS
TI
ZA
BA
L
DOBBINS AIR RESERVE BASE
MARIETTA, GEORGIA
EROSION CONTROL PLAN
PROJECT NO.: FGWB 21-0002 & FGWB 25-0006
P2#: 470584
CONSTRUCTION ENTRANCE
SEE DETAIL B2/CE501
SILT FENCE, TYPE 'C'
SEE DETAIL A1/CE501
INLET PROTECTION - BAFFLE BOX
SEE DETAIL B3/CE501
PERMANENT SODDING
SEE DETAIL C1/CE502
DUST CONTROL
SEE DETAIL A3/CE501
STORM DRAIN OUTLET PROTECTION
SEE DETAIL A4/CE502
CHECK DAM
SEE DETAIL A3/CE502
INLET PROTECTION - SILT SAVER
SEE DETAIL A1/CE502
DRAINAGE AREA BOUNDARY
Co
Sd1-S
Sd2-B
Ds4
Du
St
ER
SI
O
N A
N D
S
ED
IM
EN
T C
O N
TR
O
L C
O
VE
R S
H
EE
T
CE001
C E0
_p lo t C he ck
O f O ld S he et
.d w g
Cd-S
Sd2-F
MULCHING
SEE DETAIL A3/CE-504
TEMPORARY SEEDING
SEE DETAIL C3/CE-504
TURF REINFORCEMENT MATTING(TRM)
SEE DETAIL A1/CE-503
CONCRETE WASHDOWN AREA
COMPOST FILTER SOCK
SEE DETAIL C1/CE-504
FILTER RING
ROCKFILTER DAM
Ds1
Ds2
PLAN
NORTH
Ch-2
Cd-Fs
Fr
Rd
24-HR. EROSION AND SEDIMENT CONTROL
CONTACT WILL BE DETERMINED WITH SELECTION
OF CONTRACTOR.
TANYA NORMAN, P.E.
P.E. No. 0038055, GA
DATE: 01/09/2026 ______________
1 2 3 4 5
A
B
C
D
SHEET ID
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
LO
U
IS
VI
LL
E
D
IS
TR
IC
T
LO
U
IS
VI
LL
E, K
EN
TU
C
KY
-0
P A
R K
W A
Y L
A N
E S
U
IT
E
P
E A
C H
TR
E
E C
O R
N E
R S
, G A
P
H O
N E
(6
) 3
-7
P
O N
D J
O B
N o.
SI
ZE
FI
LE
N
AM
E:
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SO
LI
C
IT
AT
IO
N N
O
C O
N
TR
AC
T
N O
FI
LE
N U
M
BE
R
US Army Corps of Engineers®
Louisville District
FI
LE
P
AT
H : X
:\F Y2
3\
8\
.C
AD
B
IM
\0 4.
.C
AD
PH
S H
EE
TS
\C E0
_P
LO
T
C H
EC
K
O F
O
LD
S H
TT
ED
: 0
1/
/2
B
Y:
N
O R
M
AN
, T
AN
YA
IS
SU
E D
AT
E:
JA
N
U
AR
Y 9, AN
SI
D
A.
D
U
EH
R
D .M
. L
EC
KI
E
T.
N
O R
M
AN
D
AT
E D
ES
C
R
IP
TI
O
N M
AR
K
R
EP
AI
R
M
AI
N
TA
IN
A
IR
FI
EL
D S
TO
R
M W
AT
ER
S
YS
TE
M
PH
AS
E
II
D O
BB
IN
S
AI
R R
ES
ER
VE
B
AS
E, G
EO
R G
IA
PR
O
JE
C T
N O
FG
W B
-0
FG
W B
-0
P2
CERTIFIED FINAL
J.
P.
AR
IS
TI
ZA
BA
L
EROSION, SEDIMENTATION, AND POLLUTION
CONTROL PLAN GENERAL NOTES
(IN CONFORMANCE WITH STATE OF GEORGIA GENERAL NPDES PERMIT NO.
GAR 100001)
1. A COPY OF THE APPLICABLE EROSION, SEDIMENTATION, AND POLLUTION
CONTROL PLAN CHECKLIST IS LOCATED ON CE008.
2. LEVEL II CERTIFICATION OF DESIGN PROFESSIONAL.
TANYA NORMAN, P.E.
GSWCC LEVEL II CERTIFICATION NO: 0000058386
GSWCC LEVEL II CERTIFICATION EXPIRATION: 05-29-2028
3. PROJECT LIMITS OF DISTURBANCE IS LESS THAN 50 ACRES.
4. 24-HOUR EROSION, SEDIMENTATION, AND POLLUTION CONTROL CONTACT:
NAME: TO BE ASSIGNED UPON SELECTION OF THE CONTRACTOR.
5. PRIMARY PERMITTEE:
DOBBINS AIR RESERVE BASE, BASE CIVIL ENGINEERING
1291 COBB PARKWAY SOUTH
MARIETTA, GA 30067
6. TOTAL PROJECT AREA: 55.34 ACRES DISTURBED AREA: 55.34 ACRES
7. CONSTRUCTION EXIT GPS LOCATION
NORTH LAT: N 33 55'08.394" LONG: W 84 31'18.057"
SOUTH LAT: N 33 55'07.493" LONG: W 84 31'18.547"
8. INITIAL PLAN DATE AND REVISION DATES ARE SHOWN IN THE TITLE BLOCK.
9. THE EXISTING SITE CONSISTS PRIMARILY OF AN AIRFIELD WITH
ASSOCIATED ACCESS ROADS & DRAINAGE FEATURES. THE PROPOSED
SITE WILL MATCH THE EXISTING WITH THE REPLACEMENT AND REPAIR OF
STORM DRAINAGE AND THE REMOVAL OF TREES NEAR THE LAKE.
10. VICINITY MAP IS LOCATED ON CE001.
11. PROJECT RECEIVING WATER: ROTTENWOOD CREEK AND POORHOUSE
CREEK.
STATE WATERS EXIST ON OR WITHIN 200' OF THE PROJECT SITE.
WETLANDS EXIST ON OR WITHIN 200' OF THE PROJECT SITE.
AREA OF ON-SITE WETLANDS: 0.37 AC
WETLAND CERTIFICATION: THE DESIGN PROFESSIONAL, WHOSE
SEAL APPEARS HEREON, CERTIFIES THE FOLLOWING: 1) THE
NATIONAL WETLAND INVENTORY MAPS HAVE BEEN CONSULTED; AND,
2) THE APPROPRIATE PLAN SHEET DOES INDICATE AREAS OF UNITED
STATES ARMY CORPS OF ENGINEERS JURISDICTIONAL WETLANDS AS
SHOWN ON THE MAPS; AND, 3) IF WETLANDS ARE INDICATED, THE LAND
OWNER OR DEVELOPER HAS BEEN ADVISED THAT LAND DISTURBANCE
OF PROTECTED WETLANDS SHALL NOT OCCUR UNLESS THE
APPROPRIATE FEDERAL WETLANDS ALTERATION (“SECTION 404”) PERMIT
HAS BEEN OBTAINED.
12. I CERTIFY UNDER PENALTY OF LAW THAT THIS PLAN WAS PREPARED
AFTER A SITE VISIT TO THE LOCATIONS DESCRIBED HEREIN BY MYSELF OR
MY AUTHORIZED AGENT, UNDER MY DIRECT SUPERVISION.
TANYA NORMAN, P.E.
LEVEL II CERTIFICATION NO: 0000058386 DATE: 05-29-2028
13. I CERTIFY THAT THE PERMITEE'S EROSION, SEDIMENTATION, AND
POLLUTION CONTROL PLAN PROVIDES FOR AN APPROPRIATE AND
COMPREHENSIVE SYSTEM OF BEST MANAGEMENT PRACTICES REQUIRED
BY THE GEORGIA WATER QUALITY CONTROL ACT AND THE DOCUMENT
"MANUAL FOR EROSION AND SEDIMENT CONTROL IN GEORGIA" (MANUAL)
PUBLISHED BY THE STATE SOIL AND WATER CONSERVATION COMMISSION
AS OF JANUARY 1 OF THE YEAR IN WHICH THE LAND-DISTURBING ACTIVITY
WAS PERMITTED, PROVIDES FOR THE SAMPLING OF THE RECEIVING
WATER(S) OR THE SAMPLING OF THE STORM WATER OUTFALLS AND THAT
THE DESIGNED SYSTEM OF BEST MANAGEMENT PRACTICES AND
SAMPLING METHODS IS EXPECTED TO MEET THE REQUIREMENTS
CONTAINED IN THE GENERAL NPDES PERMIT NO. GAR 100001.
TANYA NORMAN, P.E.
LEVEL II CERTIFICATION NO: 0000058386 DATE: 05-29-2028
14. THE DESIGN PROFESSIONAL WHO PREPARED THE ES&PC PLAN IS TO
INSPECT THE INSTALLATION OF THE INITIAL SEDIMENT STORAGE
REQUIREMENTS AND PERIMETER CONTROL BMPS WITHIN 7 DAYS AFTER
INSTALLATION.
15. NON-EXEMPT ACTIVITIES SHALL NOT BE CONDUCTED WITHIN THE 25 OR 50
FOOT UNDISTURBED BUFFER AS MEASURED FROM THE POINT OF
WRESTED VEGETATION OR WITHIN 25 FEET OF THE COASTAL MARSHLAND
BUFFER AS MEASURED FROM THE JURISDICTIONAL DETERMINATION LINE
WITHOUT FIRST ACQUIRING THE NECESSARY VARIANCES AND PERMITS.
16. PROJECT BUFFER ENCROACHMENTS: STATE AND LOCAL BUFFER
REQUIREMENTS ARE SHOWN ON DESIGN DRAWINGS.
17. AMENDMENTS/REVISIONS TO THE ES&C PLAN WHICH HAVE A SIGNIFICANT
EFFECT ON BMPS WITH A HYDRAULIC COMPONENT MUST BE CERTIFIED
BY THE DESIGN PROFESSIONAL.
18. WASTE MATERIALS SHALL NOT BE DISCHARGED TO WATERS OF THE
STATE, EXCEPT AS AUTHORIZED BY A SECTION 404 PERMIT.
19. THE ESCAPE OF SEDIMENT FROM THE SITE SHALL BE PREVENTED BY THE
INSTALLATION OF EROSION AND SEDIMENT CONTROL MEASURES AND
PRACTICES PRIOR TO LAND DISTURBING ACTIVITIES.
20. EROSION AND SEDIMENT CONTROL MEASURES MUST BE MAINTAINED AT
ALL TIMES. IF FULL IMPLEMENTATION OF THE APPROVED PLAN DOES NOT
PROVIDE EFFECTIVE EROSION AND SEDIMENT CONTROL, ADDITIONAL
EROSION AND SEDIMENT CONTROL MEASURES SHALL BE IMPLEMENTED
TO CONTROL OR TREAT THE SEDIMENT SOURCE.
21. ANY DISTURBED AREA LEFT EXPOSED FOR A PERIOD GREATER THAN 14
DAYS SHALL BE STABILIZED WITH MULCH OR TEMPORARY SEEDING.
22. CONSTRUCTION ACTIVITY FOR THIS PROJECT DISCHARGES INTO AN
IMPAIRED STREAM SEGMENT. THE PROJECT IS WITHIN 1 LINEAR MILE
UPSTREAM OF AN IMPAIRED STREAM SEGMENT. ROTTENWOOD CREEK IS
IMPAIRED FOR BIOTA M. FOUR ADDITIONAL BMPS HAVE BEEN SELECTED
AND NOTED ON SHEET CE008.
23. A TMDL IMPLEMENTATION PLAN FOR BIOTA M FOR ROTTENWOOD CREEK
WAS COMPLETED IN 2003 AND REVISED IN 2008 (GAR031300011103).
24. CONCRETE WASHDOWN OF TOOLS, CONCRETE MIXER CHUTES, HOPPERS,
AND THE REAR OF VEHICLES WILL ONLY BE ALLOWED IN A DESIGNATED
AREA PROVIDED FOR THIS PURPOSE, AS SHOWN ON THE DRAWINGS.
WASHOUT OF THE DRUM AT THE CONSTRUCTION SITE IS PROHIBITED. THE
FOLLOWING BEST MANAGEMENT PRACTICES WILL BE FOLLOWED:
(1) CONTAIN ALL WASH WATER ON SOIL, IN A BOWL SHAPED AREA
CREATED IN THE DESIGNATED WASH AREA TO PREVENT THE WASH
WATER FROM FLOWING FROM THE WASHOUT AREA;
(2) USE THE MINIMUM AMOUNT OF WATER TO WASH DOWN TOOLS,
CONCRETE MIXER CHUTES,HOPPERS, AND THE REAR OF VEHICLES;
(3) REMOVE ANY CONCRETE SEDIMENT FROM THE AREA SURROUNDING
THE WASHOUT AREA BEFORE IT HARDENS; AND
(4) REMOVE ALL CONCRETE RESIDUE FROM THE DESIGNATED
AREA ONCE IT HAS HARDENED.
25. SPILL PREVENTION CONTROL AND COUNTERMEASURES (SPCC) PLAN:
- LOCAL, STATE, AND MANUFACTURER'S RECOMMENDED METHODS FOR
SPILL CLEANUP SHALL BE CLEARLY POSTED AND PROCEDURES SHALL
BE MADE AVAILABLE TO SITE PERSONNEL.
- MATERIAL AND EQUIPMENT NECESSARY FOR SPILL CLEANUP SHALL BE
KEPT IN THE MATERIAL STORAGE AREAS. TYPICAL MATERIALS AND
EQUIPMENT INCLUDES, BUT IS NOT LIMITED TO, BROOMS, DUSTPANS,
MOPS, RAGS, GLOVES, GOGGLES, CAT LITTER, SAND, SAWDUST, AND
PROPERLY LABELED PLASTIC AND METAL WASTE CONTAINERS.
- SPILL PREVENTION PRACTICES AND PROCEDURES SHALL BE REVIEWED
AFTER A SPILL AND ADJUSTED AS NECESSARY TO PREVENT FUTURE
SPILLS.
- ALL SPILLS MUST BE CLEANED IMMEDIATELY UPON DISCOVERY. ALL
SPILLS SHALL BE REPORTED AS REQUIRED BY LOCAL, STATE AND
FEDERAL REGULATIONS.
- THE DISCHARGE OF HAZARDOUS SUBSTANCES OR OIL IN THE STORM
WATER DISCHARGE(S) FROM A SITE SHALL BE PREVENTED.
- WHERE A RELEASE CONTAINING A HAZARDOUS SUBSTANCE IN AN
AMOUNT EQUAL TO OR IN EXCESS OF A REPORTING QUANTITY
ESTABLISHED UNDER EITHER GEORGIA'S OIL OR HAZARDOUS MATERIAL
SPILLS OR RELEASES ACT (O.C.G.A. SEC. 12-14-2, ET SEQ.), 40 CFR 117,
OR 40 CFR 302 OCCURS DURING A 24-HOUR PERIOD, THE PERMITTEE IS
REQUIRED TO NOTIFY EPD AT (404) 656-4863 OR (800) 241-4113 AND THE
NATIONAL RESPONSE CENTER (NRC) AT (800) 424-8802 IN ACCORDANCE
WITH THE REQUIREMENTS OF GEORGIA'S OIL OR HAZARDOUS MATERIAL
SPILLS OR RELEASES ACT (O.C.G.A. SEC. 12-14-2, ET SEQ.), 40 CFR 117,
AND 40 CFR 302 AS SOON AS HE HAS KNOWLEDGE OF THE DISCHARGE.
- FOR SPILLS THAT IMPACT SURFACE WATER (LEAVE A SHEEN ON
SURFACE WATER) OR SPILLS OF AN UNKNOWN AMOUNT, THE NATIONAL
RESPONSE CENTER (NRC) SHALL BE CONTACTED WITHIN 24 HOURS AT
(800) 424-8802.
- FOR SPILLS GREATER THAN 25 GALLONS AND NO SURFACE WATER
IMPACTS, THE GEORGIA EPD SHALL BE CONTACTED WITHIN 24 HOURS AT
(404) 656-4863 OR (800) 241-4113.
- FOR SPILLS LESS THAN 25 GALLONS AND NO SURFACE WATER IMPACTS,
THE SPILL SHALL BE CLEANED AND LOCAL AGENCIES SHALL BE
CONTACTED AS REQUIRED.
GENERAL NPDES PERMIT NO. GAR 100001 DOES NOT AUTHORIZE THE
DISCHARGE OF HAZARDOUS SUBSTANCES OR OIL RESULTING FROM AN
ON-SITE SPILL. THE CONTRACTOR SHALL NOTIFY THE LICENSED
PROFESSIONAL WHO PREPARED THIS PLAN IF MORE THAN 1,320
GALLONS OF PETROLEUM IS STORED ONSITE (THIS INCLUDES CAPACITIES OF
EQUIPMENT) OR IF ANY ONE PIECE OF EQUIPMENT HAS A CAPACITY GREATER
THAN 660 GALLONS. THE CONTRACTOR WILL NEED A SPILL PREVENTION
CONTAINMENT AND COUNTERMEASURES PLAN PREPARED BY A LICENSED
PROFESSIONAL.
26. POST-CONSTRUCTION STORMWATER MANAGEMENT: NO ADDITIONAL
STORMWATER MANAGEMENT FACILITIES ARE REQUIRED FOR THIS PROJECT.
EXISTING STORMWATER MANAGEMENT FACILITIES ARE TO REMAIN.
27. BUILDING MATERIAL COVER: FOR BUILDING MATERIALS, BUILDING
PRODUCTS, CONSTRUCTION WASTES, TRASH, LANDSCAPE MATERIALS,
FERTILIZERS, PESTICIDES, HERBICIDES, DETERGENTS, SANITARY WASTE
AND OTHER MATERIALS PRESENT ON THE SITE, PROVIDE COVER (E.G.
PLASTIC SHEETING, TEMPORARY ROOFS) TO MINIMIZE THE EXPOSURE OF
THESE PRODUCTS TO PRECIPITATION AND TO STORMWATER, OR A
SIMILARLY EFFECTIVE MEANS DESIGNED TO MINIMIZE THE DISCHARGE OF
POLLUTANTS FROM THESE AREAS. MINIMIZATION OF EXPOSURE IS NOT
REQUIRED IN CASES WHERE EXPOSURE TO PRECIPITATION AND TO
STORMWATER WILL NOT RESULT IN A DISCHARGE OF POLLUTANTS, OR
WHERE EXPOSURE OF A SPECIFIC MATERIAL OR PRODUCT POSES LITTLE
RISK TO STORMWATER CONTAMINATION (SUCH AS FINAL PRODUCTS AND
MATERIALS INTENDED FOR OUTDOOR USE).
28. REDUCTION OF POLLUTANTS IN STORMWATER DISCHARGES WITH
PRODUCT SPECIFIC PRACTICES:
PETROLEUM BASED PRODUCTS - CONTAINERS FOR PRODUCTS SUCH AS
FUELS, LUBRICANTS AND TARS WILL BE INSPECTED DAILY FOR LEAKS AND
SPILLS. THIS INCLUDES ON-SITE VEHICLE AND MACHINERY DAILY
INSPECTIONS AND REGULAR PREVENTATIVE MAINTENANCE OF SUCH
EQUIPMENT. EQUIPMENT MAINTENANCE AREAS WILL BE LOCATED AWAY
FROM STATE WATER, NATURAL DRAINS AND STORM WATER DRAINAGE
INLETS. IN ADDITION, TEMPORARY FUELING TANKS SHALL HAVE A
SECONDARY CONTAINMENT LINER TO PREVENT/MINIMIZE SITE
CONTAINMENT. DISCHARGE OF OILS, FUELS AND LUBRICANTS IS
PROHIBITED. PROPER DISPOSAL METHODS WILL INCLUDE COLLECTION IN
A SUITABLE CONTAINER AND DISPOSAL AS REQUIRED BY LOCAL AND
STATE REGULATIONS.
PAINTS/FINISHES/SOLVENTS - ALL PRODUCTS WILL BE STORED IN TIGHTLY
SEALED ORIGINAL CONTAINERS WHEN NOT IN USE. EXCESS PRODUCT
WILL NOT BE DISCHARGED INTO THE STORM WATER COLLECTION SYSTEM.
EXCESS PRODUCT, MATERIALS USED WITH THESE PRODUCTS, AND
PRODUCT CONTAINERS WILL BE DISPOSED ACCORDING TO
MANUFACTURER'S SPECIFICATIONS AND RECOMMENDATIONS.
CONCRETE/MASONRY - NO CONCRETE TRUCKS WILL BE ALLOWED TO
WASH OUT OR DISCHARGE SURPLUS CONCRETE OR DRUM WASH WATER
ON SITE. THE CONCRETE PROVIDER HAS RESPONSIBILITY TO ENSURE
APPROPRIATE TRAINING HAS BEEN PROVIDED TO THEIR TRUCK DRIVERS,
AND MUST PROVIDE APPROPRIATE DETAILS AND RESOURCES TO ENABLE
THEM TO COMPLETE A DELIVERY WITHOUT CAUSING POLLUTION. CHUTES,
BARRELS, WHEELBARROWS AND OTHER EQUIPMENT MUST BE RINSED IN
THE SITE WASH-DOWN AREA. SWEEP OR SHOVEL ANY SPILLS THAT
OCCUR AND ALLOW RESIDUE TO SET BEFORE REMOVING. THE HARDENED
RESIDUE MAY THEN BE PLACED IN A DESIGNATED CONCRETE/MASONRY
RECYCLING BIN ON SITE. DO NOT WASH CONCRETE/MASONRY INTO STORM
DRAINS, OPEN DITCHES, STREETS, OR STREAMS. TRUCKS SHOULD NOT
TRACK ANY CONCRETE OR MUD AND SEDIMENT OFF SITE.
FERTILIZER/HERBICIDES - THESE PRODUCTS WILL BE APPLIED AT RATES
THAT DO NOT EXCEED THE MANUFACTURER'S SPECIFICATIONS, THE CROP
ESTABLISHMENT GUIDELINES, OR THE SPECIFICATIONS CONTAINED
WITHIN THE GSWCC MANUAL FOR EROSION AND SEDIMENT CONTROL IN
GEORGIA.
BUILDING MATERIALS - NO BUILDING OR CONSTRUCTION MATERIALS
WILL BE BURIED OR DISPOSED OF ONSITE. ALL SUCH MATERIAL WILL BE
DISPOSED OF USING PROPER WASTE DISPOSAL PROCEDURES.
29. CONSTRUCTION ACTIVITY TIMELINE:
*SCHEDULE FOR PERMITTING PURPOSES ONLY.
REFER TO OFFICIAL PROJECT SCHEDULE (AS
PROVIDED BY CONTRACTOR AND APPROVED BY COR)
FOR OFFICIAL DATES AND DURATIONS.
SCHEDULE
ACTIVITY
TIME / MONTHS
1-2 3-4 5-6 7-8 9-10 11-12
INSTALLING PERIMETER
CONTROL BMPS
DEMOLISHING, GRADING,
STORM SEWER, AND
FLUME INSTALLATION.
START: AUGUST 1, 2026 END: SEPTEMBER 23, 2027
MAINTAINING SILT FENCE
AND ALL TEMPORARY
SEDIMENT AND EROSION
CONTROL.
APPLICATION OF
TEMPORARY &
PERMANENT GRASS
PERMANENT SODDING OF
DISTURBED AREA
C1
FEMA FLOOD MAP - FM13067C0117G
EFFECTIVE DATE 12/16/2008
SCALE: N.T.S.
B1 SAMPLING PLAN
SCALE: N.T.S.
USGS TOPOGRAPHIC MAP LOCATED IN
COBB COUNTY, GEORGIA
(NOTE TO PERMITTEE(S): COMPLETE THE FOLLOWING TABLE TO INCLUDE THE DATES WHEN INITIAL CONSTRUCTION ACTIVITIES COMMENCE, MAJOR GRADING ACTIVITIES OCCUR, WHEN CONSTRUCTION
ACTIVITIES TEMPORARILY OR PERMANENTLY CEASE ON A PORTION OF THE SITE, AND WHEN
STABILIZATION MEASURES ARE INITIATED. THE DESIGN PROFESSIONAL WHO PREPARED THIS PLAN
SHALL BE NOTIFIED WHEN THIS TABLE IS AMENDED.)
DATE
RECORD OF DATES - CONSTRUCTION ACTIVITIES
DESCRIPTION OF CONSTRUCTION ACTIVITY
NOTE:
PROJECT SITE IS LOCATED WITHIN FEMA FLOOD MAP 13067C0117G EFFECTIVE DECEMBER
16, 2008. PROJECT SITE IS HIDDEN FROM VIEW ON THE FIRM MAP FOR SECURITY PURPOSES;
HOWEVER, THE PROJECT SITE AND SURROUNDING VICINITY IS WITHIN FLOOD ZONE X.
SI
O
N A
N D
S
ED
IM
EN
T C
O N
TR
O
L N
O
TE
S
CE002
C E0
_p lo t C he ck
O f O ld S he et
.d w g
PLAN
NORTH
PLAN
NORTH
24-HR. EROSION AND SEDIMENT CONTROL
CONTACT WILL BE DETERMINED WITH SELECTION
OF CONTRACTOR.
SAMPLING POINT 1
SEE SHEETS CE131,
CE231, AND CE331
SAMPLING POINT 2
SEE SHEETS CE102,
CE202, AND CE302
PROJECT SITE
01/09/2026
01/09/2026
DATE: 01/09/2026 ______________
1 2 3 4 5
A
B
C
D
SHEET ID
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
LO
U
IS
VI
LL
E
D
IS
TR
IC
T
LO
U
IS
VI
LL
E, K
EN
TU
C
KY
-0
P A
R K
W A
Y L
A N
E S
U
IT
E
P
E A
C H
TR
E
E C
O R
N E
R S
, G A
P
H O
N E
(6
) 3
-7
P
O N
D J
O B
N o.
SI
ZE
FI
LE
N
AM
E:
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SO
LI
C
IT
AT
IO
N N
O
C O
N
TR
AC
T
N O
FI
LE
N U
M
BE
R
US Army Corps of Engineers®
Louisville District
FI
LE
P
AT
H : X
:\F Y2
3\
8\
.C
AD
B
IM
\0 4.
.C
AD
PH
S H
EE
TS
\C E0
_P
LO
T
C H
EC
K
O F
O
LD
S H
TT
ED
: 0
1/
/2
B
Y:
N
O R
M
AN
, T
AN
YA
IS
SU
E D
AT
E:
JA
N
U
AR
Y 9, AN
SI
D
A.
D
U
EH
R
D .M
. L
EC
KI
E
T.
N
O R
M
AN
D
AT
E D
ES
C
R
IP
TI
O
N M
AR
K
R
EP
AI
R
M
AI
N
TA
IN
A
IR
FI
EL
D S
TO
R
M W
AT
ER
S
YS
TE
M
PH
AS
E
II
D O
BB
IN
S
AI
R R
ES
ER
VE
B
AS
E, G
EO
R G
IA
PR
O
JE
C T
N O
FG
W B
-0
FG
W B
-0
P2
CERTIFIED FINAL
J.
P.
AR
IS
TI
ZA
BA
L
EROSION, SEDIMENTATION, AND POLLUTION
CONTROL PLAN GENERAL NOTES (CONT.)
(IN CONFORMANCE WITH STATE OF GEORGIA GENERAL NPDES PERMIT NO. GAR
100001)
30. INSPECTION REQUIREMENTS IN ACCORDANCE WITH PART IV.D.4. INSPECTIONS -
PERMITTEE REQUIREMENTS
1) EACH DAY WHEN ANY TYPE OF CONSTRUCTION ACTIVITY HAS TAKEN PLACE AT
A PRIMARY PERMITTEE’S SITE, CERTIFIED PERSONNEL PROVIDED BY THE
PRIMARY PERMITTEE SHALL INSPECT: (A) ALL AREAS AT THE PRIMARY
PERMITTEE’S SITE WHERE PETROLEUM PRODUCTS ARE STORED, USED, OR
HANDLED FOR SPILLS AND LEAKS FROM VEHICLES AND EQUIPMENT; (B) ALL
LOCATIONS AT THE PRIMARY PERMITTEE’S SITE WHERE VEHICLES ENTER OR
EXIT THE SITE FOR EVIDENCE OF OFF-SITE SEDIMENT TRACKING. THESE
INSPECTIONS MUST BE CONDUCTED UNTIL A NOTICE OF TERMINATION IS
SUBMITTED.
2) MEASURE RAINFALL ONCE EVERY 24 HOURS EXCEPT ANY NON-WORKING
SATURDAY, NON-WORKING SUNDAY AND NON-WORKING FEDERAL HOLIDAY
UNTIL A NOTICE OF TERMINATION IS SUBMITTED. MEASUREMENT OF RAINFALL
MAY BE SUSPENDED IF ALL AREAS OF THE SITE HAVE UNDERGONE FINAL
STABILIZATION OR ESTABLISHED A CROP OF ANNUAL VEGETATION AND A
SEEDING OF TARGET PERENNIALS APPROPRIATE FOR THE REGION.
3) CERTIFIED PERSONNEL (PROVIDED BY THE PRIMARY PERMITTEE) SHALL
INSPECT THE FOLLOWING AT LEAST ONCE EVERY SEVEN (7) CALENDAR DAYS
AND WITHIN 24 HOURS OF THE END OF A STORM THAT IS 0.5 INCHES RAINFALL
OR GREATER (UNLESS SUCH STORM ENDS AFTER 5:00 PM ON ANY FRIDAY OR
ON ANY NON-WORKING SATURDAY, NON-WORKING SUNDAY OR ANY
NON-WORKING FEDERAL HOLIDAY IN WHICH CASE THE INSPECTION SHALL BE
COMPLETED BY THE END OF THE NEXT BUSINESS DAY AND/OR WORKING DAY,
WHICHEVER OCCURS FIRST): (A) DISTURBED AREAS OF THE PRIMARY
PERMITTEE’S CONSTRUCTION SITE; (B) AREAS USED BY THE PRIMARY
PERMITTEE FOR STORAGE OF MATERIALS THAT ARE EXPOSED TO
PRECIPITATION; AND (C) STRUCTURAL CONTROL MEASURES. EROSION AND
SEDIMENT CONTROL MEASURES IDENTIFIED IN THE PLAN APPLICABLE TO THE
PRIMARY PERMITTEE’S SITE SHALL BE OBSERVED TO ENSURE THAT THEY ARE
OPERATING CORRECTLY. WHERE DISCHARGE LOCATIONS OR POINTS ARE
ACCESSIBLE, THEY SHALL BE INSPECTED TO ASCERTAIN WHETHER EROSION
CONTROL MEASURES ARE EFFECTIVE IN PREVENTING SIGNIFICANT IMPACTS
TO RECEIVING WATER(S). FOR AREAS OF A SITE THAT HAVE UNDERGONE FINAL
STABILIZATION OR ESTABLISHED A CROP OF ANNUAL VEGETATION AND A
SEEDING OF TARGET PERENNIALS APPROPRIATE FOR THE REGION, THE
PERMITTEE MUST COMPLY WITH PART IV.D.4.A.(4). THESE INSPECTIONS MUST
BE CONDUCTED UNTIL A NOTICE OF TERMINATION IS SUBMITTED.
4) CERTIFIED PERSONNEL (PROVIDED BY THE PRIMARY PERMITTEE) SHALL
INSPECT AT LEAST ONCE PER MONTH DURING THE TERM OF THIS PERMIT (I.E.,
UNTIL A NOTICE OF TERMINATION IS RECEIVED BY EPD) THE AREAS OF THE
SITE THAT HAVE UNDERGONE FINAL STABILIZATION OR ESTABLISHED A CROP
OF ANNUAL VEGETATION AND A SEEDING OF TARGET PERENNIALS
APPROPRIATE FOR THE REGION. THESE AREAS SHALL BE INSPECTED FOR
EVIDENCE OF, OR THE POTENTIAL FOR, POLLUTANTS ENTERING THE DRAINAGE
SYSTEM AND THE RECEIVING WATER(S). EROSION AND SEDIMENT CONTROL
MEASURES IDENTIFIED IN THE PLAN SHALL BE OBSERVED TO ENSURE THAT
THEY ARE OPERATING CORRECTLY. WHERE DISCHARGE LOCATIONS OR
POINTS ARE ACCESSIBLE, THEY SHALL BE INSPECTED TO ASCERTAIN
WHETHER EROSION CONTROL MEASURES ARE EFFECTIVE IN PREVENTING
SIGNIFICANT IMPACTS TO RECEIVING WATER(S).
5) BASED ON THE RESULTS OF EACH INSPECTION, THE SITE DESCRIPTION AND
THE POLLUTION PREVENTION AND CONTROL MEASURES IDENTIFIED IN THE
EROSION, SEDIMENTATION AND POLLUTION CONTROL PLAN, THE PLAN SHALL
BE REVISED AS APPROPRIATE NOT LATER THAN SEVEN (7) CALENDAR DAYS
FOLLOWING EACH INSPECTION. IMPLEMENTATION OF SUCH CHANGES SHALL
BE MADE AS SOON AS PRACTICAL BUT IN NO CASE LATER THAN SEVEN (7)
CALENDAR DAYS FOLLOWING EACH INSPECTION. THE PRIMARY PERMITTEE
MUST AMEND THE PLAN IN ACCORDANCE WITH PART IV.D.4.B.(5) WHEN A
SECONDARY PERMITTEE NOTIFIES THE PRIMARY PERMITTEE OF ANY PLAN
DEFICIENCIES.
6) A REPORT OF EACH INSPECTION THAT INCLUDES THE NAME(S) OF PERSONNEL
MAKING EACH INSPECTION, THE DATE(S) OF EACH INSPECTION, MAJOR
OBSERVATIONS RELATING TO THE IMPLEMENTATION OF THE EROSION,
SEDIMENTATION AND POLLUTION CONTROL PLAN, AND ACTIONS TAKEN IN
ACCORDANCE WITH PART IV.D.4.A.(5). OF THE PERMIT SHALL BE MADE AND
RETAINED AT THE SITE OR BE READILY AVAILABLE AT A DESIGNATED
ALTERNATE LOCATION UNTIL THE ENTIRE SITE OR THAT PORTION OF A
CONSTRUCTION PROJECT THAT HAS BEEN PHASED HAS UNDERGONE FINAL
STABILIZATION AND A NOTICE OF TERMINATION IS SUBMITTED TO EPD. SUCH
REPORTS SHALL BE READILY AVAILABLE BY END OF THE SECOND BUSINESS
DAY AND/OR WORKING DAY AND SHALL IDENTIFY ALL INCIDENTS OF BEST
MANAGEMENT PRACTICES THAT HAVE NOT BEEN PROPERLY INSTALLED
AND/OR MAINTAINED AS DESCRIBED IN THE PLAN. WHERE THE REPORT DOES
NOT IDENTIFY AN INCIDENT, THE INSPECTION REPORT SHALL CONTAIN A
STATEMENT THAT THE BEST MANAGEMENT PRACTICES ARE IN COMPLIANCE
WITH THE EROSION, SEDIMENTATION AND POLLUTION CONTROL PLAN. THE
REPORT SHALL BE SIGNED IN ACCORDANCE WITH PART V.G.2. OF THIS PERMIT.
31. SAMPLING FREQUENCY (PART IV.D.4.d) AND REPORTING (PART IV.E) PART IV.D.4.d - SAMPLING FREQUENCY.
(1). THE PRIMARY PERMITTEE WITH A TOTAL PLANNED DISTURBANCE EQUAL TO OR
GREATER THAN ONE (1) ACRE AND TERTIARY PERMITTEE WITH A TOTAL PLANNED
DISTURBANCE EQUAL TO OR GREATER THAN FIVE (5) ACRES MUST SAMPLE IN
ACCORDANCE WITH THE PLAN AT LEAST ONCE FOR EACH RAINFALL EVENT
DESCRIBED BELOW. FOR A QUALIFYING EVENT, THE PERMITTEE SHALL SAMPLE AT
THE BEGINNING OF ANY STORM WATER DISCHARGE TO A MONITORED RECEIVING
WATER AND/OR FROM A MONITORED OUTFALL WITHIN FORTY-FIVE (45) MINUTES OR
AS SOON AS POSSIBLE.
(2). HOWEVER, WHERE MANUAL AND AUTOMATIC SAMPLING ARE IMPOSSIBLE (AS
DEFINED IN THIS PERMIT), OR ARE BEYOND THE PERMITTEE’S CONTROL, THE
PERMITTEE SHALL TAKE SAMPLES AS SOON AS POSSIBLE, BUT IN NO CASE MORE
THAN TWELVE (12) HOURS AFTER THE BEGINNING OF THE STORM WATER
DISCHARGE.
(3). SAMPLING BY THE PERMITTEE SHALL OCCUR FOR THE FOLLOWING QUALIFYING
EVENTS:
(A). FOR EACH AREA OF THE SITE THAT DISCHARGES TO A RECEIVING
WATER OR FROM AN OUTFALL, THE FIST RAIN EVENT THAT REACHES OR
EXCEEDS 0.5 INCH WITH A STORM WATER DISCHARGE THAT ALLOWS FOR
SAMPLING DURING NORMAL BUSINESS HOURS AS DEFINED IN THIS PERMIT
AFTER ALL CLEARING AND GRUBBING OPERATIONS HAVE BEEN COMPLETED,
BUT PRIOR TO COMPLETION OF MASS GRADING OPERATIONS, IN THE
DRAINAGE AREA OF THE LOCATION SELECTED AS THE SAMPLING LOCATION;
(B). IN ADDITION TO (A) ABOVE, FOR EACH AREA OF THE SITE THAT
DISCHARGES TO A RECEIVING WATER OR FROM AN OUTFALL, THE FIRST RAIN
EVENT THAT REACHES OR EXCEEDS 0.5 INCH WITH A STORM WATER
DISCHARGE THAT OCCURS DURING NORMAL BUSINESS HOURS AS DEFINED IN
THIS PERMIT EITHER 90 DAYS AFTER THE FIRST SAMPLING EVENT OR AFTER
ALL MASS GRADING OPERATIONS HAVE BEEN COMPLETED, BUT PRIOR TO
SUBMITTAL OF A NOT, IN THE DRAINAGE AREA OF THE LOCATION SELECTED AS
THE SAMPLING LOCATION, WHICHEVER COMES FIRST;
(C). AT THE TIME OF SAMPLING PERFORMED PURSUANT TO (A) AND (B) ABOVE,
IF BMPS ARE FOUND TO BE PROPERLY DESIGNED, INSTALLED AND MAINTAINED,
NO FURTHER ACTION IS REQUIRED. IF BMPS IN ANY AREA OF THE SITE THAT
DISCHARGES TO A RECEIVING WATER ARE NOT PROPERLY DESIGNED,
INSTALLED AND MAINTAINED, CORRECTIVE ACTION SHALL BE DEFINED AND
IMPLEMENTED WITHIN TWO (2) BUSINESS DAYS, AND TURBIDITY SAMPLES
SHALL BE TAKEN FROM DISCHARGES FROM THAT AREA OF THE SITE FOR EACH
SUBSEQUENT RAIN EVENT THAT REACHES OR EXCEEDS 0.5 INCH DURING
NORMAL BUSINESS HOURS* UNTIL THE SELECTED TURBIDITY STANDARD IS
ATTAINED, OR UNTIL POST-STORM EVENT INSPECTIONS DETERMINE THAT
BMPS ARE PROPERLY DESIGNED, INSTALLED AND MAINTAINED;
(D). WHERE SAMPLING PURSUANT TO (A), (B), OR (C) ABOVE IS REQUIRED BUT
NOT POSSIBLE (OR NOT REQUIRED BECAUSE THERE WAS NO DISCHARGE), THE
PRIMARY PERMITTEE, IN ACCORDANCE WITH PART IV.D.4.A.(6), OR THE
TERTIARY PERMITTEE, IN ACCORDANCE WITH PART IV.D.4.C.(6)., MUST INCLUDE
A WRITTEN JUSTIFICATION IN THE INSPECTION REPORT OF WHY SAMPLING
WAS NOT PERFORMED. PROVIDING THIS JUSTIFICATION DOES NOT RELIEVE
THE PERMITTEE OF ANY SUBSEQUENT SAMPLING OBLIGATION UNDER (A), (B),
OR (C) ABOVE; AND
(E). EXISTING CONSTRUCTION ACTIVITIES, I.E., THOSE THAT ARE OCCURRING
ON OR BEFORE THE EFFECTIVE DATE OF THIS PERMIT, THAT HAVE MET THE
SAMPLING REQUIRED BY (A) ABOVE SHALL SAMPLE IN ACCORDANCE WITH (E).
THOSE EXISTING CONSTRUCTION ACTIVITIES THAT HAVE MET THE SAMPLING
REQUIRED BY (B) ABOVE SHALL NOT BE REQUIRED TO CONDUCT ADDITIONAL
SAMPLING OTHER THAN AS
REQUIRED BY (C) ABOVE.
SUBSEQUENT TO THE INITIAL SAMPLING REQUIRED ABOVE, THE SITE
CONTRACTOR SHALL BE REQUIRED TO CONTINUE TO TAKE STORMWATER
SAMPLES AS NECESSARY AT THE INDICATED OUTFALL LOCATION.
*NOTE THAT THE PERMITTEE MAY CHOOSE TO MEET THE REQUIREMENTS OF (A) AND
(B) ABOVE BY COLLECTING TURBIDITY SAMPLES FROM ANY RAIN EVENT THAT
REACHES OR EXCEEDS 0.5 INCH AND ALLOWS FOR MONITORING AT ANY TIME OF THE
DAY OR WEEK.
PART IV.E. REPORTING
1. THE APPLICABLE PERMITTEES ARE REQUIRED TO SUBMIT A SUMMARY OF THE
MONITORING RESULTS TO THE EPD AT THE ADDRESS SHOWN IN PART II.C. BY THE
FIFTEENTH DAY OF THE MONTH FOLLOWING THE REPORTING PERIOD. REPORTING
PERIODS ARE MONTHS DURING WHICH SAMPLES ARE TAKEN IN ACCORDANCE WITH
THIS PERMIT. SAMPLING RESULTS SHALL BE IN A CLEARLY LEGIBLE FORMAT. UPON
WRITTEN NOTIFICATION, EPD MAY REQUIRE THE APPLICABLE PERMITTEE TO SUBMIT
THE SAMPLING RESULTS ON A MORE FREQUENT BASIS. SAMPLING AND ANALYSIS OF
ANY STORM WATER DISCHARGE(S) OR THE RECEIVING WATER(S) BEYOND THE
MINIMUM FREQUENCY STATED IN THIS PERMIT MUST BE REPORTED IN A SIMILAR
MANNER TO THE EPD. THE SAMPLING REPORTS MUST BE SIGNED IN ACCORDANCE
WITH PART V.G.2. SAMPLING REPORTS MUST BE SUBMITTED TO EPD UNTIL SUCH
TIME AS A NOT IS SUBMITTED IN ACCORDANCE WITH PART VI.
2. ALL SAMPLING REPORTS SHALL INCLUDE THE FOLLOWING INFORMATION:
A. THE RAINFALL AMOUNT, DATE. EXACT PLACE AND TIME OF SAMPLING OR
MEASUREMENTS;
B. THE NAME(S) OF THE INDIVIDUAL(S) WHO PERFORMED THE SAMPLING AND
MEASUREMENTS;
C. THE DATE(S) ANALYSES WERE PERFORMED;
D. THE TIME(S) ANALYSES WERE INITIATED;
E. THE NAME(S) OF THE CERTIFIED INDIVIDUAL(S) WHO PERFORMED THE ANALYSES;
F. REFERENCES AND WRITTEN PROCEDURES, WHEN AVAILABLE, FOR THE
ANALYTICAL TECHNIQUES OR METHODS USED; AND
G. THE RESULTS OF SUCH ANALYSES, INCLUDING THE BENCH SHEETS, INSTRUMENT
READOUTS, COMPUTER DISKS OR TAPES, ETC., USED TO DETERMINE THESE
RESULTS.
H. RESULTS WHICH EXCEED 1000 NTU SHALL BE REPORTED AS "EXCEEDS 1000 NTU."
I. CERTIFICATION STATEMENT THAT SAMPLING WAS CONDUCTED AS PER THE PLAN.
3. ALL WRITTEN CORRESPONDENCE REQUIRED BY THIS PERMIT SHALL BE
SUBMITTED BY RETURN RECEIPT CERTIFIED MAIL (OR SIMILAR SERVICE) TO THE
APPROPRIATE DISTRICT OFFICE OF THE EPD ACCORDING TO THE SCHEDULE IN
APPENDIX A OF THIS PERMIT. THE APPLICABLE PERMITTEES SHALL RETAIN A COPY
OF THE PROOF OF SUBMITTAL AT THE CONSTRUCTION SITE OR THE PROOF OF
SUBMITTAL SHALL BE READILY AVAILABLE AT A DESIGNATED LOCATION FROM
COMMENCEMENT OF CONSTRUCTION UNTIL SUCH TIME AS A NOT IS SUBMITTED IN
ACCORDANCE WITH PART VI. IF AN ELECTRONIC SUBMITTAL IS PROVIDED BY EPD
THEN THE WRITTEN CORRESPONDENCE MAY BE SUBMITTED ELECTRONICALLY; IF
REQUIRED, A PAPER COPY MUST ALSO BE SUBMITTED BY RETURN RECEIPT
CERTIFIED MAIL OR SIMILAR SERVICE.
32. RETENTION OF RECORDS IN ACCORDANCE WITH PART IV.F.
1. THE PRIMARY PERMITTEE SHALL RETAIN THE FOLLOWING RECORDS AT
THE CONSTRUCTION SITE OR THE RECORDS SHALL BE READILY
AVAILABLE AT A DESIGNATED ALTERNATE LOCATION FROM
COMMENCEMENT OF CONSTRUCTION UNTIL SUCH TIME AS A NOT IS
SUBMITTED IN ACCORDANCE WITH PART VI:
A. A COPY OF ALL NOTICES OF INTENT SUBMITTED TO EPD;
B. A COPY OF THE EROSION, SEDIMENTATION AND POLLUTION CONTROL
PLAN REQUIRED BY THIS PERMIT;
C. THE DESIGN PROFESSIONAL’S REPORT OF THE RESULTS OF THE
INSPECTION CONDUCTED IN ACCORDANCE WITH PART IV.A.5. OF THIS
PERMIT;
D. A COPY OF ALL SAMPLING INFORMATION, RESULTS, AND REPORTS
REQUIRED BY THIS PERMIT;
E. A COPY OF ALL INSPECTION REPORTS GENERATED IN ACCORDANCE WITH
PART IV.D.4.A. OF THIS PERMIT;
F. A COPY OF ALL VIOLATION SUMMARIES AND VIOLATION SUMMARY
REPORTS GENERATED IN ACCORDANCE WITH PART III.D.2. OF THIS PERMIT;
AND
G. DAILY RAINFALL INFORMATION COLLECTED IN ACCORDANCE WITH PART
IV.D.4.A.(1)(C) OF THIS PERMIT.
2. COPIES OF ALL NOTICES OF INTENT, NOTICES OF TERMINATION, INSPECTION
REPORTS, SAMPLING REPORTS (INCLUDING ALL CALIBRATION AND
MAINTENANCE RECORDS AND ALL ORIGINAL STRIP CHART ECORDINGS FOR
CONTINUOUS MONITORING INSTRUMENTATION) OR OTHER REPORTS
REQUESTED BY THE EPD, EROSION, SEDIMENTATION AND POLLUTION
CONTROL PLANS, RECORDS OF ALL DATA USED TO COMPLETE THE NOTICE
OF INTENT TO BE COVERED BY THIS PERMIT AND ALL OTHER
RECORDS REQUIRED BY THIS PERMIT SHALL BE RETAINED BY THE
PERMITTEE WHO EITHER PRODUCED OR USED IT FOR A PERIOD OF AT
LEAST THREE YEARS FROM THE DATE THAT THE NOT IS SUBMITTED IN
ACCORDANCE WITH PART VI OF THIS PERMIT. THESE RECORDS MUST BE
MAINTAINED AT THE PERMITTEE’S PRIMARY PLACE OF BUSINESS OR AT A
DESIGNATED ALTERNATIVE LOCATION ONCE THE CONSTRUCTION
ACTIVITY HAS CEASED AT THE PERMITTED SITE. THIS PERIOD MAY BE
EXTENDED BY REQUEST OF THE EPD AT ANY TIME UPON WRITTEN
NOTIFICATION TO THE PERMITTEE.
33. PART IV.D.6. SAMPLING REQUIREMENTS
THIS PERMIT REQUIRES THE MONITORING OF NEPHELOMETRIC TURBIDITY IN
RECEIVING WATER(S) OR OUTFALLS IN ACCORDANCE WITH THIS PERMIT. THIS
PARAGRAPH SHALL NOT APPLY TO ANY LAND DISTURBANCE ASSOCIATED WITH
THE CONSTRUCTION OF SINGLE-FAMILY HOMES WHICH ARE NOT PART OF A
SUBDIVISION OR PLANNED COMMON DEVELOPMENT UNLESS FIVE (5) ACRES OR
MORE WILL BE DISTURBED. THE FOLLOWING PROCEDURES CONSTITUTE EPD’S
GUIDELINES FOR SAMPLING TURBIDITY.
(1) MAP: REFER TO CE001 FOR SAMPLING PLAN MAP.
(2) NARRATIVE: TWO OUTFALL SAMPLING POINTS ARE REQUIRED FOR THE SITE.
THE SAMPLING POINTS ARE LOCATED AT THE STORMWATER OUTFALLS THAT
ENTER AND LEAVE THE PROJECT AREA. AN SS101 STORMWATER SAMPLER
BY GLOBAL WATER (OR EQUIVALENT) WILL BE USED TO COLLECT AND
HANDLE THE STORM WATER DISCHARGE SAMPLES PRIOR TO ANALYSIS.
PART OF THIS SAMPLING PLAN INCLUDES THE SS101 STORMWATER SAMPLER
USER'S MANUAL BY GLOBAL WATER (OR EQUIVALENT). THE STORM WATER
SAMPLES WILL BE ANALYZED USING THE LAMOTTE 2020 TURBIDIMETER (OR
EQUIVALENT). PART OF THIS SAMPLING PLAN INCLUDES THE INSTRUCTION
MANUAL FOR THE LAMOTTE 2020 TURBIDIMETER BY LAMOTTE COMPANY (OR
EQUIVALENT). THE OUTFALL SAMPLING POINTS ARE LOCATED WITHIN A
WARM WATER FISHERY. IN ACCORDANCE WITH THE NPDES PERMIT, THE
NEPHELOMETRIC TURBIDITY UNIT (NTU) VALUE AT THE DOWNSTREAM
LOCATION SHALL BE NO HIGHER THAN 75 UNIT SINCE THE SITE IS BETWEEN
1.0-10 ACRES AND THE DRAINAGE AREA IS LESS THAN 5 SQUARE MILES.
b. SAMPLE TYPE. ALL SAMPLING SHALL BE COLLECTED BY “GRAB SAMPLES"
AND THE ANALYSIS OF THESE SAMPLES MUST BE CONDUCTED IN
ACCORDANCE WITH METHODOLOGY AND TEST PROCEDURES ESTABLISHED
BY 40 CFR PART 136 (UNLESS OTHER TEST PROCEDURES HAVE BEEN
APPROVED); THE GUIDANCE DOCUMENT TITLED "NPDES STORM WATER
SAMPLING GUIDANCE DOCUMENT, EPA 833-B-92-001" AND GUIDANCE
DOCUMENTS THAT MAY BE PREPARED BY THE EPD.
(1). SAMPLE CONTAINERS SHOULD BE LABELED PRIOR TO COLLECTING THE
SAMPLES.
(2). SAMPLES SHOULD BE WELL MIXED BEFORE TRANSFERRING TO A
SECONDARY CONTAINER.
(3). LARGE MOUTH, WELL CLEANED AND RINSED GLASS OR PLASTIC JARS
SHOULD BE USED FOR COLLECTING SAMPLES. THE JARS SHOULD BE
CLEANED THOROUGHLY TO AVOID CONTAMINATION.
(4). MANUAL, AUTOMATIC OR RISING STAGE SAMPLING MAY BE UTILIZED.
SAMPLES REQUIRED BY THIS PERMIT SHOULD BE ANALYZED IMMEDIATELY,
BUT IN NO CASE LATER THAN 48 HOURS AFTER COLLECTION. HOWEVER,
SAMPLES FROM AUTOMATIC SAMPLERS MUST BE COLLECTED NO LATER
THAN THE NEXT BUSINESS DAY AFTER THEIR ACCUMULATION, UNLESS FLOW
THROUGH AUTOMATED ANALYSIS IS UTILIZED. IF AUTOMATIC SAMPLING IS
UTILIZED AND THE AUTOMATIC SAMPLER IS NOT ACTIVATED DURING THE
QUALIFYING EVENT, THE PERMITTEE MUST UTILIZE MANUAL SAMPLING OR
RISING STAGE SAMPLING DURING THE NEXT QUALIFYING EVENT. DILUTION
OF SAMPLES IS NOT REQUIRED. SAMPLES MAY BE ANALYZED DIRECTLY WITH
A PROPERLY CALIBRATED TURBIDIMETER. SAMPLES ARE NOT REQUIRED TO
BE COOLED.
(5). SAMPLING AND ANALYSIS OF THE RECEIVING WATER(S) OR OUTFALLS
BEYOND THE MINIMUM FREQUENCY STATED IN THIS PERMIT MUST BE
REPORTED TO EPD AS SPECIFIED IN PART IV.E.
c. SAMPLING POINTS.
(1). FOR CONSTRUCTION ACTIVITIES THE PRIMARY PERMITTEE WITH A TOTAL
PLANNED DISTURBANCE EQUAL TO OR GREATER THAN ONE (1) ACRE AND
TERTIARY PERMITTEE WITH A TOTAL PLANNED DISTURBANCE EQUAL TO OR
GREATER THAN FIVE (5) ACRES MUST SAMPLE ALL RECEIVING WATER(S), OR
ALL OUTFALL(S), OR A COMBINATION OF RECEIVING WATER(S) AND
OUTFALL(S). SAMPLES TAKEN FOR THE PURPOSE OF COMPLIANCE WITH THIS
PERMIT SHALL BE REPRESENTATIVE OF THE MONITORED ACTIVITY AND
REPRESENTATIVE OF THE WATER QUALITY OF THE RECEIVING WATER(S)
AND/OR THE STORM WATER OUTFALLS USING THE FOLLOWING MINIMUM
GUIDELINES:
(A). THE UPSTREAM SAMPLE FOR EACH RECEIVING WATER(S) MUST BE
TAKEN IMMEDIATELY UPSTREAM OF THE CONFLUENCE OF THE FIRST STORM
WATER DISCHARGE FROM THE PERMITTED ACTIVITY (I.E. THE DISCHARGE
FARTHEST UPSTREAM AT THE SITE) BUT DOWNSTREAM OF ANY OTHER
STORM WATER DISCHARGES NOT ASSOCIATED WITH THE PERMITTED
ACTIVITY. WHERE APPROPRIATE, SEVERAL UPSTREAM SAMPLES FROM
ACROSS THE RECEIVING WATER(S) MAY NEED TO BE TAKEN AND THE
ARITHMETIC AVERAGE OF THE TURBIDITY OF THESE SAMPLES USED FOR THE
UPSTREAM TURBIDITY VALUE.
(B). THE DOWNSTREAM SAMPLE FOR EACH RECEIVING WATER(S) MUST BE
TAKEN DOWNSTREAM OF THE CONFLUENCE OF THE LAST STORM WATER
DISCHARGE FROM THE PERMITTED ACTIVITY (I.E., THE DISCHARGE FARTHEST
DOWNSTREAM AT THE SITE) BUT UPSTREAM OF ANY OTHER STORM WATER
DISCHARGE NOT ASSOCIATED WITH THE PERMITTED ACTIVITY. WHERE
APPROPRIATE, SEVERAL DOWNSTREAM SAMPLES FROM ACROSS THE
RECEIVING WATER(S) MAY NEED TO BE TAKEN AND THE ARITHMETIC
AVERAGE OF THE TURBIDITY OF THESE SAMPLES USED FOR THE
DOWNSTREAM TURBIDITY VALUE.
(C). IDEALLY THE SAMPLES SHOULD BE TAKEN FROM THE HORIZONTAL AND
VERTICAL CENTER OF THE RECEIVING WATER(S) OR THE STORM WATER
OUTFALL CHANNEL(S).
(D). CARE SHOULD BE TAKEN TO AVOID STIRRING THE BOTTOM SEDIMENTS
IN THE RECEIVING WATER(S) OR IN THE OUTFALL STORM WATER CHANNEL.
(E). THE SAMPLING CONTAINER SHOULD BE HELD SO THAT THE OPENING
FACES UPSTREAM.
(F). THE SAMPLES SHOULD BE KEPT FREE FROM FLOATING DEBRIS.
(G). PERMITTEES DO NOT HAVE TO SAMPLE SHEETFLOW THAT FLOWS
ONTO UNDISTURBED NATURAL AREAS OR AREAS STABILIZED BY THE
PROJECT. FOR PURPOSES OF THIS SECTION, STABILIZED SHALL MEAN, FOR
UNPAVED AREAS AND AREAS NOT COVERED BY PERMANENT STRUCTURES
AND AREAS LOCATED OUTSIDE THE WASTE DISPOSAL LIMITS OF A LANDFILL
CELL THAT HAS BEEN CERTIFIED BY EPD FOR WASTE DISPOSAL, 100% OF THE
SOIL SURFACE IS UNIFORMLY COVERED IN PERMANENT VEGETATION WITH A
DENSITY OF 70% OR GREATER, OR EQUIVALENT PERMANENT STABILIZATION
MEASURES (SUCH AS THE USE OF RIP RAP, GABIONS, PERMANENT MULCHES
OR GEOTEXTILES) HAVE BEEN USED. PERMANENT VEGETATION SHALL
CONSIST OF: PLANTED TREES, SHRUBS, PERENNIAL VINES; A CROP OF
PERENNIAL VEGETATION APPROPRIATE FOR THE TIME OF YEAR AND REGION;
OR A CROP OF ANNUAL VEGETATION AND A SEEDING OF TARGET CROP
PERENNIALS APPROPRIATE FOR THE REGION. FINAL STABILIZATION APPLIES
TO EACH PHASE OF CONSTRUCTION.
(H). ALL SAMPLING PURSUANT TO THIS PERMIT MUST BE DONE IN SUCH A
WAY (INCLUDING GENERALLY ACCEPTED SAMPLING METHODS, LOCATIONS,
TIMING, AND FREQUENCY) AS TO ACCURATELY REFLECT WHETHER STORM
WATER RUNOFF FROM THE CONSTRUCTION SITE IS IN COMPLIANCE WITH
THE STANDARD SET FORTH IN PARTS III.D.3. OR III.D.4.., WHICHEVER IS
APPLICABLE.
34. APPENDIX B RATIONALE FOR NTU VALUE: THIS PROJECT IS LOCATED NEAR
WATERS SUPPORTING WARM WATER FISHERIES. THE PROJECT SIZE IS
BETWEEN 1.0-30 ACRES WITH A SURFACE WATER DRAINAGE AREA OF 0-4.99
SQUARE MILES. THUS, THE APPLICABLE NEPHELOMETRIC TURBIDITY UNITY
(NTU) IS 50 NTU. REFER TO SHEET CE006 FOR THE APPENDIX B NTU TABLE.
35. REFER TO CE001 FOR SAMPLING LOCATIONS, PERENNIAL AND INTERMITTENT
STREAMS, AND OTHER WATER BODIES INTO WHICH STORMWATER
DISCHARGES.
SI
O
N A
N D
S
ED
IM
EN
T C
O N
TR
O
L N
O
TE
S
CE003
C E0
_p lo t C he ck
O f O ld S he et
.d w g
24-HR. EROSION AND SEDIMENT CONTROL
DATE: 01/09/2026 ______________
1 2 3 4 5
A
B
C
D
SHEET ID
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
LO
U
IS
VI
LL
E
D
IS
TR
IC
T
LO
U
IS
VI
LL
E, K
EN
TU
C
KY
-0
P A
R K
W A
Y L
A N
E S
U
IT
E
P
E A
C H
TR
E
E C
O R
N E
R S
, G A
P
H O
N E
(6
) 3
-7
P
O N
D J
O B
N o.
SI
ZE
FI
LE
N
AM
E:
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SO
LI
C
IT
AT
IO
N N
O
C O
N
TR
AC
T
N O
FI
LE
N U
M
BE
R
US Army Corps of Engineers®
Louisville District
FI
LE
P
AT
H : X
:\F Y2
3\
8\
.C
AD
B
IM
\0 4.
.C
AD
PH
S H
EE
TS
\C E0
_P
LO
T
C H
EC
K
O F
O
LD
S H
TT
ED
: 0
1/
/2
B
Y:
N
O R
M
AN
, T
AN
YA
IS
SU
E D
AT
E:
JA
N
U
AR
Y 9, AN
SI
D
A.
D
U
EH
R
D .M
. L
EC
KI
E
T.
N
O R
M
AN
D
AT
E D
ES
C
R
IP
TI
O
N M
AR
K
R
EP
AI
R
M
AI
N
TA
IN
A
IR
FI
EL
D S
TO
R
M W
AT
ER
S
YS
TE
M
PH
AS
E
II
D O
BB
IN
S
AI
R R
ES
ER
VE
B
AS
E, G
EO
R G
IA
PR
O
JE
C T
N O
FG
W B
-0
FG
W B
-0
P2
CERTIFIED FINAL
J.
P.
AR
IS
TI
ZA
BA
L
EROSION, SEDIMENTATION, AND POLLUTION
CONTROL PLAN GENERAL NOTES (CONT.)
(IN CONFORMANCE WITH STATE OF GEORGIA GENERAL NPDES PERMIT NO.
GAR 100001)
36. CONSTRUCTION SITE CONTROLS
a. EROSION AND SEDIMENT CONTROL MEASURES
(1) STABILIZATION MEASURES:
THE STABILIZATION MEASURES SHOWN ON THESE PLANS HAVE BEEN
DESIGNED TO STABILIZE THE DISTURBED AREAS FOLLOWING THE
TEMPORARY OR PERMANENT COMPLETION OF CONSTRUCTION. ALL
EXPOSED AREAS SHALL BE STABILIZED WITH TEMPORARY MULCHING (DS1)
PRIOR TO GRADING IF THEY ARE TO REMAIN INACTIVE FOR 14 DAYS OR
MORE. ALL DISTURBED AREAS SHALL BE STABILIZED WITH TEMPORARY (DS2)
OR PERMANENT (DS3) VEGETATION AS INDICATED ON THE PLAN. DITCHES,
TEMPORARY DIVERSION BERMS, AND SLOPES (WHICH HAVE 3:1 OR STEEPER
SLOPE AND 10 FEET OR MORE HEIGHT) ARE TO BE STABILIZED WITH
EROSION CONTROL MATTING (MB). DUST CONTROL (DU) SHALL ALSO BE
PROVIDED AS NEEDED DURING GRADING ACTIVITIES. SEE EROSION,
SEDIMENTATION, AND POLLUTION CONTROL (ESPCP) DETAIL SHEETS FOR
MORE DETAILS REGARDING THESE STABILIZATION MEASURES.
STABILIZATION MEASURES SHALL BE INITIATED AS SOON AS PRACTICABLE IN
PORTIONS OF THE SITE WHERE CONSTRUCTION ACTIVITIES HAVE
TEMPORARILY OR PERMANENTLY CEASED, BUT IN NO CASE MORE THAN 14
DAYS AFTER THE CONSTRUCTION ACTIVITY IN THAT PORTION OF THE SITE
HAS TEMPORARILY OR PERMANENTLY CEASED, EXCEPT:
WHERE THE INITIATION OF STABILIZATION MEASURES BY THE 14TH DAY
AFTER CONSTRUCTION ACTIVITY TEMPORARILY OR PERMANENTLY CEASED
IS PRECLUDED BY SNOW COVER OR OTHER ADVERSE WEATHER
CONDITIONS, STABILIZATION MEASURES SHALL BE INITIATED AS SOON AS
PRACTICABLE.
WHERE CONSTRUCTION ACTIVITY WILL RESUME ON A PORTION OF THE SITE
WITHIN 21 DAYS FROM WHEN ACTIVITIES CEASED (E.G. THE TOTAL TIME
PERIOD THAT CONSTRUCTION ACTIVITY IS TEMPORARILY CEASED IS LESS
THAN 21 DAYS) THEN STABILIZATION MEASURES DO NOT HAVE TO BE
INITIATED ON THAT PORTION OF THE SITE BY THE 14TH DAY AFTER
CONSTRUCTION ACTIVITY TEMPORARILY CEASED.
(2) STRUCTURAL PRACTICES
THE STRUCTURAL PRACTICES SHOWN ON THIS PLAN HAVE BEEN DESIGNED
TO DIVERT FLOWS FROM EXPOSED SOILS, STORE FLOWS, OR OTHERWISE
LIMIT RUNOFF AND THE DISCHARGE OF POLLUTANTS FROM EXPOSED AREAS
OF THE SITE. FOR SEDIMENT AND EROSION CONTROL PURPOSES,
STRUCTURAL PRACTICES HAVE BEEN SHOWN IN THREE PHASES, BASED ON
CONSTRUCTION ACTIVITIES. THESE PHASES INCLUDE INITIAL, INTERMEDIATE
AND FINAL EROSION & SEDIMENT CONTROL PHASES.
DURING THE INITIAL PHASE, ONE CONSTRUCTION EXIT (CO) MUST BE
INSTALLED AT THE ENTRANCE TO THE SITE. SILT FENCE MUST BE INSTALLED
PRIOR TO CLEARING AND GRADING OPERATIONS TO KEEP SEDIMENT
CONTAINED WITHIN THE SITE AS NECESSARY. DISTURBED AREAS SHALL BE
STABILIZED WITH MULCH (DS1), TEMPORARY SEEDING (DS2) AND DUST
CONTROL (DU) MUST BE UTILIZED DURING THIS PHASE. INLET PROTECTION
MUST ALSO BE USED TO HELP PREVENT SEDIMENT FROM ENTERING THE
EXISTING INLETS.
DURING THE INTERMEDIATE PHASE, THE INITIAL MEASURES SHALL BE
MAINTAINED AS NECESSARY TO ACHIEVE COMPLIANCE WITH THE
CONDITIONS OF THE STATE OF GEORGIA NPDES PERMIT. DISTURBED AREAS
SHALL BE STABILIZED WITH MULCH (DS1), TEMPORARY SEEDING (DS2), DUST
CONTROL (DU) AND PERMANENT SEEDING (DS3) AS NECESSARY. INLET
SEDIMENT PROTECTION AND CHECK DAMS WILL ALSO BE UTILIZED.
DURING THE FINAL PHASE, MOST OF THE CONSTRUCTION OPERATIONS WILL
HAVE BEEN COMPLETED AND ALL DISTURBED AREAS SHALL RECEIVE FINAL
STABILIZATION. PERMANENT SEEDING (DS3) AND PERMANENT MULCHING
(DS1) SHALL BE INSTALLED. INLET PROTECTION SHALL REMAIN IN PLACE
UNTIL THE UPSTREAM SITE IS STABILIZED. COORDINATE WITH LANDSCAPE
PLANS FOR PERMANENT LANDSCAPING AND PERMANENT SODDING. INLET
SEDIMENT TRAP PROTECTION MUST BE USED TO HELP PREVENT SEDIMENT
FROM ENTERING ANY INLETS WITHIN OR IMMEDIATELY DOWNSTREAM OF
THE DISTURBED AREA. SEDIMENT STORAGE OF 67 CY PER DISTURBED ACRE
IS PROVIDED BY TEMPORARY INLET SEDIMENT TRAP PROTECTION, SILT,
FENCE, AND CHECK DAMS.
(3) SEDIMENT BASINS: NOT INCLUDED AS A PART OF THIS PROJECT.
(4) ALTERNATIVE BMP'S: NOT INCLUDED AS A PART OF THIS PROJECT
(5) HIGH PERFORMANCE BMP'S: NOT INCLUDED AS A PART OF THIS PROJECT.
b. ADDITIONAL BMP'S:
PART III.C. DISCHARGES INTO, OR WITHIN ONE MILE UPSTREAM OF AND
WITHIN THE SAME WATERSHED AS, ANY PORTION OF A BIOTA IMPAIRED
STREAM SEGMENT.
(1) IMPAIRED SEGMENT: ROTTENWOOD CREEK
(2) IMPARIMENT: BIOTA M
(3) FOUR ADDITIONAL BMP'S
c. CONDUCT TURBIDITY SAMPLING AFTER EVERY RAIN EVENT OF 0.5 INCH OR
GREATER WITHIN ANY 24-HOUR PERIOD, RECOGNIZING THE EXCEPTIONS
SPECIFIED IN PART IV.D.6.D. OF THE CURRENT NPDES PERMITS
d. CONDUCT SOIL TESTS REPRESENTATIVE OF CONDITIONS AT THE TIME OF
PLANTING TO IDENTIFY AND TO IMPLEMENT SITE-SPECIFIC FERTILIZER
NEEDS AND/OR ADD APPROPRIATE ORGANIC SOIL AMENDMENTS (E.G.,
COMPOST) AND CONDUCT PRE- AND POST-CONSTRUCTION SOIL SAMPLING
TO A DEPTH OF SIX (6) INCHES TO DOCUMENT IMPROVED LEVELS OF SOIL
CARBON AFTER FINAL STABILIZATION OF THE CONSTRUCTION SITE.
e. CONDUCT INSPECTIONS DURING THE INTERMEDIATE GRADING AND
DRAINAGE BMP PHASE AND DURING THE FINAL BMP PHASE OF THE PROJECT
BY THE DESIGN PROFESSIONAL WHO PREPARED THE PLAN IN ACCORDANCE
WITH PART IV.A.5 OF THE PERMIT.
f. INSTALL POST CONSTRUCTION BMPS (E.G., RUNOFF REDUCTION BMPS)
WHICH REMOVE 80% TSS AS OUTLINED IN THE GEORGIA STORMWATER
MANAGEMENT MANUAL, KNOWN AS THE BLUE BOOK, OR AN EQUIVALENT OR
MORE STRINGENT DESIGN MANUAL.
g. OTHER CONTROLS
(1) WASTE DISPOSAL: NO SOLID MATERIALS, INCLUDING BUILDING MATERIALS,
SHALL BE DISCHARGED INTO STORM WATER INLETS OR WATERS OF THE
STATE, EXCEPT AS AUTHORIZED BY A SECTION 404 PERMIT.
ALL WASTE MATERIALS SHALL BE COLLECTED AND STORED IN A SECURELY
LIDDED METAL DUMPSTER OR OTHER APPROPRIATE WASTE MANAGEMENT
FACILITY PERMISSIBLE UNDER GAR PERMIT NO. 100001. WASTE
MANAGEMENT FACILITIES SHALL MEET ALL SOLID WASTE MANAGEMENT
REGULATIONS. ALL TRASH AND CONSTRUCTION DEBRIS FROM THE SITE
SHALL BE DEPOSITED IN THE WASTE MANAGEMENT FACILITIES. WASTE
MANAGEMENT FACILITIES SHALL BE EMPTIED A MINIMUM OF ONCE PER
WEEK OR MORE OFTEN IF NECESSARY AND TRASH SHALL BE HAULED AS
REQUIRED BY LOCAL REGULATIONS. NO CONSTRUCTION WASTE SHALL BE
BURIED ON-SITE.
ALL PERSONNEL SHALL BE INSTRUCTED ON PROPER PROCEDURES FOR
WASTE DISPOSAL. A NOTICE STATING THESE PRACTICES SHALL BE POSTED
AT THE JOB SITE AND THE CONTRACTOR SHALL BE RESPONSIBLE FOR
SEEING THAT THESE PROCEDURES ARE FOLLOWED.
LOCATE WASTE COLLECTION AREAS AWAY FROM STREETS, GUTTERS,
WATERCOURSES AND STORM DRAINS. WASTE COLLECTION AREAS, SUCH AS
DUMPSTERS, ARE OFTEN BEST LOCATED NEAR CONSTRUCTION SITE
ENTRANCES TO MINIMIZE TRAFFIC ON DISTURBED SOILS.
(3) OFFSITE VEHICLE TRACKING/DUST CONTROL:
OFF-SITE VEHICLE TRACKING OF DIRT, SOILS, AND SEDIMENTS AND THE
GENERATION OF DUST SHALL BE MINIMIZED OR ELIMINATED TO THE
MAXIMUM EXTENT PRACTICAL. A STABILIZED CONSTRUCTION EXIT (CO)
SHALL BE PROVIDED TO REDUCE VEHICLE TRACKING OF SEDIMENT. SEE
ESPCP PLAN AND DETAIL SHEETS FOR THE CONSTRUCTION EXIT LOCATIONS
AND DETAIL. THE PAVED STREET ADJACENT TO THE CONSTRUCTION EXIT
SHALL BE INSPECTED DAILY BY A REPRESENTATIVE OF THE SITE
CONTRACTOR FOR TRACKING OF MUD, DIRT, OR ROCK. DUMP TRUCKS
HAULING MATERIAL FROM THE CONSTRUCTION SITE SHALL BE COVERED
WITH A TARPAULIN. DUST CONTROL (DU) SHALL BE APPLIED AS NECESSARY
TO PREVENT SURFACE AND AIR MOVEMENT OF DUST.
(4) SANITARY SEWER / HAZARDOUS WASTE
ALL PERMITTEES SHALL ENSURE THAT THIS PLAN IS IN COMPLIANCE WITH
APPLICABLE STATE AND/OR LOCAL WASTE DISPOSAL, SANITARY SEWER, OR
SEPTIC SYSTEM REGULATIONS.
A MINIMUM OF ONE PORTABLE SANITARY UNIT SHALL BE PROVIDED FOR
EVERY TEN (10) WORKERS ON THE SITE. ALL SANITARY WASTE SHALL BE
COLLECTED FROM THE PORTABLE UNITS A MINIMUM OF ONE TIME PER WEEK
BY A LICENSED PORTABLE FACILITY PROVIDER IN COMPLETE COMPLIANCE
WITH THE LOCAL STATE REGULATIONS.
ALL SANITARY WASTE UNITS SHALL BE LOCATED IN AN AREA WHERE THE
LIKELIHOOD OF THE UNIT CONTRIBUTING TO STORM WATER DISCHARGE IS
NEGLIGIBLE. ADDITIONAL CONTAINMENT OF BMP'S SHALL BE IMPLEMENTED
AS NECESSARY, SUCH AS GRAVEL BAGS OR SPECIFICALLY DESIGNED
PLASTIC SKID CONTAINERS AROUND THE BASE, TO PREVENT WASTE FROM
CONTRIBUTING TO STORM WATER DISCHARGES. THE LOCATION OF
SANITARY WASTE UNITS MUST BE IDENTIFIED ON THE EROSION CONTROL
PLAN GRADING PHASE BY THE CONTRACTOR ONCE THE LOCATIONS HAVE
BEEN DETERMINED.
ALL HAZARDOUS WASTE MATERIALS SHALL BE DISPOSED OF IN THE MANNER
AS REQUIRED BY LOCAL, STATE, AND/OR FEDERAL REGULATIONS AND BY
THE MANUFACTURER OF SUCH PRODUCTS. THE JOB SITE SUPERINTENDENT,
WHO WILL ALSO BE RESPONSIBLE FOR SEEING THAT THESE PRACTICES ARE
FOLLOWED, SHALL INSTRUCT SITE PERSONNEL IN THESE PRACTICES.
MATERIAL SAFETY DATA SHEETS (MSDS'S) FOR EACH SUBSTANCE WITH
HAZARDOUS PROPERTIES THAT IS USED ON THE JOB SITE SHALL BE
OBTAINED AND USED FOR THE PROPER MANAGEMENT OF POTENTIAL
WASTES THAT MAY RESULT FROM THESE PRODUCTS. AN MSDS SHALL BE
POSTED IN THE IMMEDIATE AREA…