D. SOW.pdf

PDF 64 KB Posted

Attached to
PPSC DQ 27-006 Operable Wall Partitions
Solicitation number
DQ1 GJJA 2027000129 1
Issued by
El Paso County, Colorado

About this file

This Scope of Work document pertains to Pikes Peak State College in Colorado and outlines the requirements for the replacement of an existing operable wall partition system at the Downtown Studio Campus. The project involves furnishing and installing one completely operated operable partition system, including removal and disposal of the existing system, delivery of all materials, installation of track and operating components, testing, adjustment, commissioning, and final inspection. The contractor shall provide a complete turnkey installation with all hardware, accessories, and electrical components necessary for full functionality. The work will commence with a site review and coordination with college staff, followed by removal of the existing operable wall system, delivery of required materials and equipment, and installation of the new partition system. Upon completion, the contractor must perform testing, adjustments, and commissioning to verify proper operation and ensure the system complies with manufacturer specifications, applicable building codes, and college requirements.

The project is being undertaken to replace the existing operable wall to ensure reliable operation and continued support of the college's instructional and simulation spaces. The new system will provide improved functionality, dependability, and flexibility for room configuration and space utilization. The contractor is responsible for providing manufacturer warranty and closeout documentation, any required training, and a final inspection to confirm the system is fully operational and ready for use. No pricing terms, set-asides, response dates, site visit information, or award dates are specified in this scope of work document.

View the file

Other files

File Type Posted
B. Tax Payer Identification Number.pdf PDF
A Quote Response Sheet.docx DOCX document
E. Personal Services Contract.pdf PDF
PPSC DQ 27-006 Operable Wall Partitions DRAFT v2.docx DOCX document
C. PERA.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

The contractor shall provide all labor, materials, equipment, supervision, and services necessary to complete the replacement of the existing operable wall at the Downtown Studio Campus The project includes furnishing and installing a new operated operable partition system, removal and disposal of the existing partition, delivery of all required materials, installation of track and operating components, testing, adjustment, commissioning, and final inspection. The contractor shall provide a complete turnkey installation, including all hardware, accessories, electrical components, warranties, and manufacturer documentation necessary for a fully functional system. The completed installation must comply with manufacturer specifications, applicable building codes, and Pikes Peak State

College requirements.

Specifications:

• Furnish and install one completely operated operable partition system.

• Remove and dispose of the existing operable wall system.

• Provide all labor, materials, equipment, hardware, and accessories required for installation.

• Perform testing, adjustment, and commissioning of the new partition system.

• Provide manufacturer warranty and closeout documentation.

• Ensure the system is fully operational and ready for use upon project completion.

Why Is This Project Being Done?

The existing operable wall at the Downtown Studio Campus requires replacement to ensure reliable operation and continued support of the college's instructional and simulation spaces. The new operated operable partition system will provide improved functionality, dependability, and flexibility for room configuration and space utilization.

How Will the Job Be Carried Out?

The project will be completed as a turnkey installation by the contractor. Work will begin with a site review and coordination with Pikes Peak State College staff. The contractor will then remove and dispose of the existing operable wall system, deliver all required materials and equipment, and install the new operated operable partition system. Following installation, the contractor will perform testing, adjustments, and commissioning to verify proper operation. Upon successful completion, the contractor will provide warranty documentation, any required training, and a final inspection to ensure the system is fully functional and ready for use

Scope of Work/Specifications for the project