D- 1988 SGM Gypsum Mosher Elevation Plans.pdf

PDF 2 MB Posted

Attached to
2025 Mosher Water Treatment Plant (WTP) Roof Replacement
Solicitation number
25-24
Issued by
Gilpin County, Colorado

About this file

The document is an architectural elevation drawing prepared by Schmueber Gordon Meyer Inc., Engineers & Surveyors, for the Town of Gypsum, Colorado, specifically detailing the elevation plans for a building. The drawing includes four distinct elevation views - West, North, South, and an implied East elevation - with precise measurements and architectural details. The elevation plans show a rectangular structure with varying heights, multiple wall sections, and several ventilation or utility openings, suggesting this is a technical schematic for a proposed construction or renovation project.

The elevation drawing provides detailed architectural specifications, including precise linear measurements ranging from 77.1' to 85.85', with notations about specific architectural features such as "No Door Here" and a "~1' Gap". The document appears to be part of the technical documentation for the 2025 Mosher Water Treatment Plant Roof Replacement project, which involves constructing a new metal mechanically sealed standing seam roof. The drawing is formatted with professional engineering standards, including a title block with the engineering firm's information and space for revision tracking, indicating this is a formal technical document intended for construction planning and potential bidding purposes.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

77.1' ??

No Door Here

~1' Gap

85.85'

File details come from the government source that posted it. Updated .