D.1 QUALITY ASSURANCE SURVEILLANCE PLAN - QASP.pdf

PDF 269 KB Posted

Attached to
Q522--Mobile MRI and Technologist Services Federal contract opportunity
Solicitation number
36C25725Q0664
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 17

About this file

The document is a Quality Assurance Surveillance Plan (QASP) for Mobile MRI Services for the Department of Veterans Affairs, Network Contracting Office 17. The QASP outlines a systematic method to evaluate contractor performance across three key performance measures: 1) Response time to the CT Suite compared to scheduled procedure time, with a 95% acceptable quality level, 2) Required training compliance, requiring 100% adherence to federal regulations for patient care and MRI operations, and 3) Maintenance with a 95% or better uptime requirement.

The surveillance plan details government roles and responsibilities, including those of the Contracting Officer (CO) and Contracting Officer's Representative (COR), who will monitor and document contractor performance. Performance will be evaluated quarterly and semi-annually using formal written reports, with potential ratings ranging from Exceptional to Unsatisfactory. Significant performance issues may result in a Contract Discrepancy Report (CDR) and potential contract cancellation. The QASP is designed as a "living document" that can be revised through contract modification, emphasizing the government's objective to ensure fair and consistent contractor evaluation.

View the file

Other files for this federal contract opportunity

Other files attached to Q522--Mobile MRI and Technologist Services, newest first.
File Type Posted
36C25725Q0664 0001 Amendment.docx DOCX document
36C25725Q0664_1.docx DOCX document
D.2 CONTRACTOR RULES OF BEHAVIOR.pdf PDF
D.1 QUALITY ASSURANCE SURVEILLANCE PLAN _ QASP.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)

Mobile MRI Services

The contractor will be evaluated in accordance with the following:

1. PURPOSE: This Quality Assurance Surveillance Plan (QASP) provides a systematic method to evaluate performance for the stated contract. This QASP explains the following:

• What will be monitored?

• How monitoring will take place?

• Who will conduct the monitoring?

• How monitoring efforts and results will be documented?

a. This QASP does not detail how the contractor accomplishes the work. Rather, the

QASP is created with the premise that the contractor is responsible for the management and quality control actions to meet the terms of the contract. It is the Government’s responsibility to be objective, fair and consistent in evaluating performance.

b. This QASP is a “living document” and the Government may review and revise it on a regular basis. However, the Government shall coordinate changes with the contractor through contract modification. Copies of the original QASP and revisions shall be provided to the contractor and the Government officials implementing surveillance activities.

2. GOVERNMENT ROLES AND RESPONSIBILITIES: The following personnel shall oversee and coordinate surveillance activities.

a. Contracting Officer (CO) – The CO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship. The CO shall also assure that the contractor receives impartial, fair, and equitable treatment under this contract. The CO is ultimately responsible for the final determination of the adequacy of the contractor’s performance.

Assigned CO:

Organization or Agency: Department of Veterans Affairs, Network Contracting Office 17

b. Contracting Officer’s Representative (COR) – the COR is responsible for technical administration of the contract and shall assure proper Government surveillance of the contractor’s performance. The COR shall keep a quality assurance file. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf.

Assigned COR:

Organization or Agency:

3. CONTRACTOR REPRESENTATIVES: The following employee(s) of the contractor serve as the contractor’s program manager(s) for this contract:

Primary: _____________________________________

Alternate: ____________________________________

4. PERFORMANCE STANDARDS: The contractor is responsible for performance of ALL terms and conditions of the contract. CORs will provide contract progress reports quarterly to the CO reflecting performance on this plan and all other aspects of the resultant contract. The performance standards outlined in this QASP shall be used to determine the level of contractor performance in the elements defined.

a. Performance standards define desired services. The Government performs surveillance to determine the level of Contractor performance to these standards.

b. The Performance Requirements are listed below in Section 6. The Government shall use these standards to determine contractor performance and shall compare contractor performance to the standard and assign a rating at the end of the performance period. These ratings will be used, in part, to establish the past performance of the contractor on the contract.

5. METHODS OF QA SURVEILLANCE: Various methods exist to monitor performance.

The COR shall use the surveillance methods listed below in the administration of this

QASP.

a. RESPONSE TIME: Arrival time to CT Suite compared to scheduled procedure time.

b. REQUIRED TRAINING: Training records.

PROFESSIONAL SERVICES

Measure SOW Reference

Performance Requirement

Standard Acceptable Quality Level

Method Of Surveillance

Incentive Disincentive

1 – Response time to VA

3.c. The 1.5T MRI unit and technologist is required to be on-site and ready for patient care M-F, 0730- 1630.

The vendor shall provide staff and equipment to provide MRI scans during normal operating hours;

Monday – Friday, 0730-1630.

95% MRI imaging time compared to scheduled procedure time

Favorable Contractor Performance Evaluation

Unfavorable Contractor Performance Evaluation/

Cancellation of the Contract

2 – Required training

2.h Contractor staff assigned to provide service at the VA will remain current with all required federal regulations for patient care and

MRI.

Contractor’s staff who provide services at the VA must adhere to all federal regulations for patient care, safety, medical practice and operation of mobile MRI.

100% Training records

Favorable Contractor Performance Evaluation

Unfavorable Contractor Performance Evaluation/

Cancellation of the Contract

3- Maintenance

3.a.b.c. Contractor responsible for all maintenance;

PMs must be

Contractor ensures a 95% or better up-time; must schedule PMs after normal

95% MRI Up-time vs down-time

Favorable Contractor Performance Evaluation

Unfavorable Contractor Performance Evaluation/

PROFESSIONAL SERVICES

Measure SOW Reference

Performance Requirement

Standard Acceptable Quality Level

Method Of Surveillance

Incentive Disincentive performed after hours.

business hours.

Cancellation of the Contract

6. RATINGS: Metrics and methods are designed to determine rating for a given standard and acceptable quality level. The following ratings shall be used:

EXCEPTIONAL:

Performance meets contractual requirements – Acceptable Quality Level (AQL) and exceeds many to the Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.

Note: To justify an Exceptional rating, you should identify multiple significant events in each category and state how it was a benefit to the GOVERNMENT.

However, a singular event could be of such magnitude that it alone constitutes an Exceptional rating. Also there should have been NO significant weaknesses identified.

VERY GOOD:

Performance meets contractual requirements--(AQL) and exceeds some to the Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.

Note: To justify a Very Good rating, you should identify a significant event in each category and state how it was a benefit to the GOVERNMENT. Also, there should have been NO significant weaknesses identified.

SATISFACTORY:

(Acceptable Quality Level)

Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.

Note: To justify a Satisfactory rating, there should have been only minor problems, or major problems the contractor recovered from without impact to the contract. Also, there should have been NO significant weaknesses identified.

MARGINAL:

Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.

Note: To justify Marginal performance, you should identify a significant event in each category that the contractor had trouble overcoming and state how it impacted the GOVERNMENT. A Marginal rating should be supported by referencing the management tool that notified the contractor of the contractual deficiency (e.g., Management, Quality, Safety or Environmental Deficiency Report or letter).

UNSATISFACTORY:

Performance does not meet most contractual requirements, and recovery is not likely in a timely manner. The contractual performance of the element or sub-element being assessed contains serious problem(s) for which the contractor’s corrective actions appear or were ineffective.

Note: To justify an Unsatisfactory rating, you should identify multiple significant events in each category that the contractor had trouble overcoming and state how it impacted the GOVERNMENT. However, a singular problem could be of such serious magnitude that it alone constitutes an unsatisfactory rating. An Unsatisfactory rating should be supported by referencing the management tools used to notify the contractor of the contractual deficiencies (e.g. Management, Quality, Safety or Environmental Deficiency Reports, or letters).

7. DOCUMENTING PERFORMANCE

a. The Government shall document positive and/or negative performance. Any report may become a part of the supporting documentation for any contractual action and preparing annual past performance using CONTRACTOR PERFORMANCE ASSESSMENT REPORT (CPAR).

b. If contractor performance does not meet the Acceptable Quality level, the CO shall inform the contractor. This will normally be in writing unless circumstances necessitate verbal communication. In any case the CO shall document the discussion and place it in the contract file. When the COR and the CO determines formal written communication is required, the COR shall prepare a Contract Discrepancy Report (CDR), and present it to CO. The CO will in turn review and will present to the contractor's program manager for corrective action.

c. The contractor shall acknowledge receipt of the CDR in writing. The CDR will specify if the contractor is required to prepare a corrective action plan to document how the contractor shall correct the unacceptable performance and avoid a recurrence. The CDR will also state how long after receipt the contractor has to present this corrective action plan to the CO. The Government shall review the contractor's corrective action plan to determine acceptability. The CO shall also assure that the contractor receives impartial, fair, and equitable treatment. The CO is ultimately responsible for the final determination of the adequacy of the contractor’s performance and the acceptability of the Contractor’s corrective action plan.

d. Any CDRs may become a part of the supporting documentation for any contractual action deemed necessary by the CO. See Sample CDR below.

CONTRACT DISCREPANCY REPORT

1. CONTRACT NUMBER 2. REPORT NUMBER FOR THIS DISCREPANCY

3. TO: (Contracting Officer) 4. FROM: (Name of COR)

5. DATES

a. CDR PREPARED

b. RETURNED BY

CONTRACTOR:

c. ACTION COMPLETE

6. DISCREPANCY OR PROBLEM (Describe in detail. Include reference to PWS Directive; attach continuation sheet if necessary.)

7. SIGNATURE OF COR Date:

8. SIGNATURE OF CONTRACTING OFFICER Date:

9a. TO (Contracting Officer) 9a. FROM (Contractor)

10. CONTRACTOR RESPONSE AS TO CAUSE, CORRECTIVE ACTION AND ACTIONS TO

PREVENT RECURRENCE. (Cite applicable quality control program procedures or new procedures.

Attach continuation sheet(s) if necessary.)

11. SIGNATURE OF CONTRACTOR REPRESENTATIVE Date:

12. GOVERNMENT EVALUATION. (Acceptance, partial acceptance, reflection. Attach continuation sheet(s) if necessary.)

13. GOVERNMENT ACTIONS (Acceptance, partial acceptance, reflection. Attach continuation sheet(s) if necessary.)

14. CLOSE OUT

NAME TITLE SIGNATURE DATE

CONTRACTOR

NOTIFIED

COR

CONTRACTING

OFFICER

8. FREQUENCY OF MEASUREMENT:

a. Frequency of Measurement: The frequency of measurement is defined in the contract or otherwise in this document. The government (COR or CO) will periodically analyze whether the negotiated frequency of surveillance is appropriate for the work being performed.

b. Frequency of Performance Reporting: The COR shall communicate with the contractor on a quarterly and semi-annual basis. Formal written reports, as outlined in the contract, will be submitted to the Contracting Officer for review of contractor performance.

9. COR AND CONTRACTOR ACKNOWLEDGEMENT OF QASP

SIGNED:

COR NAME/TITLE DATE

SIGNED:

CONTRACTOR NAME/TITLE DATE

a. The Government shall document positive and/or negative performance. Any report may become a part of the supporting documentation for any contractual action and preparing annual past performance using CONTRACTOR PERFORMANCE ASSESSMENT REPORT (CPAR).
a. Frequency of Measurement: The frequency of measurement is defined in the contract or otherwise in this document. The government (COR or CO) will periodically analyze whether the negotiated frequency of surveillance is appropriate for the work bei...
b. Frequency of Performance Reporting: The COR shall communicate with the contractor on a quarterly and semi-annual basis. Formal written reports, as outlined in the contract, will be submitted to the Contracting Officer for review of contractor ...

File details come from the government source that posted it. Updated .