This architectural drawing set constitutes the design documentation for the Police Department Interior Improvements project at Cincinnati/Northern Kentucky International Airport (CVG), located at 3222 Terminal Drive, Hebron, Kentucky 41048. The project encompasses comprehensive rehabilitation work including demolition plans, first and second floor plans, reflected ceiling plans, site plans, mechanical systems design, and hydronic piping layouts. The scope of work includes interior improvements to both floors of the police department facility, with mechanical systems upgrades involving air handling units (AH-1 and AH-4), variable air volume (VAV) boxes, fan coil units, exhaust fans, relief hoods, and associated ductwork and piping. The project is divided into four phased construction sequences to minimize disruption to building operations. The pre-proposal meeting and mandatory site visit are scheduled for Thursday, November 19, 2026 at 10:00 am at the project location. Written questions must be submitted by 11:59 pm on Tuesday, December 1, 2026, with answers posted no later than Monday, December 7, 2026 at 11:59 pm. Proposals are due to the Kenton County Airport Board by Thursday, December 17, 2026 at 2:00 pm, with no proposals accepted after that deadline unless extended by addendum.

The drawings include detailed specifications for mechanical equipment including split barrel chiller CH-1, new boiler integration, pump replacements, and building management system (BMS) integration for all HVAC controls. Construction phasing requires coordination with CVG to maintain essential building operations, with particular attention to the training area on the first floor and front lobby/reception area on the second floor, which must remain accessible throughout construction. The contractor is responsible for all temporary services, isolation requirements, equipment startup, testing and balancing, and commissioning of systems. The project includes provisions for temporary restroom trailers, contractor staging areas, and material lay-down zones. Specific mechanical requirements include MERV 8 and MERV 13 filtration, freeze stats, smoke detectors in supply and return ducts, condensate management through washer boxes, and chemical treatment of the chilled water system. All work must comply with Kentucky Mechanical Codes, NFPA codes, ASHRAE 62.1 ventilation standards, and existing roof warranties must be maintained through proper flashing of new penetrations.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

15141312 161110987654321

A

D

B

C

E

F

G

H

J

K

L

M

TH

IS

D O

C U M

EN

T, A N

D T

H E

ID

EA

S A N

D D

ES

IG

N S

IN

C O

R

PO

R A

TE

D H

ER

EI

N , A

S A N

I N

ST

R U M

EN

T

O F

PR

O

FE

SS

IO

N

A L

SE

R V

IC

E, I S

TH

E

PR

O

PE

R

TY

O F

EM

BO

SS

D

ES

IG

N , P

.S .C

A N

D I S

N O

T

TO

B E

U

SE

D I N

2023-047

ARCHITECTURAL SITE PLAN

IS

SU

E DATE DESCRIPTION

4/10/26 30% REVIEW

NO.

15141312 161110987654321

A

D

B

C

E

F

G

H

J

K

L

M

W H

O

LE

O R I N

P A R T

FO

R A

N Y

O

TH

ER

P

R O

JE

C T, W

IT

H O

U T

TH

E

W R

IT

TE

N

A U

TH

O R

IZ

A

TI

O N

O F

EM

BO

SS

D

ES

IG

N , P

.S .C

C O

PY

R

IG

H T

-2

5:

E

M

BO

SS

D

ES

IG

N , P

.S .C

A

LL

R

IG

H

TS

R

ES

ER

V

ED

AS100

A1 ARCHITECTURAL SITE PLAN

SCALE: 1" =20'-0"

P:

\2

3\

PR

-0

-C

VG

P

O

LI

C E

ST

AT

IO

N

\0 6-

D R

AW

IN

G S

3222 Terminal Dr.

Hebron, KY 41048

POLICE DEPARTMENT

Interior Improvements

CINCINNATI/NORTHERN KY

INTERNATIONAL AIRPORT

6/30/26 60% REVIEW

FENCE NOTES

TERMINAL DR.

FENCE MANUFACTURER

CUT SHEET FOR REFERENCE

8/18/26 90% REVIEW

10/28/26 BIDDING/PERMIT

AutoCAD SHX Text 16'-0"±

AutoCAD SHX Text

EXISTING CHAINLINK FENCE AT CANINE EXERCISE AREA

AutoCAD SHX Text

NEW 12'-0" H. FENCE, TYP.

AutoCAD SHX Text PROVIDE 3'x7' GATE ACROSS FROM GATE TO CANINE EXERCISE AREA GATE TO BE KEY LOCKED

AutoCAD SHX Text

EXISTING RETAINING WALL

AutoCAD SHX Text

26'-0" ROLLING GATE WITH ACCESS CONTROL.

AutoCAD SHX Text

25'-0"± FROM

AutoCAD SHX Text

25'-0"± FROM

AutoCAD SHX Text

BACK/CURB

AutoCAD SHX Text

CORNER OF GENERATOR ENCLOSURE

AutoCAD SHX Text FIELD VERIFY LOCATION OF EXISTING UTILITIES. EXTEND FENCE BEYOND UTILITIES TO MINIMIZE FENCE POST FOUNDATION CONFLICTS W/ UTILITIES

AutoCAD SHX Text

NEW 12'-0" H. FENCE, TYP.

AutoCAD SHX Text

EXTEND FENCE TO WITHIN 6" OF BUIDLING

AutoCAD SHX Text

LOCATE FENCE ON PARKING LOT SIDE OF POLE LIGHT

AutoCAD SHX Text

26'-0" ROLLING GATE WITH ACCESS CONTROL

AutoCAD SHX Text FIELD VERIFY LOCATION OF EXISTING UTILITIES PRIOR TO FOOTING EXCAVATION. HYDRO EXCAVATION SHALL BE EMPLOYED TO PREVENT POTENTIAL DAMAGE TO UTILITES

AutoCAD SHX Text REMOVE VEGETATION AND PROVIDE RIP-RAP EXTENDING 3'-0" FROM EXISTING RETAINING WALL FULL LENGTH OF WALL

AutoCAD SHX Text LOCATION OF TEMPORARY RESTROOM AND SHOWER TRAILERS TO BE PROVIDED BY CONTRACTOR. SEE ELEC. DWGS. FOR ELEC. SERVICE INFORMATION. SEE SECTION 011000 SUMMARY OF THE PROJECT MANUAL FOR TRAILER REQUIREMENTS

AutoCAD SHX Text DESIGNATE AREA FOR CONTRACTOR USE: JOB TRAILER, PARKING, MATERIAL LAY-DOWN PORT-A-LET, ETC. ADDITIONAL PARKING WILL BE COORDINATED WITH CVG OFF-SITE FROM POLICE DEPARTMENT BUILDING

AutoCAD SHX Text

AREA AVAILABLE FOR CONTRACTOR MATERIAL LAY-DOWN

AutoCAD SHX Text 906 Monmouth Street, AutoCAD SHX Text Newport, KY 41071

AutoCAD SHX Text EmbossDesign.com

AutoCAD SHX Text (859)431-8612

AutoCAD SHX Text

1. NEW FENCE SHALL BE 12'-0" HIGH BLACK VINYL COATED "WIREWALL" HIGH SECURITY NEW FENCE SHALL BE 12'-0" HIGH BLACK VINYL COATED "WIREWALL" HIGH SECURITY SINGLE FABRIC ANIT-CLIMB FENCING BY RIVERDALE MILLS. 2. FENCE MESH TO BE 1/2"x3" - 8 GAUGE FENCE MESH TO BE 1/2"x3" - 8 GAUGE 3. FENCE POSTS TO BE EMBEDDED IN CONCRETE FOOTINGS. COORDINATE REQUIRED SIZE WITH FENCE POSTS TO BE EMBEDDED IN CONCRETE FOOTINGS. COORDINATE REQUIRED SIZE WITH MANUFACTURER. 4. ROLLING GATE OPERATOR TO BE LIFTMASTER #SL595UL, SECURITY +2.0. VERIFY GATE ROLLING GATE OPERATOR TO BE LIFTMASTER #SL595UL, SECURITY +2.0. VERIFY GATE OPERATOR HAS CAPACITY TO OPERATE SPECIFIED GATE SIZE. 5. STAKE OUT FENCE LAYOUT AND OBTAIN APPROVAL FROM OWNER PRIOR TO INSTALLATION.STAKE OUT FENCE LAYOUT AND OBTAIN APPROVAL FROM OWNER PRIOR TO INSTALLATION.

D

B

C

E

F

G

H

J

K

L

M

TH

IS

D O

C U M

EN

T, A N

D T

H E

ID

EA

S A N

D D

ES

IG

N S

IN

C O

R

PO

R A

TE

D H

ER

EI

N , A

S A N

I N

ST

R U M

EN

T

O F

PR

O

FE

SS

IO

N

A L

SE

R V

IC

E, I S

TH

E

PR

O

PE

R

TY

O F

EM

BO

SS

D

ES

IG

N , P

.S .C

A N

D I S

N O

T

TO

B E

U

SE

D I N

2023-047

FIRST FLOOR DEMOLITION

PLAN

IS

SU

E DATE DESCRIPTION

4/10/26 30% REVIEW

6/30/26 60% REVIEW

NO.

15141312 161110987654321

A

D

B

C

E

F

G

H

J

K

L

M

W H

O

LE

O R I N

P A R T

FO

R A

N Y

O

TH

ER

P

R O

JE

C T, W

IT

H O

U T

TH

E

W R

IT

TE

N

A U

TH

O R

IZ

A

TI

O N

O F

EM

BO

SS

D

ES

IG

N , P

.S .C

C O

PY

R

IG

H T

-2

5:

E

M

BO

SS

D

ES

IG

N , P

.S .C

A

LL

R

IG

H

TS

R

ES

ER

V

ED

D100

A1 FIRST FLOOR DEMOLITION PLAN

SCALE: 1/8" =1'-0"

P:

\2

3\

PR

-0

-C

VG

P

O

LI

C E

ST

AT

IO

N

\0 6-

D R

AW

IN

G S

8/18/26 90% REVIEW

10/28/26 BIDDING/PERMIT

3222 Terminal Dr.

Hebron, KY 41048

POLICE DEPARTMENT

Interior Improvements

CINCINNATI/NORTHERN KY

INTERNATIONAL AIRPORT

AutoCAD SHX Text

GENERATOR

AutoCAD SHX Text

FITNESS

AutoCAD SHX Text

AutoCAD SHX Text

MECHANICAL

AutoCAD SHX Text

AutoCAD SHX Text

MECHANICAL

AutoCAD SHX Text

AutoCAD SHX Text

TRAINING

AutoCAD SHX Text

AutoCAD SHX Text

WOMEN

AutoCAD SHX Text

AutoCAD SHX Text

PHONE/

AutoCAD SHX Text

ALARM

AutoCAD SHX Text

AutoCAD SHX Text

PHONE/

AutoCAD SHX Text

ALARM

AutoCAD SHX Text

AutoCAD SHX Text

EXISTING

AutoCAD SHX Text

KENNEL

AutoCAD SHX Text

AutoCAD SHX Text

EXSITING

AutoCAD SHX Text

GARAGE

AutoCAD SHX Text

AutoCAD SHX Text

EXSITING

AutoCAD SHX Text

GARAGE

AutoCAD SHX Text

AutoCAD SHX Text

PHONE

AutoCAD SHX Text

AutoCAD SHX Text

MECHANICAL

AutoCAD SHX Text

AutoCAD SHX Text

CORR.

AutoCAD SHX Text

AutoCAD SHX Text

PATROL ROOM

AutoCAD SHX Text

AutoCAD SHX Text

EXISTING

AutoCAD SHX Text

STAIR

AutoCAD SHX Text S-1

AutoCAD SHX Text

EVIDENCE

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

AutoCAD SHX Text

TRAINING

AutoCAD SHX Text

AutoCAD SHX Text

ELEV

AutoCAD SHX Text X

AutoCAD SHX Text

ELEV.

AutoCAD SHX Text

EQIP

AutoCAD SHX Text

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

AutoCAD SHX Text

MEN

AutoCAD SHX Text

AutoCAD SHX Text

DEMO PLAS. LAM COUNTER

AutoCAD SHX Text

DEMO CARPET, BASE AND CEILING PADS. GRID TO REMAIN

AutoCAD SHX Text DEMO. SUSP. ACOUSTICAL PANEL CEILING SYSTEM AND TILE BASE THROUGHOUT WOMEN & MEN'S ROOM. FLOOR TILE TO REMAIN

AutoCAD SHX Text

DEMO EX. CARPET

AutoCAD SHX Text

DEMO CPT. & BASE

AutoCAD SHX Text

DEMO. SUSP. ACOUSTICAL PANEL CEILING SYSTEM

AutoCAD SHX Text

DEMO. GYP. BD. CEILINGS ABOVE SHOWER, TYP.

AutoCAD SHX Text

REMOVE CERAMIC WALL TILE AND WALLBOARD -FULL WALL HGT

AutoCAD SHX Text

REMOVE CERAMIC WALL TILE AND WALLBOARD -FULL WALL HGT

AutoCAD SHX Text

EX. LOCKERS, TYP.

AutoCAD SHX Text 906 Monmouth Street, AutoCAD SHX Text Newport, KY 41071

AutoCAD SHX Text EmbossDesign.com

(859)431-8612

D

B

C

E

F

G

H

J

K

L

M

TH

IS

D O

C U M

EN

T, A N

D T

H E

ID

EA

S A N

D D

ES

IG

N S

IN

C O

R

PO

R A

TE

D H

ER

EI

N , A

S A N

I N

ST

R U M

EN

T

O F

PR

O

FE

SS

IO

N

A L

SE

R V

IC

E, I S

TH

E

PR

O

PE

R

TY

O F

EM

BO

SS

D

ES

IG

N , P

.S .C

A N

D I S

N O

T

TO

B E

U

SE

D I N

2023-047

SECOND FLOOR

DEMOLITION PLAN

IS

SU

E DATE DESCRIPTION

4/10/26 30% REVIEW

NO.

15141312 161110987654321

A

D

B

C

E

F

G

H

J

K

L

M

W H

O

LE

O R I N

P A R T

FO

R A

N Y

O

TH

ER

P

R O

JE

C T, W

IT

H O

U T

TH

E

W R

IT

TE

N

A U

TH

O R

IZ

A

TI

O N

O F

EM

BO

SS

D

ES

IG

N , P

.S .C

C O

PY

R

IG

H T

-2

5:

E

M

BO

SS

D

ES

IG

N , P

.S .C

A

LL

R

IG

H

TS

R

ES

ER

V

ED

D101

A1 SECOND FLOOR DEMOLITION PLAN

SCALE: 1/8" =1'-0"

P:

\2

3\

PR

-0

-C

VG

P

O

LI

C E

ST

AT

IO

N

\0 6-

D R

AW

IN

G S

6/30/26 60% REVIEW

8/18/26 90% REVIEW

10/28/26 BIDDING/PERMIT

3222 Terminal Dr.

Hebron, KY 41048

POLICE DEPARTMENT

Interior Improvements

CINCINNATI/NORTHERN KY

INTERNATIONAL AIRPORT

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

AutoCAD SHX Text

INVESTIGATORS

AutoCAD SHX Text

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

AutoCAD SHX Text

LAB

AutoCAD SHX Text

AutoCAD SHX Text

EXISTING

AutoCAD SHX Text

STAIR

AutoCAD SHX Text S-1

AutoCAD SHX Text

MEN

AutoCAD SHX Text

AutoCAD SHX Text

JAN.

AutoCAD SHX Text

AutoCAD SHX Text

IT SERVER

AutoCAD SHX Text

AutoCAD SHX Text

AOC

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

AutoCAD SHX Text

AOC

AutoCAD SHX Text

AutoCAD SHX Text

ELEV

AutoCAD SHX Text X

AutoCAD SHX Text

LOBBY

AutoCAD SHX Text

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text X

AutoCAD SHX Text

VEST.

AutoCAD SHX Text

AutoCAD SHX Text

EXIST.

AutoCAD SHX Text R.R.

AutoCAD SHX Text

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text

AutoCAD SHX Text

VEST.

AutoCAD SHX Text

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

AutoCAD SHX Text

INTERVIEW

AutoCAD SHX Text

AutoCAD SHX Text

CHIEF'S

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

AutoCAD SHX Text

BREAK ROOM

AutoCAD SHX Text

AutoCAD SHX Text

CONFERENCE

AutoCAD SHX Text

AutoCAD SHX Text

RECEPTION

AutoCAD SHX Text

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

AutoCAD SHX Text

WOMEN

AutoCAD SHX Text

AutoCAD SHX Text

STOR.

AutoCAD SHX Text

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

AutoCAD SHX Text

INTERVIEW

AutoCAD SHX Text

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text

AutoCAD SHX Text

HOLDING

AutoCAD SHX Text

AutoCAD SHX Text

HOLDING

AutoCAD SHX Text

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

AutoCAD SHX Text

OPEN

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

AutoCAD SHX Text

REMOVE DOOR/FRAME/HWR AND SALVAGE FOR REUSE

AutoCAD SHX Text

DEMO SECTION OF FILE STORAGE SYSTEM TO ACCOMMODATE NEW DOOR

AutoCAD SHX Text

DEMO SUSP. ACOUSTIC CEILING DUE TO HVAC WORK SCOPE

AutoCAD SHX Text

REMOVE SUSP. ACOUSTIC CEILING DUE TO HVAC WORK SCOPE

AutoCAD SHX Text

DEMO PORTION OF WALL FOR NEW DOOR

AutoCAD SHX Text

DEMO WALL CABINETS

AutoCAD SHX Text 906 Monmouth Street, AutoCAD SHX Text Newport, KY 41071

AutoCAD SHX Text EmbossDesign.com

(859)431-8612

D

B

C

E

F

G

H

J

K

L

M

TH

IS

D O

C U M

EN

T, A N

D T

H E

ID

EA

S A N

D D

ES

IG

N S

IN

C O

R

PO

R A

TE

D H

ER

EI

N , A

S A N

I N

ST

R U M

EN

T

O F

PR

O

FE

SS

IO

N

A L

SE

R V

IC

E, I S

TH

E

PR

O

PE

R

TY

O F

EM

BO

SS

D

ES

IG

N , P

.S .C

A N

D I S

N O

T

TO

B E

U

SE

D I N

2023-047

FIRST FLOOR PLAN

IS

SU

E DATE DESCRIPTION

4/10/26 30% REVIEW

NO.

15141312 161110987654321

A

D

B

C

E

F

G

H

J

K

L

M

W H

O

LE

O R I N

P A R T

FO

R A

N Y

O

TH

ER

P

R O

JE

C T, W

IT

H O

U T

TH

E

W R

IT

TE

N

A U

TH

O R

IZ

A

TI

O N

O F

EM

BO

SS

D

ES

IG

N , P

.S .C

C O

PY

R

IG

H T

-2

5:

E

M

BO

SS

D

ES

IG

N , P

.S .C

A

LL

R

IG

H

TS

R

ES

ER

V

ED

A100

A1 FIRST FLOOR PLAN

SCALE: 1/8" =1'-0"

P:

\2

3\

PR

-0

-C

VG

P

O

LI

C E

ST

AT

IO

N

\0 6-

D R

AW

IN

G S

3222 Terminal Dr.

Hebron, KY 41048

POLICE DEPARTMENT

Interior Improvements

CINCINNATI/NORTHERN KY

INTERNATIONAL AIRPORT

GENERAL NOTES

6/30/26 60% REVIEW

CONSTRUCTION NOTES

PHASING NOTES

8/18/26 90% REVIEW

10/28/26 BIDDING/PERMIT

AutoCAD SHX Text

GENERATOR

AutoCAD SHX Text

FITNESS

AutoCAD SHX Text

AutoCAD SHX Text

MECHANICAL

AutoCAD SHX Text

AutoCAD SHX Text

MECHANICAL

AutoCAD SHX Text

AutoCAD SHX Text

TRAINING

AutoCAD SHX Text

AutoCAD SHX Text

WOMEN

AutoCAD SHX Text

AutoCAD SHX Text

PHONE/

AutoCAD SHX Text

ALARM

AutoCAD SHX Text

AutoCAD SHX Text

PHONE/

AutoCAD SHX Text

ALARM

AutoCAD SHX Text

AutoCAD SHX Text

EXISTING

AutoCAD SHX Text

KENNEL

AutoCAD SHX Text

AutoCAD SHX Text

EXSITING

AutoCAD SHX Text

GARAGE

AutoCAD SHX Text

AutoCAD SHX Text

EXSITING

AutoCAD SHX Text

GARAGE

AutoCAD SHX Text

AutoCAD SHX Text

PHONE

AutoCAD SHX Text

AutoCAD SHX Text

MECHANICAL

AutoCAD SHX Text

AutoCAD SHX Text

CORR.

AutoCAD SHX Text

AutoCAD SHX Text

PATROL ROOM

AutoCAD SHX Text

AutoCAD SHX Text

EXISTING

AutoCAD SHX Text

STAIR

AutoCAD SHX Text S-1

AutoCAD SHX Text

EVIDENCE

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

AutoCAD SHX Text

TRAINING

AutoCAD SHX Text

AutoCAD SHX Text

ELEV

AutoCAD SHX Text X

AutoCAD SHX Text

ELEV.

AutoCAD SHX Text

EQIP

AutoCAD SHX Text

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

AutoCAD SHX Text

MEN

AutoCAD SHX Text

AutoCAD SHX Text

EX VCT

AutoCAD SHX Text

PROVIDE NEW WALK-OFF CPT TILE

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

EX. LOCKERS TO REMAIN, TYP.

AutoCAD SHX Text

EX. LOCKERS TO REMAIN, TYP.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 60x24 SHELVING

AutoCAD SHX Text 60x24 SHELVING

AutoCAD SHX Text 72x30 TABLE

AutoCAD SHX Text 74x22 METRO STOR. CREDENZA

AutoCAD SHX Text

CHARGING CART/CABINET

AutoCAD SHX Text 60x30 DESK

AutoCAD SHX Text 60x30 DESK

AutoCAD SHX Text 60x30 DESK

AutoCAD SHX Text 60x30 DESK

AutoCAD SHX Text 60x72 DESK

AutoCAD SHX Text 6'-0"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 906 Monmouth Street, AutoCAD SHX Text Newport, KY 41071

AutoCAD SHX Text EmbossDesign.com

AutoCAD SHX Text (859)431-8612

AutoCAD SHX Text

1. WHERE NOTED TO BE REPLACED, REMOVE/REINSTALL SUSPENDED CEILING AS REQUIRED TO WHERE NOTED TO BE REPLACED, REMOVE/REINSTALL SUSPENDED CEILING AS REQUIRED TO INSTALL HVAC/ELECTRICAL WORK. REFER TO MEP DRAWINGS FOR ADDITIONAL INFORMATION

AutoCAD SHX Text X

AutoCAD SHX Text

1. PROVIDE NEW CARPET, 4" RESILIENT BASE, 2x4 ACOUSTICAL CEILING PANELS, AND PROVIDE NEW CARPET, 4" RESILIENT BASE, 2x4 ACOUSTICAL CEILING PANELS, AND PAINT WALLS THIS ROOM 2. PROVIDE NEW CARPET, 4" RESILIENT BASE, AND PAINT WALLS THIS ROOM PROVIDE NEW CARPET, 4" RESILIENT BASE, AND PAINT WALLS THIS ROOM 3. PROVIDE NEW MOISTURE RESISTANT GYPSUM BOARD (THICKNESS TO MATCH PROVIDE NEW MOISTURE RESISTANT GYPSUM BOARD (THICKNESS TO MATCH EXISTING) WHERE GYPSUM BOARD HAS BEEN REMOVED 4. PROVIDE EPOXY FLOORING OVER EXISTING CERAMIC TILE FLOOR (PREP TILE AS PROVIDE EPOXY FLOORING OVER EXISTING CERAMIC TILE FLOOR (PREP TILE AS REQUIRED FOR EPOXY TO BOND) WITH 4" INTEGRAL EPOXY BASE THROUGHOUT ROOM. 5. EXTEND EPOXY UP SHOWER WALLS TO 6'-0" EXTEND EPOXY UP SHOWER WALLS TO 6'-0" 6. PREP AND PAINT ALL GYPSUM BOARD WALLS AND CEILINGS THROUGHOUT ROOM PREP AND PAINT ALL GYPSUM BOARD WALLS AND CEILINGS THROUGHOUT ROOM 7. SAWCUT SIDEWALK AND INSTALL 3" TRENCH DRAIN WITH COVER DISCHARGING TO SAWCUT SIDEWALK AND INSTALL 3" TRENCH DRAIN WITH COVER DISCHARGING TO PARKING LOT 8. REMOVE RECESSED PAPER TOWEL DISPENSER/RECEPTACLE. PATCH/PAINT WALL REMOVE RECESSED PAPER TOWEL DISPENSER/RECEPTACLE. PATCH/PAINT WALL 9. NEW HVAC LOUVER PER MEP DRAWINGS. SAWCUT/REMOVE CONCRETE FOUNDATION NEW HVAC LOUVER PER MEP DRAWINGS. SAWCUT/REMOVE CONCRETE FOUNDATION WALL AND REMOVE CMU VENEER AS REQUIRED. PROVIDE 3-1/2x3-1/2x " 14" GALVANIZED LINTEL AT CMU VENEER 10. NEW MASONRY OPENING FOR NEW HVAC LOUVER (REFER TO MECH DWGS,), NEW MASONRY OPENING FOR NEW HVAC LOUVER (REFER TO MECH DWGS,), SALVAGE EXTERIOR SCORED CMU VENEER FOR REUSE TO INFILL OPENINGS. PROVIDE 5x3-1/2x "LLV GALV. LINTEL PER 4" WYTHE MASONRY 38"LLV GALV. LINTEL PER 4" WYTHE MASONRY 11. INFILL EXISTING OPENING AFTER REMOVAL OF LOUVER WITH CMU AND SALVAGED INFILL EXISTING OPENING AFTER REMOVAL OF LOUVER WITH CMU AND SALVAGED EXTERIOR SCORED CMU FLUSH WITH EXISTING SURFACES. TOOTH-IN EXTERIOR SCORED CMU VENEER AT JAMBS. MORTAR TO MATCH EXISTING. REFER TO MECH. DWGS FOR LOCATION

REFER TO MEP DRAWINGS FOR PROJECT CONSTRUCTION PHASING INFORMATION

D

B

C

E

F

G

H

J

K

L

M

TH

IS

D O

C U M

EN

T, A N

D T

H E

ID

EA

S A N

D D

ES

IG

N S

IN

C O

R

PO

R A

TE

D H

ER

EI

N , A

S A N

I N

ST

R U M

EN

T

O F

PR

O

FE

SS

IO

N

A L

SE

R V

IC

E, I S

TH

E

PR

O

PE

R

TY

O F

EM

BO

SS

D

ES

IG

N , P

.S .C

A N

D I S

N O

T

TO

B E

U

SE

D I N

2023-047

SECOND FLOOR PLAN

IS

SU

E DATE DESCRIPTION

4/10/26 30% REVIEW

90% REVIEW8/18/26

NO.

15141312 161110987654321

A

D

B

C

E

F

G

H

J

K

L

M

W H

O

LE

O R I N

P A R T

FO

R A

N Y

O

TH

ER

P

R O

JE

C T, W

IT

H O

U T

TH

E

W R

IT

TE

N

A U

TH

O R

IZ

A

TI

O N

O F

EM

BO

SS

D

ES

IG

N , P

.S .C

C O

PY

R

IG

H T

-2

5:

E

M

BO

SS

D

ES

IG

N , P

.S .C

A

LL

R

IG

H

TS

R

ES

ER

V

ED

3222 Terminal Dr.

Hebron, KY 41048

POLICE DEPARTMENT

A101

A1 SECOND FLOOR PLAN

SCALE: 1/8" =1'-0"

P:

\2

3\

PR

-0

-C

VG

P

O

LI

C E

ST

AT

IO

N

\0 6-

D R

AW

IN

G S

Interior Improvements

CINCINNATI/NORTHERN KY

INTERNATIONAL AIRPORT

6/30/26 60% REVIEW

CONSTRUCTION NOTES

BIDDING/PERMIT10/28/26

A12 TYPICAL HVAC UNIT SUPPORT DETAILS

SCALE: 3/4" =1'-0"

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

AutoCAD SHX Text

INVESTIGATORS

AutoCAD SHX Text

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

AutoCAD SHX Text

LAB

AutoCAD SHX Text

AutoCAD SHX Text

EXISTING

AutoCAD SHX Text

STAIR

AutoCAD SHX Text S-1

AutoCAD SHX Text

MEN

AutoCAD SHX Text

AutoCAD SHX Text

JAN.

AutoCAD SHX Text

AutoCAD SHX Text

IT SERVER

AutoCAD SHX Text

AutoCAD SHX Text

AOC

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

AutoCAD SHX Text

AOC

AutoCAD SHX Text

AutoCAD SHX Text

ELEV

AutoCAD SHX Text X

AutoCAD SHX Text

LOBBY

AutoCAD SHX Text

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text X

AutoCAD SHX Text

VEST.

AutoCAD SHX Text

AutoCAD SHX Text

EXIST.

AutoCAD SHX Text R.R.

AutoCAD SHX Text

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text

AutoCAD SHX Text

VEST.

AutoCAD SHX Text

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

AutoCAD SHX Text

INTERVIEW

AutoCAD SHX Text

AutoCAD SHX Text

CHIEF'S

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

AutoCAD SHX Text

BREAK ROOM

AutoCAD SHX Text

AutoCAD SHX Text

CONFERENCE

AutoCAD SHX Text

AutoCAD SHX Text

RECEPTION

AutoCAD SHX Text

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

AutoCAD SHX Text

WOMEN

AutoCAD SHX Text

AutoCAD SHX Text

STOR.

AutoCAD SHX Text

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

AutoCAD SHX Text

INTERVIEW

AutoCAD SHX Text

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text

AutoCAD SHX Text

HOLDING

AutoCAD SHX Text

AutoCAD SHX Text

HOLDING

AutoCAD SHX Text

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

AutoCAD SHX Text

OPEN

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

NEW EXHAUST HOOD. SEE MEP DWGS

AutoCAD SHX Text

AutoCAD SHX Text 3'-0"

AutoCAD SHX Text 3'-0"

AutoCAD SHX Text

MIN. CLR

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 906 Monmouth Street, AutoCAD SHX Text Newport, KY 41071

AutoCAD SHX Text EmbossDesign.com

AutoCAD SHX Text (859)431-8612

AutoCAD SHX Text X

1. INFILL OPENING W/ GYPSUM BOARD AND METAL STUD FLUSH WITH EXISTING WALL INFILL OPENING W/ GYPSUM BOARD AND METAL STUD FLUSH WITH EXISTING WALL 2. REINSTALL DOOR, FRAME, AND HARDWARE. REPAINT DOOR FRAME TO MATCH REINSTALL DOOR, FRAME, AND HARDWARE. REPAINT DOOR FRAME TO MATCH EXISTING 3. PAINT WALL FULL HEIGHT TO MATCH EXISTING. PROVIDE RESILIENT BASE TO PAINT WALL FULL HEIGHT TO MATCH EXISTING. PROVIDE RESILIENT BASE TO MATCH EXISTING AT WALL INFILL 4. NEW WALL CABINETS TO MATCH EXISTING COLOR NEW WALL CABINETS TO MATCH EXISTING COLOR 5. PROVIDE FLOOR STOPS TO STOP ROLLING FILE SYSTEM SHELVING MINIMUM 3'-0" PROVIDE FLOOR STOPS TO STOP ROLLING FILE SYSTEM SHELVING MINIMUM 3'-0" FROM WALL 6. REMOVE AND RECONSTRUCT SHAFT WALLS TO MATCH EXISTING AS REQUIRED TO REMOVE AND RECONSTRUCT SHAFT WALLS TO MATCH EXISTING AS REQUIRED TO COMPLETE MEP WORK. REFER TO MEP DRAWINGS 7. NEW ROOF PENETRATION FOR NEW RELIEF HOOD. SEE HVAC UNIT SUPPORT DETAIL NEW ROOF PENETRATION FOR NEW RELIEF HOOD. SEE HVAC UNIT SUPPORT DETAIL THIS SHEET. FLASH PENETRATION TO MAINTAIN WATERTIGHT CONDITION AND TO MAINTAIN EXISTING ROOF WARRANTY. SEE MEP DRAWINGS FOR ADDL INFORMATION.

D

B

C

E

F

G

H

J

K

L

M

TH

IS

D O

C U M

EN

T, A N

D T

H E

ID

EA

S A N

D D

ES

IG

N S

IN

C O

R

PO

R A

TE

D H

ER

EI

N , A

S A N

I N

ST

R U M

EN

T

O F

PR

O

FE

SS

IO

N

A L

SE

R V

IC

E, I S

TH

E

PR

O

PE

R

TY

O F

EM

BO

SS

D

ES

IG

N , P

.S .C

A N

D I S

N O

T

TO

B E

U

SE

D I N

2023-047

FIRST FLOOR REFLECTED

CEILING PLAN

IS

SU

E DATE DESCRIPTION

4/10/26 30% REVIEW

NO.

15141312 161110987654321

A

D

B

C

E

F

G

H

J

K

L

M

W H

O

LE

O R I N

P A R T

FO

R A

N Y

O

TH

ER

P

R O

JE

C T, W

IT

H O

U T

TH

E

W R

IT

TE

N

A U

TH

O R

IZ

A

TI

O N

O F

EM

BO

SS

D

ES

IG

N , P

.S .C

C O

PY

R

IG

H T

-2

5:

E

M

BO

SS

D

ES

IG

N , P

.S .C

A

LL

R

IG

H

TS

R

ES

ER

V

ED

A400

A1 FIRST FLOOR REFLECTED CEILING PLAN

SCALE: 1/8" =1'-0"

P:

\2

3\

PR

-0

-C

VG

P

O

LI

C E

ST

AT

IO

N

\0 6-

D R

AW

IN

G S

3222 Terminal Dr.

Hebron, KY 41048

POLICE DEPARTMENT

Interior Improvements

CINCINNATI/NORTHERN KY

INTERNATIONAL AIRPORT

GENERAL NOTES

6/30/26 60% REVIEW

8/18/26 90% REVIEW

10/28/26 BIDDING/PERMIT

AutoCAD SHX Text

GENERATOR

AutoCAD SHX Text

FITNESS

AutoCAD SHX Text

AutoCAD SHX Text

MECHANICAL

AutoCAD SHX Text

AutoCAD SHX Text

MECHANICAL

AutoCAD SHX Text

AutoCAD SHX Text

TRAINING

AutoCAD SHX Text

AutoCAD SHX Text

WOMEN

AutoCAD SHX Text

AutoCAD SHX Text

PHONE/

AutoCAD SHX Text

ALARM

AutoCAD SHX Text

AutoCAD SHX Text

PHONE/

AutoCAD SHX Text

ALARM

AutoCAD SHX Text

AutoCAD SHX Text

EXISTING

AutoCAD SHX Text

KENNEL

AutoCAD SHX Text

AutoCAD SHX Text

EXSITING

AutoCAD SHX Text

GARAGE

AutoCAD SHX Text

AutoCAD SHX Text

EXSITING

AutoCAD SHX Text

GARAGE

AutoCAD SHX Text

AutoCAD SHX Text

PHONE

AutoCAD SHX Text

AutoCAD SHX Text

MECHANICAL

AutoCAD SHX Text

AutoCAD SHX Text

CORR.

AutoCAD SHX Text

AutoCAD SHX Text

PATROL ROOM

AutoCAD SHX Text

AutoCAD SHX Text

EXISTING

AutoCAD SHX Text

STAIR

AutoCAD SHX Text S-1

AutoCAD SHX Text

EVIDENCE

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

AutoCAD SHX Text

TRAINING

AutoCAD SHX Text

AutoCAD SHX Text

ELEV

AutoCAD SHX Text X

AutoCAD SHX Text

ELEV.

AutoCAD SHX Text

EQIP

AutoCAD SHX Text

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

AutoCAD SHX Text

MEN

AutoCAD SHX Text

AutoCAD SHX Text REPLACE EXISTING 2x4 CEILING PADS WITH NEW. EXISTING GRID TO REMAIN

AutoCAD SHX Text 2'x4' SUSPENDED ACOUSTICAL PANEL CEILING. HEIGHT AND GRID LAYOUT TO MATCH EXISTING TO AVOID MODIFYING SPRINKLER HEAD LOCATIONS

AutoCAD SHX Text 2'x4' SUSPENDED ACOUSTICAL PANEL CEILING, TYP., HEIGHT TO MATCH EXISTING

AutoCAD SHX Text 5/8" MOLD & MOISTURE RESISTANT GYP. BD., TYP. HEIGHT TO BE 1" LOWER THAN SUSP. ACT.

AutoCAD SHX Text 906 Monmouth Street, AutoCAD SHX Text Newport, KY 41071

AutoCAD SHX Text EmbossDesign.com

AutoCAD SHX Text (859)431-8612

1. EXCEPT WHERE NOTED TO DEMO AND PROVIDE NEW CEILING, REMOVE AND REINSTALL EXCEPT WHERE NOTED TO DEMO AND PROVIDE NEW CEILING, REMOVE AND REINSTALL SUSPENDED CEILING TILE/GRID AS REQUIRED TO COMPLETE MEP WORK. REFER TO MEP DRAWINGS FOR ADDITIONAL INFORMATION.

D

B

C

E

F

G

H

J

K

L

M

TH

IS

D O

C U M

EN

T, A N

D T

H E

ID

EA

S A N

D D

ES

IG

N S

IN

C O

R

PO

R A

TE

D H

ER

EI

N , A

S A N

I N

ST

R U M

EN

T

O F

PR

O

FE

SS

IO

N

A L

SE

R V

IC

E, I S

TH

E

PR

O

PE

R

TY

O F

EM

BO

SS

D

ES

IG

N , P

.S .C

A N

D I S

N O

T

TO

B E

U

SE

D I N

2023-047

SECOND FLOOR REFLECTED

CEILING PLAN

IS

SU

E DATE DESCRIPTION

4/10/26 30% REVIEW

90% REVIEW8/18/26

NO.

15141312 161110987654321

A

D

B

C

E

F

G

H

J

K

L

M

W H

O

LE

O R I N

P A R T

FO

R A

N Y

O

TH

ER

P

R O

JE

C T, W

IT

H O

U T

TH

E

W R

IT

TE

N

A U

TH

O R

IZ

A

TI

O N

O F

EM

BO

SS

D

ES

IG

N , P

.S .C

C O

PY

R

IG

H T

-2

5:

E

M

BO

SS

D

ES

IG

N , P

.S .C

A

LL

R

IG

H

TS

R

ES

ER

V

ED

3222 Terminal Dr.

Hebron, KY 41048

POLICE DEPARTMENT

A401

A1 SECOND FLOOR REFLECTED CEILING PLAN

SCALE: 1/8" =1'-0"

P:

\2

3\

PR

-0

-C

VG

P

O

LI

C E

ST

AT

IO

N

\0 6-

D R

AW

IN

G S

Interior Improvements

CINCINNATI/NORTHERN KY

INTERNATIONAL AIRPORT

GENERAL NOTES

6/30/26 60% REVIEW

BIDDING/PERMIT10/28/26

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

AutoCAD SHX Text

INVESTIGATORS

AutoCAD SHX Text

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

AutoCAD SHX Text

LAB

AutoCAD SHX Text

AutoCAD SHX Text

EXISTING

AutoCAD SHX Text

STAIR

AutoCAD SHX Text S-1

AutoCAD SHX Text

MEN

AutoCAD SHX Text

AutoCAD SHX Text

JAN.

AutoCAD SHX Text

AutoCAD SHX Text

IT SERVER

AutoCAD SHX Text

AutoCAD SHX Text

AOC

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

AutoCAD SHX Text

AOC

AutoCAD SHX Text

AutoCAD SHX Text

ELEV

AutoCAD SHX Text X

AutoCAD SHX Text

LOBBY

AutoCAD SHX Text

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text X

AutoCAD SHX Text

VEST.

AutoCAD SHX Text

AutoCAD SHX Text

EXIST.

AutoCAD SHX Text R.R.

AutoCAD SHX Text

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text

AutoCAD SHX Text

VEST.

AutoCAD SHX Text

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

AutoCAD SHX Text

INTERVIEW

AutoCAD SHX Text

AutoCAD SHX Text

CHIEF'S

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

AutoCAD SHX Text

BREAK ROOM

AutoCAD SHX Text

AutoCAD SHX Text

CONFERENCE

AutoCAD SHX Text

AutoCAD SHX Text

RECEPTION

AutoCAD SHX Text

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

AutoCAD SHX Text

WOMEN

AutoCAD SHX Text

AutoCAD SHX Text

STOR.

AutoCAD SHX Text

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

AutoCAD SHX Text

INTERVIEW

AutoCAD SHX Text

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text

AutoCAD SHX Text

HOLDING

AutoCAD SHX Text

AutoCAD SHX Text

HOLDING

AutoCAD SHX Text

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

AutoCAD SHX Text

OPEN

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

AutoCAD SHX Text 2'x2' SUSPENDED ACOUSTICAL PANEL CEILING, TYP. HEIGHT AND GRID LAYOUT TO MATCH EXISTING TO AVOID MODIFYING SPRINKLER HEAD LOCATIONS

AutoCAD SHX Text 2'x2' SUSPENDED ACOUSTICAL PANEL CEILING, TYP.. HEIGHT AND GRID LAYOUT TO MATCH EXISTING TO AVOID MODIFYING SPRINKLER HEAD LOCATIONS

AutoCAD SHX Text 906 Monmouth Street, AutoCAD SHX Text Newport, KY 41071

AutoCAD SHX Text EmbossDesign.com

AutoCAD SHX Text (859)431-8612

1. EXCEPT WHERE NOTED TO DEMO AND PROVIDE NEW CEILING, REMOVE AND REINSTALL EXCEPT WHERE NOTED TO DEMO AND PROVIDE NEW CEILING, REMOVE AND REINSTALL SUSPENDED CEILING TILE/GRID AS REQUIRED TO COMPLETE MEP WORK. REFER TO MEP DRAWINGS FOR ADDITIONAL INFORMATION.

GENERAL NOTES - MECHANICAL

1. THE CONTRACTOR'S ATTENTION IS DIRECTED TO THE GENERAL AND SPECIAL CONDITIONS, "GENERAL

CONDITIONS - MECHANICAL" OF THE PROJECT SPECIFICATIONS AND TO ALL OTHER CONTRACT DOCUMENTS AS THEY APPLY TO THIS BRANCH OF WORK. ATTENTION IS ALSO DIRECTED TO ALL OTHER SECTIONS OF THE CONTRACT DOCUMENTS WHICH AFFECTS THE WORK AND WHICH ARE HEREBY MADE A PART OF THE

WORK SPECIFIED.

2. ALL MANUFACTURERS, SUPPLIERS, FABRICATORS, CONTRACTORS, ETC. SUBMITTING PROPOSALS FOR ANY PART OF THE WORK, SERVICES, MATERIALS OR EQUIPMENT TO BE USED ON OR APPLIED TO THIS PROJECT ARE HEREBY DIRECTED TO FAMILIARIZE THEMSELVES WITH THE CONTRACT DOCUMENTS. IN CASE OF

CONFLICTS, THE CONTRACTOR SHALL CONTACT THE ENGINEER FOR CLARIFICATION AND FINAL

DETERMINATION PRIOR TO THE BID.

3. THE WORK SHALL CONSIST OF FURNISHING ALL LABOR, EQUIPMENT, TRANSPORTATION, SUPPLIES, MATERIALS, APPURTENANCES AND SERVICES NECESSARY FOR THE SATISFACTORY INSTALLATION OF THE

COMPLETE AND OPERATING SYSTEMS INDICATED OR SPECIFIED IN THE CONTRACT DOCUMENTS.

4. ANY MATERIALS, LABOR, EQUIPMENT OR SERVICES NOT MENTIONED SPECIFICALLY HEREIN WHICH MAY BE NECESSARY TO COMPLETE ANY PART OF THE SYSTEMS IN A SUBSTANTIAL MANNER, IN COMPLIANCE WITH THE REQUIREMENTS STATED, IMPLIED OR INTENDED IN THE PLANS AND SPECIFICATIONS, SHALL BE

INCLUDED IN THE BID AS PART OF THE CONTRACT.

5. THE ENGINEER DOES NOT DEFINE THE SCOPE OF INDIVIDUAL TRADES, SUBCONTRACTORS, MATERIAL SUPPLIERS AND VENDORS. ANY SHEET NUMBERING OR SPECIFICATION NUMBERING SYSTEM USED WHICH IDENTIFIES DISCIPLINES IS SOLELY FOR THE ENGINEER'S CONVENIENCE AND IS NOT INTENDED TO DEFINE

A SUBCONTRACTOR'S SCOPE OF WORK. INFORMATION REGARDING INDIVIDUAL TRADES,

SUBCONTRACTORS, MATERIAL SUPPLIERS AND VENDORS MAY BE DETAILED, DESCRIBED AND INDICATED AT DIFFERENT LOCATIONS THROUGHOUT THE CONTRACT DOCUMENTS. NO CONSIDERATION WILL BE GIVEN TO REQUESTS FOR CHANGE ORDERS FOR FAILURE TO OBTAIN AND REVIEW THE COMPLETE SET OF CONTRACT DOCUMENTS WHEN PREPARING BIDS, PRICES AND QUOTATIONS. UNLESS STATED OTHERWISE, THE SUBDIVISION AND ASSIGNMENT OF WORK UNDER THE VARIOUS SECTIONS SHALL BE THE

RESPONSIBILITY OF THE CONTRACTOR HOLDING THE PRIME CONTRACT.

6. IT IS THE INTENTION OF THE CONTRACT DOCUMENTS TO CALL FOR A COMPLETE AND OPERATIONAL SYSTEM, INCLUDING ALL COMPONENTS, ACCESSORIES, FINISH WORK, ETC NECESSARY FOR TROUBLE FREE OPERATION; TESTED AND READY FOR OPERATION. ANYTHING THAT MAY BE REQUIRED, IMPLIED, OR INFERRED BY THE CONTRACT DOCUMENTS SHALL BE PROVIDED AND INCLUDED AS PART OF THE BID.

7. ALL CONTRACTORS AND VENDORS PROVIDING A BID FOR THIS PROJECT SHALL REVIEW THE PLANS AND SPECIFICATIONS AND DETERMINE ANY MODIFICATIONS AND/OR ADJUSTMENTS NECESSARY RELATIVE TO

THE PROPOSED EQUIPMENT AND MATERIALS WITH SPECIFIC MANUFACTURER'S INSTALLATION

REQUIREMENTS. INCLUDE IN THE BID ANY NECESSARY METHODS, FEATURES, OPTIONS, ACCESSORIES, ETC.

NECESSARY TO INSTALL THE PROPOSED EQUIPMENT AND MATERIALS, REGARDLESS OF WHETHER USED AS BASIS OF DESIGN OR BEING OFFERED AS A SUBSTITUTION, IN ACCORDANCE WITH THE SPECIFIC MANUFACTURER'S INSTALLATION REQUIREMENTS, WHETHER SPECIFICALLY DETAILED OR NOT, WITHIN THE

PLANS AND SPECIFICATIONS.

8. THE BIDDER/PROPOSER SHALL COMPLETELY REVIEW THE CONTRACT DOCUMENTS. ANY INTERPRETATION AS TO DESIGN INTENT OR SCOPE SHALL BE PROVIDED BY THE ENGINEER. SHOULD ANY INTERPRETATION BE REQUIRED, THE BIDDER/PROPOSER SHALL REQUEST A CLARIFICATION NOT LESS THAN TEN (10) DAYS PRIOR TO THE SUBMISSION OF THE BID SO THAT THE CONDITION MAY BE CLARIFIED BY ADDENDUM. IN THE EVENT OF ANY CONFLICT, DISCREPANCY, OR INCONSISTENCY DEVELOPS; THE INTERPRETATION OF THE

ENGINEER SHALL BE FINAL.

9. THE CONTRACTOR SHALL PROVIDE LAYOUT CONFIRMATION OF EQUIPMENT LOCATIONS TO VERIFY THAT ALL COMPONENTS WILL FIT IN THE PROPOSED SPACE AND HAVE ADEQUATE CLEARANCE FOR SERVICES.

COORDINATE THE LOCATION OF DRAINS, CONNECTIONS, ETC. PRIOR TO COMMENCING INSTALLATION.

WORK NOT SO COORDINATED SHALL BE REMOVED AND PROPERLY INSTALLED AT THE EXPENSE OF THE

RESPONSIBLE CONTRACTOR(S).

10. EQUIPMENT AND MATERIALS SUBSTITUTIONS OR DEVIATIONS SHALL COMPLY WITH "GENERAL PROVISIONS - MECHANICAL PART 6." ANY VENDOR WISHING TO OBTAIN AN EQUIPMENT SUBSTITUTION SHALL REQUEST A CLARIFICATION NOT LESS THAN TEN (10) DAYS PRIOR TO THE SUBMISSION OF THE PROPOSAL SO THAT IT MAY BE CONSIDERED AND POTENTIALLY INCLUDED BY ADDENDUM. REQUESTS MADE AFTER THIS PERIOD

WILL BE REJECTED.

11. CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLIANCE REGARDLESS IF CONTRACTOR IS IGNORANT OF CODES, RULES, REGULATIONS, LAWS, ETC. THE CONTRACTOR SHALL ALSO BE VERSED IN ALL CODES, RULES, REGULATIONS, LAWS, ETC. PERTINENT TO THEIR PART OF THE WORK PRIOR TO SUBMISSION OF THE

PROPOSAL.

12. ALL WARRANTIES SHALL BEGIN STARTING AT THE PROJECT'S SUBSTANTIAL COMPLETION DATE. ALL

EQUIPMENT, MATERIAL AND LABOR WARRANTIES SHALL BE FURNISHED BY THE EQUIPMENT

SUPPLIER/VENDOR.

13. WHEREVER WORK PENETRATES ROOFING, IT SHALL BE DONE IN A MANNER THAT WILL NOT DIMINISH OR VOID THE ROOFING GUARANTEE OR WARRANTY IN ANY WAY. COORDINATE ALL SUCH WORK WITH THE

ROOFING INSTALLER.

14. DUCTWORK, PIPING AND EQUIPMENT SHALL BE KEPT CLEAN AT ALL TIMES. DUCTWORK STORED ON THE JOB SITE SHALL BE PLACED A MINIMUM OF 4" ABOVE THE FLOOR AND BE COMPLETELY COVERED IN PLASTIC.

INSTALLED DUCTWORK SHALL BE PROTECTED WITH PLASTIC. DO NOT INSTALL THE DUCTWORK OR INSULATION (PIPE OR DUCT) IF THE BUILDING IS NOT "DRIED-IN". IF THIS IS REQUIRED, THE ENTIRE LENGTHS SHALL BE COVERED IN PLASTIC TO PROTECT. THE OWNER/ENGINEER SHALL PERIODICALLY INSPECT THAT THESE PROCEDURES ARE FOLLOWED. IF DEEMED UNACCEPTABLE, THE CONTRACTOR SHALL

BE REQUIRED TO CLEAN THE DUCT SYSTEM UTILIZING A NADCA CERTIFIED CONTRACTOR.

15. THE PERMANENT SYSTEMS, WHEN INSTALLED, MAY BE USED FOR TEMPORARY SERVICES WITH THE CONSENT OF THE ENGINEER AND IN STRICT ACCORDANCE WITH "GENERAL PROVISIONS - MECHANICAL -

TEMPORARY USE OF EQUIPMENT."

16. THE CONTRACTOR AND THEIR SUBCONTRACTORS SHALL INCLUDE IN THE BID TO PROVIDE EQUIPMENT AND CONTROLS STARTUP AND VERIFICATION FOR ALL MECHANICAL SYSTEMS SPECIFIED FOR THIS PROJECT AND IN STRICT ACCORDANCE WITH "GENERAL PROVISIONS - MECHANICAL - EQUIPMENT/CONTROLS STARTUP &

VERIFICATION."

17. THE CONTRACTOR SHALL DETERMINE FROM THE CONTRACT DOCUMENTS, THE DATE OF COMPLETION FOR THE PROJECT AND INSURE THAT EQUIPMENT DELIVERY SCHEDULES CAN BE MET SO AS TO ALLOW THIS

COMPLETION TO BE MET.

18. THROUGH COORDINATION WITH OTHER CONTRACTORS, VENDORS, AND SUPPLIERS ASSOCIATED WITH THIS PROJECT, THIS CONTRACTOR SHALL INSURE, 100% FUNCTIONAL, TESTED, INSPECTED AND APPROVED

SYSTEMS. CLAIMS FOR ADDITIONAL COST OR CHANGE ORDERS WILL BE REJECTED.

19. PRIOR TO ORDERING ANY MATERIALS OR ROUGH-IN OF ANY KIND, THE MECHANICAL CONTRACTOR SHALL BE RESPONSIBLE FOR FINAL COORDINATION OF ALL ELECTRICAL REQUIREMENTS (I.E. VOLTAGE, PHASE, CIRCUIT BREAKER, WIRE SIZING, ETC.) WITH THE ELECTRICAL CONTRACTOR. THERE WILL BE NO CHANGE

IN THE CONTRACT AMOUNT FOR ANY DISCREPANCIES.

20. ALL OFFSETS, TURNS, FITTINGS, TRIM, DETAIL, ETC., MAY NOT BE INDICATED, BUT SHALL BE PROVIDED AS REQUIRED. ADDITIONAL ALLOWANCES SHALL BE INCLUDED FOR SAME AT EACH PROPOSERS' DISCRETION.

21. DO NOT SCALE FROM DRAWINGS, PRINTING DISTORTS SCALE. WORK SHALL BE LAID OUT FROM

CONTRACTOR GENERATED DIMENSIONED DRAWINGS.

22. THE CONTRACTOR SHALL ENSURE PROPER COORDINATION BETWEEN ALL TRADES SUCH THAT CONDUITS, PIPING, DUCTWORK, ETC, DOES NOT BLOCK ACCESS TO VALVES, EQUIPMENT, DUCT ACCESS DOORS, ETC.

ITEMS THAT HAVE BEEN INSTALLED WHERE ACCESS IS COMPROMISED SHALL BE RELOCATED AT THE

CONTRACTOR'S EXPENSE.

23. THESE DRAWINGS ARE ACCURATE TO THE BEST OF OUR KNOWLEDGE, HOWEVER LOCATIONS AND SIZES WERE TAKEN FROM DIFFERENT SOURCES AND ARE SUBJECT TO DEVIATION. THE CONTRACTOR SHALL ASSUME SOME DEVIATIONS AND INCLUDE OFFSETS, ADDITIONAL PIPING, ETC. AT THE TIME OF BID.

24. THIS CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CUTTING AND PATCHING REQUIRED FOR THEIR WORK.

ALL CUTTING AND PATCHING SHALL MATCH ADJACENT SURFACES AND PERFORMED BY SKILLED WORKERS OF THE TRADE. REFER TO SPECIFICATION SECTION "SLEEVING, CUTTING, PATCHING, REPAIRING, ETC."

AND ARCHITECTURAL DRAWINGS FOR ADDITIONAL INFORMATION.

25. ALL SUPPORTS FOR EQUIPMENT, DEVICES OR FIXTURES SHALL BE UNIQUE, FROM THE BUILDING STRUCTURE. DO NOT SUPPORT WORK FROM OTHER TRADES, EQUIPMENT OR SUPPORTS WITHOUT WRITTEN

PERMISSION FROM THE ENGINEER AND CONSENT OF THE OTHER TRADE, IN WRITING.

26. PRIOR TO PURCHASE OR FABRICATION OF PIPING, THE CONTRACTOR SHALL COORDINATE INSTALLATION

WITH ACTUAL CONDITIONS AND INSTALL ACCORDINGLY.

27. VALVES, BALANCING DAMPERS OR ANY MECHANICAL/ELECTRICAL ITEM SHALL NOT BE LOCATED ABOVE A HARD CEILING. IF THIS IS NOT POSSIBLE, THEN AN APPROPRIATELY SIZED ACCESS DOOR SHALL BE PLACED AT NO ADDITIONAL COST UNDER THE ITEM WHETHER SHOWN OR NOT ON THE PLANS TO ALLOW ACCESS

AND ADJUSTMENT.

28. THE CONTRACTOR SHALL VISIT THE SITE FOR EXACT LOCATIONS OF ALL WALL AND CEILING DEVICES. THIS

SHALL INCLUDE PLUMBING FIXTURES, CEILING GRILLES AND DIFFUSERS, ETC.

29. CONTRACTOR SHALL CLEAN UP CONSTRUCTION DEBRIS AT ALL TIMES DURING CONSTRUCTION.

NOTE: NOT ALL SYMBOLS AND ABBREVIATIONS MAY BE USED ON THIS PROJECT

GENERAL NOTES - DEMOLITION

A. THE CONTRACTOR SHALL REFER TO THE ARCHITECTURAL PLANS FOR AREAS IN WHICH THE CEILING IS

REMAINING. THE CONTRACTOR IS RESPONSIBLE FOR REMOVING THE EXISTING CEILING AS REQUIRED AND REINSTALLATION. TEMPORARILY SUPPORT LIGHTS, DIFFUSERS, CEILING ETC. REPLACE BROKEN CEILING

TILES WITH NEW AT NO ADDITIONAL COST TO OWNER. FIELED VERIFY EXACT REQUIREMENTS.

B. ALL OUTAGES SHALL BE SCHEDULED THROUGH THE PROJECT REPRESENTATIVE FOR PROPER

COORDINATION. A REQUEST FOR AN OUTAGE SHALL BE SUBMITTED IN WRITING A MINIMUM OF TWO WEEKS

IN ADVANCE.

C. DURING SPRINKLER SYSTEM OUTAGES THE CONTRACTORS SHALL PROVIDE FIRE WATCH OF AREAS WITH

OUTAGES.

D. ALL WALLS AND FLOOR SLABS SHALL BE REPAIRED TO MATCH EXISTING AND TO A LIKE NEW CONDITION.

ALL RATED WALLS AND FLOOR SLABS SHALL BE PATCHED AND REPAIRED TO MAINTAIN RATING.

E. ALL EXISTING BUILDING FINISHES SHALL BE PROTECTED DURING THE DEMOLITION PHASE.

F. HEAVY DASHED LINES INDICATE ITEMS FOR REMOVAL (U.O.N) AND LIGHT SOLID LINES INDICATE EXISTING

ITEMS TO REMAIN.

G. COORDINATE DISPOSAL OF ALL FIXTURES, DEVICES, ETC. (INDICATED FOR DEMOLITION) WITH THE OWNER.

PHASING NOTES

A. THIS PROJECT INTERFACES EXTENSIVELY WITH EXISTING BUILDING SERVICES. IT SHALL BE THE

CONTRACTOR'S RESPONSIBILITY TO COORDINATE AND PHASE ALL TIE-INS AND INTERRUPTIONS OF EXISTING SERVICES TO MINIMIZE OR ELIMINATE DOWNTIME. AS AN EXAMPLE, WATER SERVICE, ELECTRICAL SERVICE, HVAC SERVICES, ETC., WILL BE AFFECTED AND REPLACED OR MOVED DURING THIS PROJECT. THE CONTRACTOR SHALL INSTALL ALL NEW SERVICES AND EQUIPMENT AND HAVE THEM TESTED AND FULLY AND RELIABLY FUNCTIONAL PRIOR TO INTERRUPTING, RELOCATING OR REMOVING ANY EXISTING SERVICES. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO BARE ANY AND ALL COSTS ASSOCIATED WITH THIS PHASING, INCLUDING TEMPORARY SERVICES, TEMPORARY RELOCATION, PREMIUM TIME WORK, ETC. CONTRACTOR SHALL COORDINATE ALL SAID WORK WITH THE OWNER AND APPLICABLE

UTILITIES PER THE CONTRACT DOCUMENTS.

ABBREVIATIONS

TAGGED NOTE DESIGNATOR

GENERAL SYMBOLS

X REVISION TRIANGLE

ROOM NAME

RM # ROOM TAG

AFF ABOVE FINISHED FLOOR

AFR ABOVE FINISHED ROOF

ADJ ADJUSTABLE

APD AIR PRESSURE DROP

HVAC LEGEND

SUPPLY AIR DIFFUSER

TRANSFER AIR GRILLE W/ SOUND ATTENUATING BOOT

POINT OF CONNECTION / CONNECT TO EXISTING

POINT OF DEMOLITION

SIDEWALL DIFFUSER/GRILLE

RETURN AIR GRILLE

EXHAUST AIR DIFFUSER

MECHANICAL PIPING LEGEND

AIR DEVICE TAG (REGISTER, GRILLE, DIFFUSER,LOUVER)AIRFLOW

TAG

SA AIR DUCT TURNING UP

SA AIR DUCT TURNING DOWN

SUPPLY AIR DUCT

RETURN AIR DUCT

EXHAUST AIR DUCT

OUTSIDE AIR DUCT

TRANSFER AIR DUCT

RA AIR DUCT TURNING UP

RA AIR DUCT TURNING DOWN

EA AIR DUCT TURNING UP

EA AIR DUCT TURNING DOWN

DUCT TO BE DEMOLISHED - (XXX) DENOTES SYSTEM

EXISTING DUCT - (XXX) DENOTES SYSTEM

RA

SA

EA

OA

TA

SA

SA

RA

RA

EA

EA

D(XXX)

E(XXX)

RECTANGULAR DUCT

ROUND/SPIRAL DUCT#ø

PIPE ELBOW TURNING DOWN

PIPE ELBOW TURNING UP

PIPE TEE; CONNECTION ON BOTTOM

PIPE TEE; CONNECTION ON TOP

CONDENSATE DRAINCD

CHILLED WATER SUPPLY/RETURNCHWS/R

REFRIGERANT SUPPLY/RETURNRFS/R

PIPE CAP

FLEXIBLE DUCT

THERMOSTAT

TS

T

C

TEMPERATURE SENSOR

CARBON DIOXIDE SENSOR

TC TEMPERATURE & CARBON DIOXIDE SENSOR

MANUAL BALANCING/VOLUME DAMPER

MOTORIZED DAMPER

H HUMIDITY SENSOR

VERT. HORIZ.

VERT. HORIZ.

MITERED ELBOW WITH TURNING VANES

EQUIPMENT TAG

BAS BUILDING AUTOMATION SYSTEM

AVG AVERAGE

BHP BREAK HORSEPOWER

CAV CONSTANT AIR VOLUME

BTU BRITISH THERMAL UNIT

CFM CUBIC FEET PER MINUTE

CO CARBON MONOXIDE

CO2 CARBON DIOXIDE

DB DRY BULB

ABBREVIATIONS (CONTINUED)

FIRE PROTECTION CONTRACTORFPC

FEET PER MINUTEFPM

FEET PER SECONDFPS

GALLON (-S)GAL

GENERAL CONTRACTORGC

GALLONS PER MINUTEGPM

GRAINSGR

HEADHD

H (-ORSEPOWER, -EAT PUMP)HP

KILOWATTkW

LEAVING AIR TEMPERATURELAT

LEAVING WATER TEMPERATURELWT

BTU PER HOUR [THOUSANDS]MBH

MINIMUM CIRCUIT AMPSMCA

MANUFACTURERMFG

MAXIMUM OVERCURRENT PROTECTION [AMPS]MOCP

ID I (-DENTIFICATION, -NSIDE DIAMETER, -NSIDE DIMENSION)

FIRE DAMPERFD

FULL LOAD AMPSFLA

NOISE CRITERIA OR NORMALLY CLOSEDNC

NORMALLY OPEN OR NUMBERNO

NOT TO SCALENTS

OUTSIDE DI (-AMETER, -MENSION)OD

OWNER FURNISHED, CONTRACTOR INSTALLEDOFCI

OWNER FURNISHED, OWNER INSTALLEDOFOI

PLUMBING CONTRACTORPC

PHASE [ELECTRICAL]PH

PARTS PER MILLIONPPM

PRESSURE DROPPD

PRESSURE REDUCING STATIONPRS

PRESSURE REDUCING VALVE (STEAM, WATER, GAS)PRV

POUNDS PER SQUARE INCHPSI

POUNDS PER SQUARE FOOTPSF

PSI GAUGEPSIG

RELATIVE HUMIDITY [%]RH

REVOLUTIONS PER MINUTERPM

SMOKE DAMPERSD

STATIC PRESSURESP

SQUARE FEET OR FOOTSQ FT

TYPICALTYP

UNLESS NOTED OTHERWISEUNO

TOTAL STATIC PRESSURETSP

VOLT (-AGE, -S)V

VARI (-ABLE, -IES)VAR

VARIABLE AIR VOLUMEVAV

VELOCITYVEL

VARIABLE FEQUENCY DRIVEVFD

WATT (-AGE, -S)W

WET BULBWB

WATER PRESSURE DROPWPD

DIFFERENTIAL PRESSUREΔP

TEMPERATURE DIFFERENCEΔT

℄ CENTERLINE

DDC DIRECT DIGITAL CONTROLS

DN DOWN

EAT ENTERING AIR TEMPERATURE

EC ELECTRICAL CONTRACTOR

EWT ENTERING WATER TEMPERATURE

ESP EXTERNAL STATIC PRESSURE

ETR EXISTING TO REMAIN

FREE AREAFA

XXX-X

FSD FIRE SMOKE DAMPER

HEATING WATER SUPPLY/RETURNHWS/R

PIPING TO BE DEMOLISHED - (XXX) DENOTES SYSTEMD(XXX)

EXISTING PIPING - (XXX) DENOTES SYSTEME(XXX)

DATE DESCRIPTION NO.

906 Monmouth Street, Newport, KY 41071

EmbossDesign.com

(859)431-8612

3222 Terminal Dr.

Hebron, KY 41015

POLICE DEPARTMENT

CINCINNATI/NORTHERN KY

INTERNATIONAL AIRPORT

TH

IS

D O

CU

M

EN

T, A N

D T

H E

ID

EA

S A N

D D

ES

IG

N S

IN

CO

RP

O

RA

TE

D H

ER

EI

N , A

S A N

IN

ST

RU

M

EN

T

O F

PR

O

FE

SS

IO

N

AL

S

ER

VI

CE

, I

S

TH

E

PR

O

PE

RT

Y

O F

EM

BO

SS

D

ES

IG

N , P

.S .C

A N

D

IS

N O

T

TO

B E

U

SE

D

IN

W H

O

LE

O R

IN

P

A

RT

F O

R A N

Y O

TH

ER

P

RO

JE

CT

, W

IT

H O

U T

TH

E

W

RI

TT

EN

A U

TH

O

RI

ZA

TI

O N

O F

EM

BO

SS

D

ES

IG

N , P

.S .C

CO

PY

RI

G H

T

-2

5:

E M

BO

SS

D

ES

IG

N

, P .S

.C

AL

L

RI

G H

TS

R

ES

ER

VE

D

151413 161110987654321

A

D

B

C

E

F

G

H

J

K

L

M

15141312 161110987654321

A

D

B

C

E

F

G

H

J

K

L

M

IS

SU

E

P

3\ P

R

3-

7-

C V

G P

O L

IC

E

S T

A T

IO

N

\0 6-

D R

A W

IN

G

S

1100 Sycamore St Suite 400, Cincinnati, OH 45202

Interior Improvements

2023-047

M000

MECHANICAL LEGEND

Sheet List - Mechanical

SHEET # SHEET NAME

M000 MECHANICAL LEGEND

M001 MECHANICAL VENTILATION PLAN

M002 MECHANICAL PHASING PLAN

M101 FIRST FLOOR MECHANICAL DEMOLITION PLAN

M102 SECOND FLOOR MECHANICAL DEMOLITION PLAN

M103 FIRST FLOOR HYDRONIC PIPING DEMOLITION PLAN

M201 FIRST FLOOR AIR DISTRIBUTION PLAN

M202 SECOND FLOOR AIR DISTRIBUTION PLAN

M301 FIRST FLOOR HYDRONIC PIPING PLAN

M500 MECHANICAL PIPING SCHEMATICS

M700 MECHANICAL SCHEDULES

M701 MECHANICAL SCHEDULES

M800 MECHANICAL DETAILS

M801 MECHANICAL DETAILS

M802 MECHANICAL DETAILS

M803 MECHANICAL DETAILS

M900 MECHANICAL ZONING FLOOR PLANS

M901 MECHANICAL CONTROL SCHEMATICS

M902 MECHANICAL CONTROL SCHEMATICS

M903 MECHANICAL CONTROL SCHEMATICS

M904 MECHANICAL CONTROL SCHEMATICS

M905 MECHANICAL CONTROL SCHEMATICS

M906 MECHANICAL CONTROL SCHEMATICS

4/10/26 30% SET

6/30/26 60% SET

8/18/26 90% SET

10/28/26 Permit and Bidding

(NOT IN VENTILATION SCOPE (NIVC)

101C102C

103C

A101

A102 A104

A105

A106 A107

A108

A109

A100

(SERVED BY

ERV)

NIVC

NIVC

104C 105C 106C 107C 108C

109C

115C112C

114C113C

111C110C

A200

A202

A203

A204

A205

A206 A207 A210

A209

A211

A208 A212 A213

A214

A215

A216

A217

A218

A219

A220

A222A223

A224

A225

A226

A228

A229 A230 A231

A232

(NOT IN AH-4

VENTILATION

SCOPE)

(NOT IN AH-4

VENTILATION

SCOPE)

(NOT IN AH-4

VENTILATION

SCOPE)

DATE DESCRIPTION NO.

906 Monmouth Street, Newport, KY 41071

EmbossDesign.com

(859)431-8612

3222 Terminal Dr.

Hebron, KY 41015

POLICE DEPARTMENT

CINCINNATI/NORTHERN KY

INTERNATIONAL AIRPORT

TH

IS

D O

CU

M

EN

T, A N

D T

H E

ID

EA

S A N

D D

ES

IG

N S

IN

CO

RP

O

RA

TE

D H

ER

EI

N , A

S A N

IN

ST

RU

M

EN

T

O F

PR

O

FE

SS

IO

N

AL

S

ER

VI

CE

, I

S

TH

E

PR

O

PE

RT

Y

O F

EM

BO

SS

D

ES

IG

N , P

.S .C

A N

D

IS

N O

T

TO

B E

U

SE

D

IN

W H

O

LE

O R

IN

P

A

RT

F O

R A N

Y O

TH

ER

P

RO

JE

CT

, W

IT

H O

U T

TH

E

W

RI

TT

EN

A U

TH

O

RI

ZA

TI

O N

O F

EM

BO

SS

D

ES

IG

N , P

.S .C

CO

PY

RI

G H

T

-2

5:

E M

BO

SS

D

ES

IG

N

, P .S

.C

AL

L

RI

G H

TS

R

ES

ER

VE

D

151413 161110987654321

A

D

B

C

E

F

G

H

J

K

L

M

15141312 161110987654321

A

D

B

C

E

F

G

H

J

K

L

M

IS

SU

E

P

3\ P

R

3-

7-

C V

G P

O L

IC

E

S T

A T

IO

N

\0 6-

D R

A W

IN

G

S

1100 Sycamore St Suite 400, Cincinnati, OH 45202

Interior Improvements

2023-047

M001

MECHANICAL

VENTILATION PLAN

SCALE:M001 1/16" = 1'-0"

1 FIRST FLOOR VENTILATION ZONING PLAN

SCALE:M001 1/16" = 1'-0"

2 SECOND FLOOR VENTILATION ZONING PLAN

AH-1 VENTILATION CALCULATION:

AH-4 VENTILATION CALCULATION:

NOTES:

1. ALL VRP CALCULATIONS ARE PERFORMED PER AHSRAE 62.1 APPENDIX A.

2. CONDITION ANALYZED: HEATING.

A COMPARISON BETWEEN HEATING AND COOLING CONDITIONS WAS PERFORMED. THE HEATING CONDITION WAS DETERMINED TO BE THE GOVERNING (WORST-CASE) CONDITION FOR VENTILATION CALCULATIONS. ALL VENTILATION DESIGN IS BASED ON THE HEATING CONDITION.

2. RESTROOMS ARE GOVERNED BY EXHAUST REQUIREMENTS AND ARE DESIGNED PER ASHRAE/IMC GUIDELINES.

NOTES:

1. ALL VRP CALCULATIONS ARE PERFORMED AS PER AHSRAE 62.1 APPENDIX A.

2. CONDITION ANALYZED: HEATING.

A COMPARISON BETWEEN HEATING AND COOLING CONDITIONS WAS PERFORMED. THE HEATING CONDITION WAS DETERMINED TO BE THE GOVERNING (WORST-CASE) CONDITION FOR VENTILATION CALCULATIONS. ALL VENTILATION DESIGN IS BASED ON THE HEATING CONDITION.

4/10/26 30% SET

6/30/26 60% SET

PHASE-1

PHASE-3

CHILLER PLANT

PHASE-2

AOC

204 EXISTING GARAGE

ELEV

X

ELEV.EQUIPMENT

105 PHONE

MECHANICAL

CORRIDOR

EXISTING KENNEL

PHONE /ALARM

PHONE/ALARM

109 TRAINING

MEN

WOMEN

STORAGE

EVIDENCE STORAGE

TRAINING

PATROL ROOM

FITNESS

118 MECHANICAL

MECHANICAL

PHASE -1

PHASE-3

PHASE 4

AOC

AOC OFF

IT SERVER

RECEPTION

LOBBY

VEST.

EXISTING RR

STORAGE

X

HOLDING

HOLDING

LAB

CORRIDOR

221 CHIEF'S OFFICE

INTERVIEW

INTERVIEW

222 VEST.

CORRIDOR

OFFICE

OFFICE

STOR.

OFFICE

JAN

MEN

WOMEN

OFFICE

CONFERENCE

OFFICE

INVESTIGATORS

STORAGE

228 OPEN OFFICE

OFFICE

OFFICE

BREAK RM

DATE DESCRIPTION NO.

906 Monmouth Street, Newport, KY 41071

EmbossDesign.com

(859)431-8612

3222 Terminal Dr.

Hebron, KY 41015

POLICE DEPARTMENT

CINCINNATI/NORTHERN KY

INTERNATIONAL AIRPORT

TH

IS

D O

CU

M

EN

T, A N

D T

H E

ID

EA

S A N

D D

ES

IG

N S

IN

CO

RP

O

RA

TE

D H

ER

EI

N , A

S A N

IN

ST

RU

M

EN

T

O F

PR

O

FE

SS

IO

N

AL

S

ER

VI

CE

, I

S

TH

E

PR

O

PE

RT

Y

O F

EM

BO

SS

D

ES

IG

N , P

.S .C

A N

D

IS

N O

T

TO

B E

U

SE

D

IN

W H

O

LE

O R

IN

P

A

RT

F O

R A N

Y O

TH

ER

P

RO

JE

CT

, W

IT

H O

U T

TH

E

W

RI

TT

EN

A U

TH

O

RI

ZA

TI

O N

O F

EM

BO

SS

D

ES

IG

N , P

.S .C

CO

PY

RI

G H

T

-2

5:

E M

BO

SS

D

ES

IG

N

, P .S

.C

AL

L

RI

G H

TS

R

ES

ER

VE

D

151413 161110987654321

A

D

B

C

E

F

G

H

J

K

L

M

15141312 161110987654321

A

D

B

C

E

F

G

H

J

K

L

M

IS

SU

E

P

3\ P

R

3-

7-

C V

G P

O L

IC

E

S T

A T

IO

N

\0 6-

D R

A W

IN

G

S

1100 Sycamore St Suite 400, Cincinnati, OH 45202

Interior Improvements

2023-047

M002

MECHANICAL PHASING

PLAN

GENERAL NOTES:

1. THE PHASING PLAN IS CONCEPTUAL FOR PLANNING PURPOSES.

ACTUAL CONSTRUCTION PHASING ORDER MAY VARY.

CONTRACTOR SHALL COORDINATE WITH CVG AND EQUIPMENT

LEAD TIMES TO FINALIZE THE CONSTRUCTION SEQUENCE.

2. REFER TO ARCHITECTURAL DRAWINGS FOR ADDITIONAL

INFORMATION.

3. CONTRACTOR SHALL PROTECT WORK AREAS FROM THE

GENERAL PUBLIC.

4. CONTRACTOR IS RESPONSIBLE FOR ISOLATING THEIR WORK

AND MAINTAINING MINIMUM DISTURBANCES TO OCCUPIED

SPACES DURING CONSTRUCTION.

5. THE CONTRACTOR SHALL DEVELOP A PHASING AND ISOLATION

PLAN AS PART OF THEIR BID, CLEARLY IDENTIFYING ALL POINTS

OF ISOLATION REQUIRED TO MINIMIZE SYSTEM SHUTDOWNS

THROUGHOUT CONSTRUCTION.

6. CONTRACTOR SHALL COVER ALL FURNITURE WITH PLASTIC FOR

PROTECTION AND SHALL WORK AROUND THE FURNITURE.

7. CONTRACTOR SHALL KEEP NON-CONSTRUCTION AREAS CLEAN

AND FREE OF CONSTRUCTION TOOLS AND MATERIALS.

8. CONTRACTOR TO NOTIFY THE POLICE DEPARTMENT A MINIMUM

OF TWO WEEKS PRIOR TO REQUEST OF ANY SHUTDOWNS

REQUIRED.

9. IF WORK IS REQUIRED IN A NON ACTIVE PHASE AREA WHICH

COULD CAUSE DISTURBANCES, CONTRACTOR TO NOTIFY CVG

PROJECT MANAGER IN ADVANCE OF THIS WORK.

10. ALL PIPING NOT IN USE DURING PHASED CONSTRUCTION SHALL

BE SEALED, CAPPED, AND PROTECTED AT BOTH ENDS TO

PREVENT OXIDATION, DUST AND MOISTURE INTRUSION, AND

CONTAMINATION. PIPING SHALL REMAIN PROTECTED UNTIL

FINAL RECONNECTION OR REMOVAL PER PROJECT

REQUIREMENTS.

11. CONTRACTOR TO INSTALL TEMPORARY BYPASS VALVES AND

DAMPERS ACROSS PUMPS AND AHU'S IF REQUIRED TO

MAINTAIN MINIMUM FLOWS.

12. AT THE END OF EACH PHASE, ALL NEW HVAC EQUIPMENT SHALL

BE FULLY OPERATIONAL. UNTIL THE MAIN HVAC SYSTEMS

(INCLUDING AHUS, BOILERS, CHILLERS, AND ANY NEW CENTRAL

PLANT EQUIPMENT) ARE INSTALLED AND COMMISSIONED, ALL

NEWLY INSTALLED TERMINAL UNITS, PUMPS, FAN COIL UNITS,

DUCTWORK, AND PIPING SHALL BE TEMPORARILY CONNECTED

TO THE EXISTING HVAC EQUIPMENT OR PIPING SYSTEMS TO

MAINTAIN CONTINUOUS OPERATION AND PROVIDE REQUIRED

HEATING, COOLING, AND VENTILATION DURING EACH PHASE.

13. WHERE ONE-FOR-ONE VAV REPLACEMENT WORK OCCURS

NEAR AN OCCUPIED AREA, THE CONTRACTOR SHALL ISOLATE

THE IMMEDIATE CONSTRUCTION AREA USING TEMPORARY

DUST-PROOF CONTAINMENT CONSISTING OF FLOOR-TO-

CEILING PLASTIC SHEETING OR AN APPROVED EQUIVALENT

BARRIER. THE CONTAINMENT SHALL BE LIMITED TO THE

MINIMUM AREA NECESSARY TO SAFELY PERFORM THE WORK

AND PREVENT THE SPREAD OF DUST AND DEBRIS. THE

CONTRACTOR SHALL MAINTAIN CLEAR AND SAFE ACCESS

AROUND THE CONTAINMENT SO THAT BUILDING OCCUPANTS

CAN CONTINUE TO CIRCULATE THROUGH ADJACENT AREAS

WITHOUT OBSTRUCTION.

PHASE NUMBER PHASE 1 PHASE 2 PHASE 3 PHASE 4

REQUIREMENTS

& SCOPE OF

WORK

GENERAL PHASING REQUIREMENTS:

• FIRST AND SECOND FLOOR WORK CAN OCCUR

SIMULTANEOUSLY SO LONG AS THE FOLLOWING

REQUIREMENTS ARE MET.

FIRST FLOOR:

• TRAINING AREA ON FIRST FLOOR MUST REMAIN

ACCESSIBLE FOR CVG STAFF DURING PROJECT.

SECOND FLOOR:

• WORK SHALL BE GROUPED IN THE FOLLOWING

SUBPHASES:

1. PHASE 1A: ROOM 217, 218, 219 AND 208

CORRIDOR

2. PHASE 1B: ROOM 222, 223, 221,220, 224, 225, 226

AND 208 CORRIDOR

3. PHASE 1C: ROOM 200, 201, 202, 203 AND 205

4. PHASE 1D: DISPATCH(AOC 28) AND

MISCELLANEOUS GARAGE AREAS

• FRONT LOBBY/RECEPTION AREA SHALL REMAIN

OCCUPIED BY CVG THROUGHOUT CONSTRUCTION.

CONTRACTOR SHALL PROTECT WORK IN THIS

AREA FROM THE BUILDING OCCUPANTS.

PHASE 1 SCOPE:

• DEMOLISH EXISTING AHU-1, VVT BOXES,

CONTROLS, AND ASSOCIATED DUCTWORK AS

SHOWN.

• REPLACE HOT WATER CONTROL VALVES FOR

FINNED TUBE HEATERS, CABINET HEATERS AND

UNIT HEATERS.

• INSTALL NEW AHU-1, VAV'S, DUCTWORK AND

PIPING.

• INSTALL NEW RANGE HOOD AND EXHAUST FAN.

• INSTALL NEW BUILDING PRESSURE RELIEF FANS.

• REPLACEMENT OF AHU-1 WILL REQUIRE

TEMPORARY REMOVAL OF AN EXISTING BOILER

AND PIPING. COORDINATE TIMING OF AHU

REPLACEMENT WHEN WEATHER PERMITS THE

BUILDING TO BE HEATED BY A SINGLE BOILER.

• INTEGRATE SYSTEMS AND EQUIPMENT WITHIN

THIS AREA WITH THE NEW BMS. COMPLETELY

REMOVE EXISTING CONTROLS, COMPONENTS AND

WIRING/TUBING.

• COMPLETE EQUIPMENT STARTUP, TESTING AND

BALANCING, AND COMMISSIONING OF IMPACTED

SYSTEMS PRIOR TO TURNING OVER TO OWNER AT

THE END OF THIS PHASE.

UNLESS OTHERWISE AUTHORIZED IN WRITING BY CVG, THE CONTRACTOR SHALL NOT PERFORM WORK IN MULTIPLE PHASES OR SUBPHASES SIMULTANEOUSLY. WORK SHALL BE COMPLETED IN ACCORDANCE WITH THE APPROVED PHASING PLAN WITH ONLY ONE PHASE / SUBPHASE ACTIVE AT ANY GIVEN TIME. CONTRACTOR TO PROVIDE A DETAILED CONSTRUCTION SCHEDULE WITH CONSTRUCTION PHASES/AREAS BROKEN OUT. PROVIDE SCHEDULE TO

CVG PRIOR TO COMMENCEMENT OF WORK.

CHILLER / BOILER PLANT

SCALE:M002 1/16" = 1'-0"

1 FIRST FLOOR MECHANICAL PHASING PLAN

SCALE:M002 1/16" = 1'-0"

2 SECOND FLOOR MECHANICAL PHASING PLAN

GENERAL PHASING REQUIREMENTS:

• CONSTRUCTION SHALL BE DIVIDED INTO

SUBPHASES 2A AND 2B.

PHASE 2A:

• INCLUDES MENS AND WOMENS RESTROOM AND

LOCKER AREAS.

• A RENTAL RESTROOM TRAILER SHALL BE

PROVIDED BY THE CONTRACTOR FOR THE

DURATION OF CONSTRUCTION IN THIS AREA

PHASE 2B:

• EVIDENCE ROOM, NEW LOCKER AND STORAGE

AREAS:

1. CONTRACTOR SHALL MAKE CVG AWARE IF

WORK IN THIS AREA REQUIRES LONGER THAN

A 2 WEEK SHUTDOWN.

2. WORK IN/ABOVE THE EVIDENCE ROOM SHALL

BE COORDINATED WITH CVG. CONTRACTORS

IN THIS AREA WILL NEED AN EVIDENCE TECH

ESCORT FOR THE DURATION OF THE WORK IN

THESE LOCATIONS. WORK SHALL BE PLANNED

BETWEEN THE HOURS OF 8A THROUGH 4PM,

MONDAY THROUGH FRIDAY, BUT SHALL BE

COORDINATED WITH CVG.

PHASE 2 SCOPE:

• DEMOLISH EXISTING VVT BOXES, CONTROLS, AND

ASSOCIATED DUCTWORK AS SHOWN.

• REPLACE HOT WATER CONTROL VALVES FOR

FINNED TUBE HEATERS, CABINET HEATERS AND

UNIT HEATERS.

• DEMOLISH EXHAUST FAN EF-4 AND ASSOCIATED

DUCTWORK.

• INSTALL NEW VAV'S, FCU'S, LOUVERS, EXHAUST

FAN, ERV, DUCTWORK, AND PIPING.

• INTEGRATE SYSTEMS AND EQUIPMENT WITHIN

THIS AREA WITH THE NEW BMS. COMPLETELY

REMOVE EXISTING CONTROLS, COMPONENTS AND

WIRING/TUBING.

• COMPLETE EQUIPMENT STARTUP, TESTING AND

BALANCING, AND COMMISSIONING OF IMPACTED

SYSTEMS PRIOR TO TURNING OVER TO OWNER AT

THE END OF THIS PHASE.

GENERAL PHASING REQUIREMENTS:

• ENTIRE AREA MAY BE VACATED TO COMPLETE

WORK IN SINGLE PHASE.

• CVG INTENDS TO LEAVE EXISTING FURNITURE IN

PLACE DURING CONSTRUCTION. CONTRACTOR

SHALL PROTECT ALL FURNITURE WITH PLASTIC.

COORDINATE ANY NECESSARY FURNITURE

RELOCATION WITH CVG PRIOR TO THE START OF

THIS PHASE.

• WORK IN THIS PHASE MAY OCCUR

SIMULTANEOUSLY WITH OTHER WORK IN THE

BUILDING.

PHASE 3 SCOPE:

• DEMOLISH EXISTING AHU-4, VVT BOXES,

CONTROLS, AND ASSOCIATED DUCTWORK AS

SHOWN.

• REPLACE HOT WATER CONTROL VALVES FOR

FINNED TUBE HEATERS, CABINET HEATERS AND

UNIT HEATERS.

• INSTALL NEW AH-4, VAV'S, LOUVER, EXHAUST FAN,

DUCTWORK, AND PIPING.

• INSTALL NEW RELIEF HOOD.

• INTEGRATE SYSTEMS AND EQUIPMENT WITHIN

THIS AREA WITH THE NEW BMS. COMPLETELY

REMOVE EXISTING CONTROLS, COMPONENTS AND

WIRING/TUBING.

• COMPLETE EQUIPMENT STARTUP, TESTING AND

BALANCING, AND COMMISSIONING OF IMPACTED

SYSTEMS PRIOR TO TURNING OVER TO OWNER AT

THE END OF THIS PHASE.

GENERAL PHASING REQUIREMENTS:

• CONSTRUCTION SHALL BE DIVIDED INTO

SUBPHASES 4A AND 4B.

PHASE 4A:

• ROOM 214, 215 AND 216

PHASE 4B:

• ROOM 211 AND 213

PHASE 4 SCOPE:

• DEMOLISH EXISTING AHU-2, CONTROLS, AND

ASSOCIATED DUCTWORK AS SHOWN.

• REPLACE HOT WATER CONTROL VALVES FOR

FINNED TUBE HEATERS, CABINET HEATERS AND

UNIT HEATERS.

• INSTALL NEW VAV'S AND ASSOCIATED DUCTWORK.

• INTEGRATE SYSTEMS AND EQUIPMENT WITHIN

THIS AREA WITH THE NEW BMS. COMPLETELY

REMOVE EXISTING CONTROLS, COMPONENTS AND

WIRING/TUBING.

• COMPLETE EQUIPMENT STARTUP, TESTING AND

BALANCING, AND COMMISSIONING OF IMPACTED

SYSTEMS PRIOR TO TURNING OVER TO OWNER AT

THE END OF THIS PHASE.

GENERAL PHASING REQUIREMENTS:

• COORDINATE SYSTEM OUTAGES WITH CVG PRIOR

TO REMOVAL OF ANY PLANT EQUIPMENT OR

DISRUPTION TO SERVICES.

CHILLED WATER PLANT:

• REPLACEMENT OF CHILLER, PUMP, AND PIPING

SHALL OCCUR DURING THE HEATING SEASON. AHU

ECONOMIZER FUNCTION SHALL BE UTILIZED TO

PROVIDE COOLING TO BUILDING DURING SYSTEM

OUTAGE.

• INTEGRATE CHILLED WATER SYSTEMS AND

EQUIPMENT WITH THE NEW BMS. COMPLETELY

REMOVE EXISTING CONTROLS, COMPONENTS AND

WIRING/TUBING.

• COMPLETE EQUIPMENT STARTUP, TESTING AND

BALANCING, AND COMMISSIONING OF IMPACTED

SYSTEMS PRIOR TO TURNING OVER TO OWNER.

HOT WATER PLANT:

• ONE OF THE EXISTING BOILERS WILL NEED TO BE

TEMPORARILY REMOVED TO REPLACE AHU-1.

COORDINATE TIMING OF THIS WORK OUTSIDE OF

THE HEATING SEASON TO ENSURE BUILDING CAN

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .