This file contains stamped certified final engineering drawings for the Dobbins Air Reserve Base stormwater drainage system repair and maintenance project (Phase II). The drawings represent the design specifications for work encompassing stormwater infrastructure improvements on the airfield east of Taxiway 'J', including regrading of failed slopes, sod application for stabilization, cleaning of existing flumes, pipes, and swales, and installation of new concrete flumes at strategic locations to reestablish positive drainage patterns and prevent erosion and standing water accumulation.
The stamped drawings serve as the technical basis for the Phase II stormwater system project and include detailed plans for drainage basin maintenance in designated areas (Basins III, IV, and V) of the airfield. These certified final drawings establish the engineering requirements and design parameters that contractors will be required to follow during the repair and maintenance work. The drawings reflect professional engineering certification and approval, indicating readiness for contractor use during the solicitation and execution phases of this Air Force Reserve Command project at Dobbins ARB.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
© 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS
TANYA NORMAN, P.E.
P.E. No. 0038055, GA
DATE: 01/09/2026 ______________
1 2 3 4 5
A
B
C
D
SHEET ID
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
LO
U
IS
VI
LL
E
D
IS
TR
IC
T
LO
U
IS
VI
LL
E, K
EN
TU
C
KY
-0
P A
R K
W A
Y L
A N
E S
U
IT
E
P
E A
C H
TR
E
E C
O R
N E
R S
, G A
P
H O
N E
(6
) 3
-7
P
O N
D J
O B
N o.
SI
ZE
FI
LE
N
AM
E:
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SO
LI
C
IT
AT
IO
N N
O
C O
N
TR
AC
T
N O
FI
LE
N U
M
BE
R
US Army Corps of Engineers®
Louisville District
FI
LE
P
AT
H : X
:\F Y2
3\
8\
.C
AD
B
IM
\0 4.
.C
AD
PH
S H
EE
TS
\G -0
P
LO
TT
ED
: 0 1/
/2
B Y:
N O
R M
AN
, T
AN
YA
IS
SU
E D
AT
E:
JA
N
U
AR
Y 9, AN
SI
D
A.
D
U
EH
R
D .M
. L
EC
KI
E
T.
N
O R
M
AN
D
AT
E D
ES
C
R
IP
TI
O
N M
AR
K
R
EP
AI
R
M
AI
N
TA
IN
A
IR
FI
EL
D S
TO
R
M W
AT
ER
S
YS
TE
M
PH
AS
E
II
D O
BB
IN
S
AI
R R
ES
ER
VE
B
AS
E, G
EO
R G
IA
PR
O
JE
C T
N O
FG
W B
-0
FG
W B
-0
P2
CERTIFIED FINAL
J.
P.
AR
IS
TI
ZA
BA
L
PROJECT LOCATION MAP
SCALE: N.T.S.
C O
VE
R
S H
EE
T
G-001
G -0
.d w g
Repair & Maintain Airfield Stormwater System Phase II
01/09/2026 Certified Final
COUNTY: COBB
LAND LOT: 00513
DISTRICT 17
SITE PLAN PROJECT NUMBER: SPR-2025-00264
24 HR. EROSION CONTROL CONTACT TO
BE DETERMINED WITH SELECTION OF
CONTRACTOR
Dobbin Air Reserve Base, GA USACE Louisville District Project #:FGWB 21-0002 A/B P2#: 470584
FY2026
DISTURBED AREA:
APPROX. 21.2 ACRES
P.E. No. 0038055, GA
DATE: 01/09/2026 ______________
1 2 3 4 5
A
B
C
D
SHEET ID
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
LO
U
IS
VI
LL
E
D
IS
TR
IC
T
LO
U
IS
VI
LL
E, K
EN
TU
C
KY
-0
P A
R K
W A
Y L
A N
E S
U
IT
E
P
E A
C H
TR
E
E C
O R
N E
R S
, G A
P
H O
N E
(6
) 3
-7
P
O N
D J
O B
N o.
SI
ZE
FI
LE
N
AM
E:
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SO
LI
C
IT
AT
IO
N N
O
C O
N
TR
AC
T
N O
FI
LE
N U
M
BE
R
US Army Corps of Engineers®
Louisville District
FI
LE
P
AT
H : X
:\F Y2
3\
8\
.C
AD
B
IM
\0 4.
.C
AD
PH
S H
EE
TS
\G
TT
ED
: 0 1/
/2
B Y:
N O
R M
AN
, T
AN
YA
IS
SU
E D
AT
E:
JA
N
U
AR
Y 9, AN
SI
D
A.
D
U
EH
R
D .M
. L
EC
KI
E
T.
N
O R
M
AN
D
AT
E D
ES
C
R
IP
TI
O
N M
AR
K
R
EP
AI
R
M
AI
N
TA
IN
A
IR
FI
EL
D S
TO
R
M W
AT
ER
S
YS
TE
M
PH
AS
E
II
D O
BB
IN
S
AI
R R
ES
ER
VE
B
AS
E, G
EO
R G
IA
PR
O
JE
C T
N O
FG
W B
-0
FG
W B
-0
P2
CERTIFIED FINAL
J.
P.
AR
IS
TI
ZA
BA
L
SH
EE
T
IN
D
EX
G-002
G -0
.d w g
Sheet List Table Sheet
Number Sheet Title
G-001 COVER SHEET
G-002 SHEET INDEX
G-003 CONSTRUCTION HAUL ROUTE AND CONTRACTOR
LAYDOWN AREAS
C-001 CIVIL ABBREVIATIONS AND LEGEND
C-002 CIVIL GENERAL NOTES
C-100 OVERALL STORM DRAINAGE PLAN
C-101 STORM DRAINAGE PLAN
C-102 STORM DRAINAGE PLAN
C-103 STORM DRAINAGE PLAN
C-104 STORM DRAINAGE PLAN
C-105 STORM DRAINAGE PLAN
C-106 STORM DRAINAGE PLAN
C-107 STORM DRAINAGE PLAN
C-108 STORM DRAINAGE PLAN
C-109 STORM DRAINAGE PLAN
C-110 STORM DRAINAGE PLAN
C-111 STORM DRAINAGE PLAN
C-112 STORM DRAINAGE PLAN
C-113 STORM DRAINAGE PLAN
C-114 STORM DRAINAGE PLAN
C-115 STORM DRAINAGE PLAN
C-116 STORM DRAINAGE PLAN
C-117 STORM DRAINAGE PLAN
C-118 STORM DRAINAGE PLAN
C-119 STORM DRAINAGE PLAN
C-120 STORM DRAINAGE PLAN
C-121 STORM DRAINAGE PLAN
C-122 STORM DRAINAGE PLAN
C-123 STORM DRAINAGE PLAN
C-124 STORM DRAINAGE PLAN
C-125 STORM DRAINAGE PLAN
C-126 STORM DRAINAGE PLAN
C-127 STORM DRAINAGE PLAN
C-128 STORM DRAINAGE PLAN
C-129 STORM DRAINAGE PLAN
C-130 STORM DRAINAGE PLAN
C-131 STORM DRAINAGE PLAN
C-201 STORM DRAINAGE PROFILES
C-202 STORM DRAINAGE PROFILES
C-203 STORM DRAINAGE PROFILES
C-204 STORM DRAINAGE PROFILES
C-401 ENLARGED STORM DRAINAGE PLAN
C-402 ENLARGED STORM DRAINAGE PLAN
C-403 ENLARGED STORM DRAINAGE PLAN
C-501 CONSTRUCTION DETAILS
C-502 CONSTRUCTION DETAILS
C-503 CONSTRUCTION DETAILS
C-504 CONSTRUCTION DETAILS
C-505 CONSTRUCTION DETAILS
C-506 CONSTRUCTION DETAILS
C-507 CONSTRUCTION DETAILS
C-508 CONSTRUCTION DETAILS
C-509 CONSTRUCTION DETAILS
C-510 CONSTRUCTION DETAILS
C-511 CONSTRUCTION DETAILS
C-512 CONSTRUCTION DETAILS
C-513 CONSTRUCTION DETAILS
C-514 CONSTRUCTION DETAILS
C-601 STRUCTURE TABLES
C-602 STRUCTURE TABLES
C-603 STRUCTURE TABLES
C-604 STRUCTURE TABLES
C-605 STRUCTURE TABLES
C-606 STRUCTURE TABLES
CE001 EROSION AND SEDIMENT CONTROL COVER SHEET
CE002 EROSION AND SEDIMENT CONTROL NOTES
CE003 EROSION AND SEDIMENT CONTROL NOTES
CE004 EROSION AND SEDIMENT CONTROL NOTES AND SOILS MAP
CE005 EROSION AND SEDIMENT CONTROL LEGEND
CE006 EROSION AND SEDIMENT CONTROL NOTES AND
NARRATIVE
CE007 EROSION AND SEDIMENT CONTROL PLAN
CE008 EROSION AND SEDIMENT CONTROL CHECKLIST
CE101 EROSION AND SEDIMENT CONTROL INITIAL PLAN
CE102 EROSION AND SEDIMENT CONTROL INITIAL PLAN
CE103 EROSION AND SEDIMENT CONTROL INITIAL PLAN
CE104 EROSION AND SEDIMENT CONTROL INITIAL PLAN
CE106 EROSION AND SEDIMENT CONTROL INITIAL PLAN
CE107 EROSION AND SEDIMENT CONTROL INITIAL PLAN
CE108 EROSION AND SEDIMENT CONTROL INITIAL PLAN
CE109 EROSION AND SEDIMENT CONTROL INITIAL PLAN
CE110 EROSION AND SEDIMENT CONTROL INITIAL PLAN
CE111 EROSION AND SEDIMENT CONTROL INITIAL PLAN
CE112 EROSION AND SEDIMENT CONTROL INITIAL PLAN
CE113 EROSION AND SEDIMENT CONTROL INITIAL PLAN
CE114 EROSION AND SEDIMENT CONTROL INITIAL PLAN
CE115 EROSION AND SEDIMENT CONTROL INITIAL PLAN
CE116 EROSION AND SEDIMENT CONTROL INITIAL PLAN
CE117 EROSION AND SEDIMENT CONTROL INITIAL PLAN
CE118 EROSION AND SEDIMENT CONTROL INITIAL PLAN
CE120 EROSION AND SEDIMENT CONTROL INITIAL PLAN
CE121 EROSION AND SEDIMENT CONTROL INITIAL PLAN
CE122 EROSION AND SEDIMENT CONTROL INITIAL PLAN
CE123 EROSION AND SEDIMENT CONTROL INITIAL PLAN
CE125 EROSION AND SEDIMENT CONTROL INITIAL PLAN
CE126 EROSION AND SEDIMENT CONTROL INITIAL PLAN
CE129 EROSION AND SEDIMENT CONTROL INITIAL PLAN
CE130 EROSION AND SEDIMENT CONTROL INITIAL PLAN
CE131 EROSION AND SEDIMENT CONTROL INITIAL PLAN
CE201 EROSION AND SEDIMENT CONTROL INTERMEDIATE PLAN
CE202 EROSION AND SEDIMENT CONTROL INTERMEDIATE PLAN
CE203 EROSION AND SEDIMENT CONTROL INTERMEDIATE PLAN
CE204 EROSION AND SEDIMENT CONTROL INTERMEDIATE PLAN
CE206 EROSION AND SEDIMENT CONTROL INTERMEDIATE PLAN
CE207 EROSION AND SEDIMENT CONTROL INTERMEDIATE PLAN
CE208 EROSION AND SEDIMENT CONTROL INTERMEDIATE PLAN
CE209 EROSION AND SEDIMENT CONTROL INTERMEDIATE PLAN
CE210 EROSION AND SEDIMENT CONTROL INTERMEDIATE PLAN
CE211 EROSION AND SEDIMENT CONTROL INTERMEDIATE PLAN
CE212 EROSION AND SEDIMENT CONTROL INTERMEDIATE PLAN
CE213 EROSION AND SEDIMENT CONTROL INTERMEDIATE PLAN
CE214 EROSION AND SEDIMENT CONTROL INTERMEDIATE PLAN
CE215 EROSION AND SEDIMENT CONTROL INTERMEDIATE PLAN
CE216 EROSION AND SEDIMENT CONTROL INTERMEDIATE PLAN
CE217 EROSION AND SEDIMENT CONTROL INTERMEDIATE PLAN
CE218 EROSION AND SEDIMENT CONTROL INTERMEDIATE PLAN
CE220 EROSION AND SEDIMENT CONTROL INTERMEDIATE PLAN
CE221 EROSION AND SEDIMENT CONTROL INTERMEDIATE PLAN
CE222 EROSION AND SEDIMENT CONTROL INTERMEDIATE PLAN
CE223 EROSION AND SEDIMENT CONTROL INTERMEDIATE PLAN
CE225 EROSION AND SEDIMENT CONTROL INTERMEDIATE PLAN
CE226 EROSION AND SEDIMENT CONTROL INTERMEDIATE PLAN
CE229 EROSION AND SEDIMENT CONTROL INTERMEDIATE PLAN
CE230 EROSION AND SEDIMENT CONTROL INTERMEDIATE PLAN
CE231 EROSION AND SEDIMENT CONTROL INTERMEDIATE PLAN
CE301 EROSION AND SEDIMENT CONTROL FINAL PLAN
CE302 EROSION AND SEDIMENT CONTROL FINAL PLAN
CE303 EROSION AND SEDIMENT CONTROL FINAL PLAN
CE304 EROSION AND SEDIMENT CONTROL FINAL PLAN
CE306 EROSION AND SEDIMENT CONTROL FINAL PLAN
CE307 EROSION AND SEDIMENT CONTROL FINAL PLAN
CE308 EROSION AND SEDIMENT CONTROL FINAL PLAN
CE309 EROSION AND SEDIMENT CONTROL FINAL PLAN
CE310 EROSION AND SEDIMENT CONTROL FINAL PLAN
CE311 EROSION AND SEDIMENT CONTROL FINAL PLAN
CE312 EROSION AND SEDIMENT CONTROL FINAL PLAN
CE313 EROSION AND SEDIMENT CONTROL FINAL PLAN
CE314 EROSION AND SEDIMENT CONTROL FINAL PLAN
CE315 EROSION AND SEDIMENT CONTROL FINAL PLAN
CE316 EROSION AND SEDIMENT CONTROL FINAL PLAN
CE317 EROSION AND SEDIMENT CONTROL FINAL PLAN
CE318 EROSION AND SEDIMENT CONTROL FINAL PLAN
CE320 EROSION AND SEDIMENT CONTROL FINAL PLAN
CE321 EROSION AND SEDIMENT CONTROL FINAL PLAN
CE322 EROSION AND SEDIMENT CONTROL FINAL PLAN
CE323 EROSION AND SEDIMENT CONTROL FINAL PLAN
CE325 EROSION AND SEDIMENT CONTROL FINAL PLAN
CE326 EROSION AND SEDIMENT CONTROL FINAL PLAN
CE329 EROSION AND SEDIMENT CONTROL FINAL PLAN
CE330 EROSION AND SEDIMENT CONTROL FINAL PLAN
CE331 EROSION AND SEDIMENT CONTROL FINAL PLAN
CE401 ENLARGED EROSION AND SEDIMENT CONTROL INITIAL
PLAN
CE402 ENLARGED EROSION AND SEDIMENT CONTROL INITIAL
PLAN
CE403 ENLARGED EROSION AND SEDIMENT CONTROL FINAL PLAN
CE404 ENLARGED EROSION AND SEDIMENT CONTROL FINAL PLAN
CE405 ENLARGED EROSION AND SEDIMENT CONTROL FINAL PLAN
CE501 EROSION AND SEDIMENT CONTROL DETAILS
CE502 EROSION AND SEDIMENT CONTROL DETAILS
CE503 EROSION AND SEDIMENT CONTROL DETAILS
CE504 EROSION AND SEDIMENT CONTROL DETAILS
S-001 STRUCTURAL GENERAL NOTES
S-002 STRUCTURAL SPECIAL INSPECTIONS
S-301 STRUCTURAL CONDUIT SUPPORT DETAILS
S-302 STRUCTURAL CONDUIT ENCASEMENT DETAILS
DATE: 01/09/2026 ______________
1 2 3 4 5
A
B
C
D
SHEET ID
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
LO
U
IS
VI
LL
E
D
IS
TR
IC
T
LO
U
IS
VI
LL
E, K
EN
TU
C
KY
-0
P A
R K
W A
Y L
A N
E S
U
IT
E
P
E A
C H
TR
E
E C
O R
N E
R S
, G A
P
H O
N E
(6
) 3
-7
P
O N
D J
O B
N o.
SI
ZE
FI
LE
N
AM
E:
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SO
LI
C
IT
AT
IO
N N
O
C O
N
TR
AC
T
N O
FI
LE
N U
M
BE
R
US Army Corps of Engineers®
Louisville District
FI
LE
P
AT
H : X
:\F Y2
3\
8\
.C
AD
B
IM
\0 4.
.C
AD
PH
S H
EE
TS
\G
TT
ED
: 0 1/
/2
B Y:
N O
R M
AN
, T
AN
YA
IS
SU
E D
AT
E:
JA
N
U
AR
Y 9, AN
SI
D
A.
D
U
EH
R
D .M
. L
EC
KI
E
T.
N
O R
M
AN
D
AT
E D
ES
C
R
IP
TI
O
N M
AR
K
R
EP
AI
R
M
AI
N
TA
IN
A
IR
FI
EL
D S
TO
R
M W
AT
ER
S
YS
TE
M
PH
AS
E
II
D O
BB
IN
S
AI
R R
ES
ER
VE
B
AS
E, G
EO
R G
IA
PR
O
JE
C T
N O
FG
W B
-0
FG
W B
-0
P2
CERTIFIED FINAL
J.
P.
AR
IS
TI
ZA
N
ST
R U
C
TI
O N
H
AU
L R
O U
TE
A
N D
C O
N
TR
AC
TO
R L
AY
D
O W
N A
R
EA
S
G-003
G -0
.d w g
SCALE: 1" = 50' 0 25' 50' 100' 150'A1 CONSTRUCTION HAUL ROUTE AND CONTRACTOR LAYDOWN AREAS
NORTH
CO
BB PARKW
AY
(U.S. HW
Y 41, S.R.3)
LOCKHEED MARTIN
AERONAUTICAL
RUNWAY 11-29
TAXIW
AY M
TA
XI
W
AY
E
ATLANTA RD
TA
XI
W
AY
J
TAXIWAY E
TA
XI
W
AY
G
TA
XI
W
AY
G TAXIW
AY A
TAXIW
AY A
TAXIWAY F
TAXIW
AY C
NORTHEAST PARALLEL TAXIWAY
RUNWAY 11-29
7T H S
T
NAVY AIRCRAFT
MAINTENANCE
AREA
NORTH HAUL
ROUTE
CONTRACTOR'S
CONSTRUCTION VEHICLE
ENTRANCE AND EXIT
GATE - BARCLAY GATE
ARMY RES
AVIATION
SUPPORT
FACILITY
DEAD RUNW
AY TRAINING AREA
PROPOSED
LAYDOWN AREA
PROPOSED
STOCKPILE
LOCATION
ATLANTIC AVE
SHEET NOTES:
1. DISPOSAL AREAS FOR RUBBLE, UNSUITABLE EXCESS SOIL MATERIALS, OR
OTHER CONSTRUCTION DEBRIS ARE NOT AVAILABLE ON THE BASE FOR THE
CONTRACTOR'S USE. DISPOSAL MUST BE PROVIDED BY THE CONTRACTOR AT
SITES OFF GOVERNMENT CONTROLLED LANDS.
2. TEST BORROW MATERIAL FOR COMPLIANCE WITH ENVIRONMENTAL
SPECIFICATIONS. ONLY ENVIRONMENTALLY CLEAN SOIL WILL BE ACCEPTABLE
TO BE BROUGHT ONSITE. TESTING BY THE CONTRACTOR WILL BE PAID FOR BY
THE CONTRACTOR TO DETERMINE IF SOURCE FILL IS ACCEPTABLE FOR USE.
3. CONTRACTOR STAGING AREAS SHALL BE RETURNED TO PRE-CONSTRUCTION
CONDITIONS AS APPROVED BY THE COR AT THE COMPLETION OF
CONSTRUCTION.
4. CONTRACTORS AND SUPPLIERS SHALL ENTER BASE THROUGH THE
CONSTRUCTION VEHICLE ENTRANCE GATE.
5. ENSURE PERSONNEL AND EQUIPMENT HAVE PROPER BADGES AND TRAINING
FOR ACCESS TO THE FACILITY AND AIRFIELD WHERE APPROPRIATE.
6. THE DATUM FOR THIS SITE WAS ESTABLISHED UTILIZING GLOBAL POSITIONING
SYSTEMS, AND BASED ON POSITIONAL VALUES FOR THE VIRTUAL REFERENCE
STATION NETWORK DEVELOPED BY eGPS SOLUTIONS. THE HORIZONTAL
REFERENCE FRAME IS NORTH AMERICAN DATUM OF 1983(2011)-STATE PLANE
COORDINATE SYSTEM OF GEORGIA-WEST ZONE. THE VERTICAL REFERENCE
FRAME IS NORTH AMERICAN VERTICAL DATUM OF 1988. ANY DIRECTIONS OR
DIMENSIONS SHOWN ARE A RECTANGULAR, GROUND LEVEL PROJECTION OF
THE STATE PLANE COORDINATE SYSTEM.
AT
LA
NT
A
RD
AIRCRAFT
PARKING
APRON
CLIN I HAUL
ROUTE
LEGEND
HAUL ROUTE
CLIN I HAUL ROUTE
CLIN II HAUL ROUTE
CLIN III & IV HAUL ROUTE
ACCESS GATE
PROPOSED
STAGING AREA
PROPOSED
STOCKPILE
LOCATION
1ST ST
1ST ST
4TH ST
ATLANTIC AVE
6T H
ST
1ST ST
HERCULES W
AY
INDUSTRIAL DR
CLIN II HAUL ROUTE
CLIN III & IV
HAUL
ROUTE
CURED-IN-PLACE PIPE LINER STORM PIPE
REMOVE AND REPLACE STORM PIPE
NEW STORM PIPE
EXISTING STORM PIPE
JACK AND BORE
SOD REPLACEMENT
EXISTING ASPHALT PAVEMENT
PAVEMENT RESTORATION
JURISDICTIONAL WATERWAY
TANYA NORMAN, P.E.
P.E. No. 0038055, GA
DATE: 01/09/2026 ______________
1 2 3 4 5
A
B
C
D
SHEET ID
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
LO
U
IS
VI
LL
E
D
IS
TR
IC
T
LO
U
IS
VI
LL
E, K
EN
TU
C
KY
-0
P A
R K
W A
Y L
A N
E S
U
IT
E
P
E A
C H
TR
E
E C
O R
N E
R S
, G A
P
H O
N E
(6
) 3
-7
P
O N
D J
O B
N o.
SI
ZE
FI
LE
N
AM
E:
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SO
LI
C
IT
AT
IO
N N
O
C O
N
TR
AC
T
N O
FI
LE
N U
M
BE
R
US Army Corps of Engineers®
Louisville District
FI
LE
P
AT
H : X
:\F Y2
3\
8\
.C
AD
B
IM
\0 4.
.C
AD
PH
S H
EE
TS
\G
TT
ED
: 0 1/
/2
B Y:
N O
R M
AN
, T
AN
YA
IS
SU
E D
AT
E:
JA
N
U
AR
Y 9, AN
SI
D
A.
D
U
EH
R
D .M
. L
EC
KI
E
T.
N
O R
M
AN
D
AT
E D
ES
C
R
IP
TI
O
N M
AR
K
R
EP
AI
R
M
AI
N
TA
IN
A
IR
FI
EL
D S
TO
R
M W
AT
ER
S
YS
TE
M
PH
AS
E
II
D O
BB
IN
S
AI
R R
ES
ER
VE
B
AS
E, G
EO
R G
IA
PR
O
JE
C T
N O
FG
W B
-0
FG
W B
-0
P2
CERTIFIED FINAL
J.
P.
AR
IS
TI
ZA
IV
IL
A
BB
R
EV
IA
TI
O
N S
AN
D
L
EG
EN
D
C-001
G -0
.d w g
CL
CIVIL ABBREVIATIONS
@ AT
& AND
Ø DIAMETER
APPR APPROVED
APPROX APPROXIMATELY
ARV AIR RELEASE VALVE
AW AIR WING
BLDG BUILDING
BM BENCHMARK
BOT BOTTOM
CENTERLINE
CES CIVIL ENGINEERING SQUADRON
CF CUBIC FEET
CL CONSTRUCTION LIMITS
CLIN CONTRACT LINE ITEM NUMBER
CO CLEANOUT
CONC CONCRETE
COR CONTRACTING OFFICER'S REPRESENTATIVE
CPP CORRUGATED PLASTIC PIPE
DARB DOBBINS AIR RESERVE BASE
DI DROP INLET
DIA DIAMETER
DB DUCTBANK
DIP DUCTILE IRON PIPE
DS DOWNSPOUT
E EASTING
EG EXISTING GRADE
ELEC ELECTRICAL
ELEV ELEVATION
EP EDGE OF PAVEMENT
ESMT EASEMENT
EX EXISTING
FDC FIRE DEPARTMENT CONNECTION
FFE FINISHED FLOOR ELEVATION
FG FINISHED GRADE
FES FLARED END SECTION
FH FIRE HYDRANT
FT FEET
GI GRATE INLET
GIS GEOGRAPHIC INFORMATION SYSTEM
GSWCC GEORGIA SOIL & WATER CONSERVATION COMMISSION
HDPE HIGH DENSITY POLYETHYLENE PIPE
HORZ HORIZONTAL
HT HEIGHT
HW HEADWALL
IBW INSIDE BOTTOM OF WALL
ID INSIDE DIAMETER
IE INVERT ELEVATION
ILS INSTRUMENT LANDING SYSTEM
INC INCORPORATED
INV INVERT
JB JUNCTION BOX
LF LINEAR FEET
LOD LIMITS OF DISTURBANCE
MAX MAXIMUM
M.E. MATCH ELEVATION
MECH MECHANICAL
MEG MATCH EXISTING GRADE
MES MITERED END SECTION
MH MANHOLE
MIN MINIMUM
N NORTHING
NO NUMBER
NTS NOT TO SCALE
OC ON CENTER
OCEW ON CENTER EACH WAY
OD OUTSIDE DIAMETER
PIV POST INDICTOR VALVE
PROP PROPOSED
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PVC POLYVINYL CHLORIDE
RCP REINFORCED CONCRETE PIPE
R/W RIGHT OF WAY
SD STORM DRAIN
SEG SEGMENT
SF SQUARE FEET
SPEC SPECIFICATIONS
SQ SQUARE
SS SANITARY SEWER
SSMH SANITARY SEWER MANHOLE
ST STORM SEWER
STD STANDARD
TYP TYPICAL
UNO/UON UNLESS NOTED OTHERWISE
UP UTILITY POLE
USACE UNITED STATES ARMY CORPS OF ENGINEERS
USAF UNITED STATES AIR FORCE
VERT VERTICAL
WM WATER METER
WV WATER VALVE
WWF WELDED WIRE FABRIC
W/ WITH
W/C WATER TO CEMENT
YI YARD INLET
SHEET NAMING CONVENTION
C-001
2 DIGIT SEQUENTIAL # (01-99)
(FIRST DIGIT INDICATES PLAN
TYPE. SECOND DIGIT INDICATES
FLOOR)
1 DIGIT SHEET TYPE DESIGNATOR
0 - GENERAL
2 - PROFILES
3 - SECTIONS
4 - ENLARGED PLANS
6 - SCHEDULES AND DIAGRAMS
9 - 3D VIEWS (ISO, PERSPECTIVES,
PHOTOS)
2 DIGIT DISCIPLINE
DESIGNATOR
(IF ONLY ONE LETTER IS
USED, THE SECOND
LETTER IS REPLACED
WITH A DASH "-" AS A
PLACEHOLDER)**
PROJECT CONTACTS:
CIVIL ENGINEER FOR THIS PROJECT IS:
POND AND COMPANY
3500 PARKWAY LANE, SUITE 500
PEACHTREE CORNERS, GA 30092
P: (470) 494.1466
CONTACT: TANYA NORMAN, P.E.
1 - PLANS
5 - DETAILS
7 - USER DEFINED
8 - USER DEFINED
NOTE:
1. NOT ALL ABBREVIATIONS SHOWN WILL BE USED ON THIS
PROJECT.
SURVEYOR FOR THIS PROJECT IS:
GEO SURVEY, LTD.
1660 BARNES MILL ROAD
MARIETTA, GA 30062
P: (770) 795. 9900
990.8
ST
STORM MANHOLE
HEADWALL
DY
H
CLF
T
T
S
STORM LINE TO BE DEMOLISHED
AND REMOVED
STORM LINE TO BE ABANDONED
IN PLACE
EXISTING FEATURES ARE SCREENED
O O O O O O O O O O O O O O
RIP RAP
REMOVE GRAVEL/ REGRADE AND
SOD DISTURBED UNPAVED AREAS
PROPOSED INTERMEDIATE CONTOUR
CLIN OPTION
LIMITS OF DISTURBANCE
EXISTING MINOR CONTOUR
EXISTING MAJOR CONTOUR
CHAINLINK FENCE
EXISTING STORM PIPE
EXISTING SPOT ELEVATION
EXISTING DROP INLET
STORM MANHOLE
FIRE HYDRANT
SANITARY SEWER
HEADWALL
TELEPHONE MANHOLE
BOLLARD
COMPUTED POINT
CHAIN LINK FENCE
LIGHT POLE
GUY WIRE
POWER POLE
TELEPHONE BOX
SIGN
AIRFIELD LIGHTING
ILS CHECKPOINT
STORM SEWER STRUCTURES
MONITORING WELL
EXISTING UNDERGROUND COMM
EXISTING SANITARY SEWER LINE
EXISTING WATER LINE
EXISTING NATURAL GAS LINE
EXISTING FENCE LINE
EXISTING FLOW LINE OF CONCRETE FLUME
EXISTING COMMUNICATION LINE
EXISTING FORCE MAIN LINE
EXISTING UNDERGROUND ELEC
EXISTING UNDERGROUND COMPRESSED AIR LINE
EXISTING UNDERGROUND INDUSTRIAL WASTE LINE
EXISTING STORM DRAINAGE
EXISTING FIBER OPTIC
EXISTING WETLANDS
STREAM DELINEATION TOP OF BANK
LOCKHEED PROPERTY BOUNDARY
TAXIWAY CENTERLINE MARKINGS
TAXIWAY EDGE MARKINGS
NON-MOVEMENT AREA BOUNDARY MARKING
EXISTING CONCRETE PAVEMENT
EXISTING CONDITIONS LEGEND
DEMOLITION LEGEND
GRADING & DRAINAGE LEGEND
1006 PROPOSED INDEX CONTOUR
S
NEW OR MODIFIED EXISTING
STORM SEWER STRUCTURES
DATE: 01/09/2026 ______________
1 2 3 4 5
A
B
C
D
SHEET ID
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
LO
U
IS
VI
LL
E
D
IS
TR
IC
T
LO
U
IS
VI
LL
E, K
EN
TU
C
KY
-0
P A
R K
W A
Y L
A N
E S
U
IT
E
P
E A
C H
TR
E
E C
O R
N E
R S
, G A
P
H O
N E
(6
) 3
-7
P
O N
D J
O B
N o.
SI
ZE
FI
LE
N
AM
E:
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SO
LI
C
IT
AT
IO
N N
O
C O
N
TR
AC
T
N O
FI
LE
N U
M
BE
R
US Army Corps of Engineers®
Louisville District
FI
LE
P
AT
H : X
:\F Y2
3\
8\
.C
AD
B
IM
\0 4.
.C
AD
PH
S H
EE
TS
\G
TT
ED
: 0 1/
/2
B Y:
N O
R M
AN
, T
AN
YA
IS
SU
E D
AT
E:
JA
N
U
AR
Y 9, AN
SI
D
A.
D
U
EH
R
D .M
. L
EC
KI
E
T.
N
O R
M
AN
D
AT
E D
ES
C
R
IP
TI
O
N M
AR
K
R
EP
AI
R
M
AI
N
TA
IN
A
IR
FI
EL
D S
TO
R
M W
AT
ER
S
YS
TE
M
PH
AS
E
II
D O
BB
IN
S
AI
R R
ES
ER
VE
B
AS
E, G
EO
R G
IA
PR
O
JE
C T
N O
FG
W B
-0
FG
W B
-0
P2
CERTIFIED FINAL
J.
P.
AR
IS
TI
ZA
IV
IL
G
EN
ER
AL
N
O
TE
S
C-002
G -0
.d w g
1. ALL DISTURBED AREAS TO BE ROLLED SODDED WITH BERMUDA
SOD (PENNINGTON'S SAHARA OR CHEYENNE) SECURED WITH
STAPLES UPON COMPLETION. BROWN TOP MILLET NOT ALLOWED
ON OR AROUND AIRFIELD. SOD STAPLES SHALL BE
BIODEGRADABLE DESIGNED TO BE SECURE AN RETAIN IN THE
SOIL, STAPLES MUST NOT BECOME FOD (FOREIGN OBJECT
DEBRIS) AROUND THE AIRFIELD.
2. EXISTING CONDITIONS SHOWN ARE BASED ON BASE PROVIDED
INFORMATION, LOCKHEED MARTIN INFORMATION, SELECT FIELD
RUN TOPOGRAPHY AND STORM SEWER ELEVATIONS.
3. NOT ALL UTILITIES ARE SHOWN ON THIS PLAN. THE CONTRACTOR
SHALL OBTAIN AN UNDERGROUND UTILITY SURVEY ON DOBBINS
PROPERTY USING A PRIVATE UTILITY LOCATING SERVICE PRIOR
TO START OF CONSTRUCTION. LOCKHEED MARTIN WILL MARK
THEIR OWN UTILITIES. THE CONTRACTOR SHALL SURVEY BOTH
UTILITY MARKINGS, REVIEW THE SURVEY AGAINST THE PLANS,
AND COORDINATE WITH THE CONTRACTING OFFICER.
4. THE CONTRACTOR MUST COMPLETE AND FILE AN AF 103 DIG
PERMIT AS REFERENCED IN SPECIFICATION 01 01 00, GENERAL
REQUIREMENTS. THE CONTRACTOR MUST ALSO CONTACT THE
GEORGIA UTILITIES PROTECTION CENTER AT "811" BEFORE ANY
DIGGING AND COORDINATE WITH BASE CE.
5. FIELD RUN TOPOGRAPHY AND STORM SEWER ELEVATIONS WERE
PROVIDED BY GEO SURVEY LTD, 1660 BARNES MILL ROAD,
MARIETTA, GA 30062. PHONE: 770-795-9900. DATED JULY 17 , 2018.
6. GENERAL EXCAVATION MUST HAVE A MAXIMUM BERM HEIGHT OF
3 FEET. EXTENSIVE EXCAVATION MUST USE ASSIGNED STOCK
PILE AREAS. COORDINATE WITH THE CONTRACTING OFFICER FOR
ALL PROPOSED TAXIWAY CLOSURES.
7. THE CONTRACTOR MUST COORDINATE ALL WORK WITHIN
LOCKHEED MARTIN'S PROPERTY. COORDINATE WITH THE
CONTRACTING OFFICER FOR POINT OF CONTACT.
8. WETLAND AND STREAM IDENTIFICATION AND LIMITS SHOWN ON
THESE PLANS WERE PROVIDED BY DOBBINS AIR RESERVE BASE
PER A JURISDICTIONAL DETERMINATION, 2010.
9. THE CONTRACTOR MUST NOT DISTURB MORE THAN 5 ACRES AT
ANY TIME DURING THE CONSTRUCTION PROCESS. ALL DISTURBED
AREAS MUST BE FULLY STABILIZED PRIOR TO MOVING TO NEXT
CONSTRUCTION AREA. STOCKPILE AREAS SHOWN ON THE PLAN
REPRESENT APPROXIMATELY 400 LF OF TRENCH EXCAVATION
FOR THE "A" LINE. CONSTRUCTION SHALL BE PHASED IN 400 LF
INCREMENTS AND LIMITED TO THE STOCKPILE AREAS AND
CONSTRAINTS PROVIDED ON THE PLANS.
10. SECURITY FORCES MUST BE NOTIFIED 2 WEEKS PRIOR TO ANY
AUGMENTATION OF THE FENCE LINE.
11. ALL OPEN CUTS/TRENCHING MUST BE GRADED TO THE ORIGINAL
GRADES UNLESS SHOWN ON THE PLANS TO BE RE-GRADED.
12. CONTRACTOR MUST PROVIDE FINAL JACKING AND BORING
DETAILS TO THE CONTRACTING OFFICER BEFORE
CONSTRUCTION. THE PLANS MUST BE IN ACCORDANCE WITH THE
CONSTRUCTION PLANS. THE CONTRACTOR MUST TAKE ALL
PRECAUTIONS TO AVOID DAMAGE TO THE EXISTING STORM
SEWER LINE AND WILL BE RESPONSIBLE FOR ANY DAMAGE TO IT.
13. CONTRACTOR MUST PROVIDE DESIGN AND IMPLEMENTATION OF
THE MOST ECONOMICAL METHOD OF EXCAVATION IN THE BASE
BID TO INCLUDE OPEN CUT OR OPEN CUT WITH SHORING.
14. CONTRACTOR MUST PROVIDE DESIGN AND IMPLEMENTATION OF
DEWATERING METHODS AND INCLUDE IN BASE BID FOR
APPROVAL.
15. CONTRACTOR MUST PROVIDE DESIGN AND IMPLEMENTATION OF
SHORING AND BRACING AROUND CRITICAL AREAS SUCH AS
RUNWAY AND TAXIWAY EDGES AND INCLUDE IN BASE BID FOR
APPROVAL.
16. ALL FLOWABLE FILL MUST USE GEOFILL (DESIGN BASIS) LD (LOW
DENSITY) CELLULAR CONCRETE OR APPROVED EQUAL. ALL PIPES
AND STRUCTURES INDICATED TO BE ABANDONED IN PLACE SHALL
BE COMPLETELY FILLED WITH FLOWABLE FILL.
17. ALL SODDED/DISTURBED AREAS TO BE FREE OF DELETERIOUS
MATERIAL, SCARIFIED, GRADED AS NEEDED FOR POSITIVE
DRAINAGE AND FINE GRADED PER THE SPECIFICATIONS PRIOR TO
INSTALLATION.
18. SEE EROSION AND SEDIMENT CONTROL PLANS FOR DESIGNATED
STOCKPILE AREAS.
19. ALL SOD BASE MATERIAL (DIRT) MUST BE PLACED AT LEAST ONE
INCH BELOW THE EDGE OF ALL PAVEMENT INTERFACES. POSITIVE
DRAINAGE FROM PAVED AREAS THROUGH SOD INTERFACE MUST
BE OBTAINED. THERE MUST BE NO PONDING AT THE INTERFACE
UPON COMPLETION OF WORK.
20. ALL STOCKPILE AREAS MUST HAVE ORANGE TREE PROTECTION
FENCE INSTALLED AROUND THEM. ALL STAGING AREAS MUST
HAVE BARRICADES WITH LIGHTS AS DESCRIBED IN UFC 3-260-04.
ALL VEHICLES MUST BE FLAGGED WITH ORANGE & WHITE FLAG
AND LIGHT AT ALL TIMES. CONTRACTOR MUST PLACE NAME ON
SIDE OF ALL VEHICLES.
21. ALL PAVEMENT USED BY THE CONTRACTOR MUST BE MAINTAINED
AND REPLACED AS NEEDED TO THE SATISFACTION OF THE BASE
AT NO ADDITIONAL COST. INSPECTION WITH BASE ENGINEERING
IS REQUIRED AT THE END OF EACH SEGMENT OF STORM SEWER
CONSTRUCTION.
22. ALL AREAS NOTED FOR PAVEMENT REPLACEMENT MUST HAVE
BASE MATERIAL REMOVED FULL DEPTH AND REPLACED AND
SUBGRADE COMPACTED AND TESTED IN THE PRESENCE OF A
BASE REPRESENTATIVE PRIOR TO PLACEMENT OF NEW
MATERIAL.
23. SOILS REMOVED FROM SITE MUST BE DISPOSED OF IN A
CONSTRUCTION AND DEMOLITION LANDFILL UNLESS
ENVIRONMENTALLY CONTAMINATED. NO MANAGEMENT OF
CONTAMINATED SOIL IS ANTICIPATED. IF CONTAMINATED SOIL
ENCOUNTERED, THE SITE CONTRACTOR SHALL COORDINATE
WITH THE COR.
CIVIL DEMOLITION NOTES
1. "DEMOLISH" MEANS TO REMOVE AN OBJECT IN ITS ENTIRETY.
RESTORE GRADES AND SURFACE IMPROVEMENTS TO MATCH
EXISTING CONDITIONS OR PER REQUIREMENTS OF WORK,
WHICHEVER IS APPLICABLE.
2. EROSION AND SEDIMENT CONTROL MEASURES AND TEMPORARY
CONSTRUCTION FENCING MUST BE IN PLACE PRIOR TO
COMMENCEMENT OF DEMOLITION WORK.
3. ESTABLISH SURVEY CONTROL NETWORK OUTSIDE LIMITS OF
DEMOLITION PRIOR TO COMMENCEMENT OF WORK. THIS WORK
MUST BE PERFORMED BY A LICENSED & REGISTERED STATE OF
GEORGIA LAND SURVEYOR.
4. DEMOLITION WORK MUST BE COORDINATED WITH THE SCHEDULE,
LOGISTICS PLAN (APPROVED BY THE COR), EROSION AND
SEDIMENT PLAN PRIOR TO WORK.
5. REMEDIATE AND DISPOSE OF CONTAMINATED SOILS IN THE
EVENT THEY ARE ENCOUNTERED DURING CONSTRUCTION.
NOTIFY 94 CE IF CONTAMINATED SOILS ARE DISCOVERED.
CONTACT 94 CEV AT 678-655-3546.
CIVIL SITE NOTES
1. PROVIDE AND MAINTAIN NECESSARY BARRICADES AROUND THE
WORK AND PROVIDE PROTECTION AGAINST WATER DAMAGE AND
SOIL EROSION.
2. PAVEMENT MARKINGS, INCLUDING ANY STANDARD HANDICAP
SYMBOLS, PARKING STRIPING AND TRAFFIC ARROWS, MUST BE
PAINTED ON PAVEMENT AT LOCATIONS SHOWN.
GRADING AND DRAINAGE NOTES
1. POSITIVE DRAINAGE MUST BE MAINTAINED TO PREVENT
SATURATION OF EXPOSED SOILS IN CASE OF SUDDEN RAINS, AND
FOR FINISHED GRADING. LOCATE EXISTING UTILITIES PRIOR TO
ANY EXCAVATION. GRADE DISTURBED AREAS TO ENSURE
POSITIVE DRAINAGE AWAY FROM BUILDINGS AND TO DRAINAGE
STRUCTURES OR DITCHES. NATURAL FLOW OF SURROUNDING
WATERS MUST NOT BE DISTURBED DURING CONSTRUCTION,
UNLESS SHOWN OTHERWISE.
2. PROVIDE PERIMETER EROSION AND SEDIMENT CONTROL
MEASURES PRIOR TO SITE CLEARING OR EXCAVATION. INSPECT
SEDIMENT AND EROSION CONTROL MEASURES DAILY AND
DURING PROLONGED PERIODS OF CONTINUOUS RAINFALL
EVENTS TO ENSURE THAT CONTROLS ARE FUNCTIONING
PROPERLY. DAMAGED CONTROLS MUST BE REPLACED BY THE
END OF THE WORKDAY.
3. BACKFILL AND FILL MATERIAL MUST BE FREE OF ORGANIC
MATTER AND WASTE.
4. REMOVE SEDIMENT CONTROL FENCING FROM THE SITE PRIOR TO
FINAL PROJECT ACCEPTANCE, AND MUST SMOOTH THE GROUND
SURFACE WHERE THE FENCE WAS REMOVED THEN MULCH OR
SEED & STRAW (SEASON APPROPRIATE GRASS) THE RESTORED
SURFACE AS SUNLIGHT CONDITIONS WARRANT.
5. MAINTAIN A SURVEY CONTROL NETWORK OUTSIDE
CONSTRUCTION LIMITS. THIS WORK MUST BE PERFORMED BY A
LICENSED & REGISTERED STATE OF GEORGIA LAND SURVEYOR.
MARK, PRESERVE AND PROTECT SURVEY BENCHMARKS. IF
BENCHMARK ARE DEMOLISHED DURING CONSTRUCTION,
RELOCATE BENCHMARK, AND PROVIDE DATA ON AS-BUlLTS BY
SAID LAND SURVEYOR.
6. SPOT ELEVATIONS NOTED ARE FINISH GRADE.
7. CONTRACTOR TO REPLACE EACH CONNECTING PIPE WITH A NEW
LEG OF PIPE AS PART OF STRUCTURE REPLACEMENT.
8. DEWATERING DURING CONSTRUCTION WILL BE CONDUCTED AS
NEEDED DURING REMOVAL AND REPLACEMENT OF STORM
SEWER STRUCTURES AND PIPES. PROVIDE DEWATERING IN
ACCORDANCE WITH SPECIFICATION 31 00 00 AND DETAILS ON
SHEET CE504.
9. WHERE NEW INLETS WILL BE INSTALLED ON EXISTING STORM
SEWER PIPES, SEE DETAIL A1 ON SHEET C-505.
10. PROVIDE PIPE BEDDING IN ACCORDANCE WITH SPECIFICATION 31
00 00.00 06 EARTHWORK AND DETAIL C1 ON SHEET C-504.
1. WHEN AIRFIELD OPERATIONS ARE UNDERWAY, CONTRACTORS WILL
ADHERE TO TEMPORARY AIRFIELD CONSTRUCTION WAIVER/RISK
ASSESSMENT GUIDELINES FOR THE DESIGNATED WORK AREAS.
2. AIRFIELD CLOSURE NOT APPROVED FOR THIS PROJECT UNLESS
DESIGNATED BY THE INSTALLATION COMMANDER.
3. UPON AWARD, THE CONTRACTOR SHALL COORDINATE TO COMPLETE A
TEMPORARY CONSTRUCTION WAIVER WITH DOBBINS AIR RESERVE BASE
AND IT SHALL STAY IN AFFECT DURING THE ENTIRE CONSTRUCTION
PERIOD. RENEWALS SHALL BE APPLIED FOR 60 DAYS IN ADVANCE
THROUGH BASE CIVIL ENGINEERING AND THE AIRFIELD MANAGER.
4. UPON AWARD, THE CONTRACTOR MUST COMPLETE AND FILE FAA
WAIVER FORM 7460-1 WITH COPIES PROVIDED TO THE CONTRACTING
OFFICER AND AIRFIELD MANAGER.
5. WORK WITHIN THE C-130 RAMP AREA AND THE TRANSIENT PARKING
RAMP AREA REQUIRE COORDINATION WITH THE CONTRACTING OFFICER
60-DAYS PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL PROVIDE
AND PLACE BARRIERS (AIRPORT LOW PROFILE WATER FILLED
BARRICADES WITH LIGHT), AS DIRECTED BY THE AIRFIELD MANAGER
FOR CLOSED AIRCRAFT MOVEMENT AREAS. THE CONTRACTOR SHALL
PROVIDE A MAP OF THE REQUIRED AREA FOR ACCESS TO THESE SITES
FOR APPROVAL.
6. ACCESS TO THE BASE IS RESTRICTED TO THE WEST END COMMERCIAL
GATE DOBBINS AND LOCKHEEDMARTIN. ACCESS TO THE AIRFIELD IS
RESTRICTED. SEE HAUL ROUTE PLANS FOR VIA TEMPORARY AIRFIELD
CONSTRUCTION WAIVER/RISK ASSESSMENT DETAILS.
7. CONTRACTOR SHALL COORDINATE WITH THE CONTRACTING OFFICER
AND COMPLY WITH AFI 31-101 AIR FORCE INSTALLATION SECURITY
PROGRAM AND DAFI 31-145 ANTITERRORISM. THE CONTRACTORS
RESPONSIBILITY LETTER FOR FREE ZONE REQUIREMENTS SHALL BE
PROVIDED AT THE PRE-CONSTRUCTION MEETING.
8. CONTRACTOR SHALL TAKE EVERY OPPORTUNITY TO REDUCE THE
POTENTIAL OF FOREIGN OBJECTS AND DEBRIS (FOD) AROUND THE
AIRFIELD. DURING CONSTRUCTION WORK PERIODS AND AT THE END OF
EACH WORK DAY, THE CONTRACTOR SHALL CONDUCT A FOD CHECK OF
THE CONSTRUCTION AREA AND CLEAN THE AREA WITH A VACUUM
SWEEPER. A VACUUM SWEEPER WITH STEEL BRISTLES WILL NOT BE
ALLOWED. REMOVAL OF ANY POTENTIAL FOD AT THE END OF EACH
WORK DAY SHALL BE REQUIRED. CONTRACTOR SHALL BE RESPONSIBLE
FOR REMOVAL AND DISPOSAL OF ALL FOD FOUND WITHIN THE LIMITS OF
CONSTRUCTION.
9. A FOD CHECK MUST BE COMPLETED ON ALL VEHICLES, EQUIPMENT, ETC.
UPON EACH ENTRY TO THE AIRFIELD PERIMETER.
10. CONTRACTOR PERSONNEL WHO WILL ROUTINELY OPERATED VEHICLES
OR EQUIPMENT MUST COMPLETED THE BASE AIRFIELD DRIVING COURSE
PRIOR TO THE START OF WORK. THIS COURSE IS 8 HOURS IN DURATION
AND REQUIRES REVIEW OF MATERIAL AHEAD OF TIME AS WELL AS A
WRITTEN EXAM. SUPPLY VEHICLES SUCH AS DUMP HAULS AND OR
CONCRETE TRUCKS MAY BE ESCORTED BY A INDIVIDUAL WHO HAS
COMPLETED AND PASSED THE AIRFIELD DRIVING COURSE. AIRFIELD
DRIVING COURSE WILL BE PROVIDED BY DOBBINS ARB STAFF, NO FEE
FOR THE CLASS IS REQUIRED.
11. THE CONTRACTOR SHALL COORDINATE WITH THE CONTRACTING
OFFICER FOR THE DISPLACED THRESHOLD SCHEDULE 60 DAYS PRIOR
TO CONSTRUCTION. THE CONTRACTOR IS REQUIRED TO PROVIDE NEW
DISPLACED THRESHOLD PAVEMENT MARKINGS, RENUMBER RUNWAY
DISTANCE MARKERS, USE APPROPRIATE SIGN COVERS TO CLOSE
TAXIWAYS/AIRCRAFT MOVEMENT AREAS AS APPLICABLE AND REMOVAL
OF DISPLACED THRESHOLD PAVEMENT MARKINGS. COORDINATE WITH
AIRFIELD MANAGER FOR CHANGES TO RUNWAY LIGHTING
CONFIGURATIONS ASSOCIATED WITH THE DISPLACED THRESHOLD. AS
OUTLINED IN UFC 3-260-04 PAVEMENT MARKING SCHEMES. THE
CONTRACTOR IS RESPONSIBLE FOR RESTORING THE RUNWAY
PAVEMENT MARKINGS, AND AIRFIELD SIGNS TO THE ORIGINAL
CONDITION EXISTING PRIOR TO THE DISPLACED THRESHOLD. THE
CONTRACTOR IS ALSO RESPONSIBLE FOR PROVIDING AND PLACING
TEMPORARY BARRICADES (AIRPORT LOW PROFILE WATER FILLED
BARRICADES WITH LIGHT) AT DESIGNATED LOCATIONS. THE DISPLACED
THRESHOLD SHALL BE IN PLACE MAXIMUM 45 CALENDAR DAYS AND ALL
WORK SHALL BE COMPLETED IN THAT TIME PERIOD.
12. IN THE PRESENCE OF THE CONTRACTING OFFICER, PERFORM A SURVEY
OF EXISTING RUNWAY OR TAXIWAY EDGE LIGHTS, RDM'S (RUNWAY
DISTANCE MARKERS), AND AIRFIELD SIGNAGE TO DETERMINE WITHIN
100' BEYOND THE EDGE OF THE CONSTRUCTION AREA SHOWN ON THE
DRAWINGS AND RECORD THE LOCATION OF ANY NON-FUNCTIONAL OR
DAMAGED UNITS PRIOR TO CONSTRUCTION. PRIOR TO DEMOLITION THE
CONTRACTOR SHALL SUBMIT A REPORT TO THE GOVERNMENT FOR
REVIEW. ANY DAMAGE OR LOSS OF FUNCTION SHOWN TO HAVE
OCCURRED DURING CONSTRUCTION MUST BE REPAIRED BY THE
CONTRACTOR AT NO EXPENSE TO THE GOVERNMENT.
13. TO WORK AND PROVIDE FREE WORK ZONE WITHIN RESTRICTED AREAS
OF THE FACILITY, THE CONTRACTOR SHALL PROVIDE RED FLASHING
LIGHTED AND WEIGHTED LOW PROFILE BARRICADES WITHIN AIRFIELD
RESTRICTED SPACE WHERE AND WHEN DIRECTED BY THE AIRFIELD
MANAGER OR COR. NO SOLAR LIGHTS ARE ACCEPTED FOR LOW PROFILE
BARRICADES, BATTERY POWERED ONLY.
14. SOIL CONTAINING PFAS IS PRESENT WITHIN THE DARB AIRFIELD. SEE
A3/C-001 FOR PFAS LOCATIONS. SEE SPECIFICATION SECTION 01 56 00 -
DOBBINS ARB ENVIRONMENTAL REQUIREMENTS.
15. CONTRACTOR PERSONNEL WILL ADHERE TO THE TEMPORARY AIRFIELD
CONSTRUCTION WAIVER/RISK ASSESSMENT GUIDELINES WHEN
OPERATING ON THE AIRFIELD.
1. ALL RCP SHALL BE CLASS III EXCEPT WHERE NOTED.
2. REFER TO PLAN SHEETS FOR ALL GRATE INLET MODEL NUMBERS.
3. ALL STORM SEWER LINES SHALL HAVE BEDDING PER THE PROFILES AND DETAILS.
4. ALL INLETS SHALL MEET AIRFIELD TRAFFIC STANDARDS AND ALL INLETS/BOXES SHALL BE CAPABLE TO
WITHSTAND AIRCRAFT LOADING OF A C5 (840,000 LBS), IF THE INLET OR BOX IS WITHIN 250' OF THE CENTERLINE OF THE LANDING STRIP OR ASPHALT STRIP, 50' FROM THE EDGE OF A TAXIWAY.
5. ALL STORM STRUCTURES SHALL BE A MINIMUM OF 48" INSIDE DIAMETER. ALL FRAME/GRATE SHALL BE CAST INTO A FLAT TOP BY THE PRECAST MANUFACTURER. FLAT TOP/CONCRETE COLLAR AND FRAME/GRATE SHALL BE FLUSH WITH FINAL GRADE. ALL STRUCTURES PLACED ON TOP OF A BOX CULVERT SHALL BE AT
LEAST 48" INSIDE DIAMETER.
6. PIPE LENGTHS SHOWN ARE MEASURED FROM CENTER OF STRUCTURE TO CENTER OF STRUCTURE.
CONTRACTOR SHALL BID OUTSIDE OF STRUCTURE TO OUTSIDE OF STRUCTURE.
7. THE CONTRACTOR SHALL CONSTRUCT AND INSTALL THE GRATE INLETS PRIOR TO PERFORMING THE CENTRIFUGALLY CAST CONCRETE PIPE INSTALLATION. THE CONTRACTOR SHALL INSTALL PRECAST GRATE INLETS. THE INSTALLATION SHALL REQUIRE THE REMOVAL OF EXISTING PIPE IN ORDER TO INSTALL THE PROPOSED GRATED INLET. THE CONTRACTOR SHALL INCLUDE THE REMOVAL AND REPLACEMENT OF EXISTING PIPE AND THE PIPE COLLARS REQUIRED TO CONNECT THE PROPOSED PIPE TO EXISTING PIPE.
8. PRIOR TO PERFORMING CENTRIFUGALLY CAST CONCRETE PIPE INSTALLATION, THE CONTRACTOR WILL BE REQUIRED TO INSTALL MEASURES THAT WILL MAINTAIN DRY CONDITIONS IN THE PIPE. THE CONTRACTOR SHALL PROVIDE THE BASE WITH A CONSTRUCTION PHASING PLAN PRIOR TO THE INSTALLATION. EQUIPMENT AND MATERIAL USED TO MAINTAIN THE DRY CONDITION SHALL BE INCLUDED IN THE BID. THIS SHOULD INCLUDE ANY BYPASS PUMPING NEEDED TO MAINTAIN AIRFIELD DRAINAGE DURING CONSTRUCTION. THE CONTRACTOR SHALL FOLLOW THE GEORGIA SOIL AND WATER CONSERVATION'S MANUAL FOR EROSION AND
SEDIMENT CONTROL DURING THE INSTALLATION.
9. SEE PROFILES AND STORM SEWER NOTES FOR ALL STORM SEWER ELEVATIONS, STORM SEWER PIPE SIZES, STORM SEWER MATERIALS AND SPECIFICATIONS, STORM SEWER CASING SPECIFICATIONS AND SLOPES.
10. OVER-EXCAVATE ALL STORM SEWER LINES THAT ARE WITHIN 2-FT OF THE SEASONAL HIGH WATER TABLE AND REPLACE THE TOP 12 INCHES WITH WASHED No. 34 CRUSHED STONE WRAPPED IN 6 OZ. NON-WOVEN GEOTEXTILE. WHERE APPLICABLE (SEE DETAILS) No. 57 CRUSHED STONE SHALL EXTEND TO THE MIDPOINT OF THE PIPE OR BOX CULVERT AND SHALL BE WRAPPED IN 6 OZ. NON-WOVEN GEOTEXTILE WITH
PERFORATED DRAIN PIPE.
11. CONTRACTOR SHALL VERIFY LOCATION OF PIPE, REPAIRS, AND UTILITIES BEFORE CUTTING PAVEMENT.
12. WHERE IDENTIFIED ON THE PLANS TO "CLEAN PIPES" THIS IS TO REMOVE ACCUMULATED SEDIMENT AND
DEBRIS WITHIN THE PIPE WITHOUT DAMAGE TO THE EXISTING INFRASTRUCTURE.
13. THE CONTRACTOR SHALL PERFORM VIDEO CAMERA INSPECTIONS OF ALL PIPES AND STRUCTURES AS
SPECIFIED IN SECTION 01 01 00 FOR PHASE II. ELECTRONIC FILES OF ALL INSPECTION VIDEOS SHALL BE
PROVIDED.
14. ALL PIPES SHALL BE CLEANED TO A LEVEL ACCEPTABLE TO THE MANUFACTURE WHEN PIPE LINING IS
SPECIFIED.
15. CONTRACTOR TO PROTECT EXISTING STANDPIPE. REPLACEMENT IN KIND OF THE EXISTING STANDPIPE WILL
NOT VOID THE TEMPORARY WAIVER.
16. PIPES DAMAGED DURING CONSTRUCTIONS MUST BE REPLACED USING PIPE MATERIALS APPROVED BY THE
COR AT CONTRACTORS EXPENSE
1. PIPE GREATER THAN 24" SHALL BE PER SPEC 33 40 00.
2. PIPE LESS THAN 24" SHALL BE CURE IN PLACE PIPE REPAIR (CIPP).
3. POINT REPAIR FOR PIPES SHALL BE TRENCHLESS REPAIR SYSTEM
(BASIS OF DESIGN IS HAMMERHEAD TRENCHLESS SYSTEM).
CIVIL GENERAL NOTES AIRFIELD NOTES STORM SEWER NOTES
LINING NOTES
SCALE: N.T.S.A3 PFAS LOCATIONS
NORTH
DATE: 01/09/2026 ______________
1 2 3 4 5
A
B
C
D
SHEET ID
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
LO
U
IS
VI
LL
E
D
IS
TR
IC
T
LO
U
IS
VI
LL
E, K
EN
TU
C
KY
-0
P A
R K
W A
Y L
A N
E S
U
IT
E
P
E A
C H
TR
E
E C
O R
N E
R S
, G A
P
H O
N E
(6
) 3
-7
P
O N
D J
O B
N o.
SI
ZE
FI
LE
N
AM
E:
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SO
LI
C
IT
AT
IO
N N
O
C O
N
TR
AC
T
N O
FI
LE
N U
M
BE
R
US Army Corps of Engineers®
Louisville District
FI
LE
P
AT
H : X
:\F Y2
3\
8\
.C
AD
B
IM
\0 4.
.C
AD
PH
S H
EE
TS
\G
TT
ED
: 0 1/
/2
B Y:
N O
R M
AN
, T
AN
YA
IS
SU
E D
AT
E:
JA
N
U
AR
Y 9, AN
SI
D
A.
D
U
EH
R
D .M
. L
EC
KI
E
T.
N
O R
M
AN
D
AT
E D
ES
C
R
IP
TI
O
N M
AR
K
R
EP
AI
R
M
AI
N
TA
IN
A
IR
FI
EL
D S
TO
R
M W
AT
ER
S
YS
TE
M
PH
AS
E
II
D O
BB
IN
S
AI
R R
ES
ER
VE
B
AS
E, G
EO
R G
IA
PR
O
JE
C T
N O
FG
W B
-0
FG
W B
-0
P2
CERTIFIED FINAL
J.
P.
AR
IS
TI
ZA
BA
L
SCALE: 1" = 600' 0 300' 600' 1200' 1800'
OVERALL STORM DRAINAGE PLAN
VE
R
AL
L
ST
O R
M D
R
AI
N
AG
E
PL
AN
C-100
G -0
.d w g
CLIN I
PROJECT CLIN LEGEND
CLIN II - NORTH OF RUNWAY, EAST OF TAXIWAY
CLIN III - SOUTH OF RUNWAY
CLIN I - NORTH OF RUNWAY, WEST OF TAXIWAY
CLIN IV - JACK AND BORE
CLIN III
CLIN IV
CL
IN
II
PHASE SHEET LIST
C-101 CLIN III
C-102 CLIN I
C-103 CLIN I
C-104 CLIN I
C-105 CLIN I
C-106 CLIN II
C-107 CLIN II
C-108 CLIN II
C-109 CLIN III
C-110 CLIN I + CLIN III
C-111 CLIN I + CLIN III
C-112 CLIN II
C-113 CLIN II
C-114 CLIN II
C-115 CLIN II
C-116 CLIN III
C-117 CLIN III
C-118 CLIN III
C-119 CLIN II + CLIN III
C-120 CLIN IV
C-121 CLIN II
C-122 CLIN III
C-123 CLIN III
C-124 CLIN III
C-125 CLIN IV
C-126 CLIN III
C-127 CLIN III
C-128 CLIN III
C-129 CLIN III
C-130 CLIN III
C-131 CLIN III
C101 C102 C103
C104 C105 C106 C107 C108
C110 C111 C112 C113 C114
C116 C117 C118 C119 C120
C122 C123 C124 C125
C127 C128 C129
C130 C131
C109 C115
C121
C126
CLIN V - SODDING ALONG RUNWAYS
CLIN VI - PIPE LINING
GENERAL NOTES:
1. PROJECT PHASING
- FY2026
-- BASE BID
---- CLIN 1
---- CLIN 2
-- OPTION 1
---- CLIN 3
-- OPTION 2
---- CLIN 4
- TBD FY
-- OPTION 3
---- CLIN 5
-- OPTION 4
---- CLIN 6
NORTH
CLIN II
CLIN III
DLO
D
LOD
LO
D
LOD
LO
D
LOD
LO
D
LO
D
LOD
LOD LO
D
LO
D
LO
D
LOD
LO
D
LOD
LOD
LO
D LOD
LO
D
LO
D
LO
D
LOD
LOD
LO
D o o o o o o o o o oooo o
TANYA NORMAN, P.E.
P.E. No. 0038055, GA
DATE: 01/09/2026 ______________
1 2 3 4 5
A
B
C
D
SHEET ID
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
LO
U
IS
VI
LL
E
D
IS
TR
IC
T
LO
U
IS
VI
LL
E, K
EN
TU
C
KY
-0
P A
R K
W A
Y L
A N
E S
U
IT
E
P
E A
C H
TR
E
E C
O R
N E
R S
, G A
P
H O
N E
(6
) 3
-7
P
O N
D J
O B
N o.
SI
ZE
FI
LE
N
AM
E:
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SO
LI
C
IT
AT
IO
N N
O
C O
N
TR
AC
T
N O
FI
LE
N U
M
BE
R
US Army Corps of Engineers®
Louisville District
FI
LE
P
AT
H : X
:\F Y2
3\
8\
.C
AD
B
IM
\0 4.
.C
AD
PH
S H
EE
TS
\4
4-
C -1
(A
P
LO
TT
ED
: 0
1/
/2
B
Y:
N
O R
M
AN
, T
AN
YA
IS
SU
E D
AT
E:
JA
N
U
AR
Y 9, AN
SI
D
A.
D
U
EH
R
D .M
. L
EC
KI
E
T.
N
O R
M
AN
D
AT
E D
ES
C
R
IP
TI
O
N M
AR
K
R
EP
AI
R
M
AI
N
TA
IN
A
IR
FI
EL
D S
TO
R
M W
AT
ER
S
YS
TE
M
PH
AS
E
II
D O
BB
IN
S
AI
R R
ES
ER
VE
B
AS
E, G
EO
R G
IA
PR
O
JE
C T
N O
FG
W B
-0
FG
W B
-0
P2
CERTIFIED FINAL
J.
P.
AR
IS
TI
ZA
ST
R M
D R
AI
N
AG
E
PL
AN
C-101
-C
-1
(A ).d w g
SHEET NOTES
1. REFER TO SHEETS C-001 AND C-002 FOR PROJECT ABBREVIATIONS,
LEGEND, AND GENERAL, AIRFIELD AND STORM SEWER NOTES.
2. THIS SHEET IS PART OF A MULTI-SHEET SET OF CONSTRUCTION
PLANS AND MUST BE READ WITH THE FULL SET TO BEST ENSURE
PROPER INTERPRETATION.
3. REFER TO SHEETS C-601 - C-606 FOR STORM DRAINAGE
STRUCTURE TABLES.
4. ALL PIPES AND STRUCTURES INDICATED TO BE ABANDONED IN
PLACE SHALL BE COMPLETELY FILLED WITH FLOWABLE FILL.
5. DEPTHS OF SOME EXISTING UTILITIES WHICH ARE NOT NOTED ON
THE PLANS ARE UNKNOWN AND MAY CONFLICT WITH STORM
DRAINAGE AS DESIGNED. NOTIFY COR OF ANY CONFLICTS FOUND.
M A
T C
H L
IN
E
S
E E
S H
E E
T C
-1
KEY MAP
CLIN III
C
LI
N I
C101 C102 C103
C104 C105 C106 C107 C108
C110 C111 C112 C113 C114
C116 C117 C118 C119 C120
C122 C123 C124 C125
C127 C128 C129
C130 C131
C109 C115
C121
C126
CLIN IV
C
LI
N
II
SCALE: 1" = 50' 0 25' 50' 100' 150'A1 STORM DRAINAGE PLAN
NORTH
500' RUNWAY WINGTIP CLEARANCE
A4 C-505
A3 C-502
A4 C-508
A4 C-505
LOD
LOD
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LOD
LOD
LOD
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LOD
LOD
LO
D
LOD
LOD
LOD
LOD
LOD
LO
D
LOD
LOD
LOD
TANYA NORMAN, P.E.
P.E. No. 0038055, GA
DATE: 01/09/2026 ______________
1 2 3 4 5
A
B
C
D
SHEET ID
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
LO
U
IS
VI
LL
E
D
IS
TR
IC
T
LO
U
IS
VI
LL
E, K
EN
TU
C
KY
-0
P A
R K
W A
Y L
A N
E S
U
IT
E
P
E A
C H
TR
E
E C
O R
N E
R S
, G A
P
H O
N E
(6
) 3
-7
P
O N
D J
O B
N o.
SI
ZE
FI
LE
N
AM
E:
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SO
LI
C
IT
AT
IO
N N
O
C O
N
TR
AC
T
N O
FI
LE
N U
M
BE
R
US Army Corps of Engineers®
Louisville District
FI
LE
P
AT
H : X
:\F Y2
3\
8\
.C
AD
B
IM
\0 4.
.C
AD
PH
S H
EE
TS
\4
4-
C -1
(A
P
LO
TT
ED
: 0
1/
/2
B
Y:
N
O R
M
AN
, T
AN
YA
IS
SU
E D
AT
E:
JA
N
U
AR
Y 9, AN
SI
D
A.
D
U
EH
R
D .M
. L
EC
KI
E
T.
N
O R
M
AN
D
AT
E D
ES
C
R
IP
TI
O
N M
AR
K
R
EP
AI
R
M
AI
N
TA
IN
A
IR
FI
EL
D S
TO
R
M W
AT
ER
S
YS
TE
M
PH
AS
E
II
D O
BB
IN
S
AI
R R
ES
ER
VE
B
AS
E, G
EO
R G
IA
PR
O
JE
C T
N O
FG
W B
-0
FG
W B
-0
P2
CERTIFIED FINAL
J.
P.
AR
IS
TI
ZA
R M
D R
AI
N
AG
E
PL
AN
C-102
-C
-1
(A ).d w g
SHEET NOTES
1. REFER TO SHEETS C-001 AND C-002 FOR PROJECT ABBREVIATIONS,
LEGEND, AND GENERAL, AIRFIELD AND STORM SEWER NOTES.
2. THIS SHEET IS PART OF A MULTI-SHEET SET OF CONSTRUCTION
PLANS AND MUST BE READ WITH THE FULL SET TO BEST ENSURE
PROPER INTERPRETATION.
3. REFER TO SHEETS C-601 - C-606 FOR STORM DRAINAGE
STRUCTURE TABLES.
4. ALL PIPES AND STRUCTURES INDICATED TO BE ABANDONED IN
PLACE SHALL BE COMPLETELY FILLED WITH FLOWABLE FILL.
5. DEPTHS OF SOME EXISTING UTILITIES WHICH ARE NOT NOTED ON
THE PLANS ARE UNKNOWN AND MAY CONFLICT WITH STORM
DRAINAGE AS DESIGNED. NOTIFY COR OF ANY CONFLICTS FOUND.
M A
T C
H L
IN
E
- S E
E S
H E
E T
C -1
KEY MAP
CLIN III
C
LI
N I
C101 C102 C103
C104 C105 C106 C107 C108
C110 C111 C112 C113 C114
C116 C117 C118 C119 C120
C122 C123 C124 C125
C127 C128 C129
C130 C131
C109 C115
C121
C126
CLIN IV
C
LI
N
II
SCALE: 1" = 50' 0 25' 50' 100' 150'A1 STORM DRAINAGE PLAN
NORTH
500' RUNWAY WINGTIP CLEARANCE
77 LF CONCRETE FLUME
TO WEIR CUT INTO INLET
132 LF CONCRETE FLUME
TO WEIR CUT INTO INLET
INSTALL RIPRAP AT INVERT
A3 C-502
C3 C-501
A3 C-502
C3 C-501
A4 C-505
25' STATE BUFFER
50' COUNTY BUFFER
75' IMPERVIOUS BUFFER
25' STATE BUFFER
50' COUNTY BUFFER
75' IM
PERVIOUS BUFFER
EX. WETLANDS
EX. WETLANDS
LO
DLOD
LOD
LO
D
LODLOD
LO
D
LOD
LOD LO
D
LOD
LOD
LO
D
LO
D
LOD
LO
D
LO
D
LOD
LOD
LOD
LOD
LO
D
LO
D
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LOD
LO
D
LOD
LODLOD
LOD LOD
LOD
LOD
LO
D
LO
D
LO
D
LO
D LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LOD
LOD LOD
LODLOD
LODLO
D
LOD
LOD
LOD
LOD
LOD
LODLO
D
LO
D
LO
D
LOD
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
WETLAND
111b
WL7
OW1
102510261027 10281029
1032 1030
10171021 1015
100810101011
10391040
TANYA NORMAN, P.E.
P.E. No. 0038055, GA
DATE: 01/09/2026 ______________
1 2 3 4 5
A
B
C
D
SHEET ID
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
LO
U
IS
VI
LL
E
D
IS
TR
IC
T
LO
U
IS
VI
LL
E, K
EN
TU
C
KY
-0
P A
R K
W A
Y L
A N
E S
U
IT
E
P
E A
C H
TR
E
E C
O R
N E
R S
, G A
P
H O
N E
(6
) 3
-7
P
O N
D J
O B
N o.
SI
ZE
FI
LE
N
AM
E:
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SO
LI
C
IT
AT
IO
N N
O
C O
N
TR
AC
T
N O
FI
LE
N U
M
BE
R
US Army Corps of Engineers®
Louisville District
FI
LE
P
AT
H : X
:\F Y2
3\
8\
.C
AD
B
IM
\0 4.
.C
AD
PH
S H
EE
TS
\4
4-
C -1
(A
P
LO
TT
ED
: 0
1/
/2
B
Y:
N
O R
M
AN
, T
AN
YA
IS
SU
E D
AT
E:
JA
N
U
AR
Y 9, AN
SI
D
A.
D
U
EH
R
D .M
. L
EC
KI
E
T.
N
O R
M
AN
D
AT
E D
ES
C
R
IP
TI
O
N M
AR
K
R
EP
AI
R
M
AI
N
TA
IN
A
IR
FI
EL
D S
TO
R
M W
AT
ER
S
YS
TE
M
PH
AS
E
II
D O
BB
IN
S
AI
R R
ES
ER
VE
B
AS
E, G
EO
R G
IA
PR
O
JE
C T
N O
FG
W B
-0
FG
W B
-0
P2
CERTIFIED FINAL
J.
P.
AR
IS
TI
ZA
R M
D R
AI
N
AG
E
PL
AN
C-103
-C
-1
(A ).d w g
SHEET NOTES
1. REFER TO SHEETS C-001 AND C-002 FOR PROJECT ABBREVIATIONS,
LEGEND, AND GENERAL, AIRFIELD AND STORM SEWER NOTES.
2. THIS SHEET IS PART OF A MULTI-SHEET SET OF CONSTRUCTION
PLANS AND MUST BE READ WITH THE FULL SET TO BEST ENSURE
PROPER INTERPRETATION.
3. REFER TO SHEETS C-601 - C-606 FOR STORM DRAINAGE
STRUCTURE TABLES.
4. ALL PIPES AND STRUCTURES INDICATED TO BE ABANDONED IN
PLACE SHALL BE COMPLETELY FILLED WITH FLOWABLE FILL.
5. DEPTHS OF SOME EXISTING UTILITIES WHICH ARE NOT NOTED ON
THE PLANS ARE UNKNOWN AND MAY CONFLICT WITH STORM
DRAINAGE AS DESIGNED. NOTIFY COR OF ANY CONFLICTS FOUND.
M A
T C
H L
IN
E
S
E E
S H
E E
T C
-1
KEY MAP
CLIN III
C
LI
N I
C101 C102 C103
C104 C105 C106 C107 C108
C110 C111 C112 C113 C114
C116 C117 C118 C119 C120
C122 C123 C124 C125
C127 C128 C129
C130 C131
C109 C115
C121
C126
CLIN IV
C
LI
N
II
SCALE: 1" = 50' 0 25' 50' 100' 150'A1 STORM DRAINAGE PLAN
NORTH
A4 C-505
96 LF CONCRETE FLUME TO
TIE INTO EXISTING
CONCRETE FLUME
A3 C-502
A3 C-502
B3 C-503
A1 C-514
MATCH THE EXISTING FLUME DOWELS
INSTALLED AT THE CONNECTION TO
PREVENT MOVEMENT, APPLY AN
ADHESIVE SEALANT TO PROVIDE A
WATERTIGHT JOINT. ALONG INTERFACE
WITH EXISTING FLUME.
A4 C-508
EXISTING FLUME
C3 C-504
A1 C-511
C1 C-501
25' STATE BU
FFER
50' C O
U N
TY BU
FFER
75' IM
PERVIO
US BUFFER
25' STATE BUFFER
50' COUNTY BUFFER
75' IMPERVIOUS BUFFER
25' STATE BUFFER
50' COUNTY BUFFER
75' IM
PERVIOUS BUFFER
EX. WETLANDS
EX. WETLANDS
LOD
LOD
LOD LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LOD
LOD LOD
LODLOD
LODLO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LO
D
LO
D
LO
D LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D LOD
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LO
D
LO
D
LOD
LO
D
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
PH
AS
E I S
U R
VE
Y
LI
M
IT
S
SU
R
VE
Y
D
AT
E:
1-
-2
BE
G
IN
P H
AS
E
II
SU
R
VE
Y
D
AT
E:
-1 9-
WETLAND
111b
WL7
OW1
OPEN
WATER
PS9
100810101011
TANYA NORMAN, P.E.
P.E. No. 0038055, GA
DATE: 01/09/2026 ______________
1 2 3 4 5
A
B
C
D
SHEET ID
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
LO
U
IS
VI
LL
E
D
IS
TR
IC
T
LO
U
IS
VI
LL
E, K
EN
TU
C
KY
-0
P A
R K
W A
Y L
A N
E S
U
IT
E
P
E A
C H
TR
E
E C
O R
N E
R S
, G A
P
H O
N E
(6
) 3
-7
P
O N
D J
O B
N o.
SI
ZE
FI
LE
N
AM
E:
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SO
LI
C
IT
AT
IO
N N
O
C O
N
TR
AC
T
N O
FI
LE
N U
M
BE
R
US Army Corps of Engineers®
Louisville District
FI
LE
P
AT
H : X
:\F Y2
3\
8\
.C
AD
B
IM
\0 4.
.C
AD
PH
S H
EE
TS
\4
4-
C -1
(A
P
LO
TT
ED
: 0
1/
/2
B
Y:
N
O R
M
AN
, T
AN
YA
IS
SU
E D
AT
E:
JA
N
U
AR
Y 9, AN
SI
D
A.
D
U
EH
R
D .M
. L
EC
KI
E
T.
N
O R
M
AN
D
AT
E D
ES
C
R
IP
TI
O
N M
AR
K
R
EP
AI
R
M
AI
N
TA
IN
A
IR
FI
EL
D S
TO
R
M W
AT
ER
S
YS
TE
M
PH
AS
E
II
D O
BB
IN
S
AI
R R
ES
ER
VE
B
AS
E, G
EO
R G
IA
PR
O
JE
C T
N O
FG
W B
-0
FG
W B
-0
P2
CERTIFIED FINAL
J.
P.
AR
IS
TI
ZA
R M
D R
AI
N
AG
E
PL
AN
C-104
-C
-1
(A ).d w g
SHEET NOTES
1. REFER TO SHEETS C-001 AND C-002 FOR PROJECT ABBREVIATIONS,
LEGEND, AND GENERAL, AIRFIELD AND STORM SEWER NOTES.
2. THIS SHEET IS PART OF A MULTI-SHEET SET OF CONSTRUCTION
PLANS AND MUST BE READ WITH THE FULL SET TO BEST ENSURE
PROPER INTERPRETATION.
3. REFER TO SHEETS C-601 - C-606 FOR STORM DRAINAGE
STRUCTURE TABLES.
4. ALL PIPES AND STRUCTURES INDICATED TO BE ABANDONED IN
PLACE SHALL BE COMPLETELY FILLED WITH FLOWABLE FILL.
5. DEPTHS OF SOME EXISTING UTILITIES WHICH ARE NOT NOTED ON
THE PLANS ARE UNKNOWN AND MAY CONFLICT WITH STORM
DRAINAGE AS DESIGNED. NOTIFY COR OF ANY CONFLICTS FOUND.
M A
T C
H L
IN
E
S
E E
S H
E E
T C
-1
M A
T C
H L
IN
E
S
E E
S H
E E
T C
-1
MATCH LINE - SEE SHEET C-110
KEY MAP
CLIN III
C
LI
N I
C101 C102 C103
C104 C105 C106 C107 C108
C110 C111 C112 C113 C114
C116 C117 C118 C119 C120
C122 C123 C124 C125
C127 C128 C129
C130 C131
C109 C115
C121
C126
CLIN IV
C
LI
N
II
SCALE: 1" = 50' 0 25' 50' 100' 150'A1 STORM DRAINAGE PLAN
NORTH
REMOVE AND REPLACE EXISTING 6' CHAIN-LINK
FENCE. MAINTAIN A SECURE AIRFIELD PERIMETER
THROUGHOUT CONSTRUCTION.
REPAIR ERODED SLOPE,
COMPACT THE AREA, AND
RESOD ALL DISTURBED
SECTIONS WITH GEOGRID
REINFORCEMENT.
A1 C-514
B3 C-503
A1 C-514
SOD
REPLACEMENT
SOD REPLACEMENT
APPROXIMATE
DISTANCE 106'
C3 C-502
S-175
HW
DEMOLISH AND REPLACE
HEADWALLL AND INSTALL
SECURITY GRATE
INV IN=971.18 (SW)
A1 C-507
A2 C-508
22 10
25' STATE BUFFER
50' COUNTY BUFFER
75' IMPERVIOUS BUFFER
EX. WETLANDS
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LOD
LOD
LOD
LO
D
LO
DLOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LODLOD
LOD
LOD
LOD
LOD
LO
D
LOD
LOD
LOD
LOD LO
D LOD
LOD
LOD
LOD
LOD
LOD
LOD LOD
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD LO
D
LOD
LOD
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD LOD
LO
D
LO
D
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
PS9
WL8
REINSTALL SALVAGED 6'
CHAIN LINK FENCE IN LINE
WITH EXISTING PERIMETER
FENCE. DISPOSE EXCESS
FENCE OFF BASE PROPERTY.
TANYA NORMAN, P.E.
P.E. No. 0038055, GA
DATE: 01/09/2026 ______________
1 2 3 4 5
A
B
C
D
SHEET ID
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
LO
U
IS
VI
LL
E
D
IS
TR
IC
T
LO
U
IS
VI
LL
E, K
EN
TU
C
KY
-0
P A
R K
W A
Y L
A N
E S
U
IT
E
P
E A
C H
TR
E
E C
O R
N E
R S
, G A
P
H O
N E
(6
) 3
-7
P
O N
D J
O B
N o.
SI
ZE
FI
LE
N
AM
E:
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SO
LI
C
IT
AT
IO
N N
O
C O
N
TR
AC
T
N O
FI
LE
N U
M
BE
R
US Army Corps of Engineers®
Louisville District
FI
LE
P
AT
H : X
:\F Y2
3\
8\
.C
AD
B
IM
\0 4.
.C
AD
PH
S H
EE
TS
\4
4-
C -1
(A
P
LO
TT
ED
: 0
1/
/2
B
Y:
N
O R
M
AN
, T
AN
YA
IS
SU
E D
AT
E:
JA
N
U
AR
Y 9, AN
SI
D
A.
D
U
EH
R
D .M
. L
EC
KI
E
T.
N
O R
M
AN
D
AT
E D
ES
C
R
IP
TI
O
N M
AR
K
R
EP
AI
R
M
AI
N
TA
IN
A
IR
FI
EL
D S
TO
R
M W
AT
ER
S
YS
TE
M
PH
AS
E
II
D O
BB
IN
S
AI
R R
ES
ER
VE
B
AS
E, G
EO
R G
IA
PR
O
JE
C T
N O
FG
W B
-0
FG
W B
-0
P2
CERTIFIED FINAL
J.
P.
AR
IS
TI
ZA
R M
D R
AI
N
AG
E
PL
AN
C-105
-C
-1
(A ).d w g
SEE ENLARGEMENT
PLAN C-401
SHEET NOTES
1. REFER TO SHEETS C-001 AND C-002 FOR PROJECT ABBREVIATIONS
AND GENERAL, AIRFIELD AND STORM SEWER NOTES.
2. THIS SHEET IS PART OF A MULTI-SHEET SET OF CONSTRUCTION
PLANS AND MUST BE READ WITH THE FULL SET TO BEST ENSURE
PROPER INTERPRETATION.
3. REFER TO SHEETS C-601 - C-604 FOR STORM DRAINAGE
STRUCTURE TABLES.
4. ALL PIPES AND STRUCTURES INDICATED TO BE ABANDONED IN
PLACE SHALL BE COMPLETELY FILLED WITH FLOWABLE FILL.
5. REMOVE AND REPLACE FENCE AS REQUIRED. CONTRACTOR MUST
VERIFY EXISTING CONDITIONS OF FENCE PRIOR TO
CONSTRUCTION TO DETERMINE IF FENCE CAN BE SALVAGED AND
REUSED. FENCE SALVAGING MUST BE APPROVED BY COR.
6. FILL EROSION REPAIR AREAS. ASSUME 55 CY OF FILL AT EACH
EROSION AREA.
M A
T C
H L
IN
E
- S E
E S
H E
E T
C -1
MATCH LINE - SEE SHEET C-111
M A
T C
H L
IN
E
S
E E
S H
E E
T C
-1
KEY MAP
CLIN III
C
LI
N I
C101 C102 C103
C104 C105 C106 C107 C108
C110 C111 C112 C113 C114
C116 C117 C118 C119 C120
C122 C123 C124 C125
C127 C128 C129
C130 C131
C109 C115
C121
C126
CLIN IV
C
LI
N
II
SCALE: 1" = 50' 0 25' 50' 100' 150'A1 STORM DRAINAGE PLAN
NORTH
A4 C-505
REMOVE 6' CHAIN LINK FENCE.
REPAIR GRADES FROM EROSION,
COMPACT, AND RESOD AREA
WITH GEOGRID REINFORCEMENT
SALVAGE AND REINSTALL EXISTING 6'
CHAIN LINK FENCE. SECURE AIRFIELD
THROUGHOUT CONSTRUCTION,
PROVIDING A SECURE PERIMETER AT
ALL TIMES.
REPAIR GRADES FROM EROSION,
COMPACT, AND RESOD AREA
WITH GEOGRID REINFORCEMENT
INSTALL RIPRAP
AT INVERT
REMOVE AND SALVAGE EXISTING 6'
CHAIN LINK FENCE. SECURE
AIRFIELD THROUGHOUT
CONSTRUCTION, PROVIDING A
SECURE PERIMETER AT ALL TIMES .
REPAIR ERODED SLOPES, COMPACT THE
AREAS, AND RESOD ALL DISTURBED AREAS
WITH GEOGRID REINFORCEMENT. REMOVE
EXISTING TREES WITHIN THE LIMITS OF
DISTURBANCE.
REPAIR ERODED GRADES, COMPACT THE AREA,
AND RESOD ALL DISTURBED SECTIONS WITH
GEOGRID REINFORCEMENT. REMOVE EXISTING
TREES WITHIN THE LIMITS OF DISTURBANCE.
A1 C-514
A1 C-514
A1 C-514
SOD DISTURBED AREA
REMOVE AND REINSTALL EXISTING 6' CHAIN
LINK FENCE. SECURE AIRFIELD THROUGHOUT
CONSTRUCTION, PROVIDING A SECURE
PERIMETER AT ALL TIMES.
S-150
HW
DEMOLISH AND REPLACE
HEADWALLL AND INSTALL
SECURITY GRATE
INV IN=971.30 (SW)
A1 C-507
A1 C-507
A1 C-507
A1 C-503
A1 C-507
A1 C-507
REMOVE 6' CHAIN
LINK FENCE.
A1 C-514
D
LO
D
LOD
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LOD
LO
DLOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD LOD
LO
DLOD
LOD
LOD
LOD
LODLO
D
LOD
LOD
LOD
1.
159.00'
175'
1011.25
LO
D
LOD
LO
D
LO
D
TANYA NORMAN, P.E.
P.E. No. 0038055, GA
DATE: 01/09/2026 ______________
1 2 3 4 5
A
B
C
D
SHEET ID
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
LO
U
IS
VI
LL
E
D
IS
TR
IC
T
LO
U
IS
VI
LL
E, K
EN
TU
C
KY
-0
P A
R K
W A
Y L
A N
E S
U
IT
E
P
E A
C H
TR
E
E C
O R
N E
R S
, G A
P
H O
N E
(6
) 3
-7
P
O N
D J
O B
N o.
SI
ZE
FI
LE
N
AM
E:
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SO
LI
C
IT
AT
IO
N N
O
C O
N
TR
AC
T
N O
FI
LE
N U
M
BE
R
US Army Corps of Engineers®
Louisville District
FI
LE
P
AT
H : X
:\F Y2
3\
8\
.C
AD
B
IM
\0 4.
.C
AD
PH
S H
EE
TS
\4
4-
C -1
(A
P
LO
TT
ED
: 0
1/
/2
B
Y:
N
O R
M
AN
, T
AN
YA
IS
SU
E D
AT
E:
JA
N
U
AR
Y 9, AN
SI
D
A.
D
U
EH
R
D .M
. L
EC
KI
E
T.
N
O R
M
AN
D
AT
E D
ES
C
R
IP
TI
O
N M
AR
K
R
EP
AI
R
M
AI
N
TA
IN
A
IR
FI
EL
D S
TO
R
M W
AT
ER
S
YS
TE
M
PH
AS
E
II
D O
BB
IN
S
AI
R R
ES
ER
VE
B
AS
E, G
EO
R G
IA
PR
O
JE
C T
N O
FG
W B
-0
FG
W B
-0
P2
CERTIFIED FINAL
J.
P.
AR
IS
TI
ZA
R M
D R
AI
N
AG
E
PL
AN
C-106
-C
-1
(A ).d w g
MATCHLINE-AA
MATCHLINE-AA
SEE ENLARGEMENT
PLAN C-401
SHEET NOTES
1. REFER TO SHEETS C-001 AND C-002 FOR PROJECT ABBREVIATIONS,
LEGEND, AND GENERAL, AIRFIELD AND STORM SEWER NOTES.
2. THIS SHEET IS PART OF A MULTI-SHEET SET OF CONSTRUCTION
PLANS AND MUST BE READ WITH THE FULL SET TO BEST ENSURE
PROPER INTERPRETATION.
3. REFER TO SHEETS C-601 - C-606 FOR STORM DRAINAGE
STRUCTURE TABLES.
4. ALL PIPES AND STRUCTURES INDICATED TO BE ABANDONED IN
PLACE SHALL BE COMPLETELY FILLED WITH FLOWABLE FILL.
5. DEPTHS OF SOME EXISTING UTILITIES WHICH ARE NOT NOTED ON
THE PLANS ARE UNKNOWN AND MAY CONFLICT WITH STORM
DRAINAGE AS DESIGNED. NOTIFY COR OF ANY CONFLICTS FOUND.
M A
T C
H L
IN
E
S
E E
S H
E E
T C
-1
M A
T C
H L
IN
E
- S E
E S
H E
E T
C -1
MATCH LINE - SEE SHEET C-112
KEY MAP
CLIN III
C
LI
N I
C101 C102 C103
C104 C105 C106 C107 C108
C110 C111 C112 C113 C114
C116 C117 C118 C119 C120
C122 C123 C124 C125
C127 C128 C129
C130 C131
C109 C115
C121
C126
CLIN IV
C
LI
N
II
SCALE: 1" = 50' 0 25' 50' 100' 150'A1 STORM DRAINAGE PLAN
NORTH
A4 C-505
INSTALL RIPRAP
AT INVERT
CONTRACTOR MUST PROTECT
FENCING AND GATE FROM DAMAGE
FIRE
ACCESS
FIRE
ACCESS
RESOD DISTURBED AREA
(SEE SHEET CE303)
RESOD DISTURBED AREA
(SEE SHEET CE303)
A2 C-508
S-625
NEW HW
TOP=978.51
INV IN=973.59 (SE)
A1 C-511
6. AREAS OUTSIDE OF SURVEY IS SUPPLEMENTED WITH BASE GIS.
7. ROOF DRAINS TO BE RE-CONNECTED TO NEW PIPE SYSTEM. FIELD
VERIFY LOCATIONS.
8. COORDINATE WITH FACILITY USER THROUGH THE COR FOR
CLOSURE OF DRIVEWAY.
ATLANTIC AVE SE
KEEP ROADWAY OPEN FOR FIRE
ACCESS. TRAFFIC MUST PASS
DURING AND AFTER WORK DUTY
HOURS. PROVIDE TRAFFIC
RATED STEEL PLATE FOR FULL
ACCESS DURING
CONSTRUCTION.
RESTORE PAVEMENT
A3
C-504
RESTORE PAVEMENT
A1
C-504
RESTORE PAVEMENT
SEE NOTES #7 & #8
D1 C-504
OPEN CUT
RESTORE
PAVEMENT
SEE NOTES #7 & #8
C3 C-504
LOD
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D LOD
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LOD
LOD
LO
D
LO
D
LO
D
LO
DLO
D
LO
D
LO
D
LO
D
LOD
LOD
LO
D
LO
D
LO
D
LOD
LOD
LOD
LODLODLOD
LOD
LO
D
LOD
LOD
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LO
D
LO
D
LO
DLO
D
LO
D
LO
D
LO
D
91'
TANYA NORMAN, P.E.
P.E. No. 0038055, GA
DATE: 01/09/2026 ______________
1 2 3 4 5
A
B
C
D
SHEET ID
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
LO
U
IS
VI
LL
E
D
IS
TR
IC
T
LO
U
IS
VI
LL
E, K
EN
TU
C
KY
-0
P A
R K
W A
Y L
A N
E S
U
IT
E
P
E A
C H
TR
E
E C
O R
N E
R S
, G A
P
H O
N E
(6
) 3
-7
P
O N
D J
O B
N o.
SI
ZE
FI
LE
N
AM
E:
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SO
LI
C
IT
AT
IO
N N
O
C O
N
TR
AC
T
N O
FI
LE
N U
M
BE
R
US Army Corps of Engineers®
Louisville District
FI
LE
P
AT
H : X
:\F Y2
3\
8\
.C
AD
B
IM
\0 4.
.C
AD
PH
S H
EE
TS
\4
4-
C -1
(A
P
LO
TT
ED
: 0
1/
/2
B
Y:
N
O R
M
AN
, T
AN
YA
IS
SU
E D
AT
E:
JA
N
U
AR
Y 9, AN
SI
D
A.
D
U
EH
R
D .M
. L
EC
KI
E
T.
N
O R
M
AN
D
AT
E D
ES
C
R
IP
TI
O
N M
AR
K
R
EP
AI
R
M
AI
N
TA
IN
A
IR
FI
EL
D S
TO
R
M W
AT
ER
S
YS
TE
M
PH
AS
E
II
D O
BB
IN
S
AI
R R
ES
ER
VE
B
AS
E, G
EO
R G
IA
PR
O
JE
C T
N O
FG
W B
-0
FG
W B
-0
P2
CERTIFIED FINAL
J.
P.
AR
IS
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .