CVG_POLICE_DEPT_BID_SPECS_-_Exhibit_E.pdf
PDF 9 MB Posted
- Attached to
- Police Department Rehabilitation Project
- Solicitation number
- 26-059-ITB
- Issued by
- Kenton County, Kentucky
About this file
This is a bid specifications document (Exhibit E) for the Kenton County Airport Board's Police Department Rehabilitation Project located in Hebron, Kentucky. The project involves rehabilitation work for the airport's police department facilities at 3222 Terminal Drive. A mandatory pre-proposal meeting and site visit is scheduled for Thursday, November 19, 2026, at 10:00 am at the project location. Written questions from bidders must be submitted by 11:59 am on Tuesday, December 1, 2026, with answers posted no later than Monday, December 7, 2026, at 11:59 pm. Proposals must be received by Thursday, December 17, 2026, at 2:00 pm, with no late submissions accepted unless an addendum extends the deadline.
The specifications document contains detailed technical requirements and standards for the rehabilitation work. Pricing terms, set-asides, funding sources, and other financial details are not disclosed in this excerpt of the bid specifications. Bidders should review the complete specifications document along with all related exhibits and addenda for comprehensive project requirements, scope details, and evaluation criteria necessary to prepare a competitive proposal.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Kenton County Airport Board Cincinnati/Northern KY International Airport
Interior Improvements
Police Department
Issued for Bidding: October 2026 TOC - 1/2 Table of Contents
Table of Contents
General Requirements
DIVISION 01 - GENERAL REQUIREMENTS
011000 SUMMARY 8
012100 ALLOWANCES 3
Architectural
DIVISION 02 - EXISTING CONDITIONS
024119 SELECTIVE DEMOLITION 6
DIVISION 04 – UNIT MASONRY
040120 MASONRY REPAIR 7
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
079200 JOINT SEALANTS 8
DIVISION 09 - FINISHES
092900 GYPSUM BOARD 6
095123 ACOUSTICAL TILE CEILINGS 7
096513 RESILIENT BASE AND ACCESSORIES 4
096723 RESINOUS FLOORING 7
096813 TILE CARPETING 5
099123 INTERIOR PAINTING 7
099611 HIGH PERFORMANCE COATINGS 5
DIVISION 21 – FIRE SUPPRESSION
210501 Common work results for Fire Protection
210517 Sleeves and sleeve seals for Fire-Suppression piping
210518 Escutcheons for fire-suppression piping
210529 Hangers and Supports for Fire-Suppression Piping and Equipment
210553 Identification for fire-suppression piping and equipment
211313 Wet-pipe sprinkler systems
DIVISION 23 - HEATING VENTILATING AND AIR CONDITIONING
230501 Common Requirements for HVAC
230505 Existing Conditions and Demolition
230513 Common Motor Requirements for HVAC Equipment
230513.13 HVAC Variable Frequency Drives
230519 Meters and Gages for HVAC Piping
230529 Hangers and Supports for HVAC Piping and Equipment
230548.13 Vibration Isolation for HVAC
230553 Identification for HVAC Piping and Equipment
230593 Testing, Adjusting, and Balancing for HVAC
230713 HVAC Duct Insulation
230716 HVAC Equipment Insulation
230719 HVAC Piping Insulation
230800 Commissioning of HVAC Systems
230923 Direct Digital Control (DDC) System for HVAC
232113 Above Ground Hydronic Piping
232116 Hydronic Piping Specialties and Valves
Issued for Bidding: October 2026 TOC - 2/2 Table of Contents
232123 HVAC Hydronic Pumps
232300 Refrigerant Piping
232500 HVAC Water Treatment
233113 Metal Ductwork
233300 Air Duct Accessories
233423 HVAC Power Ventilators
233600 Air Terminal Units
233713 HVAC Diffusers, Registers, and Louvers
233723 Gravity Ventilators
236423.13 Air-Cooled, Scroll Water Chillers
237313 Central Station Air Handling Units
DIVISION 26 - ELECTRICAL
260010 General Requirements for Electrical Systems
260500 Common Work Results for Electrical Systems
260503 Shop Drawings, Submittals, Literature, Manuals, Parts Lists, and Special Tools
260505 Selective Demolition for Electrical
260519 Low-Voltage Electrical Power Conductors and Cables
260526 Grounding and Bonding for Electrical Systems
260529 Hangers and Supports for Electrical Systems
260533 Raceways and Boxes for Electrical Systems
260553 Identification for Electrical Systems
262416 Panelboards
262726 Wiring Devices
262813 Fuses
262816 Enclosed Switches and Circuit Breakers
265119 LED Interior Lighting
DIVISION 27 – COMMUNICATIONS
270010 Supplemental Requirements for Communications
270528 Pathways for Communications Systems
270553 Identification for Communications Systems
DIVISION 32 – EXTERIOR IMPROVEMENTS
323116 WELDED WIRE FENCE AND GATES 10
END OF TABLE OF CONTENTS
Issued for Bidding: October 2026 011000 - 1/8 Summary
SECTION 011000 - SUMMARY
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section Includes:
1. Project information.
2. Work covered by Contract Documents.
3. Schedule and Submittals
4. Work by Owner.
5. Work under separate contracts.
6. Coordination with occupants.
7. Work restrictions.
8. Specification and drawing conventions.
9. Permits and Fees.
10. Safety and Protection.
1.3 PROJECT INFORMATION
A. Project Identification: Police Station
1. Project Location: 3222 Terminal Drive - Boone County, Kentucky.
B. Owner: CINCINNATI / NORTHERN KENTUCKY INTERNATIONAL AIRPORT P.O. Box 752000 Cincinnati, OH
45275-2000.
1.4 WORK COVERED BY CONTRACT DOCUMENTS
A. The Scope of Work is defined by the Contract Documents and consists of the following:
1. The demolition and renovation of interior spaces and miscellaneous exterior work.
2. Coordination and execution of all demolition/renovation activities including:
a. Removal and legal disposal of demolished material.
b. Salvaging items for reuse or storage by Owner.
c. Conformance and implementation of all requirements dictated by federal, state and local authorities having jurisdiction.
B. Temporary restroom trailers:
1. Contractor shall provide one (3) stall restroom trailer and one (2) stall restroom trailer with shower in each stall throughout the Phase 2 renovation of Women #112 and Men #113. The trailers shall be located in the parking lot per sheet AS100.
a. Trailers shall be self-containing with fresh water tank and waste tank. There will NOT be water or sanitary connection to the building. Electric connection to the existing building is to be provided. Refer to the Electrical drawings
b. Both trailers are to be serviced daily (including weekends/holidays) including fresh water tank fill, waste holding tank pump out, stocking of toiletry supplies, and cleaning.
Issued for Bidding: October 2026 011000 - 2/8 Summary
C. Type of Contract:
1. Project will be constructed under a single prime contract using Owners Standard Construction
Contract.
1.5 SCHEDULES AND PLAN SUBMITTALS
A. Construction Schedule submitted prior to the commencement of work.
1. Contractor shall submit a comprehensive, fully developed, horizontal, Gantt-chart-type, Contractor's construction schedule within 30 days of the Notice of Award. Base schedule on the
Owner’s startup construction schedule and all additional information received pre and post bid due date.
2. Preparation: Indicate each significant construction activity separately. Identify first workday of each week with a continuous vertical line.
3. For construction activities that require three months or longer to complete, indicate an estimated completion percentage in 10 percent increments within time bar.
B. Contractor's Construction Schedule Updating: At monthly intervals, update schedule to reflect actual construction progress and activities. Issue schedule one week before each regularly scheduled progress meeting.
1. Revise schedule immediately after each meeting or other activity where revisions have been recognized or made. Issue updated schedule concurrently with the report of each such meeting.
2. Include a report with updated schedule that indicates every change, including, but not limited to, changes in logic, durations, actual starts and finishes, and activity durations.
C. As the Work progresses, indicate final completion percentage for each activity
1.6 WORK BY OWNER
A. General: Cooperate fully with Owner so work may be carried out smoothly, without interfering with or delaying work under this Contract or work by Owner. Coordinate the Work of this Contract with work performed by Owner.
B. Preceding Work: Owner shall remove and salvage furniture, casework, equipment, devices, materials deemed of value. Those operations are scheduled to be substantially complete before work under this
Contract begins.
1.7 WORK UNDER SEPARATE CONTRACTS
A. General: Cooperate fully with separate contractors so work on those contracts may be carried out smoothly, without interfering with or delaying work under this Contract or other contracts. Coordinate the Work of this Contract with work performed under separate contracts.
1.8 COORDINATION WITH OCCUPANTS
A. Partial Owner Occupancy: Owner will occupy the site and maintain airfield operations during the entire construction period. Cooperate with Owner during construction operations to minimize conflicts and facilitate Owner usage. Perform the Work so as not to interfere with Owner's operations. Maintain existing exits unless otherwise indicated.
1. Maintain access to existing walkways, corridors, and other adjacent occupied or used facilities.
Do not close or obstruct walkways, corridors, or other occupied or used facilities without written permission from Owner and authorities having jurisdiction.
Issued for Bidding: October 2026 011000 - 3/8 Summary
2. Provide not less than 72 hours' notice to Owner of activities that will affect Owner's operations.
1.9 WORK RESTRICTIONS
A. Work Restrictions, General: Comply with restrictions on construction operations.
1. Comply with limitations on use of public streets and with other requirements of authorities having jurisdiction.
B. On-Site Work Hours: Working hours Monday through Saturday shall not 7:00 AM – 5:00 PM.
C. Existing Utility Interruptions: Do not interrupt utilities serving facilities occupied by Owner or others unless permitted under the following conditions and then only after providing temporary utility services according to requirements indicated:
1. Notify Owner and Project Coordinator not less than two days in advance of proposed utility interruptions.
2. Obtain Project Coordinator’s written permission before proceeding with utility interruptions.
D. Noise, Vibration, Odors and Dust: Coordinate operations that may result in high levels of noise and vibration, odors, dust or other disruption to Owner occupancy with Owner.
1. Notify Owner and Project Coordinator not less than two days in advance of proposed disruptive operations.
2. Obtain Project Coordinator’s written permission before proceeding with disruptive operations.
3. Dust control shall include the concurrent application of water to control the creation and movement of dust clouds. NO additional compensation shall be made for water dust control requirements of the Owner or Engineer.
E. Code of Conduct: The contractor shall establish and enforce a CODE OF CONDUCT for all individuals working on the airport grounds. The Owner is the sole arbiters of what constitutes a violation resulting in immediate and permanent removal from the project.
1. All workers are required to wear shirts.
2. Smoking and tobacco use of any kind is prohibited.
3. Alcohol consumption and illicit drug use is prohibited.
4. Firearms and switchblades are prohibited.
5. Profanity and any other foul language or phrases are prohibited.
6. Fraternizing with airport personal is prohibited.
7. Radios, CD players and tape players are prohibited.
1.10 SPECIFICATION AND DRAWING CONVENTIONS
A. Specification Content: The Specifications use certain conventions for the style of language and the intended meaning of certain terms, words, and phrases when used in particular situations. These conventions are as follows:
1. Imperative mood and streamlined language are generally used in the Specifications. The words
"shall," "shall be," or "shall comply with," depending on the context, are implied where a colon (:)
is used within a sentence or phrase.
2. Specification requirements are to be performed by Contractor unless specifically stated otherwise.
B. General Requirements: Requirements of all the Kenton County Airport Board contract documents and
Sections in Division 01 apply to the Work of ALL Sections in the Specifications.
Issued for Bidding: October 2026 011000 - 4/8 Summary
C. Drawing Coordination: Requirements for materials and products identified on Drawings are described in detail in the Specifications. One or more of the following are used on Drawings to identify materials and products:
1. Terminology: Materials and products are identified by the typical generic terms used in the individual Specifications Sections.
2. Abbreviations: Materials and products are identified by abbreviations published as part of the
U.S. National CAD Standard.
3. Keynoting: Materials and products are identified by keynotes and by association to respective
Specification Sections.
1.11 PERMITS AND FEES
A. The Contractor shall obtain and pay for the local building permit. The original upon receipt shall be kept on display at the site and a copy will be furnished to the Owner. The contractor and or subcontractors shall obtain and pay for all other necessary permits, governmental fees, licenses and inspections required for the proper execution and completion of the scope of work requiring additional permits and/or fees.
1. Contractor shall schedule and include costs for inspections and testing in order to prevent delays.
Multiple tests or comebacks as may be required for this coordination shall be included.
1.12 SAFETY AND PROTECTION
A. The Architect’s and Engineer’s on site observations of the work are not intended to include review of the adequacy of the Contractor’s safety measures on or near the site. Compliance with all regulations pertaining to safety and health is the complete responsibility of the Contractor. Contractor shall be solely responsible for safety and protective measures in order to protect persons and property.
B. Contractor shall comply with all OSHA regulations and shall submit to Owner the required Material
Safety Data Sheets for any hazardous material they may use or bring on the site in the performance of their work. Contractors are to submit site-specific MSDS sheets, organized in a binder. If a catalog is submitted, it shall be properly tabbed with job site-specific items identifying each hazardous chemical on the work place.
C. This is a 100% eye protected project. Any contractor employee that doesn’t have the required eye protection shall be required to leave the site until such eye protection is obtained.
D. Safety measures shall include barricades and trench boxes at all open excavations. All Sub-Contractors prior to the start of work must execute an affidavit verifying compliance.
1. Contractor and Subcontractors are to provide to the Owner a written safety plan to be utilized in the execution of the work.
2. All doorways affected by construction need to be maintained for life safety. All individuals are required to keep their materials, equipment, tools and supplies away from all exterior doors in the construction area. These doors will be used as emergency egress only and shall not to be blocked or barricaded for any reason.
PART 2 - PRODUCTS
2.1 PRODUCT SELECTION DEFINITIONS
A. Where Specifications include the phrase "as selected from manufacturer's colors, patterns, and textures" or a similar phrase, select a product that complies with other specified requirements.
Issued for Bidding: October 2026 011000 - 5/8 Summary
1. Standard Range: Where Specifications include the phrase "standard range of colors, patterns, textures" or similar phrase, Architect will select color, pattern, density, or texture from manufacturer's product line that does not include premium items.
2. Full Range: Where Specifications include the phrase "full range of colors, patterns, textures" or similar phrase, Architect will select color, pattern, density, or texture from manufacturer's product line that includes both standard and premium items.
PART 3 - EXECUTION
3.1 GENERAL REQUIREMENTS
A. The General Contractor shall be responsible for and have control over all construction means, methods, manners, techniques, sequences and procedures for all portions of the Work and shall be responsible for any injury or damage which may result from improper construction, installation, maintenance or operation to the fullest extent permitted by law.
1. Providing submittals including product data, material certificates and meeting quality assurance items including testing standards and preinstallation conferences are the sole responsibility of the Contractor. Failure of the Contractor to provide information requested or proof of quality standards established for this project does not absolve the Contractor in meeting all industry standards and quality required in the execution of the work as defined in the contract documents and agreement between Owner and Contractor.
B. The Contractor shall perform all related work shown on the Contract Documents other than those items specifically indicated to be excluded.
1. The Scope of Work takes precedence over the drawings and specifications in the event of a conflict in trade assignment or responsibility.
2. Where drawings or specifications exceed code requirements, the drawings and specifications shall govern. Install no work contrary to minimum legal standards
3. Quantities of materials if noted on the drawings are for information only.
C. Conflicts between Industry/trade standards and manufacturer’s written recommendations shall be immediately brought to the attention of the Project Coordinator. Contactor shall assume all responsibility for installation of systems and materials that do not meet BOTH Industry/trade standards and manufacturer’s written recommendations or are known, suspected, or proven to distort, crack, or fail in any way without written notice to the Architect and Owner.
3.2 SUBMITTALS, SHOP DRAWINGS, AND COLOR SUBMISSIONS
A. Providing the various submittals requested throughout the contract documents shall be the sole responsibility of the contractor. Submissions intentionally or un-intentionally not provided do not relieve the Contractor of providing materials and installations as specified in the contract documents acceptable to the Architect and Owner.
B. The Contractor shall review and approve all submittals including shop drawings and samples prior to submitting to the Architect for review for completeness including required samples for finish and color selections. The architect’s review of shop drawings does not relieve the contractor from providing all material and work shown and described on the contract documents. The architect’s approval of shop drawings is limited to conformance with the design intent implied through the contract documents.
1. Pictures or facsimiles that do not guarantee color accuracy of the material or finish are not acceptable submittals.
Issued for Bidding: October 2026 011000 - 6/8 Summary
2. The contractor shall verify all dimensions and locations and be responsible for coordination drawings of items furnished by their supplier and sub-contractors, when modified, adjusted or relocated from what was shown or described on the contract documents. Coordination drawings shall be submitted with respective shop drawings. Review of shop drawings and coordination drawings by the Architect or their consultants does not relieve the contractor from verifying and accepting responsibility for all measurements and dimensions.
3. SHOP DRAWINGS AND COORDINATION DRAWINGS ARE NOT CONTRACT DOCUMENTS. They are instruments prepared and used by the contractor, suppliers, sub-contractors and others as directed by the contractor to facilitate in the execution of the work and as such cannot and shall not be used to reduce or change the scope of work defined by the contract documents.
3.3 COORDINATION AND SUBSTITUTION OF WORK FOR CONTRACTOR CONVENIENCE
A. Coordination Drawings shall be prepared and submitted, according to requirements in individual
Sections, and additionally where installation is not completely shown on Shop Drawings, where limited space availability necessitates coordination, or if coordination is required to facilitate integration of products and materials fabricated or installed by more than one entity. Coordination of the work between the various trades is critical in accomplishing the design intent expressed by the contract documents. The Contractor is expected to complete well-developed coordination drawings and provide vigilant supervision to ensure the installations of the various trades and building systems are in accordance with the contract documents.
B. The Owner shall not be charged for work or adjustments to the work due to deficient coordination drawings, a lack of coordination between subcontractors, or lack of vigilant field supervision by the
Contractor.
C. The Owner reserves the right to be fairly compensated for the acceptance of work substituted for convenience by the contractor due to deficient coordination drawings, a lack of coordination between subcontractors, or lack of vigilant field supervision by the Contractor.
D. The Owner reserves the right to be fairly compensated when accepting work, of no added value to the
Owner that is substituted for convenience or because of a construction or dimensional error by the contractor and is a cost benefit to the Contractor.
3.4 MOISTURE CONTROL PLAN
A. The following Moisture Control Plan is intended for buildings to remain and is intended to be an additional source of information, and at times, a clarification to the Construction Drawings and
Specifications. The Contractor shall perform all related work shown on the Contract Documents
(Construction Drawings, Specifications, Scopes of Work) other than those items specifically indicated below to be excluded.
1. The following Moisture Control procedure related to buildings shall be implemented throughout the course of the work:
a. Take all precautions necessary to maintain all interior spaces in a dry condition. The
Contractor shall remove all standing water or ice throughout the building, in slab recesses, pits, etc., immediately following rains or snow. This Contractor shall take precautions to minimize major water infiltration until such time as the building is enclosed.
b. When a water spill or piping leak occurs in partially or fully enclosed building areas, the
Contractor shall immediately take measures to clean up the area affected, stop the water infiltration, and remove any saturated materials (i.e. drywall, carpet, insulation, etc.)
Issued for Bidding: October 2026 011000 - 7/8 Summary within 24-hours of the occurrence. The General Contractor shall assist the Owner in the investigation of the leak/spill.
2. Contractor shall take special precautions to maintain all interior spaces in a dry condition. Prior to the start of any “wet” work such as core drilling or testing of piping where water must be introduced into a dry space, the Contractor and/or their Subcontractors performing the work shall control/contain water and ultimately eliminate the water and humidity. Protect all surrounding finishes. Spills are to be cleaned up immediately, and adjacent materials that become wet and are susceptible to mold growth shall be removed and replaced at the
Contractor’s expense.
3. Contractor shall report any incidents involving water infiltration into interior spaces.
3.5 INSTALLATION
A. Layout of the Work.
1. The Contractor shall make all necessary field measurements to insure correct fitting. Field verify locations and conditions. Coordinate work with all trades to avoid conflicts or delay.
2. The Contractor shall take measurements at the site and be responsible for same before ordering materials or doing work which is dependent on proper size or installation or coordination with the building.
B. Locate the Work and components of the Work accurately, in correct alignment and elevation, as indicated.
1. Make vertical work plumb and make horizontal work level.
2. Where space is limited, install components to maximize space available for maintenance and ease of removal for replacement.
3. Conceal pipes, ducts, and wiring in finished areas unless otherwise indicated.
4. Maintain minimum headroom clearance of 96 inches in occupied spaces and 90 inchesin unoccupied spaces.
C. Comply with manufacturer's written instructions and recommendations for installing products in applications indicated.
D. Install products at the time and under conditions that will ensure the best possible results. Maintain conditions required for product performance until Substantial Completion.
E. Conduct construction operations so no part of the Work is subjected to damaging operations or loading in excess of that expected during normal conditions of occupancy.
F. Sequence the Work and allow adequate clearances to accommodate movement of construction items on site and placement in permanent locations.
G. Tools and Equipment: Do not use tools or equipment that produce harmful noise levels.
H. Templates: Obtain and distribute to the parties involved templates for work specified to be factory prepared and field installed. Check Shop Drawings of other work to confirm that adequate provisions are made for locating and installing products to comply with indicated requirements.
I. Attachment: Provide blocking and attachment plates and anchors and fasteners of adequate size and number to securely anchor each component in place, accurately located and aligned with other portions of the Work. Where size and type of attachments are not indicated, verify size and type required for load conditions.
Issued for Bidding: October 2026 011000 - 8/8 Summary
1. Mounting Heights: Where mounting heights are not indicated, mount components at heights directed by Architect.
2. Allow for building movement, including thermal expansion and contraction.
3. Coordinate installation of anchorages. Furnish setting drawings, templates, and directions for installing anchorages, including sleeves, concrete inserts, anchor bolts, and items with integral anchors, that are to be embedded in concrete or masonry. Deliver such items to Project site in time for installation.
J. Joints: Make joints of uniform width. Where joint locations in exposed work are not indicated, arrange joints for the best visual effect. Fit exposed connections together to form hairline joints.
K. Hazardous Materials: Use products, cleaners, and installation materials that are not considered hazardous.
3.6 PROGRESS CLEANING
A. General: Clean Project site and work areas.
1. Comply with requirements in NFPA 241 for removal of combustible waste materials and debris.
2. Coordinate progress cleaning for joint-use areas where Contractor and other contractors are working concurrently.
B. Limiting Exposures: Supervise construction operations to assure that no part of the construction completed or in progress, is subject to harmful, dangerous, damaging, or otherwise deleterious exposure during the construction period.
C. Clean areas and spaces where cutting and patching are performed. Remove paint, mortar, oils, putty, and similar materials from adjacent finished surfaces.
END OF SECTION 011000
Police Station
Issued for Bidding: October 2026 012100 Allowances
SECTION 012100 - ALLOWANCES
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section includes administrative and procedural requirements governing allowances.
B. Types of allowances include the following:
1. Quantity allowances.
2. Contingency allowances.
1.3 DEFINITIONS
A. Allowance: A quantity of work or dollar amount included in the Contract, established in lieu of additional requirements, used to defer selection of actual materials and equipment to a later date when direction will be provided to Contractor. If necessary, additional requirements will be issued by Change
Order.
1.4 SELECTION AND PURCHASE
A. At the earliest practical date after award of the Contract, advise Architect of the date when final selection, or purchase and delivery, of each product or system described by an allowance must be completed by the Owner to avoid delaying the Work.
B. At Architect's request, obtain proposals for each allowance for use in making final selections. Include recommendations that are relevant to performing the Work.
C. Purchase products and systems selected by Architect from the designated supplier.
1.5 ACTION SUBMITTALS
A. Submit proposals for purchase of products or systems included in allowances in the form specified for
Change Orders.
1.6 INFORMATIONAL SUBMITTALS
A. Submit invoices or delivery slips to show actual quantities of materials delivered to the site for use in fulfillment of each allowance.
B. Submit time sheets and other documentation to show labor time and cost for installation of allowance items that include installation as part of the allowance.
C. Coordinate and process submittals for allowance items in same manner as for other portions of the
Work.
Police Station
Issued for Bidding: October 2026 012100 Allowances
1.7 QUANTITY ALLOWANCES
A. Allowance shall include cost to Contractor of specific products and materials ordered by Owner or selected by Architect under allowance and shall include taxes, freight, and delivery to Project site.
B. Unless otherwise indicated, Contractor's costs for receiving and handling at Project site, labor, installation, overhead and profit, and similar costs related to products and materials ordered by Owner or selected by Architect under allowance shall be included as part of the Allowance.
C. Any quantity allowance not used shall be credited back to the Owner at the higher unit price listed in the Form of Proposal under unit prices.
1. The Contractor shall maintain accurate records of any and all quantity allowances.
1.8 CONTINGENCY ALLOWANCES
A. Use the contingency allowance only as directed by Architect for Owner's purposes and only by Change
Orders that indicate amounts to be charged to the allowance.
B. Contractor's overhead, profit, and related costs for products and equipment ordered by Owner under the contingency allowance are included in the allowance and are not part of the Contract Sum. These costs include delivery, installation, taxes, insurance, equipment rental, and similar costs.
C. Change Orders authorizing use of funds from the contingency allowance will include Contractor's related costs and reasonable overhead and profit as established in Kentucky Department of Education regulations.
D. At Project closeout, credit unused amounts remaining in the contingency allowance to Owner by Change
Order.
1.9 ADJUSTMENT OF ALLOWANCES
A. Allowance Adjustment: To adjust allowance amounts, prepare a Change Order proposal based on the difference between purchase amount and the allowance, multiplied by final measurement of work-in-place where applicable. If applicable, include reasonable allowances for cutting losses, tolerances, mixing wastes, normal product imperfections, required maintenance materials, and similar margins.
1. Include installation costs in purchase amount only where indicated as part of the allowance.
2. If requested, prepare explanation and documentation to substantiate distribution of overhead costs and other markups.
3. Submit substantiation of a change in scope of Work, if any, claimed in Change Orders related to unit-cost allowances.
4. Owner reserves the right to establish the quantity of work-in-place by independent quantity survey, measure, or count.
B. Submit claims for increased costs due to a change in the scope or nature of the allowance described in the Contract Documents, whether for the purchase order amount or Contractor's handling, labor, installation, overhead, and profit.
Police Station
Issued for Bidding: October 2026 012100 Allowances
1. Do not include Contractor's or subcontractor's indirect expense in the Change Order cost amount unless it is clearly shown that the nature or extent of Work has changed from what could have been foreseen from information in the Contract Documents.
2. No change to Contractor's indirect expense is permitted for selection of higher- or lower-priced materials or systems of the same scope and nature as originally indicated.
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION
3.1 EXAMINATION
A. Examine products covered by an allowance promptly on delivery for damage or defects. Return damaged or defective products to manufacturer for replacement.
3.2 PREPARATION
A. Coordinate materials and their installation for each allowance with related materials and installations to ensure that each allowance item is completely integrated and interfaced with related work.
3.3 SCHEDULE OF ALLOWANCES
A. Allowance No. 1: Contingency Allowance: In addition to all work shown on the drawings and defined within specifications, the Electrical Contractor shall include $25,000 to clean up and secure with J-hooks and hangers all wiring and conduit above the ceiling as necessary and directed by the Owner.
Contractor to coordinate this work with the Owner. Labor rates included in Bid Form to be used for billing against the allowance.
B. Allowance No. 2: Contingency Allowance: In addition to all work shown on the drawings and defined within specifications, the Contractor shall include $15,000 for additional maintenance or services for the temporary restrooms. Contractor to coordinate this work with the Owner and use unit prices included in the Bid Form.
C. Allowance No. 3: Contingency Allowance: In addition to all work shown on the drawings and defined within specifications, the Contractor shall include $125,000 for additional work scope due to unforeseen conditions. Contractor to coordinate this work with the Owner.
END OF SECTION 012100
Issued for Bidding: October 2026 024119 - 1/6 Selective Demolition
SECTION 024119 - SELECTIVE DEMOLITION
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and
Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section Includes:
1. Demolition and removal of selected portions of building or structure.
2. Salvage of existing items to be reused or recycled.
B. Related Requirements:
1. Section 011000 "Summary" for restrictions on use of the premises, Owner-occupancy requirements, and phasing requirements.
1.3 DEFINITIONS
A. Remove: Detach items from existing construction and dispose of them off-site unless indicated to be salvaged or reinstalled.
B. Remove and Salvage: Detach items from existing construction, in a manner to prevent damage, and store on site as directed by the Owner.
C. Remove and Reinstall: Detach items from existing construction, in a manner to prevent damage, prepare for reuse, and reinstall where indicated.
D. Existing to Remain: Leave existing items that are not to be removed and that are not otherwise indicated to be salvaged or reinstalled.
1.4 MATERIALS OWNERSHIP
A. Unless otherwise indicated, demolition waste becomes property of Contractor.
B. Historic items, relics, antiques, and similar objects including, but not limited to, cornerstones and their contents, commemorative plaques and tablets, and other items of interest or value to Owner that may be uncovered during demolition remain the property of Owner.
1. Carefully salvage in a manner to prevent damage and promptly return to Owner.
1.5 PREINSTALLATION MEETINGS
A. Predemolition Conference: Conduct conference at Project site.
1. Inspect and discuss condition of construction to be selectively demolished.
2. Review structural load limitations of existing structure.
3. Review and finalize selective demolition schedule and verify availability of materials, demolition personnel, equipment, and facilities needed to make progress and avoid delays.
Issued for Bidding: October 2026 024119 - 2/6 Selective Demolition
4. Review requirements of work performed by other trades that rely on substrates exposed by selective demolition operations.
5. Review areas where existing construction is to remain and requires protection.
1.6 INFORMATIONAL SUBMITTALS
A. Proposed Protection Measures: Submit report, including Drawings, that indicates the measures proposed for protecting individuals and property, for environmental protection, for dust control and, for noise control. Indicate proposed locations and construction of barriers.
B. Schedule of Selective Demolition Activities: Indicate the following:
1. Detailed sequence of selective demolition and removal work, with starting and ending dates for each activity. Ensure Owner's representative on-site operations are uninterrupted.
2. Interruption of utility services. Indicate how long utility services will be interrupted.
3. Coordination for shutoff, capping, and continuation of utility services.
4. Coordination of Owner's continuing occupancy of portions of existing building and of Owner's partial occupancy of completed Work.
C. Statement of Refrigerant Recovery: Signed by refrigerant recovery technician responsible for recovering refrigerant, stating that all refrigerant that was present was recovered and that recovery was performed according to EPA regulations. Include name and address of technician and date refrigerant was recovered.
1.7 QUALITY ASSURANCE
A. Refrigerant Recovery Technician Qualifications: Certified by an EPA-approved certification program.
1.8 FIELD CONDITIONS
A. Owner will occupy portions of building immediately adjacent to selective demolition area. Conduct selective demolition so Owner's operations will not be disrupted.
B. Conditions existing at time of inspection for bidding purpose will be maintained by Owner as far as practical.
1. Before selective demolition, Owner will remove the following items:
a. Computers and TV’s.
b. Furniture.
C. Notify Architect of discrepancies between existing conditions and Drawings before proceeding with selective demolition.
D. Hazardous Materials: Hazardous materials may be encountered in the Work.
1. If suspected hazardous materials are encountered, do not disturb; immediately notify Architect and Owner. Hazardous materials with the exception of lead paint containing materials will be removed by Owner under a separate contract.
E. Storage or sale of removed items or materials on-site is not permitted.
F. Utility Service: Maintain existing utilities indicated to remain in service and protect them against damage during selective demolition operations.
1. Maintain fire-protection facilities in service during selective demolition operations.
Issued for Bidding: October 2026 024119 - 3/6 Selective Demolition
1.9 COORDINATION
A. Arrange selective demolition schedule so as not to interfere with Owner's operations.
PART 2 - PRODUCTS
2.1 PERFORMANCE REQUIREMENTS
A. Regulatory Requirements: Comply with governing EPA notification regulations before beginning selective demolition. Comply with hauling and disposal regulations of authorities having jurisdiction.
B. Standards: Comply with ASSE A10.6 and NFPA 241.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Verify that utilities have been disconnected and capped before starting selective demolition operations.
B. Review Project Record Documents of existing construction or other existing condition and hazardous material information provided by Owner. Owner does not guarantee that existing conditions are same as those indicated in Project Record Documents.
C. Survey existing conditions and correlate with requirements indicated to determine extent of selective demolition required.
D. When unanticipated mechanical, electrical, or structural elements that conflict with intended function or design are encountered, investigate and measure the nature and extent of conflict. Promptly submit a written report to Architect.
E. Perform an engineering survey of condition of building to determine whether removing any element might result in structural deficiency or unplanned collapse of any portion of structure or adjacent structures during selective building demolition operations.
1. Perform surveys as the Work progresses to detect hazards resulting from selective demolition activities.
3.2 PREPARATION
A. Refrigerant: Before starting demolition, remove refrigerant from mechanical equipment according to
40 CFR 82 and regulations of authorities having jurisdiction.
3.3 UTILITY SERVICES AND MECHANICAL/ELECTRICAL SYSTEMS
A. Existing Services/Systems to Remain: Maintain services/systems indicated to remain and protect them against damage.
B. Existing Services/Systems to Be Removed, Relocated, or Abandoned: Locate, identify, disconnect, and seal or cap off utility services and mechanical/electrical systems serving areas to be selectively demolished.
1. Arrange to shut off utilities with utility companies.
Issued for Bidding: October 2026 024119 - 4/6 Selective Demolition
2. If services/systems are required to be removed, relocated, or abandoned, provide temporary services/systems that bypass area of selective demolition and that maintain continuity of services/systems to other parts of building.
3. Disconnect, demolish, and remove plumbing, and HVAC systems, equipment, and components indicated on Drawings to be removed.
a. Piping to Be Removed: Remove portion of piping indicated to be removed and cap or plug remaining piping with same or compatible piping material.
b. Equipment to Be Removed: Disconnect and cap services and remove equipment.
c. Equipment to Be Removed and Reinstalled: Disconnect and cap services and remove, clean, and store equipment; when appropriate, reinstall, reconnect, and make equipment operational.
d. Equipment to Be Removed and Salvaged: Disconnect and cap services and remove equipment and deliver to Owner.
e. Ducts to Be Removed: Remove portion of ducts indicated to be removed and plug remaining ducts with same or compatible ductwork material.
3.4 PROTECTION
A. Temporary Protection: Provide temporary barricades and other protection required to prevent injury to people and damage to adjacent buildings and facilities to remain.
1. Provide protection to ensure safe passage of people around selective demolition area and to and from occupied portions of building.
2. Provide temporary weather protection, during interval between selective demolition of existing construction on exterior surfaces and new construction, to prevent water leakage and damage to structure and interior areas.
3. Protect walls, ceilings, floors, and other existing finish work that are to remain or that are exposed during selective demolition operations.
4. Cover and protect furniture, furnishings, and equipment that have not been removed.
5. Comply with requirements for temporary enclosures, dust control, heating, and cooling specified in Section 015000 "Temporary Facilities and Controls."
B. Temporary Shoring: Design, provide, and maintain shoring, bracing, and structural supports as required to preserve stability and prevent movement, settlement, or collapse of construction and finishes to remain, and to prevent unexpected or uncontrolled movement or collapse of construction being demolished.
1. Strengthen or add new supports when required during progress of selective demolition.
C. Remove temporary barricades and protections where hazards no longer exist.
3.5 SELECTIVE DEMOLITION, GENERAL
A. General: Demolish and remove existing construction only to the extent required by new construction and as indicated. Use methods required to complete the Work within limitations of governing regulations and as follows:
1. Proceed with selective demolition systematically, from higher to lower level. Complete selective demolition operations above each floor or tier before disturbing supporting members on the next lower level.
2. Neatly cut openings and holes plumb, square, and true to dimensions required. Use cutting methods least likely to damage construction to remain or adjoining construction. Use hand tools or small power tools designed for sawing or grinding, not hammering and chopping. Temporarily cover openings to remain.
Issued for Bidding: October 2026 024119 - 5/6 Selective Demolition
3. Cut or drill from the exposed or finished side into concealed surfaces to avoid marring existing finished surfaces.
4. Do not use cutting torches until work area is cleared of flammable materials. At concealed spaces, such as duct and pipe interiors, verify condition and contents of hidden space before starting flame-cutting operations. Maintain portable fire-suppression devices during flame-cutting operations.
5. Maintain fire watch during and for at least 4 hours after flame-cutting operations.
6. Maintain adequate ventilation when using cutting torches.
7. Remove decayed, vermin-infested, or otherwise dangerous or unsuitable materials and promptly dispose of off-site.
8. Remove structural framing members and lower to ground by method suitable to avoid free fall and to prevent ground impact or dust generation.
9. Locate selective demolition equipment and remove debris and materials so as not to impose excessive loads on supporting walls, floors, or framing.
10. Dispose of demolished items and materials promptly.
B. Site Access and Temporary Controls: Conduct selective demolition and debris-removal operations to ensure minimum interference with roads, streets, walks, walkways, and other adjacent occupied and used facilities.
C. Removed and Salvaged Items:
1. Transport items to Owner's storage area on-site designated by Owner.
2. Protect items from damage during transport and storage.
D. Removed and Reinstalled Items:
1. Clean and repair items to functional condition adequate for intended reuse.
2. Protect items from damage during transport and storage.
3. Reinstall items in locations indicated. Comply with installation requirements for new materials and equipment. Provide connections, supports, and miscellaneous materials necessary to make item functional for use indicated.
E. Existing Items to Remain: Protect construction indicated to remain against damage and soiling during selective demolition. When permitted by Architect, items may be removed to a suitable, protected storage location during selective demolition and cleaned and reinstalled in their original locations after selective demolition operations are complete.
3.6 SELECTIVE DEMOLITION PROCEDURES FOR SPECIFIC MATERIALS
A. Concrete: Demolish in small sections. Using power-driven saw, cut concrete to a depth of at least 3/4 inch at junctures with construction to remain. Dislodge concrete from reinforcement at perimeter of areas being demolished, cut reinforcement, and then remove remainder of concrete. Neatly trim openings to dimensions indicated.
B. Masonry: Demolish in small sections. Cut masonry at junctures with construction to remain, using power-driven saw, and then remove masonry between saw cuts.
C. Concrete Slabs-on-Grade: Saw-cut perimeter of area to be demolished, and then break up and remove.
D. Resilient Floor Coverings (not containing hazardous materials): Remove floor coverings and adhesive according to recommendations in RFCI's "Recommended Work Practices for the Removal of Resilient
Floor Coverings."
Issued for Bidding: October 2026 024119 - 6/6 Selective Demolition
3.7 DISPOSAL OF DEMOLISHED MATERIALS
A. Remove demolition waste materials from Project site and dispose of them in an EPA-approved construction and demolition waste landfill acceptable to authorities having jurisdiction.
1. Do not allow demolished materials to accumulate on-site.
2. Remove and transport debris in a manner that will prevent spillage on adjacent surfaces and areas.
B. Burning: Do not burn demolished materials.
3.8 CLEANING
A. Clean adjacent structures and improvements of dust, dirt, and debris caused by selective demolition operations. Return adjacent areas to condition existing before selective demolition operations began.
END OF SECTION 024119
Issued for Bidding: October 2026 040120 - 1/7 Masonry Repair
SECTION 040120 - MASONRY REPAIR
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and
Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section Includes:
1. Repairing masonry, including replacing units.
1.3 DEFINITIONS
A. Low-Pressure Spray: 100 to 400 psi; 4 to 6 gpm.
B. Rebuilding (Setting) Mortar: Mortar used to set and anchor masonry in a structure, distinct from pointing mortar installed after masonry is set in place.
C. Saturation Coefficient: Ratio of the weight of water absorbed during immersion in cold water to weight absorbed during immersion in boiling water; used as an indication of resistance of masonry units to freezing and thawing.
1.4 PREINSTALLATION MEETINGS
A. Preinstallation Conference: Conduct conference at Project site.
1. Review methods and procedures related to brick masonry repair including, but not limited to, the following:
a. Verify masonry repair specialist's personnel, equipment, and facilities needed to make progress and avoid delays.
b. Materials, material application, sequencing, tolerances, and required clearances.
c. Quality-control program.
d. Coordination with building occupants.
1.5 SEQUENCING AND SCHEDULING
A. Order sand for colored mortar immediately after approval of Samples. Take delivery of and store at
Project site enough quantity to complete Project.
B. Work Sequence: Perform masonry repair work in the following sequence, which includes work specified in this and other Sections:
1. Rake out mortar from joints surrounding masonry to be replaced and from joints adjacent to masonry repairs along joints.
2. Repair masonry, including replacing existing masonry with new masonry materials.
3. Rake out mortar from joints to be repointed.
4. Rake out sealant from control joints to be replaced.
5. Point mortar and sealant joints.
Issued for Bidding: October 2026 040120 - 2/7 Masonry Repair
6. After repairs and repointing have been completed and cured, perform a final cleaning to remove residues from this work.
1.6 ACTION SUBMITTALS
A. Product Data: For each type of product.
1. Include construction details, material descriptions, dimensions of individual components and profiles, and finishes.
2. Include recommendations for product application and use. Include test data substantiating that products comply with requirements.
B. Samples for Initial Selection: For the following:
1. Colored Mortar: Submit sets of mortar that will be left exposed in the form of sample mortar strips, 6 inches long by 1/4 inch wide, set in aluminum or plastic channels.
a. Have each set contain a close color range of at least three Samples of different mixes of colored sands and cements that produce a mortar matching existing, cleaned mortar when cured and dry.
b. Submit with precise measurements on ingredients, proportions, gradations, and source of colored sands from which each Sample was made.
C. Samples for Verification: For the following:
1. Each type of masonry unit to be used for replacing existing units. Include sets of Samples to show the full range of shape, color, and texture to be expected. For each brick type, provide straps or panels containing at least four bricks. Include multiple straps for brick with a wide range.
2. Each type of patching compound in the form of briquettes, at least 3 inches long by 1-1/2 inches wide.