d. LIST OF EVALUATION FACTORS.pdf

PDF 46 KB Posted

Attached to
Office Space - US Army Corps of Engineers - San Juan, Puerto Rico
Solicitation number
DACW17-5-21-3010
Issued by

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EVALUATION FACTORS

1. OPERATIONAL FACTORS

a. LOCATION WITHIN DELINEATED AREA.

b. NEIGHBORHOOD. Overall feel for the neighborhood around the site. Consideration will be given to known crime rate for the area, overall level of pedestrian and/or vehicular traffic, and the overall appearance of the neighborhood (i.e. presence of graffiti, vacant buildings, surrounding property upkeep, etc.).

c. ACCESS CONTROLLED FACILITY.

d. EASE OF ACCESS TO BUILDING. Ease of locating the site. Accessibility from a major street or distance from a major street. Capability to accommodate access, egress and maneuverability of oversized government vehicles.

e. LOCATION WITHIN BUILDING.

f. ACCESS TO LEASED SPACE. This is a simple pass-fail standard. Unrestricted, typically 24-hour, access is generally required for employees.

g. PARKING AVAILABILITY FOR VISITORS. Adequate parking for visitors within the premises or within walking distance from the office. Availability of an overflow parking facility in the event that the on-site parking facility is full.

h. ACCESSED CONTROLLED PARKING FACILITY FOR GOVERNMENT OWNED

VEHICLES (GOV) AND PRIVATE OWNED VEHICLES (POV).

i. OVERALL APPEARANCE OF BUILDING. Appearance of the exterior and common areas (parking lots, sidewalks, etc.) of the facility in relation to the general standards for similar properties in the community.

j. POTENTIAL FOR SIGNS. Visibility of building and/or roadside signs. Limitations and/ or

Local building code restrictions.

k. FLOOR PLAN / LAYOUT. An overall assessment of the efficiency and practicality of the floor plan.

l. PAST PERFORMANCE (between the years 2010 and 2020)

m. PHYSICAL SECURITY AND ACCESS CONTROL

2. COST. Based on best rental consideration on a fully-serviced lease (e.g. rent, janitorial services and supplies, utilities, and parking) and construction cost to include any potential

Lessor contribution toward build-out.

NOTE: All evaluation factors other than cost or price, when combined, are significantly more important than cost or price.

File details come from the government source that posted it. Updated .