D.1 Quality Assurance Surveillance Plan.pdf
PDF 116 KB Posted
- Attached to
- Q531--HEMODIALYSIS FOLLOW ON - Columbia
- Solicitation number
- 36C25525Q0252
About this file
The document is a Quality Assurance Surveillance Plan (QASP) for Hemodialysis Services, contract number 36C25525Q0252, issued by the Department of Veterans Affairs Veterans Health Administration at the Columbia, MO VAMC. The QASP outlines comprehensive performance monitoring and evaluation methods for the contract, with specific performance measures including patient access to care, hemodialysis administration, invoice submission, procedure documentation, meeting attendance, licensure maintenance, emergent response, and regulatory compliance. Key surveillance methods include periodic inspections of 10 randomly selected patient files quarterly, validated customer complaint tracking, and performance ratings ranging from Exceptional to Unsatisfactory based on the contractor's ability to meet contractual requirements.
The document details government roles and responsibilities, with Ashley Osborn as the Contracting Officer from Network Contracting Office 15 and Jessica Furlong as the Contracting Officer's Representative from the Columbia, MO VAMC. Performance will be evaluated quarterly, with the Contracting Officer's Representative providing written reports to assess the contractor's performance against predefined standards. The QASP emphasizes that the contractor is responsible for managing quality control and meeting all contract terms, while the government will conduct objective and consistent performance evaluations. The plan includes a detailed Contract Discrepancy Report (CDR) process for addressing performance issues and potential corrective actions.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
D.1 Quality Assurance Surveillance Plan 36C25525Q0252
Quality Assurance Surveillance Plan (QASP)
HEMODIALYSIS SERVICES
The contractor will be evaluated in accordance with the following:
1. PURPOSE
This Quality Assurance Surveillance Plan (QASP) provides a systematic method to evaluate performance for the stated contract. This QASP explains the following:
• What will be monitored?
• How monitoring will take place.
• Who will conduct the monitoring?
• How monitoring efforts and results will be documented.
This QASP does not detail how the contractor accomplishes the work. Rather, the QASP is created with the premise that the contractor is responsible for management and quality control actions to meet the terms of the contract. It is the Government’s responsibility to be objective, fair, and consistent in evaluating performance.
This QASP is a “living document” and the Government may review and revise it on a regular basis. However, the Government shall coordinate changes with the contractor through contract modification. Copies of the original QASP and revisions shall be provided to the contractor and Government officials implementing surveillance activities.
2. GOVERNMENT ROLES AND RESPONSIBILITIES
The following personnel shall oversee and coordinate surveillance activities.
a. Contracting Officer (CO) – The CO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship. The CO shall also assure that the contractor receives impartial, fair, and equitable treatment under this contract. The CO is ultimately responsible for the final determination of the adequacy of the contractor’s performance.
Assigned CO: Ashley Osborn
Organization or Agency: Network Contracting Office 15 (NCO 15)
b. Contracting Officer’s Representative (COR) – The COR is responsible for technical administration of the contract and shall assure proper Government surveillance of the contractor’s performance. The COR shall keep a quality assurance file. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf.
Assigned COR: Jessica Furlong Organization or Agency: Columbia, MO VAMC
3. CONTRACTOR REPRESENTATIVES
The following employee(s) of the contractor serve as the contractor’s program manager(s) for this contract.
Primary:
Alternate:
4. PERFORMANCE STANDARDS
The contractor is responsible for performance of ALL terms and conditions of the contract. CORs will provide contract progress reports quarterly to the CO reflecting performance on this plan and all other aspects of the resultant contract. The performance standards outlined in this QASP shall be used to determine the level of contractor performance in the elements defined. Performance standards define desired services. The Government performs surveillance to determine the level of Contractor performance to these standards.
The Performance Requirements are listed below in Section 6. The Government shall use these standards to determine contractor performance and shall compare contractor performance to the standard and assign a rating. At the end of the performance period, these ratings will be used, in part, to establish the past performance of the contractor on the contract.
5. INCENTIVES/DEDUCTS
The Government shall use past performance as incentives. Incentives shall be based on ratings received on the performance standards.
6. METHODS OF QA SURVEILLANCE
Various methods exist to monitor performance. The COR shall use the surveillance methods listed below in the administration of this QASP.
a. PERIODIC INSPECTION. Inspections scheduled and reported quarterly per COR delegation or as needed. Ten (10) randomly selected patient files will be reviewed per inspection period. All inspections and reports will be conducted in compliance with VA Privacy and Information security standards.
b. VALIDATED USER/CUSTOMER COMPLAINTS. Customer complaint data is compiled quarterly and reviewed by Service Chief – any validated complaints against a Contractor that are not resolved within the required seven day period will be further investigated.
PERFORMANCE MEASURES
Measure PWS Reference Performance Requirement
Standard Acceptable Quality Level
Surveillance Method
Frequency
Patient Access to Care
4.7.4 Patients must receive timely treatment
Contract personnel to be on-site and ready to provide procedure on-time and in accordance with the prescribed time.
100% meets Standards
Ongoing Provider Practice Evaluation (OPPE) data pertinent to care performed for each provider working under this contract.
Quarterly
Administer Hemodialysis
4.7.5
Perform/Administer all treatments as prescribed by the Nephrologist including equipment setup and safety checks.
Registered Nurse performing service shall be responsible for the composition of the dialysate, administration of IV solutions, blood and blood products, and medications (as ordered by the VA attending physician).
100% Direct Observation and/or periodic inspection
Quarterly
Invoices and Supporting Documentation
4.7.6
Invoices and supporting documentation must be submitted no later than the 20th workday of the month.
Invoices and supporting documentation must be submitted no later than the 20th workday of the month.
97% Periodic Inspection
Quarterly
Progress/Procedure Note Signatures
4.7.7
Contract employees to document progress/procedure s on the same day service is provider
Note and/or medical record documentation shall be signed the same day the procedure is performed
80%
Review of appropriate documentation, periodic inspection, and/or chart review
Quarterly
Columbia VAMC Dialysis Committee Meeting Attendance
4.8.8
Contract representative shall be present during Columbia VAMC Dialysis Committee Meeting
Contract representative shall be present during Columbia VAMC Dialysis Committee Meeting
75% Direct Observation
Monthly
Licensure and Certifications
4.7.9
Contractor personnel shall maintain licensure and certifications and renew prior to expiration; no lapse in licensure and/or certification.
All contractor personnel shall maintain licensure and certifications and renew prior to expiration; no lapse in licensure and/or certification.
100% Review of appropriate documentation
As Needed
Emergent response to Columbia VAMC
4.7.10
Contract staff will respond to the Columbia VAMC within 1 hour of notification for emergent ICU dialysis from the ordering VA physician.
Contract staff will respond to the Columbia VAMC within 1 hour of notification for emergent ICU dialysis from the ordering VA physician.
100% Direct Observation
As Requested
Compliance with regulations and standards
4.7.11
Ensure compliance with all relevant regulatory agencies and standards for their personnel
Ensure compliance with all relevant regulatory agencies and standards for their personnel
100% Direct Observation and Periodic Inspections
Quarterly
7. RATINGS
Metrics and methods are designed to determine rating for a given standard and acceptable quality level. The following ratings shall be used:
EXCEPTIONAL: Performance meets contractual requirements and exceeds many to the Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.
Note: To justify an Exceptional rating, you should identify multiple significant events in each category and state how it was a benefit to the GOVERNMENT.
However a singular event could be of such magnitude that it alone constitutes an Exceptional rating. Also there should have been NO significant weaknesses identified.
VERY GOOD:
Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.
Note: To justify a Very Good rating, you should identify a significant event in each category and state how it was a benefit to the GOVERNMENT. Also there should have been NO significant weaknesses identified.
SATISFACTOR
Y:
Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
Note: To justify a Satisfactory rating, there should have been only minor problems, or major problems the contractor recovered from without impact to the contract.
Also there should have been NO significant weaknesses identified.
MARGINAL:
Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.
Note: To justify Marginal performance, you should identify a significant event in each category that the contractor had trouble overcoming and state how it impacted the GOVERNMENT. A Marginal rating should be supported by referencing the management tool that notified the contractor of the contractual deficiency (e.g.
Management, Quality, Safety or Environmental Deficiency Report or letter).
UNSATISFACT
ORY:
Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element being assessed contains serious problem(s) for which the contractor’s corrective actions appear or were ineffective.
Note: To justify an Unsatisfactory rating, you should identify multiple significant events in each category that the contractor had trouble overcoming and state how it impacted the GOVERNMENT. However, a singular problem could be of such serious magnitude that it alone constitutes an unsatisfactory rating. An Unsatisfactory rating should be supported by referencing the management tools used to notify the contractor of the contractual deficiencies (e.g. Management, Quality, Safety or Environmental Deficiency Reports, or letters).
8. DOCUMENTING PERFORMANCE
a. The Government shall document positive and/or negative performance. Any report may become a part of the supporting documentation for any contractual action and preparing annual past performance using
CONTRACTOR PERFORMANCE ASSESSMENT REPORT (CPAR).
b. If contractor performance does not meet the Acceptable Quality level, the CO shall inform the contractor.
This will normally be in writing unless circumstances necessitate verbal communication. In any case the CO shall document the discussion and place it in the contract file. When the COR and the CO determines formal written communication is required, the COR shall prepare a Contract Discrepancy Report (CDR), and present it to CO. The CO will in turn review and will present to the contractor's program manager for corrective action.
The contractor shall acknowledge receipt of the CDR in writing. The CDR will specify if the contractor is required to prepare a corrective action plan to document how the contractor shall correct the unacceptable performance and avoid a recurrence. The CDR will also state how long after receipt the contractor has to present this corrective action plan to the CO. The Government shall review the contractor's corrective action plan to determine acceptability. The CO shall also assure that the contractor receives impartial, fair, and equitable treatment. The CO is ultimately responsible for the final determination of the adequacy of the contractor’s performance and the acceptability of the Contractor’s corrective action plan.
Any CDRs may become a part of the supporting documentation for any contractual action deemed necessary by the CO. See Sample CDR below.
CONTRACT DISCREPANCY REPORT
1. CONTRACT NUMBER 2. REPORT NUMBER FOR THIS
DISCREPANCY
3. TO: (Contracting Officer) 4. FROM: (Name of COR)
5. DATES
a. CDR PREPARED
b. RETURNED BY
CONTRACTOR:
c. ACTION COMPLETE
6. DISCREPANCY OR PROBLEM (Describe in detail. Include reference to PWS Directive;
attach continuation sheet if necessary.)
7. SIGNATURE OF COR Date:
8. SIGNATURE OF CONTRACTING OFFICER Date:
9a. TO (Contracting Officer) 9a. FROM (Contractor)
10. CONTRACTOR RESPONSE AS TO CAUSE, CORRECTIVE ACTION AND ACTIONS
TO PREVENT RECURRENCE. (Cite applicable quality control program procedures or new procedures. Attach continuation sheet(s) if necessary.)
11. SIGNATURE OF CONTRACTOR REPRESENTATIVE Date:
12. GOVERNMENT EVALUATION. (Acceptance, partial acceptance, reflection. Attach continuation sheet(s) if necessary.)
13. GOVERNMENT ACTIONS (Acceptance, partial acceptance, reflection. Attach continuation sheet(s) if necessary.)
14. CLOSE OUT
NAME TITLE SIGNATURE DATE
CONTRACTOR
NOTIFIED
COR
CONTRACTING
OFFICER
9. FREQUENCY OF MEASUREMENT
a. Frequency of Measurement. The frequency of measurement is defined in the contract or otherwise in this document. The government (COR or CO) will periodically analyze whether the frequency of surveillance is appropriate for the work being performed.
b. Frequency of Performance Reporting. The COR shall communicate with the Contractor and will provide written reports to the Contracting Officer quarterly (or as outlined in the contract or COR delegation) to review Contractor performance.
10. COR AND CONTRACTOR ACKNOWLEDGEMENT OF QASP
SIGNED:
Jessica Furlong, ADMINISTRATIVE OFFICER, COR DATE
SIGNED:
Ashley Osborn, CONTRACTING OFFICER DATE
File details come from the government source that posted it. Updated .