This is a Scope of Work (SOW) document for the Colorado Pikes Peak State College (PPSC) contract opportunity PPSC DQ 27-006 for operable wall partitions. The project involves the procurement and installation of operable wall partition systems to create flexible spaces within the college facility. The SOW outlines the specifications, performance standards, and technical requirements that bidders must meet when submitting proposals for this project. Bidders are required to provide detailed information regarding product specifications, installation methodologies, timeline for completion, and compliance with applicable building codes and safety standards. The document establishes the framework for evaluating vendor capabilities and ensuring that the selected contractor can deliver high-quality operable wall partition systems that meet the college's functional and aesthetic requirements.

The SOW details the technical performance criteria, warranty requirements, and quality assurance measures that successful bidders must incorporate into their proposals and project execution. Specific attention is given to the installation timeline, site coordination requirements, and post-installation support services. The document establishes clear expectations regarding material quality, workmanship standards, and compliance with Colorado building regulations and Americans with Disabilities Act (ADA) accessibility requirements. Pricing information, payment terms, and any applicable bonding or insurance requirements are addressed within the SOW to ensure that all bidders understand the financial and administrative obligations associated with the contract award.

View the file

Other files

File Type Posted
PPSC DQ 27-006 Operable Wall Partitions Amendment #1.docx DOCX document
E. Personal Services Contract.pdf PDF
C. PERA.pdf PDF
A. Quote Response Sheet v2.docx DOCX document
B. Tax Payer Identification Number.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

The contractor shall provide all labor, materials, equipment, supervision, and services necessary to complete the replacement of the existing operable wall at the Downtown Studio Campus The project includes furnishing and installing a new operated operable partition system, removal and disposal of the existing partition, delivery of all required materials, installation of track and operating components, testing, adjustment, commissioning, and final inspection. The contractor shall provide a complete turnkey installation, including all hardware, accessories, electrical components, warranties, and manufacturer documentation necessary for a fully functional system. The completed installation must comply with manufacturer specifications, applicable building codes, and Pikes Peak State

College requirements.

Specifications:

• Furnish and install one completely operated operable partition system.

• Remove and dispose of the existing operable wall system.

• Provide all labor, materials, equipment, hardware, and accessories required for installation.

• Perform testing, adjustment, and commissioning of the new partition system.

• Provide manufacturer warranty and closeout documentation.

• Ensure the system is fully operational and ready for use upon project completion.

Why Is This Project Being Done?

The existing operable wall at the Downtown Studio Campus requires replacement to ensure reliable operation and continued support of the college's instructional and simulation spaces. The new operated operable partition system will provide improved functionality, dependability, and flexibility for room configuration and space utilization.

How Will the Job Be Carried Out?

The project will be completed as a turnkey installation by the contractor. Work will begin with a site review and coordination with Pikes Peak State College staff. The contractor will then remove and dispose of the existing operable wall system, deliver all required materials and equipment, and install the new operated operable partition system. Following installation, the contractor will perform testing, adjustments, and commissioning to verify proper operation. Upon successful completion, the contractor will provide warranty documentation, any required training, and a final inspection to ensure the system is fully functional and ready for use

Scope of Work/Specifications for the project

Exhibit D

File details come from the government source that posted it. Updated .