The document is a Quality Assurance Surveillance Plan (QASP) for a Mobile MRI and Technologist Services contract with the Department of Veterans Affairs. The QASP outlines the government's method for evaluating contractor performance across three key metrics: 1) MRI unit and technologist availability (95% imaging time during Monday-Friday, 0730-1630 hours), 2) contractor staff adherence to federal regulations (100% compliance with training records), and 3) maintenance requirements (95% MRI up-time with preventive maintenance performed after normal business hours).
The surveillance plan establishes a comprehensive performance rating system ranging from Exceptional to Unsatisfactory, with the Contracting Officer (CO) and Contracting Officer's Representative (COR) responsible for monitoring and documenting the contractor's performance. Potential consequences for substandard performance include unfavorable performance evaluations and potential contract cancellation. The document emphasizes that the contractor is responsible for managing quality control and meeting contract terms, while the government will conduct objective and consistent performance evaluations.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25725Q0664 0001 Amendment.docx | DOCX document | |
| D.1 QUALITY ASSURANCE SURVEILLANCE PLAN - QASP.pdf | ||
| 36C25725Q0664_1.docx | DOCX document | |
| D.2 CONTRACTOR RULES OF BEHAVIOR.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)
Name of Service to Be Provided
The contractor will be evaluated in accordance with the following:
1. PURPOSE: This Quality Assurance Surveillance Plan (QASP) provides a systematic method to evaluate performance for the stated contract. This QASP explains the following:
What will be monitored?
How monitoring will take place?
Who will conduct the monitoring?
How monitoring efforts and results will be documented?
a. This QASP does not detail how the contractor accomplishes the work. Rather, the QASP is created with the premise that the contractor is responsible for management and quality control actions to meet the terms of the contract. It is the Government’s responsibility to be objective, fair, and consistent in evaluating performance.
b. This QASP is a “living document” and the Government may review and revise it on a regular basis. However, the Government shall coordinate changes with the contractor through contract modification. Copies of the original QASP and revisions shall be provided to the contractor and Government officials implementing surveillance activities.
2. GOVERNMENT ROLES AND RESPONSIBILITIES: The following personnel shall oversee and coordinate surveillance activities.
a. Contracting Officer (CO) – The CO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship. The CO shall also assure that the contractor receives impartial, fair, and equitable treatment under this contract. The CO is ultimately responsible for the final determination of the adequacy of the contractor’s performance.
Assigned CO:
Organization or Agency: Department of Veterans Affairs, Network 23 Contracting Office
b. Contracting Officer’s Representative (COR) – The COR is responsible for technical administration of the contract and shall assure proper Government surveillance of the contractor’s performance. The COR shall keep a quality assurance file. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf.
Assigned COR:
Organization or Agency:
3. CONTRACTOR REPRESENTATIVES:
The following employee(s) of the contractor serve as the contractor’s program manager(s) for this contract:
Primary: ______________________________________
Alternate: __________________________________
4. PERFORMANCE STANDARDS: The contractor is responsible for performance of ALL terms and conditions of the contract. CORs will provide contract progress reports quarterly to the CO reflecting performance on this plan and all other aspects of the resultant contract. The performance standards outlined in this QASP shall be used to determine the level of contractor performance in the elements defined.
a. Performance standards define desired services. The Government performs surveillance to determine the level of Contractor performance to these standards.
b. The Performance Requirements are listed below in Section 6. The Government shall use these standards to determine contractor performance and shall compare contractor performance to the standard and assign a rating. At the end of the performance period, these ratings will be used, in part, to establish the past performance of the contractor on the contract.
5. INCENTIVES/DEDUCTS: The Government shall use past performance as incentives.
Incentives shall be based on ratings received on the performance standards.
6. METHODS OF QA SURVEILLANCE: Various methods exist to monitor performance. The COR shall use the surveillance methods listed below in the administration of this QASP.
a. RESPONSE TIME: Arrival time to CT suite compared to scheduled procedure time.
b. REQUIRED TRAINING: Training records.
PROFESSIONAL SERVICES
Measure PWS Reference
Performance Requirement
Standard Acceptable Quality Level
Method Of Surveillance
Incentive Disincentiv e
1 – General Requirements
2.a.& 2.b. The 1.5T MRI unit and technologist is required to be on-site and ready for patient care M-F, 0730-1630.
The vendor shall provide staff and equipment to provide MRI scans during normal operating hours; Monday – Friday, 0730- 1630.
95% MRI imaging time compared to scheduled procedure time
Favorable Contractor Performance Evaluation
Unfavorable Contractor Performance Evaluation/
Cancellation of the Contract
2 – Contractor Responsibilities
3.h Contractor staff assigned to provide service at the VA will remain current with all required federal regulations for patient care and
MRI.
Contractor’s staff who provide services at the VA must adhere to all federal regulations for patient care, safety, medical practice and operation of mobile MRI.
100% Training records
Favorable Contractor Performance Evaluation
Unfavorable Contractor Performance Evaluation/
Cancellation of the Contract
4 – Maintenance Requirements
4.a.b.c. Contractor responsible for all maintenance; PMs must be performed after hours.
Contractor ensures a 95% or better up-time;
must schedule PMs after normal business hours.
95% MRI Up-time vs down-time
Favorable Contractor Performance Evaluation
Unfavorable Contractor Performance Evaluation/
Cancellation of the Contract
7. RATINGS: Metrics and methods are designed to determine rating for a given standard and acceptable quality level. The following ratings shall be used:
EXCEPTIONAL:
Performance meets contractual requirements – Acceptable Quality Level (AQL) and exceeds many to the Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.
Note: To justify an Exceptional rating, you should identify multiple significant events in each category and state how it was a benefit to the GOVERNMENT.
However, a singular event could be of such magnitude that it alone constitutes an Exceptional rating. Also there should have been NO significant weaknesses identified.
VERY GOOD: Performance meets contractual requirements--(AQL) and exceeds some to the Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.
Note: To justify a Very Good rating, you should identify a significant event in each category and state how it was a benefit to the GOVERNMENT. Also, there should have been NO significant weaknesses identified.
SATISFACTORY:
(Acceptable Quality Level)
Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
Note: To justify a Satisfactory rating, there should have been only minor problems, or major problems the contractor recovered from without impact to the contract. Also, there should have been NO significant weaknesses identified.
MARGINAL:
Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.
Note: To justify Marginal performance, you should identify a significant event in each category that the contractor had trouble overcoming and state how it impacted the GOVERNMENT. A Marginal rating should be supported by referencing the management tool that notified the contractor of the contractual deficiency (e.g., Management, Quality, Safety or Environmental Deficiency Report or letter).
UNSATISFACTORY:
Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element being assessed contains serious problem(s) for which the contractor’s corrective actions appear or were ineffective.
Note: To justify an Unsatisfactory rating, you should identify multiple significant events in each category that the contractor had trouble overcoming and state how it impacted the GOVERNMENT. However, a singular problem could be of such serious magnitude that it alone constitutes an unsatisfactory rating. An Unsatisfactory rating should be supported by referencing the management tools used to notify the contractor of the contractual deficiencies (e.g. Management, Quality, Safety or Environmental Deficiency Reports, or letters).
8. DOCUMENTING PERFORMANCE
a. The Government shall document positive and/or negative performance. Any report may become a part of the supporting documentation for any contractual action and perparing annual past performance using CONTRACTOR PERFORMANCE ASSESSMENT REPORT (CPAR).
b. If contractor performance does not meet the Acceptable Quality level, the CO shall inform the contractor. This will normally be in writing unless circumstances necessitate verbal communication. In any case the CO shall document the discussion and place it in the contract file. When the COR and the CO determines formal written communication is required, the COR shall prepare a Contract Discrepancy Report (CDR), and present it to CO. The CO will in turn review and will present to the contractor's program manager for corrective action.
c. The contractor shall acknowledge receipt of the CDR in writing. The CDR will specify if the contractor is required to prepare a corrective action plan to document how the contractor shall correct the unacceptable performance and avoid a recurrence. The CDR will also state how long after receipt the contractor has to present this corrective action plan to the CO. The Government shall review the contractor's corrective action plan to determine acceptability. The CO shall also assure that the contractor receives impartial, fair, and equitable treatment. The CO is ultimately responsible for the final determination of the adequacy of the contractor’s performance and the acceptability of the Contractor’s corrective action plan.
d. Any CDRs may become a part of the supporting documentation for any contractual action deemed necessary by the CO. See Sample CDR below.
CONTRACT DISCREPANCY REPORT
1. CONTRACT NUMBER 2. REPORT NUMBER FOR THIS DISCREPANCY
3. TO: (Contracting Officer) 4. FROM: (Name of COR)
5. DATES
a. CDR PREPARED
b. RETURNED BY
CONTRACTOR:
c. ACTION COMPLETE
6. DISCREPANCY OR PROBLEM (Describe in detail. Include reference to PWS Directive; attach continuation sheet if necessary.)
7. SIGNATURE OF COR Date:
8. SIGNATURE OF CONTRACTING OFFICER Date:
9a. TO (Contracting Officer) 9a. FROM (Contractor)
10. CONTRACTOR RESPONSE AS TO CAUSE, CORRECTIVE ACTION AND ACTIONS TO
PREVENT RECURRENCE. (Cite applicable quality control program procedures or new procedures.
Attach continuation sheet(s) if necessary.)
11. SIGNATURE OF CONTRACTOR REPRESENTATIVE Date:
12. GOVERNMENT EVALUATION. (Acceptance, partial acceptance, reflection. Attach continuation sheet(s) if necessary.)
13. GOVERNMENT ACTIONS (Acceptance, partial acceptance, reflection. Attach continuation sheet(s) if necessary.)
14. CLOSE OUT
NAME TITLE SIGNATURE DATE
CONTRACTOR
NOTIFIED
COR
CONTRACTING
OFFICER
9. FREQUENCY OF MEASUREMENT:
a. Frequency of Measurement: The frequency of measurement is defined in the contract or otherwise in this document. The government (COR or CO) will periodically analyze whether the negotiated frequency of surveillance is appropriate for the work being performed.
b. Frequency of Performance Reporting: The COR shall communicate with the contractor on a quarterly and semi-annual basis. Formal written reports, as outlined in the contract, will be submitted to the Contracting Officer for review of contractor performance.