D.1 Quality Assurance Surveillance Plan_QASP.pdf
PDF 584 KB Posted
- Attached to
- Q403--On-Site Sleep Study Services and Scoring
- Solicitation number
- 36C25526Q0038
About this file
This is a Quality Assurance Surveillance Plan (QASP) for contract 36C25526Q0038 administered by the Department of Veterans Affairs. The document serves as a template establishing systematic methods to evaluate contractor performance against specified standards and acceptable quality levels.
The QASP identifies performance requirements across nine key measures: on-site sleep study scoring (97% acceptable quality level), invoices and supporting documentation submission (97%), continuing medical education and licensing maintenance (100%), customer service/patient complaint resolution within 7 days (97%), home sleep study scoring within 24 hours of device receipt (100%), patient contact and scheduling within 48 hours of consult receipt (100%), documentation of failed/incomplete studies within 24 hours (100%), and privacy/confidentiality/HIPAA compliance (100%). Surveillance methods include periodic inspections, direct observation, random sampling, and contractor-provided documentation verification. The Contracting Officer is Kayla Haas (Dept of Veterans Affairs NCO-15, Leavenworth, KS), and the Contracting Officer's Representative is Christopher Lane, Associate Group Practice Manager at Robert J. Dole VA Medical Center. Performance ratings follow the CPARS system with five levels: Exceptional, Very Good, Satisfactory, Marginal, and Unsatisfactory. The document includes a Contract Report template for documenting performance deficiencies and required corrective action plans, with quarterly progress reporting required from the COR to the CO.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25526Q0038 0003.docx | DOCX document | |
| P07 Wage Determination 2026-0084 Rev. 1.pdf | ||
| 36C25526Q0038 0002.docx | DOCX document | |
| 36C25526Q0038 0001.docx | DOCX document | |
| 36C25526Q0038_1.docx | DOCX document | |
| D.4 Past Performance Questionnaire.pdf | ||
| D.3 Wage Det 2015-5341_Rev 32 dated 5-13-26.pdf | ||
| D.2 Contractor Certification Immigration and Nationality Act of 1952.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Quality Assurance Surveillance Plan (QASP)
The contractor will be evaluated in accordance with the following:
1. PURPOSE
This Quality Assurance Surveillance Plan (QASP) provides a systematic method to evaluate performance for the stated contract. This QASP explains the following:
• What will be monitored?
• How will monitoring take place?
• Who will conduct the monitoring?
• How will monitoring efforts and results be documented?
This QASP does not detail how the contractor accomplishes the work. Rather, the QASP is created with the premise that the contractor is responsible for management and quality control actions to meet the terms of the contract. It is the Government’s responsibility to be objective, fair, and consistent in evaluating performance.
This QASP is a “living document” and the Government may review and revise it on a regular basis. However, the Government shall coordinate changes with the contractor through contract modification. Copies of the original QASP and revisions shall be provided to the contractor and Government officials implementing surveillance activities.
2. GOVERNMENT ROLES AND RESPONSIBILITIES
The following personnel shall oversee and coordinate surveillance activities.
a. Contracting Officer (CO): The CO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship. The CO shall also assure that the contractor receives impartial, fair, and equitable treatment under this contract. The CO is ultimately responsible for the final determination of the adequacy of the contractor’s performance.
Assigned CO: Kayla Haas, CO Organization or Agency: Dept of Veterans Affairs NCO-15, Leavenworth, KS
b. Contracting Officer’s Representative (COR): The COR is responsible for technical administration of the contract and shall assure proper Government surveillance of the contractor’s performance. The COR shall keep a quality assurance file. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf.
Assigned COR: Christopher Lane, Associate Group Practice Manager
Organization or Agency: Robert J. Dole VA Medical Center
3. CONTRACTOR REPRESENTATIVES
The following employee(s) of the contractor serve as the contractor’s program manager(s) for this contract:
Primary Program Manager: _______________________________
Alternate Program Manager: _______________________________
Attachment D.1 Quality Assurance Surveillance Plan_36C25526Q0038
4. PERFORMANCE STANDARDS
The contractor is responsible for performance of ALL terms and conditions of the contract. CORs will provide contract progress reports quarterly to the CO reflecting performance on this plan and all other aspects of the resultant contract. The performance standards outlined in this QASP shall be used to determine the level of contractor performance in the elements defined. Performance standards define desired services. The Government performs surveillance to determine the level of Contractor performance to these standards.
The Performance Requirements are listed below in Section 6. The Government shall use these standards to determine contractor performance and shall compare contractor performance to the standard and assign a rating. At the end of the performance period, these ratings will be used, in part, to establish the past performance of the contractor on the contract.
5. METHODS OF QA SURVEILLANCE
Various methods exist to monitor performance. The COR shall use the surveillance methods listed below in the administration of this QASP.
a. DIRECT OBSERVATION. 100% surveillance: (if this method is used, define how surveillance will be accomplished.)
b. PERIODIC INSPECTION. Inspections scheduled and reported quarterly per COR delegation or as needed. (Define what and how often it will be inspected. For example, ten (10) randomly selected patient files will be reviewed per inspection period. All inspections and reports will be conducted in compliance with VA Privacy and Information security standards.)
c. VALIDATED USER/CUSTOMER COMPLAINTS. If this method is used, explain how data will be collected and reported.
d. RANDOM SAMPLING. If this method is used, define what and how often it will be sampled. (For example, ten (10) randomly selected patient files will be reviewed per quarter. All reviews and reports will be conducted in compliance with VA Privacy and Information security standards.)
e. Verification and/or documentation provided by Contractor. Review PWS and if this method of surveillance is selected, define how documentation will be verified and how assessment will be conducted. (For example, off-site contracts may require the contractor to provide information on services provided to patients).
6.QASP PERFORMANCE REPORT
Measure PWS Reference
Performance Requirements Standard Acceptable Quality Level
Method of Surveillance
On-Site Sleep Study Scoring
4.4.2.1 4.5.1 4.5.5.1
Complete evaluations of all sleep studies within 24 hours
Complete evaluations of all sleep studies within 24 hours
97% Periodic Inspection
Invoices and Supporting Documentation
4.1.2 4.5.5.2 6.2.1 6.3
Invoices and supporting documentation must be submitted no later than the 20th day of the month following the month services are performed
Invoices and support documentation are submitted no later than the 20th day ofthe month
97 % Periodic Inspection
Continuing medical education, licensing, registration, and certifications
2.1.5 4.1.7 4.5.5.3 6.1.1
Maintains and keep current all licensing, registrations and certification requirements
Maintains and keeps current all licenses, registrations and certification requirements
100% Direct Observation
Customer Service / Patient Complaints
2.9.2.5.1 4.5.3 4.5.5.4 5.6.1.2
Resolve customer service/patient complaints within 7 days
Resolves customer service/patient complaints within 7 days
97% Periodic Inspection
Home Slepy Study Scoring
4.1.1 4.4.2.1 4.4.2.6 4.5.1 4.5.5.5
Schedule, issue, and educate/instruct patient on use of HSAT device, required to Receive and Complete scoring and documentation of all HSAT within 24 hours of receiving HSAT device from VAMC Medicine Service.
Receive, score and document HSAT results within 24 hours of receipt of device.
100% Periodic inspection
Patient Contact and Scheduling
4.1.1 4.2.1.1 4.4.1.1 4.4.2.
4.5.1 4.5.5.6
Receive VAMC Medicine Service order (consult) for study, including patient contact and relevant information, making scheduling contact with patient, or family/caregiver within 48 hours of receipt of order (consult) and establishing a schedule appointment for study, including HSAT pick-up, set-up and education.
Receive, evaluate consult, contact and schedule patient within 48 hours of receipt of consult.
100% Periodoic inspection
Documenting failed and incomplete studies
4.11 4.2.1 4.5.5.7 5.5
Contractor shall document failed and incomplete studies within 24 hours of a failed and incomplete study with information surrounding the failure to complete the study.
All (100%) of failed or incomplete studies documented within 24 hours.
100% Periodic inspection
Privacy, Confidentiality and HIPAA
2.1.7.2 4.3 4.5.5.8 6.1.1 7.0
Maintain patient confidentially in accordance with all laws, regulations, policies and procedures relating to Privacy, Confidentiality and HIPAA.
All (100%) contractor RPSGT(s)comply with all laws, regulations, policies and procedures relating to Privacy, Confidentiality and HIPAA.
100% Periodic inspection
7. CPARS RATINGS ASSIGNED TO QASP ITEMS:
Metrics and methods are designed to determine rating for a given standard and acceptable quality level. The following ratings shall be used (Reference: CPARS User Manual https://www.cpars.gov/documents/CPARS- Guidance.pdf)
EXCEPTIONAL: Performance meets contractual requirements and exceeds many to the Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.
Note: To justify an Exceptional rating, you should identify multiple significant events in each category and state how it was a benefit to the GOVERNMENT.
However, a singular event could be of such magnitude that it alone constitutes an Exceptional rating. Also, there should have been NO significant weaknesses identified.
VERY GOOD: Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.
Note: To justify a Very Good rating, you should identify a significant event in each category and state how it was a benefit to the GOVERNMENT. Also, there should have been NO significant weaknesses identified.
SATISFACTORY: Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
Note: To justify a Satisfactory rating, there should have been only minor problems, or major problems the contractor recovered from without impact to the contract.
Also, there should have been NO significant weaknesses identified.
MARGINAL: Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.
Note: To justify Marginal performance, you should identify a significant event in each category that the contractor had trouble overcoming and state how it impacted the GOVERNMENT. A Marginal rating should be supported by referencing the management tool that notified the contractor of the contractual deficiency (e.g.
Management, Quality, Safety or Environmental Deficiency Report or letter).
UNSATISFACTO
RY: Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element being assessed contains serious problem(s) for which the contractor’s corrective actions appear or were ineffective.
Attachment D.1 Quality Assurance Surveillance Plan_36C25526Q0038 https://www.cpars.gov/documents/CPARS-Guidance.pdf https://www.cpars.gov/documents/CPARS-Guidance.pdf
Note: To justify an Unsatisfactory rating, you should identify multiple significant events in each category that the contractor had trouble overcoming and state how it impacted the GOVERNMENT. However, a singular problem could be of such serious magnitude that it alone constitutes an unsatisfactory rating. An Unsatisfactory rating should be supported by referencing the management tools used to notify the contractor of the contractual deficiencies (e.g. Management, Quality, Safety or Environmental Deficiency Reports, or letters).
8.DOCUMENTING PERFORMANCE
a. The Government shall document positive and/or negative performance. Any report may become a part of the supporting documentation for any contractual action and preparing annual past performance using CONTRACTOR PERFORMANCE ASSESSMENT REPORTING SYSTEM (CPARS).
b. If contractor performance does not meet the Acceptable Quality level, the CO shall inform the contractor. This will normally be in writing unless circumstances necessitate verbal communication. In any case the CO shall document the discussion and place it in the contract file. When the COR and the CO determines formal written communication is required, the COR shall prepare a Contract Report (CR), and present it to CO. The CO will in turn review and will present to the contractor's program manager for corrective action.
The contractor shall acknowledge receipt of the CR in writing. The CR will specify if the contractor is required to prepare a corrective action plan to document how the contractor shall correct the unacceptable performance and avoid a recurrence. The CR will also state how long after receipt the contractor has to present this corrective action plan to the CO. The Government shall review the contractor's corrective action plan to determine acceptability. The CO shall also assure that the contractor receives impartial, fair, and equitable treatment. The CO is ultimately responsible for the final determination of the adequacy of the contractor’s performance and the acceptability of the Contractor’s corrective action plan.
Any CRs may become a part of the supporting documentation for any contractual action deemed necessary by the CO. See Sample CR on the following page.
6. COR AND CONTRACTOR ACKNOWLEDGEMENT OF QASP
SIGNED:
CONTRACTOR NAME/TITLE DATE
SIGNED:
Christopher Lane, COR DATE
CONTRACT REPORT
1. CONTRACT NUMBER 2. REPORT NUMBER FOR THIS DISCREPANCY
3. TO: (Contracting Officer) 4. FROM: (Name of COR)
5. DATES
a. CR PREPARED
b. RETURNED BY
CONTRACTOR:
c. ACTION COMPLETE
6. Issue Identified (Describe in detail. Include reference to PWS Directive; attach continuation sheet if necessary.)
7. SIGNATURE OF COR Date:
8. SIGNATURE OF CONTRACTING OFFICER Date:
9a. TO (Contracting Officer) 9a. FROM (Contractor)
10. CONTRACTOR RESPONSE AS TO CAUSE AND ACTIONS TO PREVENT RECURRENCE. (Cite applicable quality control program procedures or new procedures. Attach continuation sheet(s) if necessary.)
11. SIGNATURE OF CONTRACTOR REPRESENTATIVE Date:
12. GOVERNMENT EVALUATION.
13. GOVERNMENT ACTIONS
14. CLOSE OUT
NAME TITLE SIGNATURE DATE
CONTRACTOR
NOTIFIED
COR
CONTRACTING
OFFICER
| Various methods exist to monitor performance. The COR shall use the surveillance methods listed below in the administration of this QASP. |
| a. DIRECT OBSERVATION. 100% surveillance: (if this method is used, define how surveillance will be accomplished.) |
| a. The Government shall document positive and/or negative performance. Any report may become a part of the supporting documentation for any contractual action and preparing annual past performance using CONTRACTOR PERFORMANCE ASSESSMENT REPORTING SYST... |
| b. If contractor performance does not meet the Acceptable Quality level, the CO shall inform the contractor. This will normally be in writing unless circumstances necessitate verbal communication. In any case the CO shall document the discussion and p... |
File details come from the government source that posted it. Updated .