Addendum #2 Summary: Historic Building Restoration at John Jay Homestead State Historic Site

This Addendum #2 is issued by the New York State Office of Parks, Recreation and Historic Preservation Hudson Valley District, Taconic Region, for Contract D006471, Project ID TA-JJ-2023-01, addressing the Historic Building Restoration at John Jay Homestead State Historic Site with a bid deadline of July 24, 2026. The addendum comprises responses to 35 Requests for Information (RFIs #01-08, 15, 17, 19, 21-22, 24-27, 29-36, 43, 45-46, and 48-49), with nine additional RFIs (RFIs #09-10, 37-42, 44, 47, and 50-51) to be answered in a subsequent addendum. The scope of work includes comprehensive historic building restoration involving wood shingle roof replacement, masonry restoration, interior and exterior finishes, structural repairs, electrical and lighting systems, HVAC upgrades, fire and security systems, utility infrastructure with new transformers and underground electric coordination with New York State Electric and Gas, IT infrastructure and building Wi-Fi, hardscape improvements including chip-seal and bluestone walkways, soil preparation with sod and plantings, heritage tree protection and removals, and site lighting and wayfinding elements. The RFI responses provide clarifications from project consultants including Beyer Blinder Belle Architects & Planners, Landmark Facilities Group, Rhodeside & Harwell Inc., Matrix New World, and Thornton Tomasetti on technical and scope matters regarding electrical service configurations, window restoration specifications, fireplace reconstruction sequencing, excavation procedures, arborist requirements, planting quantities, hazardous materials handling, and material sourcing. The Plan Holders List as of July 23, 2026, identifies 34 bidders confirmed as plan holders for this project.

The addendum includes a comprehensive RFI Log updated as of July 23, 2026, documenting all questions received and their scheduled resolution dates through multiple addenda. Notable clarifications address utility infrastructure specifications requiring the contractor to furnish and install the transformer vault and pad while New York State Electric and Gas furnishes and sets the transformer; electrical work scope eliminating proposed conduit runs between the Carriage Barn and Coachman's House; confirmation that surface-mounted circuiting is acceptable in specified areas with conduit painted to match ceilings; turf sod quantities revised to 982 square feet and turf seed at 19,200 square feet; fireplace restoration utilizing archived stone and marble parts cataloged with specific Roman numeral and letter designations; clarification that Specification Section 028600 hazardous materials scope is identified in Table Three of the Hazardous Materials Investigation Report (Appendix 4); confirmation that Specification Section 096823 Glass Floor Panels is not applicable to the project; and specifications that all lead-containing surface disturbances require adherence to OSHA lead-safe work practices rather than full abatement. The contract involves multiple compliance requirements including Service-Disabled Veteran-Owned Business (SDVOB) goals of 10 percent and Minority/Women Business Enterprise (MWBE) contracting goals of 20 percent for Minority Business Enterprises and 10 percent for Women Business Enterprises, with no incumbent identified from previous substantially similar procurements within the past five years.

View the file

Other files

File Type Posted
D006471_Addendum 03.pdf PDF
D006471 Notice to Bidders.pdf PDF
D006471_Addendum 04.pdf PDF
D006471_Addendum 01.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

HUDSON VALLEY DISTRICT ADDENDUM # 02

New York State Office of Parks, Recreation and Historic Preservation Taconic Region • 9 Old Post Road, Staatsburg, New York 12580 • (845) 889-4100

Palisades Region • Palisades Interstate Parkway, Bear Mountain, NY 10911 • (845) 786-2701 Saratoga Region • 19 Roosevelt Drive, Saratoga Springs, NY 12866 • (518) 584-2535

34 TOTAL PAGES

Historic Building Restoration John Jay Homestead State Historic Site 7.24.2026 Project ID: TA-JJ-2023-01 Contract Number: D006471

General Information:

• Read All Plans, Specifications, and Addenda Carefully.

• IMPORTANT: Acknowledge receipt of all addenda on the bid form when submitting your bid.

• This Addendum is part of the Contract Documents in accordance with the “Instructions to Bidders.”

#1: Contractor Request for Information (RFI) Responses

a. RFIs #01-08, 15, 17, 19, 21-22, 24-27, 29-36, 43, 45-46, and 48-49 in Attached File

b. RFI #09-10, 37-42, 44, 47 and 50-51 to be answered in subsequent Addendum

#2: REFERENCE: D006471 Request for Information (RFI) Log (7.23.2026)

a. RFI log status as of 7.23.2026 in Attached File

#3: REFERENCE: D006471 Plan Holders Log (7.23.2026)

a. Plan Holders Log as of 7.23.2026 in Attached File

ATTACHED FILES:

c. RFI Responses to RFIs #01-08, 15, 17, 19, 21-22, 24-27, 29-36, 43, 45-46, and 48-49

d. RFI Log (7.23.2026)

e. Plan Holders List (7.23.2026)

NYS Office of Parks, Recreation, & Historic Preservation Hudson Valley District, Taconic Regional Office

NYS Office of Parks, Recreation and Historic Preservation Taconic Region

REQUEST FOR INFORMATION (RFI)

OPR-103

Project: Historic Building Restoration at John Jay Homestead State Historic Site

Contract Number: D006471

Request From: Andre Badolato.

Reply Email Address: abadolato@androncc.com

Email Request to :Amanda Tucker, Amanda.Tucker@parks.ny.gov

Request Number: 01 Date: .7-8-26

Spec Section No.: . Drawing No: C-003 and SU-101 .

Remarks:

Question: C-003 shows underground primary underground electric crossing Route 22, SU-101 shows a new utility pole on the Homestead side of road with overhead power running from new pole across Route 22 to the existing pole. Confirm that SU-101 is correct, and that no upset of Route 122 is required.

Answer:

Company: Landmark Facilities Group Response:

SU-101 is correct. There is no underground work on Route 22.

Company: Beyer Blinder Belle Architects & Planners

Refer to response by Landmark Facilities Group.

06/2025 OPR 103

mailto:Amanda.Tucker@parks.ny.gov

REQUEST FOR INFORMATION (RFI)

OPR-103

Project: Historic Building Restoration at John Jay Homestead State Historic Site

Contract Number: D006471

Request From: Andre Badolato.

Reply Email Address: abadolato@androncc.com

Email Request to :Amanda Tucker, Amanda.Tucker@parks.ny.gov

Request Number: 02 Date: .7-8-26

Spec Section No.: . Drawing No: E-002 and SU-101

Remarks:

Question: Riser E-002 indicates electrical contractor to provide primary service from new utility pole to 300 kva transformer. SU-101 only references these as 3 phase primary utility lines. Which is the applicable spec for this service, Appendix 8 or Appendix 15?

Answer:

Company: Landmark Facilities Group Response:

Appendix 8 and 15/16 are duplicates.

Company: Beyer Blinder Belle Architects & Planners

Appendix 8 & 15 are duplicates. Refer to Appendix 15 and disregard Appendix 8.

REQUEST FOR INFORMATION (RFI)

OPR-103

Project: Historic Building Restoration at John Jay Homestead State Historic Site

Contract Number: D006471

Request From: Andre Badolato.

Reply Email Address: abadolato@androncc.com

Email Request to :Amanda Tucker, Amanda.Tucker@parks.ny.gov

Request Number: 03 Date: .7-8-26

Spec Section No.: . Drawing No: E-303 & E-304

Remarks:

Question: What is the scale of Drawings E-303 and E-304?

Answer:

Company: Landmark Facilities Group Response:

1/4"=1'-0"

Company: Beyer Blinder Belle Architects & Planners

REQUEST FOR INFORMATION (RFI)

OPR-103

Project: Historic Building Restoration at John Jay Homestead State Historic Site

Contract Number: D006471

Request From: Andre Badolato.

Reply Email Address: abadolato@androncc.com

Email Request to :Amanda Tucker, Amanda.Tucker@parks.ny.gov

Request Number: 04 Date: .7-8-26

Spec Section No.: . Drawing No: E-160

Remarks:

Question: There is new electrical work shown at the Coachman’s House, with a new 2” PVC conduit with (2) 12 strand fiber run between the Carriage Barn and the Coachman Racks. Is this work required, it does not appear on any site utility drawing?

Where is the Carriage Barn Rack located within the building? Are there any ceiling upset required to route this conduit?

Where are all the new outlets in the Coachman’s House terminating?

There is a new floor outlet in Office 03. What is the existing slab and floor finish, we will need to trench for this new conduit/wiring.

Answer:

Company: Landmark Facilities Group Response:

There will be no electrical work between the Carriage Barn and Coachman's House and no rack required in the Carriage House. Detail on E-160 should have been removed. Tel/data outlets in the Coachman's House to terminate in the rack in Office 01. The floor in Office 03 is wood. The conduits can be run at the ceiling of the basement below.

Company: Beyer Blinder Belle Architects & Planners

Refer to response by Landmark Facilities Group dated 7/21/2026.

REQUEST FOR INFORMATION (RFI)

OPR-103

Project: Historic Building Restoration at John Jay Homestead State Historic Site

Contract Number: D006471

Request From: Andre Badolato.

Reply Email Address: abadolato@androncc.com

Email Request to :Amanda Tucker, Amanda.Tucker@parks.ny.gov

Request Number: 05 Date: .7-8-26

Spec Section No.: . Drawing No: E-103 & E-203

Remarks:

Question: It appears that new circuiting is called to be run to Panel P3, on both E-103 and E-

203. What are the existing ceiling finishes, these rooms are NOT shown on the A-750 Finish Schedule. Can these circuits be run surface mount, or do they require concealment behind finishes?

Response:

Circuiting may be surface mounted.

Company: Beyer Blinder Belle Architects & Planners

Ceiling work is limited at the third floor. Refer to response by Landmark Facilities Group.

REQUEST FOR INFORMATION (RFI)

OPR-103

Project: Historic Building Restoration at John Jay Homestead State Historic Site

Contract Number: D006471

Request From: Andre Badolato.

Reply Email Address: abadolato@androncc.com

Email Request to :Amanda Tucker, Amanda.Tucker@parks.ny.gov

Request Number: 06 Date: .7-8-26

Spec Section No.: . Drawing No:E-200

Remarks:

Question: Can the circuiting for the FX12 fixtures at Breezeway B-19, and the F1 fixtures at Kitchen B-7, be run surface mount, or does this circuiting need to be concealed behind historic WD-5 ceiling?

Where is Panel LCP1 (the lights in Kitchen B-7 are circuited to this panel), it cannot be found on drawings.

Response:

Circuiting may be surface mounted in the breezeway and Kitchen B-7. Please paint conduit to match ceiling.

There is no panel LCP1 as this is a carryover from a previous concept that was not removed. The F1 fixtures in Kitchen B-7 are part of the exhibit space and should be tied into the main lighting control system. Please refer to Appendix 11 for the lighting control narrative.

Company: Beyer Blinder Belle Architects & Planners

REQUEST FOR INFORMATION (RFI)

OPR-103

Project: Historic Building Restoration at John Jay Homestead State Historic Site

Contract Number: D006471

Request From: Andre Badolato.

Reply Email Address: abadolato@androncc.com

Email Request to :Amanda Tucker, Amanda.Tucker@parks.ny.gov

Request Number: 07 Date: .7-8-26

Spec Section No.: . Drawing No:E-201

Remarks:

Question: Can the circuiting for the F3, EX, existing picture lights and LE fixtures be run in the attic space above the ballroom? Do finish ceilings or walls need to be upset to accomplish this work?

Lights (F1, F10, F10B) lights in Room 103, 106, 101, 104, 109, 110, 105, 115, 115A, 116 are not circuited. What is the power source for these lights?

There are several junction boxes called for in General Note 2. Are these powered back to a source, and if so what source(s)? Or is just a new junction box required?

Response:

Circuiting for the F3, EX, picture lights and LE fixtures may be run in the attic above the ballroom.

MC cabling is permitted to reduce/eliminate disturbance to the ceilings/walls to accomplish this.

The F1, F10 and F10B fixtures are powered through the lighting control system. Power can be obtained from Panel P1 in the basement.

Junction boxes for owner furnished fixtures on first floor should all be wired to a single zone back to the central lighting control system.

Company: Beyer Blinder Belle Architects & Planners

REQUEST FOR INFORMATION (RFI)

OPR-103

Project: Historic Building Restoration at John Jay Homestead State Historic Site

Contract Number: D006471

Request From: Andre Badolato.

Reply Email Address: abadolato@androncc.com

Email Request to :Amanda Tucker, Amanda.Tucker@parks.ny.gov

Request Number: 08 Date: .7-8-26

Spec Section No.: 329115 . Drawing No:

Remarks:

Question: The soil preparation spec 329115 indicates all planting soils are to be imported and amended. If we have excess topsoil, may we reuse existing topsoil for soil preparation? If not, how are we disposing of excess topsoil?

Company: Rhodeside & Harwell Inc.

Response:

Soil testing during the design phase indicated shallow topsoil profiles and poor soil conditions.

To ensure successful planting outcomes, all new planting will be in imported topsoil as indicated on Sheet L-601. Existing soil excavated for new planting bed to be disposed of as per section 3.5 of the Soil Preparation spec.

Company: Beyer Blinder Belle Architects & Planners

Refer to response by RHI.

REQUEST FOR INFORMATION (RFI)

OPR-103

Project: Historic Building Restoration at John Jay Homestead State Historic Site

Contract Number: D006471

Request From: Andre Badolato.

Reply Email Address: abadolato@androncc.com

Email Request to :Amanda Tucker, Amanda.Tucker@parks.ny.gov

Request Number: 15 Date: 7-9-26

Spec Section No.: Drawing No: A-101, 9 thru 13/A-401

Remarks:

Question: At Dining Room 104, we are called to remove chair rail and provide patch repair. Are we patching the chair rail, or the wall behind it, or both? Is the chair rail being salvaged and reinstalled?

Clarify scope here.

Company: Beyer Blinder Belle Architects & Planners, Katrina Knudsen Response:

At all locations where chair rail removal and patch repair are indicated, the existing chair rail shall be removed and not reinstalled. Patch repair shall be performed at the chair rail removals to provide a smooth transition with the existing wall surfaces above and below, in accordance with Repair P-R3 in the Repair Glossary as noted. Approximate extents of repair are indicated on the drawings. This condition occurs at Dining Room 104, South Parlor 102, Main Hall 101, and Rear Hall 105, and applies to all locations where chair rail removal and wall patching are indicated in the documents.

REQUEST FOR INFORMATION (RFI)

OPR-103

Project: Historic Building Restoration at John Jay Homestead State Historic Site

Contract Number: D006471

Request From: Andre Badolato.

Reply Email Address: abadolato@androncc.com

Email Request to :Amanda Tucker, Amanda.Tucker@parks.ny.gov

Request Number: 17 Date: 7-9-26

Spec Section No.: 013500 Drawing No: A-654

Remarks:

Question: Specification 013500 indicates (paragraph 1.3C) that all excavation within 24 inches of the structure will be performed by hand tools only. We are exposing a considerable amount of basement rubble wall to perform waterproofing work. Please confirm if all excavation required to perform our work can be done by machine.

Answer:

Company: Beyer Blinder Belle Architects & Planners Response:

Machine excavation is acceptable within 24 inches of the Bedford House north courtyard basement rubble wall to perform waterproofing work, given that the structural integrity of the foundation is not affected. Written authorization shall be obtained in accordance with Specification Section 01 35 00, Paragraph 1.3.C, prior to commencing machine excavation within this area.

REQUEST FOR INFORMATION (RFI)

OPR-103

Project: Historic Building Restoration at John Jay Homestead State Historic Site

Contract Number: D006471

Request From: Andre Badolato.

Reply Email Address: abadolato@androncc.com

Email Request to :Amanda Tucker, Amanda.Tucker@parks.ny.gov

Request Number: 19 Date: 7-9-26

Spec Section No.: 083000 Drawing No: A-751

Remarks:

Question: Confirm that the Window Restoration is guided by the Restoration Notes on A-751, and not the repair notes shown in Specification 083000-1.1B. The two appear to be different.

Response:

Window restoration requirements are coordinated between Sheet A-751 and Specification Section 080300, Part 1.1.B. The restoration level requirements shown on Sheet A-751 are consistent with the Specification and provide supplemental information, including estimated repair quantities and window-specific restoration requirements. The Contract Documents shall be read together.

REQUEST FOR INFORMATION (RFI)

OPR-103

Project: Historic Building Restoration at John Jay Homestead State Historic Site

Contract Number: D006471

Request From: Andre Badolato.

Reply Email Address: abadolato@androncc.com

Email Request to :Amanda Tucker, Amanda.Tucker@parks.ny.gov

Request Number: 21 Date: 7-9-26

Spec Section No.: Drawing No: E-002

Remarks:

Question: Who is furnishing the 300kva utility transformer shown on E-002? Who is installing the 300 kva utility transformer on E-002? Who is furnishing and installing any required vault under the transformer pad?

Landmark Facilities Group, Eleanor Lynn

Jul 22, 2026, 3:19 PM

Contractor to furnish and install the transformer vault/pad. NYSEG to furnish and set the transformer and make final connections at the transformer.

Beyer Blinder Belle Architects & Planners, Katrina Knudsen

Jul 22, 2026, 4:06 PM

Refer to response from Landmark Facilities Group dated 7/22/2026.

REQUEST FOR INFORMATION (RFI)

OPR-103

Project: Historic Building Restoration at John Jay Homestead State Historic Site

Contract Number: D006471

Request From: Andre Badolato.

Reply Email Address: abadolato@androncc.com

Email Request to :Amanda Tucker, Amanda.Tucker@parks.ny.gov

Request Number: 22 Date: 7-9-26

Spec Section No.: Drawing No: H-100

Remarks:

Question: Are the crawlspace areas (where work is required) confined spaces, as defined by OSHA?

Where is the access point(s) for these crawlspaces, they do not appear on the drawings. How tall is the space (floor to structure)?

Response:

The crawl spaces are accessed from Basement Room B-16. North crawl space access is approximately 56"H × 24"W, and south crawl space access is approximately 60"H × 43"W. The interior dimensions of the crawl spaces are generally similar to the access dimensions.

Dimensions are approximate and exclude existing ducts, piping, conduit, electrical equipment, and other obstructions within the crawl spaces.

REQUEST FOR INFORMATION (RFI)

OPR-103

Project: Historic Building Restoration at John Jay Homestead State Historic Site

Contract Number: D006471

Request From: Andre Badolato.

Reply Email Address: abadolato@androncc.com

Email Request to :Amanda Tucker, Amanda.Tucker@parks.ny.gov

Request Number: 24 Date: 7-9-26

Spec Section No.: Appendix 13 Drawing No: A-660

Remarks:

Question: The photos in Appendix 13 of the fireplace stone/marble do not list the Room number where the material was taken. How do we relate the pieces shown in the photos, to the pieces shown on A-660? Clarify scope here, are the stones/marble shown in the photos lying loose on site, ready to be cleaned, patched and reinstalled, or are we REMOVING the pieces shown at the fireplaces on A- 660, then restoring them. The stones/marble on A-660 have definitive part numbers, have they already been removed and cataloged, then reinstalled? What is the scope of REMOVALS with regard to these fireplaces.

Response:

The Owner has archived stone/marble parts in storage for restoration/reinstallation. The parts cataloged for reconstruction are not present in the existing fireplaces. Removal and salvage of existing fireplace materials are indicated on the Demolition Plans and Sheet A-660.

The fireplace reconstruction drawings on Sheet A-660 identify each stone/marble element using the archived part designations shown in Appendix 13. Each part is identified by a Roman numeral (I, II, III, or IV). Individual pieces within each part are identified by a letter suffix (e.g., I- A, II-B, III-C). Archived boxed pieces are identified with a "B" prefix (e.g., BII-A). The designations shown on Sheet A-660 correspond directly to the labeled archived pieces in Appendix 13 and are coordinated between the drawings and the archived materials.

REQUEST FOR INFORMATION (RFI)

OPR-103

Project: Historic Building Restoration at John Jay Homestead State Historic Site

Contract Number: D006471

Request From: Andre Badolato.

Reply Email Address: abadolato@androncc.com

Email Request to :Amanda Tucker, Amanda.Tucker@parks.ny.gov

Request Number: 25 Date: 7-9-26

Spec Section No.: Drawing No: A-651

Remarks:

Question: See Detail 1/A-651. There appears to be some type of sheathing above the 1 x 4 nailing strips and below the 30 pound felt that is unidentified. Please identify this material, and applicable specification.

Response:

Detail 1/A-651 identifies an eave protection membrane (ice and water shield) installed below the felt underlayment. Refer to Specification Section 07 31 29, Part 2.1.D for the specified self-adhered eave protection membrane.

Spaced 1x4 nailers shall transition to continuous solid substrate within the limits of the protection membrane. Wood shingle details will be revised for clarity identifying limits of membrane.

REQUEST FOR INFORMATION (RFI)

OPR-103

Project: Historic Building Restoration at John Jay Homestead State Historic Site

Contract Number: D006471

Request From: Andre Badolato.

Reply Email Address: abadolato@androncc.com

Email Request to :Amanda Tucker, Amanda.Tucker@parks.ny.gov

Request Number: 26 Date: 7-9-26

Spec Section No.: Drawing No: A-651

Remarks:

Question: See Detail 1/A-651. There appears to be some type of sheathing above the 1 x 4 nailing strips and below the 30 pound felt that is unidentified. Please identify this material, and applicable specification.

Refer to response to RFI #25.

REQUEST FOR INFORMATION (RFI)

OPR-103

Project: Historic Building Restoration at John Jay Homestead State Historic Site

Contract Number: D006471

Request From: Andre Badolato.

Reply Email Address: abadolato@androncc.com

Email Request to :Amanda Tucker, Amanda.Tucker@parks.ny.gov

Request Number: 27 Date: 7-9-26

Spec Section No.: Drawing No:

Remarks:

Question: Please provide the contact information for the current vendor that maintains and/or renovates the existing sprinkler system in the Bedford House.

Response:

The fire suppression system manufacturer is Marrioff.

The system was installed by United Fire Protection 908-688-0300

Company: New York State Parks, Recreation & Historic Preservation Response:

The sprinkler system was installed and is maintained by United Fire Protection as indicated by Landmark Facilities Group.

The VESDA detection system was installed and is maintained by Everon (formerly ADT) - (877) 357-1808

Company: Beyer Blinder Belle Architects & Planners

See response from Landmark Facilities Group and NYS Parks.

REQUEST FOR INFORMATION (RFI)

OPR-103

Project: Historic Building Restoration at John Jay Homestead State Historic Site

Contract Number: D006471

Request From: Andre Badolato.

Reply Email Address: abadolato@androncc.com

Email Request to :Amanda Tucker, Amanda.Tucker@parks.ny.gov

Request Number: 29 Date: 7-9-26

Spec Section No.: 096823 Drawing No:

Remarks:

Question: Confirm Spec 096823 Glass Floor Panels is not applicable to this project.

Response:

Specification Section 096823 Glass Floor Panels is not applicable to project and not included in Contract Documents.

REQUEST FOR INFORMATION (RFI)

OPR-103

Project: Historic Building Restoration at John Jay Homestead State Historic Site

Contract Number: D006471

Request From: Andre Badolato.

Reply Email Address: abadolato@androncc.com

Email Request to :Amanda Tucker, Amanda.Tucker@parks.ny.gov

Request Number: 30 Date: 7-9-26

Spec Section No.: 028600 Drawing No:

Remarks:

Question: Clarify scope of work applicable to Spec 028600. No quantities or scope tables appear in this spec, and scope cannot be identified on the drawings.

Company: Matrix New World Response:

Table three of the report has this information. Matrix has not been involved in this project since 2024-2025 and it is possible that design aspects have changed and additional removals may now be necessary.

Company: Beyer Blinder Belle Architects & Planners Response:

Refer to table three (Appendix 4 - Hazardous Materials Investigation Report) per response by Matrix.

REQUEST FOR INFORMATION (RFI)

OPR-103

Project: Historic Building Restoration at John Jay Homestead State Historic Site

Contract Number: D006471

Request From: Andre Badolato.

Reply Email Address: abadolato@androncc.com

Email Request to :Amanda Tucker, Amanda.Tucker@parks.ny.gov

Request Number: 31 Date: 7-15-26

Spec Section No.: Drawing No: L-412

Remarks:

Question: The area directly adjacent to the 3 parking spaces (in the new lot) has a hatch pattern that does not match any of the key patterns at the top right of this drawing. Clarify scope where this specific hatching occurs.

Rhodeside & Harwell Inc., Jeff Dragan

• Not sure which drawing is being referenced. Drawing L-412 Enlarged Planting Plans (2 of 2) describes in detail proposed planting around the 2 new handicap parking spaces to the east of Bedford house.

Beyer Blinder Belle Architects & Planners, Noerah Alvi

• Refer to response by RHI.

REQUEST FOR INFORMATION (RFI)

OPR-103

Project: Historic Building Restoration at John Jay Homestead State Historic Site

Contract Number: D006471

Request From: Andre Badolato.

Reply Email Address: abadolato@androncc.com

Email Request to :Amanda Tucker, Amanda.Tucker@parks.ny.gov

Request Number: 32 Date: 7-15-26

Spec Section No.: Drawing No: L-411, L-412, L-002

Remarks:

Question: L-002 lists 780 sf of turf sod. There seems to be a large discrepancy between schedule and plans. L-411 appears to show turf sod at the new water line to exterior ground hydrant (at south side of the ballroom) and at the north courtyard. L-412 appears to show turf sod in 3 separate locations adjacent to the parking lot and plantings. Confirm that these are the only turf sod on project. If so, this area is much larger than quantity shown on schedule. Which is correct?

What scope of work is required, if any, at the “EX LAWN TO REMAIN” at the south and west side of the Ballroom?

Response:

The amount of sod is 982 sf including the front terrace lawn and this should be the bid amount.

The attached plans should clarify turf sod and turf seed areas No proposed work in 'Existing lawn to remain' areas. But, if damaged during construction, repair is required at no additional cost.

Company: Beyer Blinder Belle Architects & Planners

Refer to response by Rhodeside & Harwell Inc.

3.NYS Office of Parks, Recreation and Historic Preservation

Taconic Region

REQUEST FOR INFORMATION (RFI)

OPR-103

Project: Historic Building Restoration at John Jay Homestead State Historic Site

Contract Number: D006471

Request From: Andre Badolato.

Reply Email Address: abadolato@androncc.com

Email Request to :Amanda Tucker, Amanda.Tucker@parks.ny.gov

Request Number: 33 Date: 7-15-26

Spec Section No.: Drawing No: L-411, L-412, L-002, L-601

Remarks:

Question: L-002 lists 19,520 sf of turf seed, but plans L-411 and L-412 appear to have much less than that highlighted with the hatching for turf seed. Which should be carried in this bid?

Confirm that detail A7/L-601 is the applicable detail to Turf Seed designation as shown on L-411 and L-412.

Please provide typical detail for Turf Sod designation as shown on L-411 and L-412.

Response:

After double checking, the amount of turf seed is 19,200 as shown on L-002.

Detail A7/L601 is applicable for both turf sod and turf seed. Future amendments to the drawing will label the vegetation as both turf seed and turf sod

Company: Beyer Blinder Belle Architects & Planners

Refer to response by Rhodeside & Harwell Inc.

REQUEST FOR INFORMATION (RFI)

OPR-103

Project: Historic Building Restoration at John Jay Homestead State Historic Site

Contract Number: D006471

Request From: Andre Badolato.

Reply Email Address: abadolato@androncc.com

Email Request to :Amanda Tucker, Amanda.Tucker@parks.ny.gov

Request Number: 34 Date: 7-15-26

Spec Section No.: 015639 Drawing No:

Remarks:

Question: Spec 015639-1.7A appears to require a certified arborist, but there does not appear to be any scope of work for existing trees, other than removing them, and placing protection fence around existing trees that remain. Is an arborist required? If so, who is providing, and paying for the arborist?

If required, please specify what the arborist’s responsibilities are, as implied in Spec 015639- 1.7B.

Response:

The removal of the large trees indicated on the drawing requires a contractor that must conform to spec section 015639, 1.5 and 1.6 Information Submittals and Quality Assurance.

Company: Beyer Blinder Belle Architects & Planners

REQUEST FOR INFORMATION (RFI)

OPR-103

Project: Historic Building Restoration at John Jay Homestead State Historic Site

Contract Number: D006471

Request From: Andre Badolato.

Reply Email Address: abadolato@androncc.com

Email Request to :Amanda Tucker, Amanda.Tucker@parks.ny.gov

Request Number: 35 Date: 7-15-26

Spec Section No.: Drawing No: L-101

Remarks:

Question: Please clarify the Plant Removal Legend on L-101. Only two types are shown on plans, some trees with the L designation, and one tree with the M designation. The description of work is one long paragraph, and some of the trees are not Magnolias as described. What is the scope of work for each designation (L and M), and which specification (in the description) is being referred to, regarding cutting of the tree(s)?

Response:

The 'L' designation refers to Linden trees, the 'M' refers to the Magnolia. The scope for both types of trees is as described in the Plant Removal Legend on L-101

Company: Beyer Blinder Belle Architects & Planners

REQUEST FOR INFORMATION (RFI)

OPR-103

Project: Historic Building Restoration at John Jay Homestead State Historic Site

Contract Number: D006471

Request From: Andre Badolato.

Reply Email Address: abadolato@androncc.com

Email Request to :Amanda Tucker, Amanda.Tucker@parks.ny.gov

Request Number: 36 Date: 7-15-26

Spec Section No.: Drawing No: M-300

Remarks:

Question: Is FC-3 new or existing, schedule on M-300 implies new, plan M-100 indicates existing unit?

Landmark Facilities Group, Adam Dziejma

Jul 22, 2026, 1:47 PM

FC-3 finally was decided to be replaced with new one. I’m sorry for Typo. This is new unit (as per schedules and diagrams with existing ductwork.

Beyer Blinder Belle Architects & Planners, Katrina Knudsen

Jul 22, 2026, 4:05 PM

Refer to response by Landmark Facilities Group dated 7/22/2026 indicating FC-3 as a new unit.

REQUEST FOR INFORMATION (RFI)

OPR-103

Project: Historic Building Restoration at John Jay Homestead State Historic Site

Contract Number: D006471

Request From: Andre Badolato.

Reply Email Address: abadolato@androncc.com

Email Request to :Amanda Tucker, Amanda.Tucker@parks.ny.gov

Request Number: 43 Date: 7-15-26

Spec Section No.: Drawing No: H-101

Remarks:

Question: Keynote Codes M1 is shown on almost all walls of Ballroom 123 and some walls of Porch 124. Clarify what materials are being removed in Note M1. Is the M1 intended to highlight the floors at the hatched areas, the walls along the hatched areas, or the ceilings at the hatched areas? Clarify the M1 scope.

Answer:

Company: Matrix New World Response:

The M1 note is to remove materials affected with visible microbial growth (varies by room but is primarily plaster). In Ballroom 123 there are plaster walls and ceilings. At the time of our inspection(s) August 2023, September 2023, and January 2024, the microbial growth was noted on the lower ceiling / upper wall (where the two components meet). Unfortunately, if the source of the water intrusion (roofing system) has not been addressed, it is likely that these conditions have worsened and spread over the past year and a half.

Company: Beyer Blinder Belle Architects & Planners

Refer to response by Matrix New World.

REQUEST FOR INFORMATION (RFI)

OPR-103

Project: Historic Building Restoration at John Jay Homestead State Historic Site Contract Number: D006471 Request From: Andre Badolato.

Reply Email Address: abadolato@androncc.com Email Request to :Amanda Tucker, Amanda.Tucker@parks.ny.gov Request Number: 45 Date: 7-20-26 Spec Section No.: Drawing S-902 Remarks:

Question: Clarify the intent of the two numbered notes and the “Note” shown on Detail 9/S-902.

Where are we obtaining salvaged brick on this project, of quality sufficient to re-use? How is this information to be incorporated into our bid?

Company: Thornton Tomasetti Response:

Disregard all notes. Refer to architectural for brick to be used where required to reinstate failed units.

Company: Beyer Blinder Belle Architects & Planners

Refer to response from Thornton Tomasetti.

REQUEST FOR INFORMATION (RFI)

OPR-103

Project: Historic Building Restoration at John Jay Homestead State Historic Site

Contract Number: D006471

Request From: Andre Badolato.

Reply Email Address: abadolato@androncc.com

Email Request to :Amanda Tucker, Amanda.Tucker@parks.ny.gov

Request Number: 46 Date: 7-20-26

Spec Section No.: Drawing A-504, S-910

Remarks:

Question: Details 5/A-504 and 2/A-504 shows numerous “lift support posts” and refers us to the Structural drawings. Confirm 5/S-910 is the applicable base detail at these lift posts.

Company: Thornton Tomasetti Response:

Correct - 5/S-910 is the applicable base detail at these lift posts.

Company: Beyer Blinder Belle Architects & Planners

Refer to response by Thornton Tomasetti.

REQUEST FOR INFORMATION (RFI)

OPR-103

Project: Historic Building Restoration at John Jay Homestead State Historic Site

Contract Number: D006471

Request From: Andre Badolato.

Reply Email Address: abadolato@androncc.com

Email Request to :Amanda Tucker, Amanda.Tucker@parks.ny.gov

Request Number: 48 Date: 7-20-26

Spec Section No.: Drawing

Remarks:

Question: Several wood floor restoration contractors were unable or did not attend the site walkthrough and have asked to see the site, to examine the existing wood floors. Can a time be arranged for this inspection?

Company: New York State Parks, Recreation & Historic Preservation Response:

Access to the interior of Bedford House may be arranged by contacting Amanda Tucker (Amanda.Tucker@parks.ny.gov). The site and grounds are open to the public daily from sunrise until sunset.

Company: Beyer Blinder Belle Architects & Planners

Refer to response by NYS Parks.

REQUEST FOR INFORMATION (RFI)

OPR-103

Project: Historic Building Restoration at John Jay Homestead State Historic Site

Contract Number: D006471

Request From: Andre Badolato.

Reply Email Address: abadolato@androncc.com

Email Request to :Amanda Tucker, Amanda.Tucker@parks.ny.gov

Request Number: 49 Date: 7-20-26

Spec Section No.: 028304, 028600 Drawing

Remarks:

Question:

1) Spec 028304 does not call for SPECIFIC items in this building to be abated, but implies

HAZMAT removal (suits, respirators, plastic protections, containment, disposal, etc) for lead containing items, and indicates that ALL painted surfaces are assumed to contain a detectable concentration of lead. Nearly EVERY piece of wood on this project is painted or called to sanded and painted (see W-R1 thru W-R8 repair codes on G-102). Does all the wood repair work need to occur under THIS specification?

2) What exactly are we removing or abating per Spec 028600? There are no quantities listed in this specification, and nothing mentioned on the drawings.

Answer:

Company: Matrix New World Response:

1.) All painted surfaces are assumed to contain detectable concentrations of Pb because Lead testing was not performed (at least by Matrix).

However, this specification is not calling for abatement of Pb. The spec is for incidental disturbance of lead containing materials. It does not require removal or stripping of coatings from the wood, or treatment of each component as an abatement item. It requires that whenever assumed-LCP surfaces are disturbed, the work be performed using the lead-safe work practices, worker protection, dust and debris controls, cleanup, and waste disposal specified herein and under OSHA 29 CFR 1926.62.

2.) Information for Spec 028600 can be found in table 3 of the report. Additional removals may have been added to the project since Matrix's involvement (2024-2025)

Company: Beyer Blinder Belle Architects & Planners Response:

Refer to response by Matrix New World. The report can be found in Appendix 4 of specifications.

RFI Log PROJECT: D006292 Historic Building Restoration

John Jay Homestead SHS

UPDATED: 7.23.2026 (4:00PM EST)

RFI NO. SHEET DESCRIPTION RECEIVED RETURNED

RFI 01 C-003 Confirmation of overhead power over Rt. 22 for new pole. 7/10/2026 Addendum #2 RFI 02 E-002 Confirmation of applicable spec for new power service 7/10/2026 Addendum #2 RFI 03 E-303, E-304 What is the scale of drawings? 7/10/2026 Addendum #2 RFI 04 E-160 Clarification on scope of utility work at Coachmen's house and Carriage Barn 7/10/2026 Addendum #2 RFI 05 E-103, E-203 Clarification on new circuiting installation in regard to ceiling finishes 7/10/2026 Addendum #2 RFI 06 E-200 Clarification new circuiting installation at Kitchen B-7 in regard to ceiling finishes and Panel LCP 7/10/2026 Addendum #2 RFI 07 E-201 Clarification on new light fixtures and junction boxes 7/10/2026 Addendum #2 RFI 08 329115 Clarification on requirements for new topsoil and disposal of excess 7/10/2026 Addendum #2 RFI 09 E-202 Clarification on new light fixtures, junction boxes, and power source 7/10/2026 RFI 10 A-701, A-702 Replacement of windows pulleys and sash weights for Type A windows. 7/10/2026 RFI 11 General Cond Clarification on requirement of temporary security fencing 7/10/2026 Addendum #1 RFI 12 Appendix 5 Clarification on tree work as show in Tree Survey 7/10/2026 Addendum #1 RFI 13 A-654 Clarification on requirement of stone foundation wall shoring for excavation 7/10/2026 Addendum #1 RFI 14 Confirmation of project being tax exempt 7/10/2026 Addendum #1 RFI 15 A101, A-401 Clarification on scope of wall patching at chair rail 7/10/2026 Addendum #2 RFI 16 A-730 Clarification on whether plaster board for skim coat is new or existing 7/10/2026 Addendum #1 RFI 17 A-654, 013500 Clarification on requirement of hand tools for excavation work within 24" 7/10/2026 Addendum #2 RFI 18 L-411, L-412, 013500 Confirmation on scope of "GLQ" plantings 7/10/2026 Addendum #1 RFI 19 A-751, 083000 Clarification on notes guiding window restoration 7/10/2026 Addendum #2 RFI 20 312000 Confirmation of suitability of existing onsite materials for site infill 7/10/2026 Addendum #1 RFI 21 E-002 Clarification on scope of transformer, vault, and transformer pad 7/10/2026 Addendum #2 RFI 22 H-100 Clarification on possible confined spaces as per OSHA standards 7/10/2026 Addendum #2 RFI 23 Clarification on how rock discovered during excavation will be handled 7/10/2026 Addendum #1 RFI 24 A-660, Appendix 13 Clarification on scope of restoration of marble fireplaces 7/10/2026 Addendum #2 RFI 25 1/A-651 Clarification of material and application specification shown above the 1x4 nailing strips 7/10/2026 Addendum #2 RFI 26 Same as RFI 25 7/10/2026 Addendum #2 RFI 27 Contact information for current vender of sprinkler system 7/10/2026 Addendum #2 RFI 28 PLA Agreement Clarification on how specialty/artisan contracts can be attained with regard to PLA 7/10/2026 Addendum #1 RFI 29 96823 Confirmation on whether Spec 096823 Glass Floor Plans is applicable to project 7/10/2026 Addendum #2 RFI 30 28600 Clarification on scope of work application to Spec 028600 7/10/2026 Addendum #2 RFI 31 L-412 Clarification on scope of hatched area 7/16/2026 Addendum #2 RFI 32 L-411, L-412, L-002 Clarification on extent of scope of turf sod and lawn 7/16/2026 Addendum #2 RFI 33 L-411-L-412, L-002, L-601 Clarification on extent of scope of turf seed 7/16/2026 Addendum #2 RFI 34 015639 Clarification on requirements for arborist 7/16/2026 Addendum #2 RFI 35 L-101 Clarification on scope of tree removal work 7/16/2026 Addendum #2 RFI 36 M-300 Clarification on FC-3 Unit 7/16/2026 Addendum #2 RFI 37 C-100 Clarification on scope of underground gutter system 7/16/2026 RFI 38 E-160 Clarification on scope of fiber work and wall/ceiling repair in Coachmen and Carriage Barn 7/16/2026 RFI 39 A-751 & Building Elevations Clarification on scope of shutter work 7/16/2026 RFI 40 A-751 & Building Elevations Clarification on scope of window repair work 7/16/2026 RFI 41 A-701, A-702 Clarification on scope of window pulleys and sash weights 7/16/2026 RFI 42 M-001 Clarification on applicability of drawing sheets 7/16/2026 RFI 43 H-101 Clarification on extent of removal materials for note M1 7/16/2026 Addendum #2 RFI 44 G-101 Clarification on extent of plaster bonding agent and skim coat 7/16/2026

RFI 45 S-902 Clarification of note regarding use of salvaged brick 7/20/2026 Addendum #2 RFI 46 A-504, S-910 Confirmation of applicable detail for lift support posts 7/20/2026 Addendum #2 RFI 47 96816 Request for carpet installation scope to be removed from contract 7/20/2026 RFI 48 Request for tour of the site 7/20/2026 Addendum #2 RFI 49 028304, 028600 Clarification of abatement scope 7/20/2026 Addendum #2 RFI 50 RFI 20 (140) Request for further clarification on suitability of onsite materials. 7/20/2026 RFI 51 060312, A-751 Request for clarification on sash restoration methodology 7/21/2026

Contract Number:

Project Name:

CTS ID:

# First Name Last Name Bidder Company Name Address 1 City State Zip Phone Email Contact

Confirmed (Y/N)

Addendum 1 7/17/2026

1 Oleg Shayko Padilla Construction Services 299 Main Street Westbury NY 11590 516-338-6848 oleg.shayko@pcscst.com Yes Yes 2 Joel Foley Andron Construction Corp. 21 Anderson Lane Goldens Bridge NY 10526 914-232-7531 JFoley@androncc.com Yes Yes 3 Sarah Cossette Meyer Contracting Corp 17 Charles Street Pleasant Valley NY 12569 845-723-5126 sarah@meyercontracting.com Yes Yes 4 Elaine Pellegrin Mid-State Industries 27 Airport Road Glenville NY 12302 518-374-1461 EPellegrin@midstateltd.com Yes Yes 5 Fazal Mahmood Nafees Construction Corp 55 Josephine Street Staten Island NY 10314 718-207-6228 fmklcc@hotmail.com Yes 6 Prajwala Nandan Cube Construction Services LLC 167 Main Street Woodbridge NJ 7095 908-708-0393 prajwala.n@cubecsllc.com Yes 7 Sandy Jenkins NovaTech 1401 Nobel Street Sainte-Julie QC J3E1Z4 Can315-813-7887 sjenkins@novatechnologiesgrp.com 8 Steve Mgrditchian Pierotti Corp. 84 Calvert Street Suite 2B Harrison NY 10528 914-233-9990 stevem@pierotticorp.com 9 Mary Miller PWXPress 1900 Coffeeport Road Jacksonville FL 32208 408-676-8941 bids@pwxpress.com 10 Robert Kenny Niko Development Corporation 170 Cherry Valley Avenue West Hempstead NY 11552 917-681-3720 nikodevelopment@aol.com Yes 11 Peter Smith Worth Construction Co., Inc. 24 Taylor Ave PO Box 420 Bethel CT 6801 203-797-8788 SmithP@worthconstruction.com Yes 12 Jenny Tsikotis Sea Breeze General Construction, Inc. 24-30 47th Street Astoria NY 11103 718-721-9030 jenny@seabreezegc.com Yes 13 Dan Fischer Consigli Construction Co., Inc. 199 West Road Suite 100 Pleasant Valley NY 12569 845-476-2737 dfischer@consigli.com Yes Yes 14 Dan totten Talis Historic Restoration 324 Catherine Street Medina NY 14103 585-318-4787 dtotten@talishistoricrestoration.com Yes Yes

15 Sophia Rijo Norco Construction, Inc. 1860 Walt Whitman Rd Suite 950 Melville NY 11747 631-923-1923 sophia@norcony.com jessica@norcony.com

Yes Yes

16 Christie Holzschuh Aurora Contractors 100 Raynor Ave Ronkonkoma NY 11779 631-981-3785 Christieh@auroracontractors.com Yes Yes 17 Jude Clary Titan Rooting Inc. 32 Railroad Ave Albany NY 12205 518-390-7611 jclary@titanroofing.com Yes Yes 18 Steve Swiat Northwood Sah & Joinery LLC 269 Hinman Avenue Buffalo NY 14216 716-308-6821 Steve@northwoodsash.com Yes 19 Chris Fahnestock PCC Contracting Incorporated 1861 Chrisler Ave Schenectady NY 12303 845-774-0755 cfahnestock@pcccontracting.com Yes Yes 20 Malcom Bernard AMHS services 752 St. John's Place Brooklyn NY 11216 347-636-6440 amin.bernard2@gmail.com 21 Matthew Burch Burch Historic Restoration LLC 11512 Bullis Road Marilla NY 14102 585-322-6912 matthew@burchhistoric.com Yes 22 Tariq Khan Sky Rise Inc. 49 Ashley Drive Valley Stream NY 11580 718-705-4705 skyrise4@hotmail.com Yes Yes 23 Zachary Halsey Dubner Landscaping and Construction 505 Grand Street Westbury NY 11590 631-682-2710 ZHalsey@dubnerco.com Yes 24 Molly Vidmar Kokolskis Contracting 202 E Center Street Tarpon Spring FL 34689 813-317-4164 MVidmar@jkokolakis.com Yes Yes 25 Chetan Reddy ENL Mechanical Incorporated 134 West End Ave Somerville NJ 8876 203-687-3167 cnr@enlmechanical.com Yes Yes 26 Justin Tanner BidPrime, Inc. 2211 South Interstate 35 Suite 401 Austin TX 78741 888-808-5356 jtanner@bidprime.com 27 Sahil Harkhani ABCD Construction Corp. 5702 3rd Ave Brooklyn NY 11220 718-439-3385 sh@abcdconstruction.com Yes Yes 28 James Wang NY ProConstruction Inc. 131-10 40th Road 2nd FL Flushing NY 11354 917-582-6882 james.wang@ny-proconstruction.com Yes 29 Frank Lagana ADI East, Inc. 2 West Road South Salem NY 10590 914-763-3711 flagana@alternatedesignsinc.com Yes Yes 30 Harry Judge Distinctive Cabinetry, LLC 151 Saratoga Ave Cohoes NY 12047 518-365-6155 hjudge@nycap.rr.com 31 Lauren Helstrom Standback General Contractors, LLC 1161 Little Britain Rd New Windsor NY 12553 845-500-3712 lhelstrom@standbackgc.com Yes 32 Myrna P. Nuvista Designs General Contractors LLC 589 Greenbush Road Blauvelt NY 10913 845-263-0330 info@nuvistadgc.com Yes 33 Jesse Williams Tight Lynx Construction LLC 374 Utica Ave Brooklyn NY 11213 212-502-7604 jesse@decexperts.com Yes Yes 34 Eric Butler Butler Construction Group, Inc. 344 Dunn Road Montgomery NY 12549 845-769-7713 ebutler@butlerconstructiongroup.com Yes

1 Henri Bradshaw Construct/Connect 3825 Edwards Road Cincinnati OH 45209 (877) 422-8665 henri.bradshaw@constructconnect.com Yes Yes 2 Dodge Bidding Dodge Data & Analytics 300 American Metro Blvd. Hamilton NJ 8619 (877) 784-9556 dodge.bidding@construction.com Yes Yes 3 Dustin Henry Eastern Contractors Association, Inc. 6 Airline Drive Albany NY 12205-1095 (518) 869-0961 dustinh@ecainc.org Yes Yes 4 Biddy HQ team@biddyhq.com

Plan Holder's List D006471

Historic Building Restoration

TA-JJ-2023-001

NON-BIDDERS

BIDDERS

May 2019 Page 1 of 1 mailto:oleg.shayko@pcscst.com mailto:JFoley@androncc.com mailto:sarah@meyercontracting.com mailto:EPellegrin@midstateltd.com mailto:fmklcc@hotmail.com mailto:prajwala.n@cubecsllc.com mailto:sjenkins@novatechnologiesgrp.com mailto:stevem@pierotticorp.com mailto:bids@pwxpress.com mailto:nikodevelopment@aol.com mailto:SmithP@worthconstruction.com mailto:jenny@seabreezegc.com mailto:dfischer@consigli.com mailto:dtotten@talishistoricrestoration.com mailto:sophia@norcony.com mailto:sophia@norcony.com mailto:Christieh@auroracontractors.com mailto:jclary@titanroofing.com mailto:Steve@northwoodsash.com mailto:cfahnestock@pcccontracting.com mailto:amin.bernard2@gmail.com mailto:matthew@burchhistoric.com mailto:skyrise4@hotmail.com mailto:ZHalsey@dubnerco.com mailto:MVidmar@jkokolakis.com mailto:cnr@enlmechanical.com mailto:jtanner@bidprime.com mailto:sh@abcdconstruction.com mailto:james.wang@ny-proconstruction.com mailto:flagana@alternatedesignsinc.com mailto:hjudge@nycap.rr.com mailto:lhelstrom@standbackgc.com mailto:info@nuvistadgc.com mailto:jesse@decexperts.com mailto:ebutler@butlerconstructiongroup.com mailto:henri.bradshaw@constructconnect.com mailto:team@biddyhq.com

D006471_RFI_LOG_7.23.2026.pdf
Addendum_No2
D006471_PlanHolders_7.23.2026.pdf
Plan Holder's List