A- Bid Sheet, 2025-06-24 Mosher WTP Roof Replacement.xls
XLS spreadsheet 43 KB Posted
- Solicitation number
- 25-24
- Issued by
- Gilpin County, Colorado
About this file
This is a bid sheet for the Mosher Water Treatment Plant (WTP) Roof Replacement project in the Town of Gypsum, Colorado, soliciting competitive bids for a comprehensive roof replacement. The project involves removing the existing roof, including gas vents and gutters, and installing a new mechanically sealed standing seam metal roof with 1.5" polyisocyanurate (polyiso) insulation. The project footprint is 6,104 square feet with a roof area of 6,185 square feet (62 squares). Key dates include a non-mandatory pre-bid meeting on June 26, 2025, bid opening on July 15, 2025, Town Council selection on July 22, 2025, and project completion no later than October 3, 2025. Work hours are restricted to 6 AM to 7 PM daily, with weekend work requiring Utility Director permission.
The total bid amount is $22,414.25, which includes a performance and two-year warranty bond. The roofing permit through Eagle County is estimated at $1,153. The project requires specific technical specifications, including mechanically fastened 2x4s, ISO insulation, ice and water shield, and 16" metal panels in 24-gauge with a color matching the existing roof. The contractor will have limited site access (6 AM to 4 PM Monday-Thursday, 7 AM to 4 PM Friday) and must use the gate combination provided for site security. Invoicing will be accepted by noon on the 1st or 3rd Tuesday, with payment processed on the 2nd or 4th Tuesday respectively.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bid Sheet
| Bid SHEET - Mosher Roof Replacement- 2025 | Date: June 24, 2025 | |||||
| Bid schedule critical times and dates: | ||||||
| a | Non-Mandatory Pre-bid meeting Thursday, June 26, 2025 at 11:00 AM @ Community Development Conference Room | |||||
| b | Bid all items below as winner takes all. | |||||
| c | Bid Opening = Tuesday, July 15, 2025 at 11:00 AM, at the Community Dev. Conference room | |||||
| d | Town Council (T.C.) selection on Tuesday, July 22nd at a 7 PM public meeting | |||||
| e | Notice to Proceed- as soon as all contract documents are signed and received from the Council selected bidder. | |||||
| f | Work completed and ready for punchlist No Later Than (NLT) October 3, 2025. The 7,000' elevation starts getting cold. | |||||
| g | 100% complete and accepted for Two-Year Warranty start NLT October 17, 2025. | |||||
| h | Invoices received by noon on the 1st or 3rd Tuesday, for completed work, will be paid on the 2nd or 4th Tuesday respectively. | |||||
| Standards and Definitions: | ||||||
| i | Security at the WTP- gate combo available for contractor. No inside building access outside Town working hours. | 6 AM to 4 PM Mon-Th, Friday 7-4, weekends varies | ||||
| j | Restricted hours of roofing construction are 6 AM to 7 PM daily. Weekends by permission of Utility Director only. | |||||
| k | Roofing Permit through Eagle County with a permit cost estimate of $1,153 for a $100,000 roof. | Town of Gypsum is less, but only if the County allows the Town to inspect outside of Town limits-- standby. | ||||
| l | Footprint of building = 71.1' x 85.5' = 6,104 SF | |||||
| m | Roof = 2 x 35.75' x 86.5'(includes 6" Nth & Sth overhang) = 6,185 SF = 62 squares. Confirm measure roof panels for accuracy. | |||||
| n | Existing roof has a 10" thick insulation layer of vinyl backed fiberglass under 3/4" plywood. 10" x R-3.6 = R-36 existing roof. | |||||
| o | ISO insulation, Polyisocyanurate (polyiso) rigid foam insulation material shall be used due to its superior quality and high R-value per inch, (R-5.7 to R-6.5), so 1.5" = R-8.5 min. | |||||
| p | ||||||
| q | Blank | |||||
| r | Blank | |||||
| Mosher Roof Removal and Replacement | ||||||
| GENERAL & DEMO DESCRIPTION | QNTY | Unit | Unit Price | Total | Calculations- where the quantities came from | |
| 1 | Remove all old roof propane gas vents, roof jacks, and flag brace. The only roof penetration will be the restroom VTR on the west roof slope. | 9 | EA | $ 1.00 | $ 1.00 | |
| 2 | Remove gutters to prepare for new installation. Reuse gutters & downspouts if possible. | 1.00 | LS | $ 1.00 | $ 1.00 | |
| 3 | Dispose of all debris and/or recycle locally at Trinity Recycle | 1.00 | LS | $ 1.00 | $ 1.00 | |
| 4 | Porta-jon | 1.00 | LS | $ 1.00 | $ 1.00 | |
| 5 | Roofing Permit fee through Eagle County = $1,153, less if Town? | 1.00 | LS | $ 1,153.00 | $ 1,153.00 | |
| 10 | GUTTER & TRIM DESCRIPTION | QNTY | Unit | Unit Price | Total | |
| 11 | Drip Edge all around- metal tan color to match closely. Screw at 12" O.C. | 245 | LF | $ 1.00 | $ 245.00 | 86.5' + 86.5' + 36' + 36' = 245' |
| 12 | Gutter- match existing color and style closely. Industrial grade. | 173 | LF | $ 1.00 | $ 173.00 | 86.5' x 2 = 173' install new as needed. |
| 13 | Fasteners, per 2021 Bldg Code, include cost in quantities above & below | |||||
| 14 | End Dam "C channel" near ridge to waterproof ridge | 173 | LF | $ 1.00 | $ 173.00 | |
| 15 | Ridge Cap- metal to match new color. 12" each side x 2 = 24" wide | 87 | LF | $ 1.00 | $ 87.00 | |
| 16 | Blank | |||||
| $ - 0 | ||||||
| 20 | Mechanically Sealed Standing Seam | |||||
| 21 | ROOFING DESCRIPTION | QNTY | Unit | Unit Price | Total | |
| 22 | Mechanically fasten(stagger-offset 8" O.C.) flat 2x4s to each purlin(4' O.C., using countersunk TPO self tapping screws, #14 min.) and at the perimeter's eve & rake. | 1,692 | 22 | $ 1.00 | $ 1,692.00 | Nth-Sth 18 x 86' + 4 X 36' = 1,692' |
| 23 | ISO Insulation between the 2x4s at 1.5" thick, Use adhesive to hold in place. | 6,185 | SF | $ 1.00 | $ 6,185.00 | Trim 1.5"x4'x8' sheets to fit between 2x4s |
| 24 | Cover 2x4s & ISO with Ice & water shield rubber member. Bid Alternate. | 6,185 | SF | $ 1.00 | $ 6,185.00 | 6,185 SF payable, include overlap for ordering. |
| 25 | Blank | |||||
| 26 | Install mechanically sealed Standing Seam metal roof. Color close to existing. 16" Panels, 24 gage. Bid Qty shown, but order after confirming measurement. All clips shall anchor into the 2x4s. | 6,185 | SF | $ 1.00 | $ 6,185.00 | |
| 27 | Any missing items above which are necessary to meet the 2021 IBC | 1 | LS | $ 1.00 | $ 1.00 | |
| 30 | SUB TOTAL = | $ 22,083.00 | ||||
| 31 | (formula uses 1.5%, so change if yours is different) Performance & Two Year Warranty Bond = | $ 331.25 | ||||
| 32 | Amount to be read at the bid opening = | $ 22,414.25 | ||||
| _____________________________________ ___________________________ , 2025 | ||||||
| Printed Name of Bidder Signature | Date | |||||
| _________________________________________________________________ | ||||||
| Company Name |
Sheet1 ISO insulation, commonly known as polyisocyanurate (polyiso), is a highly effective rigid foam insulation material widely used in commercial roofing and building applications due to its excellent thermal resistance and fire safety properties.
Polyisocyanurate insulation, often referred to as ISO, is a type of rigid foam insulation that is known for its high R-value per inch, typically ranging from R-5.7 to R-6.5. This makes it one of the most efficient insulation materials available, particularly for commercial applications. 1.5" = R-8.6 minimum. 3" = R-17.2 min. 3.5" = R-20 min.