1B- Mosher Roof Project Bid Form, 2025-06-24.docx

DOCX document 40 KB Posted

Attached to
2025 Mosher Water Treatment Plant (WTP) Roof Replacement
Solicitation number
25-24
Issued by
Gilpin County, Colorado

About this file

This document is a Bid Form for the Mosher Water Treatment Plant (WTP) Roof Replacement project issued by the Town of Gypsum, Colorado. The project involves replacing the existing roof with a new metal mechanically sealed standing seam roof construction. The bidder is required to complete the project with specific milestone dates: startup of major equipment within thirty days, substantial completion by October 3, 2025, and punchlist completion by October 17, 2025. The bid includes liquidated damages provisions of $100 per day for late substantial completion and late punchlist completion. Bidders must submit a 5% bid security and acknowledge any addenda.

The bid form outlines detailed submission requirements, including provisions for individual, partnership, and corporate bidders. The project will involve multiple subcontractors for various aspects of the work, including gutter work, insulating, concrete, excavating, paving, roto-milling, and traffic control. The bid requires listing of material and equipment suppliers, with mechanical sealed standing seam panels specifically noted. The Town of Gypsum reserves the right to reject any and all bids, and the bid cannot be withdrawn for 60 days after the scheduled bid receipt time. The successful bidder will be expected to enter into an agreement within 10 days of bid acceptance and provide performance, payment, and warranty bonds.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BID FORM

2025 Mosher Water Treatment Plant (WTP) Roof (To submit for Bid Opening with Bid Sheet)

To:
OWNER:

PROJECT:

TOWN OF GYPSUM

P. O. Box 130 Gypsum, Colorado 81637 (970-524-1728

Mosher WTP Roof Project

PO BOX 130

GYPSUM, COLORADO 81637

THE UNDERSIGNED BIDDER, having familiarized himself with the Work required by the Contract Documents, the site where the Work is to be performed, local labor conditions and all laws, regulations and other factors affecting performance of the Work, and having satisfied himself of the expense and difficulties attending performance of the Work, HEREBY PROPOSES AND AGREES, if this Bid is accepted, to enter into Agreement in the form attached, to perform all Work, including the assumption of all obligations, duties and responsibilities necessary to the successful completion of the Agreement and the furnishing of materials and equipment required to be incorporated in and form a permanent part of the Work, tools, equipment, supplies, transportation, facilities, labor, superintendence and services required to perform the Work; and Bond, insurance and submittals; all as indicated or specified in the Contract Documents to be performed or furnished by Contractor in accordance with the following Bid prices (Contractor must submit on Base Bid and Bid Alternates, if any, to be considered).

BASE BID PRICE: ___________________________________________ Dollars ($______________________).

The undersigned Bidder agrees to furnish the required Bond and enter into Agreement within TEN (10) days after acceptance of this Bid, and further agrees to complete all Work covered by the Bid, in accordance with specified requirements and in accordance with the following schedule (Bidder to enter number of days after date of Notice to Proceed for all of the following, unless number of days has already been entered):

1.
Startup of all Major Equipment
Thirty

Days

2.
Substantial Completion (Ready for Punchlist)
10-3-2025
Date
3.
Punchlist Complete
10-17-2025
Date

Liquidated Damages. Owner and Contractor recognize that time is of the essence of this Agreement and that Owner will suffer financial loss if the Work is not substantially completed within the time specified above, plus any extensions thereof allowed in accordance with the General Conditions. They also recognize the delays, expense and difficulties involved in proving, in a legal or arbitration proceeding, the actual loss suffered by the Owner if the Work is not substantially completed on time. Accordingly, instead of requiring any such proof, Owner and Contractor agree that as liquidated damages for delay (but not as a penalty), Contractor shall pay Owner in accordance with the following:

1
Late Startup of all major Equipment
$
0.00
Per Day
2.
Late Substantial Completion
$
100.00
Per Day

(Ready for Punchlist)

3.
Late Punchlist Completion
$
100.00
Per Day

Receipt of copies of the following addenda is hereby acknowledged.

Addendum No.
Bidder’s Signature
Date Acknowledged
#1
______________
_______________

Enclosed herewith is the required 5% Bid Security, in the form of Business Check/Bid Bond (strike one), in the amount of ________________________________________________ Dollars ($_____________) which the undersigned Bidder agrees is to be forfeited to and become the property of owner, as liquidated damages, should this Bid be accepted and he fails to enter into Agreement in the form prescribed and to furnish the required Bonds within ten (10) days, but otherwise the Bid security will be returned upon Bidder signing the Agreement and delivering the Performance, Payment and Warranty Bond.

In submitting this Bid, it is understood that Owner reserves the right to reject any and all Bids, and it is understood that this Bid may not be withdrawn during a period of sixty (60) days after the scheduled time for the receipt of Bids.

The undersigned Bidder hereby certifies (a) that this Bid is genuine and is not made in the interest of, or in the behalf of, any undisclosed person, firm, or corporation, and is not submitted in conformity with any agreement or rules of any group, association, organization, or corporation; (b) that he has not directly or indirectly induced or solicited any other Bidder to put in a false or sham Bid; (c) that he has not solicited or induced any person, firm, or corporation to refrain from bidding; and (d) that he has not sought by collusion to obtain for himself any advantage over any other Bidder or over the Owner.

The full names and addresses of parties interested in this Bid as principals are as follows:

Name
Address

SIGNATURE OF BIDDER

If an Individual:
[signature]

Print or type name:

Doing business as:

Date:

If a Partnership:

By:
[signature]

General Partner

Print or type name:

Date:

If a Corporation:

(a

Corporation)

By:
[signature]

Print or type name:

Title:

Date:

(S E A L)

ATTEST:

Title:

If Bidder is a joint venturer, all venturers or their authorized agents must sign below.

Name of Joint Venture:

If Joint Venture is:

An Individual:
[signature]

Print or type name:

Doing business as:

Date:

A Partnership:

By:
[signature]

General Partner

Print or type name:

Date:

A Corporation:

(a

Corporation)

By:
[signature]

Print or type name:

Title:

Date:

(S E A L)

ATTEST:

Title:

MATERIAL AND EQUIPMENT SUPPLIER LISTING

The following information is submitted for each major supplier of material and each manufacturer and supplier of equipment for manufacturers and suppliers of major items of material, equipment and systems to be used in the Work if the Bidder is awarded the contract.

Specification Section No.

Material or Equipment Description Manufacturer and Supplier

Mech. Sealed Standing Seam panels

The Surety who will be the surety on the Performance, Payment and Warranty Bond will be ___________________________________________________________________________.

Signature

SUBCONTRACTOR LISTING

The following information is submitted with the bid opening documents for each subcontractor that will be used in the Work if the Bidder is awarded the Agreement. Additional numbered pages shall be attached to this page as required. Each page shall be headed “SUBCONTRACTOR LISTING” and signed. All Work to be subcontracted over $_10,000.00____ shall be listed.

Amount of Subcontract Name and Address of Subcontractor Portion of Work

Gutter work Insulating Work Concrete Excavating Paving Roto-Milling Traffic Control (Delete any that don’t apply, or add new)

Signature

X:\ ENG \ Web postings-2023\Bid Form.DOC

File details come from the government source that posted it. Updated .